Volumen del concreto PLANTILLA DE CIMENTACION

longitud total de la plantilla V=0.80*0.05*52.87=2.1148 M3

CIMENTACIร“N (zapata corrida)

V=O.80*0.15*52.87=6.344 m3

CADENA DE CIMENTACION

V=0.25*0.20*52.87=2.64 m3

CADENA DE DESPLANTE (que va al nivel del piso terminado)

V=0.15*0.10*52.87=0.7930 m3

Volumen total de concreto =11.99 m3

CANTIDAD DE DE TABIQUE QUE SE UTILIZA EN EL MURETE DE ENRACE

รrea del tabique A=0.20*0.40=0.08 M2

รrea del murete A=0.35*52.87=18.5045 M2 Cantidad de tabique:

๐Ÿ๐Ÿ–.๐Ÿ“๐ŸŽ๐Ÿ’๐Ÿ“ ๐‘ถ.๐ŸŽ๐Ÿ–

= ๐Ÿ๐Ÿ‘๐Ÿ. ๐Ÿ‘๐ŸŽ ๐‘ป๐‘จ๐‘ฉ๐‘ฐ๐‘ธ๐‘ผ๐‘ฌ๐‘บ

Excavaciรณn EJE Y EJE A B B' B' C D

EJE 1 1' 2 3 3' 4 4' 5

TRAMO 1-4' 2-3' 1'-2 3'-4 1-1 1-5

ANCHO 0.9 0.9 0.9 0.9 0.9 0.9

ALTURA 0.8 0.8 0.8 0.8 0.8 0.8

LARGO 9.47 2.25 1.64 3.11 2.4 9.14 28.01

VOLUMEN(M3) 6.8114 1.62 1.1808 2.2592 1.728 6.5808 20.1802

TRAMO A-C C-D A-D A-B A-B' A'-B' A'-A' B-D

EJE X ANCHO 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

ALTURA 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

LARGO 4.18 2.68 7 2.4 1 2.15 1.19 3.46 24.06

VOLUMEN(M3) 3 1.996 5.04 1.728 0.72 1.548 0.846 2.4913 17.3693

Volumen total de la excavaciรณn = 33.473 m3 volteos =

37.473 7

= 6 vlt

Longitud total: 28.01+ 24.06= 52.87 mts