JABATAN KERJA RAYA, PULAU PINANG

SELAMAT DATANG PROJEK MENYIAPKAN KERJAKERJA-KERJA TERTINGGAL UNTUK PROJEK MENAIKTARAF LALUAN PERSEKUTUAN 6 DARI BAYAN LEPAS KE BALIK PULAU

PAKEJ 2B DARI TELUK KUMBAR KE PEKAN GENTING

PELAN LOKASI

Pakej 1 – Pekan Genting – Balik Pulau Pakej 2B – Teluk Kumbar – Pekan Genting Pakejj 2A – Bayan Lepas – Teluk Kumbar

Pelan Lokasi

SKOP TAKLIMAT „ „ „ „ „ „ „ „ „ „

Pengenalan g Data Kontrak Dahulu Data Kontrak Semasa Tender Semula Faedah Projek Pengurusan Projek k Skop Kerja Kemajuan Kerja Gambar Projek Masalah Penduduk

PENGENALAN „

„

Projek ini merupakan sebahagian daripada program untuk menaiktaraf laluan sedia ada dari Bayan Lepas ke Balik Pulau Ia sebahagian daripada 3 pakej • Pakej 2A: Bayan Lepas Lepas--Teluk Kumbar (4.2km) • Pakej 2B: Teluk Kumbar Kumbar--Pekan Genting (3.3km) • Pakej 1 : Pekan Genting – Balik Pulau (2.5km) (2 5km)

Data Kontrak Dahulu „

„ „ „ „ „ „ „

„ „

Tajuk Projek: Projek:

No Kontrak : P Pegawai i Penguasa P Penguasa: : Kos Kontrak : Tarikh Milik Tapak Tapak:: T ikh Siap Tarikh Si J d l: Jadual Kontraktor:: Kontraktor Alamat : Kelas : Jurutera Perunding: Perunding:

Menaiktaraf Laluan Persekutuan 6 dari Bayan Lepas ke Balik Pulau, Pulau, Pulau Pinang. Pakej 2B dari Teluk Kumbar ke Pekan Genting Genting.. JKR/IP/CKUB/17/2005 P Pengarah Pengarah, h, JKR Pulau P l Pi Pinang RM 56,971,045.00 4 April 2005 03 Sept S t 2008 Bulkers Corporation Sdn Bhd 88 WW-2, Jalan Tun Dr Awang, Awang, 11900 Bayan Lepas Lepas,, Pulau Pinang A ((Bumiputra Bumiputra)) Wan Mohamed & Khoo Sdn Bhd

Data Kontrak Semasa „

„ „ „ „ „ „ „

„ „

Tajuk Projek: Projek: Menyiapkan KerjaKerja-kerja Tertinggal untuk Projek Menaiktaraf Laluan Persekutuan 6 dari Bayan Lepas ke Balik Pulau, Pulau, Pulau Pinang. Pakej 2B dari Teluk Kumbar ke Pekan Genting.. Genting No Kontrak : JKR/IP/CKUB/142/2009 Pegawai Penguasa Penguasa:: Pengarah, Pengarah, JKR Pulau Pinang Kos Kontrak : RM 42,050,168.80 Tarikh Milik Tapak Tapak:: 27 Mei 2009 Tarikh Siap Jadual : 23 Nov 2010 Kontraktor:: Kontraktor Sarahon Construction Sdn Bhd Alamat : No 55-6, 6 Jalan PUJ 1/42, 1/42 Dataran Prima, 47301 Selangor Kelas : A ((Bumiputra Bumiputra)) Jurutera Perunding Perunding:: Wan Mohamed & Khoo Sdn Bhd

Tender Semula „

Penamatan Kontrak secara Persetujuan j Bersama pada : 8 Okt 2008

„

Tarikh Iklan untuk Tender : 30 Okt 08

„

Lawatan Tapak Penender :

„

Tender Tutup :

„

Lembaga Tender bersidang dan LA dikeluarkan pada 13 Mei 2009

4 Nov 08 27 Nov 08

FAEDAH PROJEK „

„

„

„

Memendekkan perjalanan dari Teluk Kumbar ke Balik Pulau sejauh 4.5 km kepada 3.3 km sepanjang tapak pembinaan.( pembinaan .(penjimatan penjimatan masa 10 minit) minit) Penambahbaikan infrastruktur awam yang lebih selamat dan selesa Sebagai pemangkin pembangunan terutama di d Balik l k Pulau l Meningkatkan taraf hidup rakyat tempatan

PENGURUSAN PROJEK JKR Tn Hj Shahawal bin Awang Pengarah JKR P.Pinang Pegawai Penguasa

Ketua Penolong Pengarah ( Kontrak & Ukur Bahan)

Mej(B) Wan Ghazali Jurutera Residen Kanan

Ketua Penolong Pengarah (Jalan) Tn Hj Hassan Harun

Ketua Jurutera Elektrik Negeri

Penolong Pengarah Kanan (Jalan)

Penolong Pengarah (Jalan) En Fahmi

Abdullah bin Abdul Rahim J Juruteknik teknik (Jalan)

Nursalbiah binti Abdullah J Juruteknik teknik (Jalan)

Organisasi Jurutera Perunding WAN MOHAMED & KHOO S/B HOME OFFICE

Senior Resident Engineer Mej(r ) Wan Ghazali

HSE & Traffic Management

Soil Nails/RE Wall, Earthwork & Drainage

Bridge Viaduct

Asst Resident Engineer Johny Malcom

Asst Resident Engineer

Assit Resident Engineer

Survey

Assit Survey Hashim Awang

QA/QC

Technical Inspector RS Simanchalahm

Admin

Admin Clerk Noraziba

SKOP KERJA „

Pembinaan Jalan Sepanjang 3.3km 3 3km • Pelebaran jalan 5.5m kepada 12.5m • Lebar carriageway 7.0m 7 0m • Lebar bahu jalan 2.75m (kiri (kiri//kanan kanan)) • Lorong mendaki di 2 lokasi

„

Pembinaan 6 buah jambatan • 1x jambatan dari Post tensioned beam • 5x jambatan dari Box Girder

„

Membaikpulih kerja tertinggal

Maklumat Perincian Jambatan Jambatan

Jenis

Panjang (m)

Lebar Carriageway

Lebar Shoulder ( ) (m)

Lebar Jambatan (m) ( )

Diameter Caisson (m) ( )

Bil Span

ST2

Box Girder (In--Situ) (In

260

7m (2 lanes)

2.75

13.4

1.5 & 2.0

13

ST3

B Box Girder Gi d (In-situ) (In-

60

10 5 m 10.5 (3 lanes)

2 75 2.75

16 9 16.9

12 1.2

3

ST4

PT Beam

60.13

10.5 m (3 lanes)

2.75

16.9

1.35

2

ST5

Box Girder (In--Situ) (In

100

10.5 m (3 lanes)

2.75

16.9

1.5 & 2.0

5

ST6

B Box Girder Gi d (In-Situ) (In-

200

10 5 m 10.5 (3 lanes)

2 75 2.75

16 9 16.9

1 5 & 2.0 1.5 20

10

ST7

Box Girder (In--Situ) (In

60

10.5 m (3 lanes)

2.75

16.9

1.5 & 2.0

3

Keratan Rentas Jalan

Keratan Rentas Jalan – RE Wall

Laporan Kemajuan Sehingga 30 Sept 09

Jadual (%)

Sebenar (%)

Progres Fi ik l Fizikal Progres Kewangan

21

14

- / + (%)

-7

Kemajuan Kerja 97%

100%

99%

99%

99%

100%

94% 88%

90% 80% 80% 72% 70% 62% 60% 52% 50%

45%

40%

36% 29%

30% 21% 20% 13% 14% 10%

6%

0%

8% 5%

1%

0%

2%

0%

Nov-10

Oct-10

Sep-10

Aug-10

Jul-10

Jun-10

May-10

Apr-10

Mar-10

Feb-10

Jan-10

Dec-09

Nov-09

Oct-09

Sep-09

Aug-09

Jul-09

Jun-09

May-09

May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 % Schedule

0%

1%

6%

13%

21%

% Actual

0%

2%

5%

8%

14%

29%

36%

45%

52%

62%

72%

80%

88%

94%

97%

99%

99%

99%

100%

Kemajuan Fizikal Projek Menaiktaraf Laluan Persekutuan 6 100.0%

90.0%

80 0% 80.0%

70.0%

Tempoh Kontrak : Sarahon Construction / S/B

Tender Semula

Tempoh Kontrak : Bulkers Corp Sdn Bhd

60 0% 60.0%

50.0%

40 0% 40.0%

30.0%

20 0% 20.0%

10.0%

Oct-10

Aug-10

Jun-10

Apr-10

Feb-10

Dec-09

Oct-09

Aug-09

Jun-09

Apr-09

Feb-09

Dec-08

Oct-08

Aug-08

Jun-08

Apr-08

Feb-08

Dec-07

Oct-07

Aug-07

Jun-07

Apr-07

Feb-07

Dec-06

Oct-06

Aug-06

Jun-06

Apr-06

Feb-06

Dec-05

Oct-05

Aug-05

Jun-05

Apr-05

0.0%

Gambar Projek

Kerja Jambatan

Kerja Jambatan

Kerja Jalan dan Lencongan

Kerja RE Wall (Geoteknikal)

Kerja RC Anchor Wall (Geoteknikal)

Masalah Kepada Penduduk „

„

„

„

Cerun berisiko runtuh bila musim hujan Laluan lama masih berisiko tinggi kerana berlikuberliku-liku L l Laluan utama t pekerja k j kilang kil k ke kawasan industri Bayan Lepas Laluan utama kenderaan berat ke Balik Pulau - pembangunan terjejas

Sekian Terima Kasih

Related Documents

Visit Audit 141009
June 2020 2
Audit
April 2020 45
Audit
October 2019 72
Audit
November 2019 37
Audit
May 2020 23