Merpro® Tore® Online Vessel Desander (OVD) Technology Document INTRODUCTION Produced sand accumulating within process trains is one of the major factors that disrupts and limits oil and gas production. Sand screens are installed in the reservoir to eliminate or reduce the amount of sand flowing in the well stream. They are expensive to install and maintain, and have varying levels of success. Early methods used to remove sand from the separation train were jetting and sparging systems. These had limited success when small amounts of sand were produced. Desanders were then introduced and installed to remove sand from the wellstream before it entered the separation train. This method is limited by size of the desander and efficiency of the liquid/solid cyclones. Desanders are prone to blockage and can have a high maintenance requirement. SAND REMOVAL SOLUTION USING TORE The application described here involves installing Tores internally within separators and is termed Tore Online Vessel Desander (Tore OVD). This provides guaranteed and effective sand removal whenever required by the operator. It has gained rapid acceptance by the industry as the preferred solution for sand removal, and is replacing traditional methods. It is not a jetting system, but utilizes the

Accumulated sand in production separator.

more Tores, usually in multiples of 4, to provide the required coverage. Vessels more than 3m wide usually require the Tore devices to be in a double bank. For effective removal of sand, the Tore units are installed with approximately 0.8m – 1.2m distance between each Tore. This provides maximum coverage of a vessel floor without overlapping the effect from neighbouring Tore devices.

unique, localized and controlled, tornado like action of the

HOW DOES TORE ONLINE VESSEL DESANDER

Tore device to lift and remove the sand.

(OVD) WORK?

WHAT IS TORE?

The Tore is a highly effective solids fluidization device that

Tore is a solids hydro-transportation device which utilizes natural forces to lift and move solids in a controlled manner. It is a core technology in the process solutions range. WHAT DOES TORE ONLINE VESSEL DESANDER (OVD) DO?

can operate even when completely buried in sand. It operates by generating a vortex below the Tore which fluidizes the sand in this area. The vortex is created by introducing fluid through the Tore feed inlet tangentially into the swirl chamber. This establishes a swirling motion which passes through the annulus between the Tore discharge tube and

Tore OVD removes sand from separators. Tore is equally

outer tube and over the foot of the Tore. When fluidized,

effective in removing fine chalk or clay particles.

the sand is drawn by the central core of the vortex towards

HOW IS IT APPLIED IN THE SEPARATION TRAIN? Within small vessels, a single Tore OVD comprising 4 Tore

the discharge tube, allowing for controlled transportation. The fluidizing effect created by the Tore is localized with no disruptive effect on a vessel’s liquid interfaces.

devices arranged in a linear fashion, usually centrally along the floor of the vessel is sufficient to remove the sand. In larger vessels, Tore OVD is installed comprising 8, 12 or www.nov.com/merpro

[email protected]

© 2011 National Oilwell Varco

D352002039-GEN-001 Rev. 02

Merpro Tore Online Vessel Desander (OVD) Technology Document Schematic of internal Tore OVD arrangement in production separator

OPERATING TORE ONLINE VESSEL DESANDER (OVD) In order to provide operational flexibility, Tore OVD may be operated individually, all at once, or in any desired combination. Each 1” Tore within a manifold requires approximately 3-4 m3/hr of motive fluid at only 0.5 bar above vessel pressure to operate. In comparison, a jetting system typically requires around 120m3/hour. Motive fluid can be supplied from a plant’s existing produced water system or from any other suitable fluid source. The flowrate can be set manually or automated using flow control valves depending on the application. The sand discharging from the Tores can be routed either to sand washing equipment, such as a Tore Scrub, or to collection equipment such as a bagging system prior to disposal. A small amount of residual sand (typically less than 2% by volume) will remain in the vessel, outside the area of influence of each Tore. The amount of residual sand is dependent on the positioning of each Tore, and the angle of repose of the sand. The residual sand is constantly changed between Tore activation cycles, as the well fluids wash over and redistribute them into the area of influence of the Tores. One operator activates their Tores for half an hour every morning and half an hour every evening, and removes up to 10 tons of sand per week from their separator. Previous practice was to shut down every 3 months for 4 days at a time to dig out sand. In 24 months, Tore OVD has eliminated 32 days of production shut downs. The NOV Merpro In-line Pressure Reducing Cartridge can be installed on the outlet from the separator if pressure requires to be reduced for discharge and collection. NEW BUILD OR RETROFIT Tore OVD can be installed in new build or existing separators and is designed in the optimum configuration for maximum sand removal. In retrofit installations, it lends itself to being mounted around existing internal structures such as baffles and weirs. Tore OVD is straightforward to install as a retrofit solution, typically taking 2 days after accumulated sand has been dug out from the separator. Approximately 50% of installations are retrofit applications. Where vessel design prevents internal installation, Tore OVD can be designed for external mounting.

www.nov.com/merpro

[email protected]

© 2011 National Oilwell Varco

D352002039-GEN-001 Rev. 02

2

Merpro Tore Online Vessel Desander (OVD) Technology Document FEATURES AND BENEFITS: •

Eliminates unplanned shutdowns. It provides a proven, guaranteed solution, whereby sand is removed from vessels while the separator remains in full production. There is no need to shut down separators or otherwise interrupt production throughput. One operator saved 32 days production time over a 2 year period by installing Tore OVD



Enables separators to operate continuously at maximum efficiency, enabling well fluid production to be maintained at maximum levels. Another operator reports that they have been able to increase well fluid throughput by 30% since they installed Tore OVD in their production separator, giving a direct increase in revenues



Provides a life of field solution to sand production, and handles all levels of sand. One 1” Tore device can remove up to 4 tons of sand per hour, and can be activated whenever required



Fluidization effect of the Tore is localized, causes no disruption of the liquid surface/interface and can therefore operate while the vessel is online



Required feed pressure to the Tore OVD is approximately 0.5 Barg above the vessel operating pressure and each Tore requires only 3-4 m3/hr of feed water, substantially less than jetting systems



Easy to retrofit



Eliminates the need for dedicated desanders, saving space and weight

Tore Online Vessel Desander (OVD) – The combination of a number of Tores with interconnecting pipework to ensure large area sand removal.

www.nov.com/merpro

[email protected]

© 2011 National Oilwell Varco

D352002039-GEN-001 Rev. 02

3

Locations Corporate Headquarters 7909 Parkwood Circle Drive Houston, Texas 77036 United States Phone: 713 375 3700 Toll-Free: 888 262 8645 Mailing Address P. O. Box 4638 Houston, Texas 77210 United States United States Colorado Denver Phone: 970 292 8216 Grand Junction Phone: 970 243 7300 Fax: 970 243 8360 Louisiana Houma Phone: 985 872 5215 Fax: 985 872 9816 New Iberia Phone: 337 365 2582 Toll-Free: 800 982 6882 Fax: 337 365 0120 Scott Phone: 337 233 9310 Toll-Free: 800 544 3437 Fax: 337 233 4256 Shreveport Phone: 318 221 7005 Fax: 318 221 7008 Oklahoma Oklahoma City Phone: 405 670 8771 Fax: 405 670 8775 Tulsa Phone: 918 447 4600 Toll-Free: 800 324 9478 Fax: 918 447 4677 Pennsylvania Washington Phone: 724 222 2600 Fax: 724 222 3100 Texas Alice Phone: 361 664 2300 Fax: 361 664 2357

www.nov.com/merpro

Fort Worth Phone: 817 696 0800 Fax: 817 696 0805 Houston – Telge Road Phone: 281 200 1000 Fax: 281 200 1005 Houston – Meadowglen Phone: 713 395 5000 Fax: 713 395 5001 Kilgore Phone: 903 983 3531 Fax: 903 983 5212 Odessa – W 2nd Street Phone: 432 333 4196 Fax: 432 333 4747 Odessa – Mankins Avenue Phone: 432 367 0711 Fax: 432 362 9465 San Angelo Phone: 325 655 8225 Fax: 325 655 1115 Wyoming Casper Phone: 307 235 2751 Fax: 307 265 2484 International Argentina Buenos Aires Phone: 54 11 4735 4301 Fax: 54 11 4763 3490 Australia Brisbane, Queensland Phone: 61 407 732 922 Brazil Macae, Rio de Janeiro Phone: 55 22 2796 9200 24-hours: 55 22 8111 1400 Fax: 55 22 2773 3631

Egypt Cairo Phone: 2 012 355 4000 Fax: 2 02 3335 4184 Libya Tripoli Phone: 21821 7144274, ext. 108 Fax: 21821 7205704 Russia Moscow Phone: 7 495 775 2540 Fax: 7 495 981 3470 Saudi Arabia Dammam Phone: 966 53 6000859 Singapore Phone: 65 6602 4022 Fax: 65 6898 4295 United Arab Emirates Jebel Ali, Dubai Phone: 971 4 811 0100 Fax: 971 4 811 0285 United Kingdom Aberdeen Phone: 44 0 1224 356339 Fax: 44 0 1224 723034 Gateshead Phone: 44 0 191 4820022 Fax: 44 0 191 4878835 Montrose Phone: 44 0 1674 662200 Fax: 44 0 1674 662266 Venezuela Anaco Phone: 58 282 4255329 Fax: 58 282 4221854 Maracaibo Phone: 58 261 7362636 Fax: 58 261 7362636

Canada Edmonton, Alberta Phone: 780 414 7616 Toll-Free: 866 855 7867 Fax: 780 465 7060 China Beijing Phone: 86 10 5707 0900 Fax: 86 10 5977 6100 [email protected]

© 2011 National Oilwell Varco

D352002039-GEN-001 Rev. 02

4