ECC 6.0 test scenario

status

document status

1

creation of masters for equipment, function location, BOM,charecteristics, measuring point,maintenance stratagy.

completed

completed

2 3 4 5 6 7 8

create and complete using transtion for notification,maintenance order, measuring document prventive maintenance with time based - single cycle, call object:order prventive maintenance with time & performane based - stratagy cycle,call object:order refurbishment order for repairable spares preventive maintenance for calibration order, call object:calibration order. prevntive maintenance for service procurement,call object: service entry cheet(single cycle-performance based) Document creation specific to a equipment and attacching to equipemnt master

completed completed completed scheduled for next cycle completed completed completed

completed completed completed

9 10 11 12 13

creation of fleet equipment and recording daily consumption, material document update, consumption analysis creation of object link creation of PRT as equipment and update its usage counter creation of master warranty, warrenty counter, check warranty status. creation of configurable task list

Completeed completed scheduled for next cycle completed completed

Completeed completed

14 15 16 17 18 19 19 20 21 22 23

check the standard reports and customer specific reports creation of multi counter plan and schedule, call object: maintenance order create permits (technical and processoriented) documentation of BPP,IMG,END USER DOC, TESTING DOC Budeget allocation to the order external workcenter for internal actvities in order processing scenario requires more than 10 days for testing order processing with work clearance management creation of single and composite roles of maintenance engeneer and maintenance manager. work flow scenario investment order preventive maintenance for outline agreement(service contract)

completed. completed completed.

completed completed.

partially partially completed.(standard completed.(standard reports checked) reports checked) completed completed completed completed completed completed configuration setting of budget profile is pending. completed completed need to study, learn, test and document need to study, learn, test and document need to study, learn, test and document need to study, learn, test and document configuration setting, creation of contract pending

remarks

slno

report 1 Daily report of PM Electrical Maintenance checklist 2 print 3 History card 4 Material 5 Down time report 6 YMJS 7 YNOS 8 Maintenance order print 9 Fleet consumption analysis individual object:Damage 10 Analysis 11 Object statistics 12 Breakdown Analysis 13 Cost analysis

Transaction YDAILY

checking status No Authorisation

YEPM YHIS YMCR YMDT YMJS YNOS YPMO MCIZ

No Authorisation Tested Tested Tested No Authorisation Tested No Authorisation No Authorisation

MCI5 MCI6 MCI7 MCI8

Tested Tested Tested Tested

remarks

OK OK OK OK

OK OK OK

No Authorisation Tested NOT tested