Total Station Notes

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Total Station Notes as PDF for free.

More details

  • Words: 394
  • Pages: 4
TOTAL STATION SOKKIA Total Station Parts 1. 2. 3. 4. 5. 6.

Tripod Stand Base Plate Three Leveling Screws Two Arms (Left & Right) Vertical Circle Foxing Screws Station Centering Foxing Left & Right Foxing Up 7. Two Bubble Tubes 8. Telescope 9. Eye Piece 10. Object Glass Or Objective 11. Optical Sight Finder Or Collimator 12.Eye Piece for Centering 13.Data out Cable Pin Fixed 14.Marks Of Instruments Height 15.Compass Taker 16.Battery 17.Battery Pocket 18.Foxing Screws Locks Horizontal calculation of Instruments Vertical Calculation of Telescope 19.Instrument Handle 20.Display Screen Or Liquid Crystal Display 21.Key Board Numerical / Alphabets Letters 22.Four Arrow Keys Up , Down , Left , Right, 23.Enter Key 24.Four Function Keys F1 , F2 , F3 , F4, 25.Escape Key 26.Bs Key Mean (Back Sight) 27. SFT Key Mean (Shift) 28.FUNC Key Mean ( Function)

Technical Terms and Abbreviation ZA= Line of Sight / Collimation Axis Telescope Axis= Line from the Recital to the Center of the Object. SA= Standing Axis Vertical Rotation Axis of the Telescope KA= Tilting Axis Horizontal Rotation Axis of the Telescope V= Vertical Angle VK= Vertical Circle With Coded Circular Division for Reading V-Angle Hr= Reflector high above Earth / Ground H1= Instrument Height above Ground H2= Horizontal Distance HK= Horizontal Circle With the Circular Division for Reading the Hz-Angle EO= Station Co-Ordinates (Easting) No= Station Co-Ordinates (Northing) HO= Station Height E= Easting of Target Point N= Northing of Target Point H= Height of Target Point

Operating the Instruments Focus Symbols Fixed Keys Alphanumeric Keys Navigation Keys Function Keys Soft Key Bar

Fixed Keys Page Menu User FNC Esc Enter Trigger Keys The Measurement Trigger has three Settings (ALL, DIST, OFF)

Soft Keys ALL LIST NEXT

DIST FIND OK

REC EDM

ENTER IR/RL

Applications Surveying Stake Out Tie Distance Area & Volume Free Station Reference Line / Arc Remote Height Construction

ENH PREWIE

Down Loading Press F4 for Configuration Open Temp Press Angle Distance Feet

Units (Enter)

Esc

COMMUNICATION (Enter) Bound Rate Data Bit Priority Stop Bit

= 9600 =9 = Even = 1 Bit

Esc

F3

Menu

Job

Job Selection

All Files Open

Esc

Select Your Files Open

COMMUNICATION Out Put (Enter) All Files Open Select You’re Files (Enter)

ProLink Software Use for Total Station Open Prolink and Go to Options Units Go to File Send / Receive File Open Download / Upload

Settings

Esc

Related Documents

Total Station Notes
May 2020 6
Total Station
July 2020 16
Total
October 2019 72
Total
November 2019 73
Total
June 2020 45