Pb= 61,696.39 Fpb= Jan-18 Fr= Po/Pb 0.ABCDE Po= PRESUPUESTO OFERTADO Po= 58,905.86 UBICACIÓN: Cusco ÁREA GEOGRÁFICA: 6 DURACIÓN: 3 MESES INICIO: MAYO
0.95477
15813.81 15494.5292
ANTERIOR DESCRIPCIÒNUND. CANT. P.UNIT. PARCIAL TOTAL CANTIDAD IMPORTE 1.00 CONCRETO ARMADO 1.01 COLUMNA 15,947.92 1.01.01 CONCRETO F'M3. 15.00 463.08 6,946.20 1.01.02 ENCOF. -DES M2. 68.00 46.79 3,181.72 1.01.03 ACERO CORRU KG. 1,200.00 4.85 5,820.00 1.02 VIGAS 11,316.00 1.02.01 CONCRETO F'M3. 10.00 443.58 4,435.80 1.02.02 ENCOF. -DES M2. 48.00 52.40 2,515.20 1.02.03 ACERO CORRU KG. 900.00 4.85 4,365.00 1.03 LOSA ALIGERADA 15,908.98 1.03.01 CONCRETO F'M3. 9.00 400.42 3,603.78 1.03.02 ENCOF. -DES M2. 120.00 36.96 4,435.20 1.03.03 ACERO CORRU KG. 1,000.00 4.85 4,850.00 1.03.04 LADRILLO 0.1UND. 1,000.00 3.02 3,020.00 2.00 MUROS 7,815.85 2.01 DE LAD. KK M2. 35.00 64.25 2,248.75 2.02 DE LAD. KK 1 M2. 55.00 101.22 5,567.10 COSTO DIRECTO 50,988.75 GASTOS GENERALES 12% 6,118.65 UTILIDAD 9% 4,588.99 SUBTOTAL 61,696.39 IGV 11,105.35 TOTAL 72,801.74 %AVANCE 100 ITEM
VR=
ACTUAL CANTIDAD IMPORTE
ACUMULADO CANTIDAD
39.85 984.65
1,864.58 4,775.55
39.85 984.65
24.85 40.55
1,596.61 4,104.47 12,341.22 1,480.95 1,110.71 14,932.88
24.85 40.55
24.20% 14,257.47
ACUMULADO IMPORTE
1,864.58 4,775.55
SALDO CANTIDAD IMPORTE
15.00 28.15 215.35 10.00 48.00 900.00 9.00 120.00 1000.00 1000.00
1,596.61 4,104.47 12,341.22 1,480.95 1,110.71 14,932.87
24.20%
10.15 14.45
6,946.20 1,317.14 1,044.45 0.00 4,435.80 2,515.20 4,365.00 0.00 3,603.78 4,435.20 4,850.00 3,020.00 0.00 652.14 1,462.63 38,647.53 4,637.70 3,478.28 46,763.51
75.80%
% AVANCE
0% 59% 82%
71% 74% 50,988.75
61,696.39
100.00%
ITEM
DESCRIPCIÒNUND. CANT. P.UNIT. PARCIAL TOTAL 1.00 CONCRETO ARMADO 1.01 COLUMNA 15,947.92 1.01.01 CONCRETO F'M3. 15.00 463.08 6,946.20 1.01.02 ENCOF. -DES M2. 68.00 46.79 3,181.72 1.01.03 ACERO CORRU KG. 1,200.00 4.85 5,820.00 1.02 VIGAS 11,316.00 1.02.01 CONCRETO F'M3. 10.00 443.58 4,435.80 1.02.02 ENCOF. -DES M2. 48.00 52.40 2,515.20 1.02.03 ACERO CORRU KG. 900.00 4.85 4,365.00 1.03 LOSA ALIGERADA 15,908.98 1.03.01 CONCRETO F'M3. 9.00 400.42 3,603.78 1.03.02 ENCOF. -DES M2. 120.00 36.96 4,435.20 1.03.03 ACERO CORRU KG. 1,000.00 4.85 4,850.00 1.03.04 LADRILLO 0.1UND. 1,000.00 3.02 3,020.00 2.00 MUROS 7,815.85 2.01 DE LAD. KK M2. 35.00 64.25 2,248.75 2.02 DE LAD. KK 1 M2. 55.00 101.22 5,567.10 COSTO DIRECTO 50,988.75 GASTOS GENERALES 12% 6,118.65 UTILIDAD 9% 4,588.99 SUBTOTAL 61,696.39 IGV 11,105.35 TOTAL 72,801.74 %AVANCE 100
v2 ANTERIOR CANTIDAD IMPORTE
39.85 984.65
ACTUAL CANTIDAD IMPORTE
10.00 28.15 215.35
1,864.58 4,775.55
24.96
39.60
24.85 40.55
1,596.61 4,104.47
10.15 14.45
4,630.80 1,317.14 1,044.45 0.00 0.00 1,307.90 0.00 0.00 0.00 1,463.62 0.00 0.00 0.00 652.14 1,462.63 11,878.67 1,425.44 1,069.08 14,373.19
23.30% V2R=
13,723.09
ACUMULADO CANTIDAD IMPORTE
10.00 68.00 1200.00 0.00 0.00 24.96 0.00 0.00 0.00 39.60 0.00 0.00 0.00 35.00 55.00
4,630.80 3,181.72 5,820.00 0.00 0.00 1,307.90 0.00 0.00 0.00 1,463.62 0.00 0.00 0.00 2,248.75 5,567.10 24,219.89 2,906.39 2,179.79 29,306.07
47.50%
SALDO CANTIDAD IMPORTE
5.00 0.00 0.00 0.00 10.00 23.04 900.00 0.00 9.00 80.40 1000.00 1000.00 0.00 0.00 0.00
2,315.40 0.00 0.00 0.00 4,435.80 1,207.30 4,365.00 0.00 3,603.78 2,971.58 4,850.00 3,020.00 0.00 0.00 0.00 38,647.53 4,637.70 3,478.28 46,763.51
75.80%
% AVANCE
67% 100% 100%
52%
33%
100% 100% 50,988.75
61,696.39
100.00%
ITEM
DESCRIPCIÒN 1.00 CONCRETO ARMADO 1.01 COLUMNA 1.01.01 CONCRETO F' 1.01.02 ENCOF. -DES 1.01.03 ACERO CORRU 1.02 VIGAS 1.02.01 CONCRETO F' 1.02.02 ENCOF. -DES 1.02.03 ACERO CORRU 1.03 LOSA ALIGERADA 1.03.01 CONCRETO F' 1.03.02 ENCOF. -DES 1.03.03 ACERO CORRU 1.03.04 LADRILLO 0.1 2.00 MUROS 2.01 DE LAD. KK 2.02 DE LAD. KK 1 COSTO DIRECTO GASTOS GENERALES 12% UTILIDAD 9% SUBTOTAL IGV TOTAL %AVANCE
UND. ONCRETO ARMADO
P.UNIT.
PARCIAL
TOTAL
ANTERIOR CANTIDAD IMPORTE
ACTUAL CANTIDAD IMPORTE
ACUMULADO CANTIDAD IMPORTE
SALDO CANTIDAD
15,947.92 M3. M2. KG.
M3. M2. KG. OSA ALIGERADA M3. M2. KG. UND.
M2. M2. OSTO DIRECTO ASTOS GENERALES 12% TILIDAD 9%
%AVANCE
CANT.
15.00 68.00 1,200.00
463.08 46.79 4.85
6,946.20 3,181.72 5,820.00 11,316.00
10.00 48.00 900.00
443.58 52.40 4.85
4,435.80 2,515.20 4,365.00 15,908.98
9.00 120.00 1,000.00 1,000.00
400.42 36.96 4.85 3.02
3,603.78 4,435.20 4,850.00 3,020.00
35.00 55.00
64.25 101.22
2,248.75 5,567.10
7,815.85
10.00 68.00 1,200.00 0.00 0.00 24.96 0.00 0.00 0.00 39.60 0.00 0.00 0.00 35.00 55.00
4,630.80 3,181.72 5,820.00 0.00 0.00 1,307.90 0.00 0.00 0.00 1,463.62 0.00 0.00 0.00 2,248.75 5,567.10
5.00 0.00 0.00 0.00 10.00 23.04 900.00 0.00 9.00 80.40 1000.00 1000.00 0.00 0.00 0.00
50,988.75 6,118.65 4,588.99 61,696.39 11,105.35 72,801.74 100
2,315.40 0.00 0.00 0.00 4,435.80 1,207.30 4,365.00 0.00 3,603.78 2,971.58 4,850.00 3,020.00 0.00 0.00 0.00 26,768.86 3,212.26 2,409.20 32,390.32
52.50% VR3
30,925.31
15.00 68.00 1200.00 0.00 10.00 48.00 900.00 0.00 9.00 120.00 1000.00 1000.00 0.00 35.00 55.00
6,946.20 3,181.72 5,820.00 0.00 4,435.80 2,515.20 4,365.00 0.00 3,603.78 4,435.20 4,850.00 3,020.00 0.00 2,248.75 5,567.10 50,988.75 6,118.65 4,588.99 61,696.39
100.00%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SALDO IMPORTE
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,647.53 4,637.70 3,478.28 46,763.51
75.80%
% AVANCE
100% 100% 100%
100%
100%
100% 100% 50,988.75
61,696.39
100.00%
FÓRMULA POLINÓMICA OBRA: AMPLIACIÒN DE LABORATORIO UCV CONTRATISTA: TQM CONTRATISTA SAC ESPECIALIDAD: ESTRUCTURA MONOMIO DESCRIPCIÓN 1 CEMENTO PORTLAND T-I PIEDRA CHANCADA 2 MAQUINARIA HERRAMIENTA 3 MADERA TORNILLO 4 ACERO CORRUGADO 5 LADRILLO TECHO 6 MANO DE OBRA 7 GASTOS GENERALES
K=
0.15 Cr Co
+
0.057 PHr PHo
0.064 (0.2381*587.84)+(0.4444*607.14)+(0.3175*304.20) (0.2381*591.03)+(0.4444*606.47)+(0.3175*304.98)
CI
(AxIr1)+(BxIr2)+(CxIr3) (AxIo1)+(BxIo2)+(CxIo3)
Se saca del Se saca del cuadro de cuadro de INDICES INDICES UNIFICADOS por UNIFICADOS por costo según area costo según area geografica geografica
P.B: 61,695.78 SIN IGV FECHA: Jan-18 ÁREA GEOGRÁFICA: 02 SÍMBOLO C
3175*304.20) 3175*304.98)
PMH M F T J GGU
+
I.U 21 5 48 37 43 3 17 47 39
0.065 Mr Mo
C.I 0.15 0.057 0.065 0.16 0.090 0.304 0.174 1.000
+
=
% 100 15.79 64.91 19.30 100 100 100 100 100
0.163 Fr Fo 0.064
ENERO Io 410.96 629.95 363.04 304.98 900.56 475.87 878.12 582.52 442.87
+
ABRIL Ir 410.96 628.08 365.01 304.2 904.3 501.98 868.72 582.52 445.52
0.09 Tr To
K 0.150 0.057 0.065 0.152 0.091 0.304 0.173 1.009 0.996 +
MAYO Ir 410.96 617.54 368.95 304.54 899.03 513.58 865.43 582.52 445.61
0.304 Jr Jo
K 0.150 0.057 0.065 0.173 0.089 0.304 0.175 1.012
+
JUNIO Ir 410.96 618.89 368.82 303.74 896.42 508.81 864.03 582.52 447.1
0.174 GGUr GGUo
k 0.150 0.057 0.065 0.171 0.089 0.304 0.176 1.011
N°
FECHA 1 MAYO 2 JUNIO 3 JULIO
Vprg. 14,257.47
Vreal 14,257.47
K-1 0.009
Rprog. 128.32
N°
Rreal 128.32
FECHA 1 MAYO 2 JUNIO 3 JULIO
Rrecon. 128.32
Vprg. 14,257.47 13,723.09 30,925.31 58,905.87
N°
Vreal 14,257.47 13,723.09 30,925.31
FECHA 1 MAYO 2 JUNIO 3 JULIO
K-1 Rprog. 0.012 171.09 0.011 150.875871 0.011 340.17837
Vprg. 14,257.47 13,723.09
Vreal 14,257.47 13,723.09
Rreal 171.09 150.88 340.18
Rrecon. 171.09 150.88 340.18 662.14 340.50 321.65
K-1 0.012 0.012
Rprog. 171.09 169.41
Rreal 171.09 169.41
Rrecon. 171.09 169.41 340.50 128.32 212.18
128.32
=
212.18
UN SUPUESTO Nª 1 2
N SUPUESTO FECHA MAYO JUNIO
Vprg. VreaL K-1 14,257.47 14,257.47 13,723.09 13,723.09
Rprog. Rreal Rrecon. -0.004 -57.03 -57.03 -57.03 -0.004 -54.89 -54.89 -54.89 -111.92 128.32 -240.24
CUADRO RESUMEN DEVALORIZACION N° 01 DEL 01 AL 30 ....… DE……………. OBRA: SUP ER VISOR : C ON T R A T IST A : P R ESUP UEST O B A SE:
61,696.39
P R ESUP UEST O C ON T R A T A D O:
58,905.86
DESCRIPCIÓN
VALORIZACIÓN (V)
SIN IGV SIN IGV MONTO CONTRATAD O SIN IGV (S/.)
ANTERIOR (S/.)
58,905.86
0.00
14,257.47
14,257.47
0.00
128.32
128.32
VALORIZACION ACTUAL (S/.)
ACUMULADO (S/.)
TOTAL CONTRACTUAL Avances en porcentaje REAJUSTES (R) DEDUCCIONES (D) POR ADELANTO EN EFECTIVO POR ADELANTO PARA MATERIALES TOTAL DEDUCCION ES VALORIZACIÓN BRUTA (VB = V + R - D)
14,385.78
AMORTIZACIONES (A) AMORTIZACION DEL ADELANTO EN EFECTIVO AMORTIZACION DEL ADELANTO PARA MATERIALES TOTAL AMORTIZACIONES (A) VALORIZACIÓN NETA (VN = VB - A)
RETENCIONES ( C ) FONDOS DEGARANTIA (5% X VB) GASTOS DELICITACION MULTA POR ATRASO DEOBRA TOTAL
14,385.78
MONTO A PAGAR AL CONTRATISTA EN EFECTIVO (VN-C) MONTO POR I.G.V. (VN x 0,18) MONTO TOTAL CON I.G.V. TOTAL COMPROMISO DEPAGO>>>>>>>>>>>>>>>>
14,385.78 2,589.44 16,975.22 S/16,975.22
SALDO POR % DEAVANCE VALORIZAR ACUMULADO (S/.)
24.20%
44,648.39
CUADRO RESUMEN DEVALORIZACION N° 01 DEL 01 AL 30 ....… DE……………. OBRA: SUP ER VISOR : C ON T R A T IST A : P R ESUP UEST O B A SE:
61,696.39
P R ESUP UEST O C ON T R A T A D O:
58,905.86
DESCRIPCIÓN
VALORIZACIÓN (V)
SIN IGV SIN IGV MONTO CONTRATAD O SIN IGV (S/.)
ANTERIOR (S/.)
ACTUAL (S/.)
58,905.86
14,257.47
13,723.09
27,980.56
128.32
212.18
340.50
VALORIZACION ACUMULADO (S/.)
TOTAL CONTRACTUAL Avances en porcentaje REAJUSTES (R) DEDUCCIONES (D) POR ADELANTO EN EFECTIVO POR ADELANTO PARA MATERIALES TOTAL DEDUCCION ES VALORIZACIÓN BRUTA (VB = V + R - D)
13,935.27
AMORTIZACIONES (A) AMORTIZACION DEL ADELANTO EN EFECTIVO AMORTIZACION DEL ADELANTO PARA MATERIALES TOTAL AMORTIZACIONES (A) VALORIZACIÓN NETA (VN = VB - A)
RETENCIONES ( C ) FONDOS DEGARANTIA (5% X VB) GASTOS DELICITACION MULTA POR ATRASO DEOBRA TOTAL
13,935.27
MONTO A PAGAR AL CONTRATISTA EN EFECTIVO (VN-C) MONTO POR I.G.V. (VN x 0,18) MONTO TOTAL CON I.G.V. TOTAL COMPROMISO DEPAGO>>>>>>>>>>>>>>>>
13,935.27 2,508.35 16,443.62 S/16,443.62
SALDO POR % DEAVANCE VALORIZAR ACUMULADO (S/.)
47.50%
30,925.30
CUADRO RESUMEN DEVALORIZACION N° 01 DEL 01 AL 30 ....… DE……………. OBRA: SUP ER VISOR : C ON T R A T IST A : P R ESUP UEST O B A SE:
61,696.39
P R ESUP UEST O C ON T R A T A D O:
58,905.86
DESCRIPCIÓN
VALORIZACIÓN (V)
SIN IGV SIN IGV MONTO CONTRATAD O SIN IGV (S/.)
ANTERIOR (S/.)
ACTUAL (S/.)
58,905.86
27,980.56
30,925.31
340.50
321.65
VALORIZACION
TOTAL CONTRACTUAL Avances en porcentaje REAJUSTES (R) DEDUCCIONES (D) POR ADELANTO EN EFECTIVO POR ADELANTO PARA MATERIALES TOTAL DEDUCCION ES VALORIZACIÓN BRUTA (VB = V + R - D)
31,246.96
AMORTIZACIONES (A) AMORTIZACION DEL ADELANTO EN EFECTIVO AMORTIZACION DEL ADELANTO PARA MATERIALES TOTAL AMORTIZACIONES (A) VALORIZACIÓN NETA (VN = VB - A)
RETENCIONES ( C ) FONDOS DEGARANTIA (5% X VB) GASTOS DELICITACION MULTA POR ATRASO DEOBRA TOTAL
31,246.96
MONTO A PAGAR AL CONTRATISTA EN EFECTIVO (VN-C) MONTO POR I.G.V. (VN x 0,18) MONTO TOTAL CON I.G.V. TOTAL COMPROMISO DEPAGO>>>>>>>>>>>>>>>>
31,246.96 5,624.45 36,871.41 S/36,871.41
CION N° 01
ALORIZACION
SALDO POR % DEAVANCE ACUMULADO ACUMULADO VALORIZAR (S/.) (S/.)
0.00
662.14
100.00%
0.00
/36,871.41
N° 1 2 3 4
1 MAYO 14,257.47 14,257.47 11405.9727
2 3 JUNIO JULIO 27,980.56 58,905.86 27,980.56 58,905.86 22384.448 47124.6879
70000 60000 50000 40000 30000 20000
14,2 114
10000 0
3.00 4 1 N°
MAYO 1
70000 60000
58,905.86
50000
47124.6879147
40000 30000
27,980.56 22384.4480083346
20000
14,257.47 11405.97267008
10000 0
3.00 4 1 N°
MAYO 1
JUNIO 2
JULIO 3
Row 4 Row 5 Row 6