Tuff B

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tuff B as PDF for free.

More details

  • Words: 207
  • Pages: 1
tuff constructors

ref: quatation for the proposed concentration of the residential units at jerusalem ( nairobi) for mrs. colletee claire ogolla on piot no. 209 / 7383 /176 nairobi. 1. excavations to remove vegetable soils ( 150ml) - 21,0007= , 2. trench-38,0007= 3. ballast ____________96 tone x 1500= 144, 000 cement ___________ 256 bags x 800 - 204, 8007= sand _____________ 192 tones x 11,00 = 210,4007= d.p.c ____________ item 25,000 = 25,0007=

|<

super structure 1. nature building stote - 138mxl6 corses x 3.3 - 7004 x 36 = 252, 0007= 2. wall pegs item 25,0007= 3. reinforcement bars item 126,0007= 4. binding wire 5 roll x 3800 = 19,0007= 5. complete windows + handles - 16pcs x av. 3200z = 51,0007= 6. complete door flame 18no x 4500 = 81,0007= 7. plumbing item ____ ______ 82,6007= 8. electrical item ______ ____ 70,0007= 9. painting _ item ____ ____ 86,0007= 10. ceramic tiles in wet areas 90,0007= ~ 11. kitchen sinks & shelves _______ 27,0007= 12. ceilings _________________ 122,4507= 13. roof construction facial board - item 544,0867= 14. window ceals _____ _____ 12, 8007= 15. pro vision for transport __________ 46,0007= 2,170,734 530.000 2.700,734 16. provision for labour 20%

itrfixtemal avorks i.e site clearingjcovelling 60,0007=

i

Related Documents

Tuff B
November 2019 2
Tuff 1
November 2019 4
Tuff Contract
November 2019 3
Tuff Ey Retirement
May 2020 11
B
November 2019 37
B
November 2019 46