Viren Desai Resume Electrical Engineer (1)-3 (1)

  • Uploaded by: Viren Desai
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Viren Desai Resume Electrical Engineer (1)-3 (1) as PDF for free.

More details

  • Words: 727
  • Pages: 3
RESUME Viren V. Desai

Email : [email protected] Phone No : +919773434621 PROFILE SUMMARY  A budding professional with Nearly 7 years of experience as Electrical Engineer.  Presently associated with L&T Hydrocarbon Engineering, Mumbai.  Possess sound knowledge about Designing, installation, testing of electrical system for Petroleum Refinery, Industrial plants.  Well aware with International Standards like IEC, IEEE, API. ORGANISATIONAL EXPERIENCE Jan’ 2019 to Till date L&T Hydrocarbon Engineering, ( Mumbai, India)  Preparation of specification and datasheets for electrical equipment.  Preparation of material requisition for electrical items.  Preparation of Substation layout, lighting layout, Cable routing layout.  Reviewing of the post order vendor document for electrical equipment. Aug’ 2018 to Jan 2019 Dodsal Engineering & Construction. (Dubai, UAE)  Review of cable sizing & cable schedule.  Review of lighting calculation and lighting layout.  Reviewing of the post order vendor document for electrical equipments. Oct’2017 to Aug’2018 TATA Consulting Engineers Ltd. ( Mumbai, India)  Preparation of single line diagram.  Sizing of electrical equipments like Transformer, NGR, Battery, Cable.  Preparation of specification and datasheets for electrical equipments.  Preparation of Substation layout, lighting layout, Cable routing layout.  Preparation of material requisition for electrical items.  Preparation of technical bid analysis for electrical equipments.  Reviewing of the post order vendor document for electrical equipments.  Preparation of BOQ for electrical installation work & scope documents for electrical erection contract.  Coordinating with other departments for expediting the Work flow of Project completion. Review of IDC  Coordinating with PDMS team for 3d-modeling. May’13 to Oct’2017

Pyramid Engineering & Consulting.

Responsibilities at Construction Site. (Fujairah, UAE)  Liaising with the client, PMC, vendors, other departments and sub-contractors for the construction & completion activities.  Attending progress review meetings to resolve constraints and site-conflicts.  Planning & monitoring the installation work of E&I subcontractor for process packages equipments like Flare, Fired heater, Desalter, Boiler  Planning & monitoring the installation work of E&I subcontractor for LV switchgear, DB, NER, Transformer.  Coordination and performing necessary site inspections of contractor work activities related to ensure compliance with project and vendor specifications.

 Review and approval of E&I subcontractor's documents like method stamens, Inspection test plan Variations, Invoices.  Inspection of material procured by E&I subcontractor.

 Ensuring construction comply with approved construction drawings, contract documents, project  Specifications and applicable standards like FEWA wiring regulation.               

Responsibilities at Design office Preparation of Electrical load schedule & cable schedule. Developing SLD (single line diagram) based on Supply Philosophy. Sizing of Electrical equipments like DG, Transformer, NER, cables, Capacitors, Battery. Power system related calculations like Short circuit calculation, CT Sizing, Earthing calculations, Lighting calculation. Preparation of specification and datasheets for electrical equipments. Preparation of Substation layout, hazardous area layout, lighting layout. Preparation of material requisition and purchase specification for electrical items. Preparation of technical bid analysis for electrical equipments. Reviewing of the post order vendor document for electrical equipments. Preparation of bulk MTO. Preparation of electrical erection scope. Inspection of electrical equipments. Coordinating with other departments for expediting the Work flow of Project completion. Assistance to proposal team to estimate the quantity of electrical equipments. June’12 to May’13 Niku Engineering, Mumbai. Responsibilities  Preparation of load list, Cable sizing, cable schedule  Preparation of Single line diagram as per client requirement. Projects Handled  Detailed Engineering and procurement assistance for Chloromethanes plant Dahej, Gujarat  Detailed Engineering and Construction management for Petroleum regeneration and processing facility– Crude distillation unit (Refinery) At Fujairah  Detailed Engineering and Construction management for Petroleum regeneration and processing facility– Tank farm, At Fujairah  Detailed Engineering and Construction management for Carbon Black plant, At Bhuj. Software Used  ETAP, DIAlux, Auto CAD, MS office, Navisworks -2011 (for model review)

ACADEMIC QUALIFICATION :  Bachelor’s in electrical engineering from University of Pune with First class with distinction.  Diploma in Electrical Engineering from K.J.Somaiya polytechnic ( Mumbai) First class with distinction  Secondary School Certificate Examination (SSC) from D.N.C Technical High School with First class with distinction

PERSONAL INFORMATION: Name Date of Birth Gender Marital Status Nationality Languages

: Mr. Viren V. Desai : 26th September , 1989 : Male : Single : Indian : English, Hindi, Marathi, Gujarati

Address

: Mumbai

Passport number : L8316146

Related Documents


More Documents from ""

Z
August 2019 42
Vmware
May 2020 25
Cctv
December 2019 43
Global Catalog
May 2020 19