Tindak_lanjut_slo_jaser_pwkta.xlsx

  • Uploaded by: Susi Septiani
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tindak_lanjut_slo_jaser_pwkta.xlsx as PDF for free.

More details

  • Words: 3,533
  • Pages: 36
STATUS NO 1 2 3 4 5

PNY SLO SUBANG KOTA PURWAKARTA KOTA CIKALONG CADASMEKAR PAGADEN

SERTIFIKAT

RLB

SELESAI INSP ULANG V V V

SELESAI CEK ULANG KD

SELESAI PERBAIKAN

BELUM PERBAIKAN

V V V V V

PERBAIKAN JARING UNTUK KELAIKAN PENYULANG CADAS MEK RAYON PLERED

NO

REKOMENDASI

Tiang miring terdapat pada tiang nomor : 171, 244, 272, 277,

1 284, 350, 428, Aftak 298.L2, Aftak 275.R4.R6, Aftak 275.R4.R8,

Aftak 275.R4.R11, Aftak 275.R4.R13, Aftak 275.R4.R20, Aftak 271.

L30, Aftak Aftak pada 271. tiang L41, Aftak L43, Aftak 66.L7, retak271. retakL35, terdapat nomor271. : 234, 275.R26, 507 , 2 Tiang

3 4 5 6 7 8

Aftak 66.L8, Aftak 458.L1, Aftak 387.R11, Aftak 387.R31, Aftak 387. 608R37L4. Tiang berkarat pada tiang nomor 139, R137, besi AFtakyang 387.R142 – terdapat R143, Aftak 387. R31. R16 –: 110 R17,–Aftak 271 – 285, Aftak 479.R11 R23, Aftak 387.R161, 527R52L3 387. R20, Aftak 387.R130.R11.L8, 486 ,487 ,490 ,507 ,555 ,570 ,, 449L28R1L21 , 449L28R1L55. 580 ,581 ,589,449L28R1L38 ,613 ,608R2 –,449L28R1L53 608R4 ,608R37 ,608R37L6 ,527L29 , 527L30 ,527L66 ,527L106 ditiang ,527L113nomor ,527L139 – 527L141 Isolator tumpu ,527L70 miring terdapat : 341, 365.L9., 527L186 ,527R30 ,527R68 ,527R52L1 ,527R52L2 ,527R52L32 , 527L80 ,527L91 ,527L92 ,527L96 ,527R47L8. 422L60R18 ,422L60R34 ,422L60R45 ,449L28R1L7 ,449L28R1L12 , Grounding KWH EXIM, LBS dan Recloser Putus terdapat pada 449L28R1L39 – 449L28R1L42 ,449L28R1L50 tiang nomor : 614,LBS POM,REC. CDK Tiang retak retak terdapat pada tiang nomor :608R37L4. Tiang retak retak terdapat pada tiang nomor : 275.R26 Kawat Fasa yang Rantas terdapat pada tiang nomor : 527.R47.L25

9 Cross Arm Miring terdapat pada tiang nomor : 521 ,528 ,527L58 ,

527L27L7 ,527L165 – 527L167 ,527L185 ,422R1. 10 Tiang main line sampai akhir serta aftak – aftak

11 Tiang retak retak terdapat pada tiang nomor : 234, 275.R26, 507 , 608R37L4. 12 Tiang retak retak terdapat pada tiang nomor : 234

yang harus dirubah terdapat pada tiang nomer : 13 Kontruksi 1. Hasil ukur Pembumian Arrester yang masih tinggi, terdapat di 527.L27.L7

Gardu:NWA, NPB, BDR, HMPB, NAW, BHW, SGS, ukur Pembumian PHBTR yang BIG, masih tinggi,CBK, terdapat di 14 1. TiangHasil retak terdapat tiang nomor :507KDD, DNA, SDN,retak PTT, NGD,pada CRG, CMN, KPT, CBH, LKB, Gardu:KBDC, NPB, CEB, MDP, BDR, LPB, ANDN, HMPB,

SAT, SDK, KKN,CLD, TJM, KTCB, BIG, BHW, CBK, LSD, SGS, CDK, DNA, MSB, PWG,MSA, PWC,BSIR, TSP, 15 CPP,

GGH. PKBT, DNC, ADG, PNN, CKE, CER, CKP, CIE, DPS, BTU, LSM, PIA, PTT, CMN, KPT,rusak SKR,terdapat CBH, LKB, CPC, CPP, GarduNGD, tidakCRG, dikunci / kunci di gardu : LGD, 16 1. CLC, BUK,NAW, LSD, SGRL, COD, CDK, GGH. DLS, KTCB, BDR, HMB, DIG, TSP, DNB, DNC, CIE, LSM, PTT, 17 NGD, KDD, DPK, SPR, SKR, CBGO, CBH, LKB, BLW, DRD, SDK, GDS, CDK, CDG, MSB, MSA, Gardu-gardu tidak diberi nama danCDD. nomor, terdapat di lokasi

18 gardu :LNN, LGD, HMB, BHW, BIAN, DIG, DNC, ADG, BTU, RBSP, SKR, CLC, BCK, SGRL, MKSR, PDM, MSA, GHJ.

19 Gardu yang pondasinya rusak / retak – retak , terdapat digardu : CLD, HMB,AMKN,DPK, KTB, LSD,

yangyang pondasinya rusak / retak – retak , terdapatterdapat digardudi: 20 Gardu PHB TR tidak dilengkapi dengan bohlamp, BHW,KDD,KTCB, BLW, CDG, Gardu :NAW, KKN, TJM, BIG,MKSR. SIS, DNA, PKBT, CIE, CWK, SDN, CRG, CPGL, TTC, XPOL, CBH, CGG, BSH, CPP, DRS, 21 BLW, DRD, SDK.

22

Engsel pintu Gardu Tembok rusak, terdapat di lokasi gardu : MBAS

23 PHBTR yang Karatan, terdapat pada gardu : BHW, DNC,BCK, PDM.

24 PHBTR yang Karatan, terdapat pada gardu :CLD,KTB

25 Trafo yang tidak menggunakan braket, hanya diikat dengan kawat seling, terdapat di gardu : KDD

PERBAIKAN JARING UNTUK KELAIKAN OPERASI (SLO) PENYULANG CADAS MEKAR RAYON PLERED RAB PELAKSANAAN PEKERJAAN

VOL

YANTEK MAT

Pemasangan Stay Set TM

59

Penggantian Tiang Beton Retak

4

Pengecetan Tiang Besi TM

64

Penggantian Isolator Tumpu

21

Pentanahan TM (ERM)

39

Bongkar TM 2B Pasang TM 4B

1 1

Perbaikan Kawat Rantas (Pasang Joint 70mm)

2

Perbaikan Travers Miring

8

Penomoran Tiang TM

JASA

700

Bongkar Tiang Beton (Retak)

4

Bongkar Pasang TM 7B

1

Bongkar Pasang TM 11B

1

Bongkar Pasang TM 4B

1

Pentanahan Gardu Portal

13

20,790,867

Pentanahan Gardu Cantol

56

41,581,733

Pemasangan Kunci Gardu

29

-

Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat

88

Pondasi Gardu Portal

6

Pondasi Gardu Cantol

6

Biaya pemasangan Penerangan & Test Lamp pada PHBTR

77

Biaya Perbaikan Engksel Pintu Gardu Tembok

1

Pengecetan PHBTR 2 Jurusan (Karatan)

4

Pengecetan PHBTR 4 Jurusan (Karatan)

2

-

4,631,000

-

3,426,787.00 8,518,552.00 -

1,155,000.00

Pemasangan Rangka Gardu Cantol

JUMLAH PPN JML + PPN TOTAL

1 67,003,600 6,700,360 73,703,960

13,100,339 1,310,034 14,410,373

RAB PELAKSANAAN NON YANTEK MAT JASA 39,719,390

5,095,889 2,932,888 5,191,168

189,000

130,578

29,526,000

5,932,563 84,000 178,700 47,928 81,832 6,660,500 1,250,253 390,660

-

1,705,950 303,790

-

145,000.00 1,405,272.00 14,082,816.00 5,844,360.00

92,500.00 183,484.00 239,644.00

192,753.00 69,434,390 6,943,439 76,377,829

52,172,528 5,217,253 57,389,781 221,881,943

PERBAIKAN JARING UNTUK KELAIKAN OPERA PENYULANG PAGADEN RAYON PAGADEN

NO

1 2 3 4 5 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24

REKOMENDASI

Perbaikan skur putus di 38,128,173,231 Penggantian tiang di 2,3,4,12,14,15 Pengecetan tiang berkarat 184L61,114 Perbaikan tiang miring No 9,35,55,63,79 Isolator miring di tiang 197,288,393 Jumper tidak baik di LBS CLR Jumper tidak baik di LBS CLR Jaringan kendor di 417L70-L71 Grounding putus di L.TKP,LPS,E.DCT Perbaikan kawat rantas di 206L01, 184L15R01 Perbaikan travers miring di 27,84,164 Penomoran tiang Penggantian tiang di 2,3,4,12,14,15 Penggantian tiang di 2,3,4,12,14,15 Penggantian tiang di 2,3,4,12,14,15 Penggantian tiang di 2,3,4,12,14,15 Konstruksi tidak sesuai di PDE Konstruksi tidak sesuai di GRM Trafo berkarat di BKS,POD,DGRS,DGS Minyak trafo tembus di G,MHU Grounding hilang di PCK Grounding hilang di GAM,SSLN,KMR,BSM

grounding tidak pakai pipa pelindung di 25 Kabel KRP,BNP,GAM,NRG,SSLN arrester dan trafo digabung di 26 Pembumian NLSP,NRG,TTM,KTU,KSBP,GNP,CRK 27 Grounding jelek di KRSP,BNP,SRN,PON 28 Tidak ada kunci gardu di KNSP,KKM,NGR,KTU 29 Tidak ada tanda bahaya di NSBK,KRP,GAM,KKM 30 Pondasi retak di MWA,MWB,SRD,GSR,PCK 31 Pondasi retak di BKT,GAM,KTU,PON,GSJ ada penerangan gardu di 32 Tidak APC,AGN,CFC,NRG,CAM 33 PHBTR pintunya copot di GAM,NRP,NWP,GRU

34 PHBTR berkarat di GAM,NRP,RWP,GSJ 35 PHBTR berkarat di KRP,GAM,NLSP,KMCD,DRGS 36 37 38 39 40

Gardu kotor di HRP,CLE,KCDG Gardu kotor di KKM,CCM,PWC,WJP,POR Gardu kotor di KMCD,DJP,GNSR,CRK PHBTR terlalu rendah di JSG PHBTR terlalu rendah di SGT,MWA

ada tanda bahaya di 41 Tidak MSDK,KRP,KRSP,GAM,NLSP,KKM ada pipa pelindung di 42 Tidak KRP,BNP,NRG,SSLN,GAM tidak ada lubang kabel di 43 PHBTR KRP,BKT,NSP,KKM,NRG,POA,SSG,DJS,CRK

PERBAIKAN JARING UNTUK KELAIKAN OPERASI (SLO) PENYULANG PAGADEN RAYON PAGADEN RAB PELAKSANAAN PEKERJAAN

VOL

YANTEK MAT

Perbaikan schoor Penggantian Tiang Beton Retak Pengecetan Tiang Besi TM Perbaikan tiang miring Penggantian Isolator Tumpu Penggantian comp conector for jumper 150 dgn pres hidrolic Penggantian comp cable shoes Perbaikan SUTM kendor Pentanahan TM (ERM) Perbaikan Kawat Rantas (Pasang Joint 70mm) Perbaikan Travers Miring Penomoran Tiang TM Bongkar Tiang Beton (Retak) Bongkar Pasang TM 7B Bongkar Pasang TM 8B Bongkar Pasang TM 1B Perbaikan jemper PGTM gardu Perbaikan travers ddk CO/arester miring Pengecetan trafo karat 50KVA Mutasi trafo 50 kVA Pentanahan Gardu Portal

16 8 2 99 15 6 6 1 6 8 16 2000 8 1 1 6 1 1 4 1 1

Pentanahan Gardu Cantol

6

Pasang pipa grounding

5

Perbaikan grounding trafo + arester

6

Perbaikan grounding LVC

4

Pemasangan Kunci Gardu

15

Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat

84

Perbaikan Pondasi Gardu Portal Perbaikan Pondasi Gardu Cantol

6 9

Biaya pemasangan Penerangan & Test Lamp pada PHBTR

66

Biaya Perbaikan Engksel Pintu dan kunci Gardu

9

JASA

5,112,720

-

-

912,702

Pengecetan PHBTR 2 Jurusan (Karatan)

37

Pengecetan PHBTR 4 Jurusan (Karatan)

14

Pembersihan halaman gardu

Peninggian PHBTR Portal

3 13 8 1 2

Pemasangan tanda bahaya

24

Pasang pipa kabel naik

5

Biaya Perbaikan lubang PHBTR bag bawah

28

pembersihan rel dan instalasi PHBTR 2jur pembersihan rel dan instalasi PHBTR 4jur Peninggian PHBTR cantol

JUMLAH PPN JML + PPN TOTAL

5,112,720 511,272 5,623,992

912,702 91,270 1,003,972

RAB PELAKSANAAN NON YANTEK MAT JASA 4,423,670

1,557,372 6,229,488

644,912 5,865,776 162,224 8,373,321 155,250 93,036 85,494 69,125 191,712 163,664 12,926,000 2,500,506 390,660 341,870 637,500 160,635 28,604 638,400 623,900 263,599 912,702 53,545 456,351 304,232 75,000 1,341,396 4,928,986 3,068,289

8,420,000

660,000 832,500

3,584,819 4,755,310 33,444 626,444 514,008 192,753 986,236 191,808 321,255 2,100,000 20,630,530 2,063,053 22,693,583

60,255,266 6,025,527 66,280,793 95,602,340

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO. RAB TANGGAL

NO URUT

PEKERJAAN

JASA BORONGAN

1

2

3

MDU PLN 4

REKAPITULASI RENCANA ANGGARAN BIAYA : /53/09/2015 : 23 MARET 2015

KEBUTUHAN MATERIAL NON MDU PLN ERCT 5 6

JUMLAH RAB RP 7

1

SUTM

29,986,699.20

-

17,181,720.00

52,252,670.00

99,421,089.20

2

GARDU

35,286,168.00

-

28,413,000.00

38,590,600.00

102,289,768.00

3

SUTR 65,272,867.20

-

45,594,720.00

90,843,270.00

201,710,857.20

SUB JUMLAH

JUMLAH RAB

201,710,857.20

PPN (10 %)

20,171,085.72

JUMLAH RAB + PPN

221,881,942.92

DIBULATKAN

221,881,943.00

MENGETAHUI,

PT.PLN (PERSERO) DISTRIBUSI JABAR & BANTEN AREA PURWAKARTA

MANAJER

ASMAN JARINGAN

HARI SANTOSO

AYI MIFTAHUSURUR 412894196.xlsx

412894196.xlsx

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO URUT

RINCIAN MATERIAL NO. RAB Tanggal

KEBUTUHAN MATERIAL

: /53/09/2015 : 23 Maret 2015

VOL

SAT

5 22 6 363 39 312 6 2 21

btg bh set mtr bh bh set bh bh

59 59 118 236 708 59 59 118 59 59 39

set bh bh bh mtr bh bh bh bh set set

HARGA SATUAN RP

MDU

RP

MATERIAL JTM 1 2 3 4 5 6 7 8 9

B 1

2

Tiang Beton 11/350 daN Isolator Tumpu Isolator Afspan lkp. Conductor AAAC 70mm (For Grounding) CCO AL 70/70 mm (For Grounding) Sepatu kabel AL/CU 70mm (For Grounding) Travers Afspan 20KV Comp. Joint AL 70mm CCO AL150/150 mm

NON MDU MATERIAL ASSESORIES JTM Stay set TM lkp : - Klem schoor untuk tiang besi bulat 11/200 daN - Mur baud galv. M16-60 mm - Preformed spiral grif - wire steel TM 35 mm - Turn Buckle medium - shackle for stay - thimble - Iisolator stay - Expanding TM Pentanahan TM :

RAB SLO P.CADAS MEKAR

15,600.00 51,000.00 27,000.00 28,920.00

-

45,000.00 4,000.00 17,200.00 11,500.00 63,480.00 19,530.00 4,830.00 47,500.00 273,240.00 -

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO URUT

4

NO. RAB Tanggal KEBUTUHAN MATERIAL

- Pipa Galv 0,75"x3mtr - Rod earthing 20 x 2500 mm lengkap clamp - Pengadaan Link 25 x 25 - Pengadaan Stoping buckle - Pengadaan stainlees steel Binding Wire

JUMLAH A

RAB SLO P.CADAS MEKAR

RINCIAN MATERIAL : /53/09/2015 : 23 Maret 2015

VOL

SAT

HARGA SATUAN RP

39 117 195 195 195 21

btg btg bh bh mtr mtr

45,000.00 57,500.00 2,760.00 2,044.00 15,000.00 9,000.00

MDU

RP

-

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO. RAB Tanggal

NO URUT

KEBUTUHAN MATERIAL

B

Perbaikan Gardu

A

MDU

1 2 3 4

MATERIAL GARDU Conductor AAAC 70mm (For Grounding) CCO AL 70/70 mm (For Grounding) Sepatu kabel AL/CU 70mm (For Grounding) Trafo Serandang / dudukan Trafo u/ tiang Cantol bulat

B

NON MDU

1

2 3

4

MATERIAL ASSESORIES GARDU Pentanahan Gardu : - Pipa Galv 0,75"x3mtr - Rod earthing 20 x 2500 mm lengkap clamp - Pengadaan Link 25 x 25 - Pengadaan Stoping buckle - Pengadaan stainlees steel Pengadaan Kunci Gardu Penerangan PHBTR : - Sakelar Pintu - Fitting lampu - NYM 2x1,5mm - Lampu Bohlam 10wat Test Lamp pada PHBTR - Sakelar Pintu - Fitting lampu

RAB SLO P.CADAS MEKAR

RINCIAN MATERIAL : /53/09/2015 : 23 Maret 2015

VOL

SAT

HARGA SATUAN RP

671 105 525 1

mtr bh bh set

15,600.00 51,000.00

105 105 315 525 525 525 29 22 22 22 44 22 55 55 55

set btg btg bh bh mtr bh set bh bh mtr bh set bh bh

45,000.00 57,500.00 2,760.00 2,044.00 15,000.00 25,000.00 30,000.00 10,000.00 8,000.00 7,000.00 30,000.00 10,000.00

MDU

RP

-

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO URUT

NO. RAB Tanggal KEBUTUHAN MATERIAL

- NYM 2x1,5mm - Lampu Bohlam 5wat

JUMLAH B JUMlAH MATERIAL

RAB SLO P.CADAS MEKAR

RINCIAN MATERIAL : /53/09/2015 : 23 Maret 2015

VOL

SAT

HARGA SATUAN RP

82.5 55

mtr bh

8,000.00 7,000.00

MDU

RP

-

RINCIAN MATERIAL

NON MDU (PLN) RP

NON MDU (PENG.PEMB) RP

608,400.00 15,912,000.00 54,000.00 607,320.00

-

-

RAB SLO P.CADAS MEKAR

2,655,000.00 472,000.00 4,059,200.00 8,142,000.00 3,745,320.00 1,152,270.00 569,940.00 2,802,500.00 16,121,160.00

-

RINCIAN MATERIAL

NON MDU (PLN) RP

RAB SLO P.CADAS MEKAR

NON MDU (PENG.PEMB) RP -

1,755,000.00 6,727,500.00 538,200.00 398,580.00 2,925,000.00 189,000.00

17,181,720.00

52,252,670.00

69,434,390.00

RINCIAN MATERIAL

NON MDU (PLN) RP

RAB SLO P.CADAS MEKAR

NON MDU (PENG.PEMB) RP

1,638,000.00 26,775,000.00 -

-

-

4,725,000.00 18,112,500.00 1,449,000.00 1,073,100.00 7,875,000.00 725,000.00 660,000.00 220,000.00 352,000.00 154,000.00 1,650,000.00 550,000.00

RINCIAN MATERIAL

NON MDU (PLN) RP

RAB SLO P.CADAS MEKAR

NON MDU (PENG.PEMB) RP -

660,000.00 385,000.00

28,413,000.00 45,594,720.00

38,590,600.00 90,843,270.00

67,003,600.00

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO URUT

RINCIAN JASA BORONG NO. RAB Tanggal

ONGKOS /JASA BORONGAN

: /53/09/2015 : 23 Maret 2015

VOL

SAT

HARGA SATUAN

JUMLAH HARGA

JASA JTM 1 2 3 4 5

Pemasangan Stay Set TM Penggantian Tiang Beton Retak Pengecetan Tiang Besi TM Penggantian Isolator Tumpu Pentanahan TM (ERM)

59 4 64 21 39

set btg bh bh set

86,371.00 733,222.00 81,112.00 6,218.00 152,117.00

5,095,889.00 2,932,888.00 5,191,168.00 130,578.00 5,932,563.00

6

Bongkar TM 2B

1

set

84,000.00

84,000.00

7 8 9 10 11 12 13 14

Pasang TM 4B Perbaikan Kawat Rantas (Pasang Joint 70mm) Perbaikan Travers Miring Penomoran Tiang TM Bongkar Tiang Beton (Retak) Bongkar Pasang TM 7B Bongkar Pasang TM 11B Bongkar Pasang TM 4B

1 2 8 700 4 1 1 1

set bh set bh btg set set set

178,700.00 23,964.00 10,229.00 9,515.00 312,563.30 390,660.00 1,705,950.00 303,790.00

178,700.00 47,928.00 81,832.00 6,660,500.00 1,250,253.20 390,660.00 1,705,950.00 303,790.00

JUMLAH A

RAB SLO P.CADAS MEKAR

29,986,699.20

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon PLERED : CADAS MEKAR

NO URUT

RINCIAN JASA BORONG NO. RAB Tanggal

ONGKOS /JASA BORONGAN

: /53/09/2015 : 23 Maret 2015

VOL

SAT

B

Perbaikan Gardu

C 1 2

JASA GARDU Pentanahan Gardu Portal Pentanahan Gardu Cantol

13 56

set set

3

Pemasangan Kunci Gardu

29

bh

4 5 6 7 8 9 10 11

Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat Pondasi Gardu Portal Pondasi Gardu Cantol Biaya pemasangan Penerangan & Test Lamp pada PHBTR Biaya Perbaikan Engksel Pintu Gardu Tembok Pengecetan PHBTR 2 Jurusan (Karatan) Pengecetan PHBTR 4 Jurusan (Karatan) Pemasangan Rangka Gardu Cantol

88 6 6 77 1 4 2 1

bh bh bh set bh bh bh set

JUMLAH B Jumlah jasa borong

RAB SLO P.CADAS MEKAR

HARGA SATUAN

263,599.00 152,117.00 5,000.00 15,969.00 2,347,136.00 974,060.00 15,000.00 92,500.00 45,871.00 119,822.00 192,753.00

JUMLAH HARGA

3,426,787.00 8,518,552.00 145,000.00 1,405,272.00 14,082,816.00 5,844,360.00 1,155,000.00 92,500.00 183,484.00 239,644.00 192,753.00 35,286,168.00 65,272,867.20

JASAPGDN

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon Pagaden : Pagaden

NO URUT

RINCIAN JASA

NO. RAB : 03 Tanggal : 26 ONGKOS /JASA BORONGAN

VOL

A

Perbaikan tiang TM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Perbaikan schoor Penggantian Tiang Beton Retak Pengecetan Tiang Besi TM Perbaikan tiang miring Penggantian Isolator Tumpu Penggantian comp conector for jumper 150 dgn pres hidrolic Penggantian comp cable shoes Perbaikan SUTM kendor Pentanahan TM (ERM) Perbaikan Kawat Rantas (Pasang Joint 70mm) Perbaikan Travers Miring Penomoran Tiang TM Bongkar Tiang Beton (Retak) Bongkar Pasang TM 7B Bongkar Pasang TM 8B Bongkar Pasang TM 1B

B

JUMLAH A Perbaikan Gardu

1 2 3 4 5 6 7

Perbaikan jemper PGTM gardu Perbaikan travers ddk CO/arester miring Pengecetan trafo karat 50KVA Mutasi trafo 50 kVA Pentanahan Gardu Portal Pentanahan Gardu Cantol Pasang pipa grounding

1 1 4 1 1 6 5

8

Perbaikan grounding trafo + arester

6

9

Perbaikan grounding LVC

4

10 11 12 13 14 15 16 17 18 19 20

Pemasangan Kunci Gardu Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat Perbaikan Pondasi Gardu Portal Perbaikan Pondasi Gardu Cantol Biaya pemasangan Penerangan & Test Lamp pada PHBTR Biaya Perbaikan Engksel Pintu dan kunci Gardu Pengecetan PHBTR 2 Jurusan (Karatan) Pengecetan PHBTR 4 Jurusan (Karatan) Pembersihan halaman gardu

15 84 6 9 66 9 37 14 3 13 8

pembersihan rel dan instalasi PHBTR 2jur pembersihan rel dan instalasi PHBTR 4jur

16 8 2 99 15 6 6 1 6 8 16 2000 8 1 1 6

21 22 23 24 25

Peninggian PHBTR cantol Peninggian PHBTR Portal Pemasangan tanda bahaya Pasang pipa kabel naik

Biaya Perbaikan lubang PHBTR bag bawah

JUMLAH B Jumlah jasa borong

1 2 24 5 28

RINCIAN JASA BORONG NO. RAB : 035/53/09/2015 Tanggal : 26 MARET 2015 SAT

HARGA SATUAN

JUMLAH HARGA

set btg bh bh bh bh bh gw set bh set bh btg set set set

40,307.00 733,222.00 81,112.00 84,579.00 10,350.00 15,506.00 14,249.00 69,125.00 152,117.00 23,964.00 10,229.00 6,463.00 312,563.30 390,660.00 341,870.00 106,250.00

644,912.00 5,865,776.00 162,224.00 8,373,321.00 155,250.00 93,036.00 85,494.00 69,125.00 912,702.00 191,712.00 163,664.00 12,926,000.00 2,500,506.40 390,660.00 341,870.00 637,500.00 33,513,752.40

set set bh bh set set bh

160,635.00 28,604.00 159,600.00 623,900.00 263,599.00 152,117.00 10,709.00

set

76,058.50

set

76,058.00

bh bh bh bh set bh bh bh bh bh bh

5,000.00 15,969.00 821,497.60 340,921.00 10,000.00 92,500.00 96,887.00 339,665.00 11,148.00 48,188.00 64,251.00

160,635.00 28,604.00 638,400.00 623,900.00 263,599.00 912,702.00 53,545.00 456,351.00 304,232.00 75,000.00 1,341,396.00 4,928,985.60 3,068,289.00 660,000.00 832,500.00 3,584,819.00 4,755,310.00 33,444.00 626,444.00 514,008.00

bh bh bh bh bh

192,753.00 493,118.00 7,992.00 64,251.00 75,000.00

192,753.00 986,236.00 191,808.00 321,255.00 2,100,000.00 27,654,215.60 61,167,968.00

PT.PLN (PERSERO) DISTRIBUSI JABAR & BANTEN AREA PURWAKARTA

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon Pagaden : Pagaden

NO URUT

PEKERJAAN

JASA BORONGAN

1

2

3

KEBUTUHAN MATERIAL

1

SUTM

33,513,752.40

2

GARDU

27,654,215.60

SUB JUMLAH

MDU PLN 4

61,167,968.00

JUMLAH RAB PPN (10 %) JUMLAH RAB + PPN DIBULATKAN

MENGETAHUI, PLH MANAJER, ASMAN KONSTRUKSI

YAYO SUWARNO

NO. RAB TANGGAL

REKAPITULASI RENCANA ANGGARAN BIAYA : 035 /53/09/2015 : 26 MARET 2015

KEBUTUHAN MATERIAL NON MDU PLN ERCT 5 6

JUMLAH RAB RP 7

2,961,600.00

6,574,790.00

43,050,142.40

2,232,000.00

13,974,860.00

43,861,075.60

5,193,600.00

20,549,650.00

86,911,218.00 86,911,218.00 8,691,121.80 95,602,339.80 95,602,340.00

PLH ASMAN JARINGAN SPV HARJAR

SUMARNA

Pekerjaan

: Perbaikan SUTM dan Gardu (untuk SLO)

Alamat Penyulang

: Rayon Pagaden : Pagaden

NO URUT A 1 2 3 4 5 6 7 8 9 10 11 1

2

3

B 1 2 3 4 5

KEBUTUHAN MATERIAL

RINCIAN MA

NO. RAB : 035 Tanggal : 26 M VOL

SAT

6 2 19 9 60 6 48 6 3 6 90

btg btg bh set mtr bh bh set set bh mtr

7 2 14 84 7 7 14 7 7 6 6 18 30 30 30 28

set bh bh bh mtr bh bh bh bh set set btg btg bh bh mtr mtr

1 145 33 22 12

u mtr bh bh bh

PERBAIKAN SUTM Tiang Beton 11/350 daN Tiang Beton 13/350 daN Isolator Tumpu 20 kV Isolator Afspan lkp. Conductor AAAC 70mm (For Grounding) CCO AL 70/70 mm (For Grounding) Sepatu kabel AL/CU 70mm (For Grounding) Travers Tumpu 20KV Travers Afspan 20KV 2m Comp. Joint AL 240mm A3C 240 mm2 MATERIAL ASSESORIES JTM Stay set TM lkp : - Klem schoor untuk tiang besi bulat 11/200 daN - Mur baud galv. M16-60 mm - Preformed spiral grif - wire steel TM 35 mm - Turn Buckle medium - shackle for stay - thimble - Iisolator stay - Expanding TM Pentanahan TM : - Pipa Galv 0,75"x3mtr - Rod earthing 20 x 2500 mm lengkap clamp - Pengadaan Link 25 x 25 - Pengadaan Stoping buckle - Pengadaan stainlees steel Binding Wire

JUMLAH A Perbaikan Gardu MATERIAL GARDU Trafo dist 3ph 50 kVA 20kv/400V Conductor AAAC 70mm (For Grounding+jemper PGTM) CCO AL 70/70 mm (For Grounding+jemper PGTM) Sepatu kabel AL/CU 70mm (For Grounding+jemper PGTM) Sepatu kabel CU 150mm

1

2 3

4

5 6 7 8

MATERIAL ASSESORIES GARDU Pentanahan Gardu : - Pipa Galv 0,75"x3mtr - Rod earthing 20 x 2500 mm lengkap clamp - Pengadaan Link 25 x 25 - Pengadaan Stoping buckle - Pengadaan stainlees steel Pengadaan Kunci Gardu Penerangan gardu tembok : - Sakelar Pintu - Fitting lampu - NYM 2x1,5mm - Lampu Bohlam 10wat Test Lamp pada PHBTR - Sakelar Pintu - Fitting lampu - NYM 2x1,5mm - Lampu Bohlam 5wat Handle pintu PHBTR Tanda bahaya Pipa Galv 3"x6mtr Pipa Galv 3"x1mtr

JUMLAH B Jumlah kebutuhan Material

7 19 39 90 90 90 15 2 2 2 4 2 66 66 66 99 66 3 24 5 5

set btg btg bh bh mtr bh set bh bh mtr bh set bh bh mtr bh bh bh bh bh

RINCIAN MATERIAL NO. RAB : 035/53/09/2015 Tanggal : 26 MARET 2015 HARGA SATUAN RP MDU

NON MDU (PLN) RP

RP

NON MDU (PENG.PEMB) RP

15,600.00 51,000.00

93,600 2,448,000 420,000

70,000.00

-

45,000.00 4,000.00 17,200.00 11,500.00 63,480.00 19,530.00 4,830.00 47,500.00 273,240.00 45,000.00 57,500.00 2,760.00 2,044.00 15,000.00 9,000.00

315,000.00 8,000.00 240,800.00 966,000.00 444,360.00 136,710.00 67,620.00 332,500.00 1,912,680.00

-

2,961,600.00

18,000.00 51,000.00 43,000.00

594,000.00 1,122,000.00 516,000.00

270,000.00 1,035,000.00 82,800.00 61,320.00 450,000.00 252,000.00 6,574,790.00

45,000.00 57,500.00 2,760.00 2,044.00 15,000.00 45,000.00 30,000.00 10,000.00 8,000.00 7,000.00 30,000.00 10,000.00 8,000.00 7,000.00 100,000.00 50,000 500,000 80,000

855,000.00 2,242,500.00 248,400.00 183,960.00 1,350,000.00 675,000.00

-

2,232,000.00 5,193,600.00

60,000.00 20,000.00 32,000.00 14,000.00 1,980,000.00 660,000.00 792,000.00 462,000.00 300,000.00 1,200,000.00 2,500,000.00 400,000.00 13,974,860.00 20,549,650.00

More Documents from "Susi Septiani"