FTENDER DOCUMENTS 1.
Tender No.
WKS/559/TEN
2.
Name of work.
Maintenance of lawn & hedge and other horticulture work in different Directorate & labs.
3.
Approximate cost of work.
Rs. 20,97,282.00
4.
Earnest Money.
Rs. 41,950.00
5.
Completion period.
01 (one) Year.
Tender Closing date & time.
:
13.01.2010
at 11.00 Hrs.
Tender to be submitted upto
:
13.01.2010
at 14.30 Hrs.
Tender Opening date & time.
:
13.01.2010
at 15.00 Hrs..
NOT TRANSFERABLE. ISSUED BY
Town Engineer RDSO, Lucknow
ISSUED TO.
----------------------------------------------------------------------------------------------------------------------------------
Signature of the Contractor
Page 1 of 24
Name of work:- Maintenance of lawn & hedge and other horticulture work in different Directorate & labs.
Sr. No. 1. 2. 3. 4. 5. 6.
Description
Page No. To From
Tender Form – First Sheet
-
3
Tender Form – Second Sheet
4
7
Special Conditions/Specifications of contract Part-I
8
12
Specification for N.S. Iems.
13
16
Certificate by the Tenderer
-
17
18
20
Offer Sheet/Schedule of Approx. Quantity.
Signature of the Contractor
Page 2 of 24
FIRST SHEET Name of work:- Maintenance of lawn & hedge and other horticulture work in different Directorate & labs. To, The President of India, Acting through the Town Engineer RDSO,Manak Nagar, Lucknow I/We_________________________________have read the various conditions to tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for a period of 90 days from the date fixed for opening the same and in default thereof, I/we will be liable for forfeiture of my/our "Earnest Money". I/we offer to do the work for Town Engineer/Director (Civil), RDSO, Manak Nagar, Lucknow at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respect within 1(One) year including monsoon from the date of issue of letter of acceptance of the tender.
(a)
(2)
I/we also hereby agree to abide by the General Conditions of Contract 1999 and to carry out the work according to the Special Conditions of Contract and specifications of materials and works laid down by the Railway in the annexed Special Conditions/Specifications and Standard Specifications 1987 of Northern Railway.
(3)
A sum of Rs. 41,950.00 (Rupees Forty one thousand nine hundred fifty only) is herewith forwarded as Earnest Money. The full value of the Earnest money shall stand forfeited without prejudice to any other right or remedies if: -
I/we do not execute the contract documents within seven days after receipt of notice issued by the Railway that such documents are ready and OR (b) I/we do not commence the work within fifteen days after receipt of orders to that effect. (4)
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modification as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
Signature of Witness: -
----------------------------
(1) ---------------------------------------
Signature of Tenderer(s)
(2) ---------------------------------------
Date ----------------------Address of the Tenderer(s)
Signature of the Contractor
Page 3 of 24
TENDER FORM (SECOND SHEET) Name of work:- Maintenance of lawn & hedge and other horticulture work in different Directorate & labs. Instructions to Tenderer and Conditions of Tender: 1.1 Tender must be enclosed in a sealed cover superscripted as Tender No. WKS/559/TEN and must be sent by registered post to the address of the Town Engineer, RDSO, Manak Nagar, Lucknow – 226011, so as to reach the office not later than 14.30 hrs. on 13.01.2010 or deposited in the special box allotted for the purpose in the office of Town Engineer, RDSO, Manak Nagar, Lucknow – 226011. The tender box will be sealed at 14.30 hrs. On 13.01.2010. The tender will be opened on 15.00 hrs. in the presence of tenderer(s) or their authorized representatives on 13.01.2010 at same place. The tender papers will not be sold after 11.00 hrs. on 13.01.2010 . 1.2 The following documents form part of tender/contract: a) Tender form - First sheet and second sheet. b) Special Conditions/Specifications (Technical & Non-Technical). c) Schedule of approximate quantities (attached). d) General Conditions of Contract (G.C.C.) 1999 with all amendments. e) Northern Railway Standards Specifications 1987 f) All general and detailed drawings pertaining to this work, which will be issued by the Engineer or his representative (from time to time) with all changes and Modifications. 2.0 SYSTEM OF TENDERING Tender will consist of one packet and to be submitted in sealed cover at the time of submitting tender. Envelops should be super scribed as under:‘Maintenance of lawn & hedge and other horticulture work in different Directorate & labs’. 2.1 As far as possible the tenderer(s) bid should not have any condition or specification or assumption contrary to the provisions in these tender documents on which the tenderer(s) bid is based, Tenderer(s) own special conditions, not in conformity with the tender specifications, are required to be listed separately & shall be supplemented by the details of exact financial implications if applicable. Railway will not take cognizance of any other conditions/variations from the drawings etc. except under the format specified in the tender documents for such special conditions if any. It needs to be emphasized that only such conditions/stipulations which are at variance with the tender conditions codal provision stipulate in the tender documents need be mentioned, in case tenderer(s) choice to stipulated such special condition taking into account the restrictions mentioned elsewhere in the tender document. Only such of the special conditions/specifications stipulated by tenderer(s) which have been specifically approved by the Railways in writing shall be deemed to have been accepted by the Railways. The tenderer(s) conditions/stipulations/codal are at variance with the tender conditions/codal provisions shall be withdrawn by the tenderer(s) 2.2 The list of documents to be attached by the tenderer(s) for this tender, duly sealed should consist of:(i) Earnest Money in proper form. (ii) Key personal matrix of staff of the firm, details of infrastructures facilities. (iii) Partnership deed if any. (iv) Complete tender documents duly stamped & signed by the tenderer(s). (v) Authentic documents in support of his/their credentials. (vi) Details of plants and machinery. (vii) Permanent Account Number (PAN) issued by income tax department. (viii) Demand draft/Pay order /Bankers cheque towards the cost of tender document in case tender documents are down loaded from website of RDSO. 2.3 If the tenderer(s) fails to submit the authenticated documents in support of his/their credentials as specified in tender documents, his/their tender will liable to be rejected summarily. 2.4 Tender form is not transferable. 3. Eligibility criteria: (i) Turnover: Tenderer(s) should have received total contractual amount against satisfactory execution/works in progress of all type of works for a minimum of 150% of advertised tender value of work during the last three financial year (i.e.2006-07,2007-08 & 2008-09) and in current financial year, as per payment certificate from the tenderer duly issued by the officer of concerned Govt. Department or as per Audited balance sheet duly certified by Chartered Accountant.
Signature of the Contractor
Page 4 of 24
(ii) Experience in similar nature of work:The tenderer (s) should have successfully completed at least one similar single work for a minimum value of 35% of advertised tender value of the work in the last three financial years (i.e. 2006-07, 2007-08 & 200809) and in current financial year. Certificate from Private/individual for whom such work are executed/ being executed should not be accepted. (iii) The tenderer(s) shall submit the documentary proof in support of eligibility criteria mentioned above alongwith the tender form. Certificate issued by individual in his personal capacity shall not be accepted. Following works will be treated as of similar nature:-
“Maintenance of lawn & hedge etc. and other horticulture work” 4.
Inspection of Site before Tendering, etc. The tenderer(s) shall inspect the proposed site of work and acquaint himself/themselves with the site conditions, availability of materials, working hours, layout of land, trees and shrubs that he/they will have to cut, type of strata likely to be met within the borrow pits, stacking space for materials, approach roads, path ways available etc. and all relevant items connected with the execution of the work. No claim shall be entertained for the contractor(s) making his/their own arrangements for approaches/approach road from outside railway land and contractor(s) will bear entire expenses such as road taxes, payment for right of way, etc. to outsiders and for Construction of approaches/approach roads, etc. 5. Drawings for the Work: Drawings for the work can be seen in the offices of the Town Engineer, RDSO, Manak Nagar, Lucknow – 226011 at any time during the office hours. These drawings are only for the guidance of tenderer(s). Detailed working drawings (if required), based generally on the drawings mentioned above, will be given by the Engineer in charge or his representative from time to time. 6. Earnest Money and Security Deposit: 6.1 The tenderer(s) is/are required to deposit a sum of 41,950.00 (Rupees Ninety eight thousand seven hundred fifty only) as earnest money for due performance of stipulation to keep the offer open for the period specified below. 6.2 The tenderer shall hold the offer open for a period of 90 (Ninety) days from the date fixed for opening the same. It is understood that the tender documents have been sold/issued to the tenderer and the tenderer is being permitted to tender in consideration of the stipulation on his/their part that after submitting his/their tender he will not resale from his offer or modify the terms and conditions thereof in a manner not acceptable to the Town Engineer, RDSO, Manak Nagar, Lucknow–226011. Should the tenderer fail to observe or comply with the foregoing stipulation, the aforesaid earnest money shall be forfeited to the Railway. 6.3 In case the tenderer(s) withdraws his offer within the validity date of his/their offer or fails to undertake the contract after acceptance of his/their tender, the full earnest money shall be forfeited. 6.4 The earnest money should be in cash or in the form of Deposit Receipt, pay orders or demand drafts executed by State Bank of India or any of the nationalized banks or by a scheduled Bank. 6.5 Guarantee bonds, Government securities (stock) certificates, bearer bonds, promissory notes, cash certificates and cash deposited with DPM or stations etc., will not be accepted. NOTE: (1) Deposit receipts, pay orders and demand drafts should be drawn in favour of Executive Director Finance, RDSO, Lucknow. (2) If the name of the directors/company is added thereafter, the tenderer(s) is/are required to paste & sign Rs.1.0 (one) Revenue stamps on backside of the deposit receipt. (3) The facility of lump-sump earnest money will not be accepted from the registered contractors of any railway and they are required to deposit earnest money alongwith their offer. 7. Tenders containing erasures, overwriting and/or alterations of the tender documents are liable to be rejected. Any correction made by the Tenderer(s) in his/their entries must be attested. 8. If a tenderer(s) deliberately gives/give wrong information in his/their tender, or creates/ create circumstances for the acceptance of his/their tender, the railway reserves the right to reject such tender at any stage. 9. If a tenderer expires after the submission of his tender or after the acceptance of his tender, the railway shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the railway shall deem such tender as cancelled unless the firm retains its character. 10. Security Deposit, Validity of Tender: 10.1 The tender must be accompanied with earnest money in any of the forms mentioned in the tender failing which the tender will be summarily rejected. Signature of the Contractor
Page 5 of 24
10.2 If the tender is accepted, the amount of earnest money will be held as security deposit for the due and faithful fulfillment of the contract. The earnest money of the unsuccessful tenderer(s) will, save as herein before provided, be returned to the unsuccessful tenderer/s but the railway shall not be responsible for any loss or depreciation that may happen to the security for the due performance of the stipulation to keep the offer open for the period specified in the tender documents or to the earnest money while in railway's possession not be liable to pay interest thereon. 11. SECURITY DEPOSIT & PERFORMANCE GUARANTEE: (A) Unless otherwise specified in the special conditions, if any, the Security Deposit/rate of recovery/mode of recovery shall be as under: i. Security Deposit for each work should be 5% of the contract value. ii. The rate of recovery should be at the rate of 10% of the bill amount till the full Security Deposit is recovered. iii. Security Deposit recovered only from the running bills of the contract and no other mode of collecting SD such as SD in the form of instruments like BG, FD etc. shall be accepted towards Security Deposit. (B) Introduction of Performance Guarantee: The procedure for obtaining performance guarantee is outlined below:(a) The successful bidder should give a Performance Guarantee (PG) amounting to 5% of the contract value in any of the following forms: (i) A deposit of cash (ii) Irrevocable Bank Guarantee (iii)Government Securities at 5 percent below the market value (iv) Deposit receipts, Pay Orders, Demand Drafts and Guarantee bonds either of the State Bank of India or of any of the nationalized Banks (v) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banks (vi) A Deposit in the Post Office Saving Bank (vii) A Deposit in the National Savings Certificates (viii) Twelve years National Defence Certificate (ix) Ten years Defence Deposits (x) National Defence Bonds and (xi) Unit Trust Certificates at 5 percent below market value or at the face value whichever is less. (b) A Performance Guarantee shall be submitted by the successful bidder after the letter of acceptance has been issued, but before signing of the agreement. The agreement should normally be signed within 15 days after the issue of LOA and the Performance Guarantee shall also be submitted within this time limit. This guarantee shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time or completion of work gets extended, the contractor shall get the validity of Performance Guarantee extended to cover such extended time for completion of work plus 60 days. (c) The Performance Guarantee (PG) shall be released after the physical completion of the work based on the “Completion Certificate” issued by the competent authority stating that the contractor has completed the work in all respects satisfactorily. The security deposit, however, shall be released only after the expiry of the maintenance period and after passing the final bill based on “No claim Certificate.” (d) Wherever the contract is rescinded, the security deposit shall be forfeited and the Performance Guarantee shall be encashed and the balance work shall be got done independently without risk and cost of the failed contractor. The failed contractor shall be debarred from participating in the tender for executing the balance work. (e) The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the contractor to pay President of India any amount due, either as agreed by the contractor or determined under any of the Clauses/Conditions of the agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The contract being determined or rescinded under provision of the GCC the Performance Guarantee shall be forfeited in full and shall be absolutely at the disposal of the President of India. 12. Partnership Deeds, Power of Attorney, etc. The tender shall clearly specify whether the tender is submitted on his own behalf or on behalf of partnership concern. If the tender is submitted on behalf of partnership concern he should submit the certified copy of partnership deed along with the tender and authorization to sign the tender documents on behalf of partnership concern. If these documents are not enclosed along with tender documents, the tender will be treated as having been submitted by individual signing the tender documents. The railway will not be bound by any Power of Attorney granted by the tendered or by changes in the composition of the firm made subsequent to the
Signature of the Contractor
Page 6 of 24
execution of the contract. It may however recognize such power of attorney and changes after obtaining proper legal advice. 13. Rights of Railway to deal with Tenders: The authority for the acceptance of the tender will rest with the Railway which does not bind itself to accept the lowest or any other tender nor does the Railway undertake to assign reason for declining to consider or reject any particular tender or tenders. 14. Execution of Contract Documents: 14.1 The successful tenderer(s) shall be required to execute an agreement with the Railway for carrying out the work according to General Conditions of Contract, Special Conditions/Specifications annexed to this tender, and specification for work and materials as laid down in the "Northern Railway’s standard specifications 1987" amended with correction slips as mentioned earlier. 14.2 The tenderer(s) whose tender is accepted will be required to appear at the office of the Town Engineer, RDSO, Manak Nagar, Lucknow – 226011 in person or in case of firm or corporation a duly authorized representative shall appear to execute the contract documents within 7 days after notice that the contract has been awarded to him and contract documents are ready for signature. Failure to do so shall constitute a breach of the agreement effected by the acceptance of the tender in which case the full value of the earnest money accompanying the tender shall stand forfeited without prejudice to any other right or remedies. 14.3 Sales Tax/Commercial Tax State Govt. /local bodies, Sales Tax/Commercial Tax at the rate prescribed by the Govt. of State for works contract/construction contracts will be recovered from the bills from time to time for works carried out in the State Govt. /local bodies. 15. Employment Partnership, etc. of Retired Railway Employees 15.1 Should a tenderer be retired engineer of the Gazetted rank or any other Gazetted officer working before his retirement, whether in the executive or administrative capacity, or whether holding a pensionable post or not, in the Engineering Department of any of the Railways owned and administered by the President of India for the time being, or should a tenderer being partnership firm have as one of its partners a retired engineer or retired Gazetted officer as aforesaid, or should a tenderer being as incorporated company have any such retired engineer or retired Officer as one of its Directors, or should a tenderer have in his employment any retired engineer or retired Gazetted officer as aforesaid, the full information as to the date of retirement of such engineer or Gazetted officer from the said service and in case when such engineer or officer has not retired from government service at least 2 years prior to the date of submission of the tender as to whether permission for taking such contract or if the contractor be a partnership firm or an incorporated company to become a partner or Director as the case may be or to take employment under the contractor, has been obtained by the tenderer or the engineer or officer as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender. Tenders without the information above referred to or a statement to the effect that no such retired engineer or retired Gazetted officer is so associated with the tenderer, as the case may be, shall be rejected. 15.2 Should a tenderer or contractor on the list of approved contractors have a relative or relatives, or in the case of firm or company of contractors one or more of his shareholders or a relative or relatives of the shareholders, employed in Gazetted capacity in the Engineering Department of the RDSO, the authority inviting tenders shall be informed of the fact at the time of submission of tender, failing which the tender may be disqualified or if such fact subsequently comes to light, the contract may be rescinded in accordance with the provisions in clause 62 of the General Conditions of Contract. 15.3 The tenderer whether a sole proprietor, a limited company or a partnership firm if they want to act through agent or individual partner/ partners should submit along with the tender or at a later stage, a power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner/ partners of the firm or any other person specifically authorizing him/them to submit the tender, sign the agreements, receive money, witness measurements, sign measurement books, compromise, settle, relinquish any claim or claims preferred by the firm and sign ‘No claim Certificate’ and refer all or any disputes to arbitration. 16. Tender documents are not transferable I/We have specially noted clause 16 of conditions of tender and declare that I/we have no relative employed in the Gazetted or non-Gazetted capacity in the RDSO.
Signature of the Contractor
Page 7 of 24
Name of work:-Maintenance of lawn & hedge and other horticulture work in different Directorate & labs. SPECIAL CONDITIONS/SPECIFICATIONS OF CONTRACT (PART-I) NON-TECHNICAL A. GENERAL 1. These special conditions and the work schedule shall govern the works to be executed under this contract in addition to and/or in part suppression of the General Conditions of Contract and Standard Specifications as laid down in the Northern Railway’s Standard Specifications 1987 as amended by correction slips on or before the opening of tender. 2 Where there is any conflict between these Special Conditions of Contract on one hand and Standard specifications and General Conditions of Contract on the other hand, the former shall prevail. 3 Any special condition stated by the tenderer(s) in the covering letter submitted along with the tender shall be deemed as part of contract to such extent only as have explicitly been accepted by the Railway. 4 Cess Charges: 4.1 For Contractor's labour employed/ residing at stations and in colonies where railway sanitary facilities exist, Contractor(s) will be required to pay Cess charges as per rules in force on the Railway from time to time. 5 Contractor's Responsibility to arrange Tools, Plants, Machinery etc. The Contractor should make his/their own arrangements for all plants and tools required for the successful completion of the work in time. 6 Materials supplied by Railway: The tenderer shall be responsible to see that the materials such as cement, steel etc., supplied by the Administration are utilised for the sole purpose for, which they have been issued to him, failing which, he is liable to be dealt according to law for any misuse of these commodities by himself, his agents or workmen etc. 6.1 If any extra quantity of Railway materials over and above that shown in the drawing or any extra quantity of cement or any other Railway materials over the standard scale have been issued to the contractors due to wastage. Workmanship or any other reason or if in the opinion of the Town Engineer, the Railway materials have not been accounted for by the contractor/s satisfactorily or have not been used on bonafide Railway works allotted to the contractor/s the cost of such Railway materials will be recovered from the contractor/s. 6.2 The cement and/or steel Railway materials issued in excess of the requirement/s as above shall be returned at the place of issue, in perfectly good condition by the contractor/s to Railway immediately after completion or determination of the contract. If the contractor/s fails to return the said materials, the cost of cement and/or steel Railway materials issued in excess of the requirements as computed by the Railway according to the specifications and approved drawings, will be recovered from the contractor/s @ one and half the prevailing procurement cost at the time of the last issue or one and half the current price of the material after completion of the particular phase of the work, whichever is higher plus 7% freight, viz. 1.5 x (Purchase price or current price+7% freight, only). This will without prejudice to the right of the Railway to take action against the contractor/s under the conditions of the contract for not doing/completing the work according to the prescribed specifications and approved drawings. 7. a) Engagement of Qualified Engineers: The contractor shall the following technical staff during the execution of the work :i) One graduate engineer when the cost of the work to be executed is Rs. 15 lacs and above ii) One qualified Diploma holder (overseer) when the cost of the work to be executed is more than Rs. 5 lacs. Technical staff should be available at site required by the Engineer In-charge to take instructions. In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay a reasonable amount not exceeding a sum of Rs. 2000/- (Rs. One thousand only) for each month of the fault in case of graduate Engineer and Rs. 1000/- (Rs. One thousand only) for each month of the fault in case of diploma holder (Engineer) The decision of the Engineer-in-charge as to the period for which the required technical staff was not employed by the contractors as to the reasonableness of the amount to be deducted on this amount shall be final and binding on the contractor. No one of the engineer should be related to the tenderers 8. Water: Signature of the Contractor
Page 8 of 24
The contractor(s) shall make his/their own arrangements for potable and other water supply required for the execution of the work as well as for his labour. However, if water is supplied by the Railway, the contractor(s) will have to pay water charges as laid down in the General Conditions of Contract. 9. Variation in quantities during execution. 9.1 Individual NS items in contracts shall be operated with variation of plus or minus 25% and payment would be made as per the agreement rate. 9.2 In case of increase in quantity of an individual item by more than 25% of the agreement quantity is considered as unavoidable, the same be got executed by floating a fresh tender. If floating a fresh tender is considered not practicable, negotiations may be held with the existing contractor for arriving at reasonable rates for additional quantities in excess of 125% of agreement quantity. 9.3 The limit for varying quantities for minor value items shall be 100% (as against 25% prescribed for other items). A minor value item for this purpose is defined as an item whose original agreement value is less than 1% of the total original agreement value. 9.4 No such quantity variation limit shall apply for foundation items. 9.5 As far as SOR items are concerned, the limit of 25% would apply to the value of SOR schedule as a whole and not on individual SOR items. However, in case of NS items, the limit of 25% would apply on the individual items irrespective of the manner of quoting the rates (single percentage rate or individual item rate). 9.6 In case variation leads to vitiation, the payment of variation quantity of that schedule which is causing vitiation, will be made at the rate quoted by lowest eligible tenderer for that particular schedule getting affected by vitiation. 9.7 Variation limits are not applicable to foundation work. The actual quantities of work to be done against items of work pertaining to foundations may, however, be varied beyond the limit of 25% plus or minus laid down above for which variation also the contractor shall be entitled to no extra payment on account of any such excess or reduction in the quantities over those given in the contract schedule but will be paid at the accepted contract rate for the actual amount of work done in all the items of work done pertaining to foundations. 10. Errors, Omissions and Discrepancies The tenderer(s) shall not take any advantage of any misinterpretation of the conditions due to typing or any other error and if any in doubt shall bring it to the notice of the Engineer without delay. In case of any Contradiction, only the printed rules and books should be followed and no claim for the misinterpretation shall be entertained. 11. Deduction for Income Tax The Railway will deduct 2% of income tax on the gross amount and surcharge on income tax of each bill as prescribed by Government from time to time and such deduction of Income Tax shall be recovered while making payment to the Contractor/s. The settlement of income tax should be made with the Income Tax authorities. 12. Arrangements for Permits or License Arrangements for permits and license for materials will not be made by the Railway or any assistance given. The Contractor will have to make his own arrangements. No import license shall be arranged by the railway for this work. 13. Taxes and Royalties 13.1 All rates quoted in the tender shall be deemed to be inclusive of all taxes, royalties’ payable by the Contractor(s) to the government or public body or local authority and no additional amount will be paid or claim entertained on this account by the Railway. 13.2 All taxes such as Income tax, Sales tax and other taxes as prescribed by Central/State Govt. from time to time shall be applicable. The Contractor shall be fully responsible for payments of all such taxes without any liability of Railway Administration deducting towards such taxes shall be made from the payments of the contractor in accordance with rules in force from time to time. 14. Measurements in Metric Units Measurements and payment will be made in metric units. In the case of items regarding measurements, the measurements will be rounded off to the second place of decimal for working out payment. 15. Inspection Register and Records The Contractor/s shall maintain accurate records, plans and charts showing the dates and progress of all main operations and the Engineer and his authorized representative shall have access to this information at all reasonable times. Records of tests made shall be handed over to the Engineer’s representative after carrying out the tests. The following registers will be maintains at site by the Contractor/s. Signature of the Contractor
Page 9 of 24
Site Order Register The Contractor/s shall maintain a site order register and promptly sign orders given therein by the Engineer or his representative or his superior officers and comply with them. The Compliance shall be reported by the Contractor/s to the Engineer in good time so that it can be checked. 15.2 Labour Register. This register will be maintained by contractor to show daily strength of labour in different categories employed by the Contractor/s & signed by Engg. Supervisor and contractor daily. 15.3 Log book of events. All events are required to be chronologically logged in this book shift wise and date wise. 16. SAFETY PRECAUTIONS 16.1 The Contractor/s shall at all times adopt such safe methods of work as will ensure safety of structure, equipment and labour. If at any time the Railway finds the safety arrangements unsafe, the contractor/s shall take immediate corrective action as directed by the Railway's in the matter shall in no way absolve the contractor/s of his/their sole responsibility to adopt safe working method. 16.2 The Contractor(s) shall design and execute temporary works such as formwork and supports, so as to ensure absolute safety of contractor(s) personnel as well as Railway staff and personnel engaged on the work. The Contractor(s) should indemnify the Railway against damages and injury to workmen. Railway reserves the right to enforce safety regulations on the contractor(s) and recover any cost, which may be incurred for the purpose. 16.3 The contractor(s) should take all precautions for safety of his/ their labour, vehicles working at site while crossing the State Highway/Railway track and ensure no interference with smooth movement or road/rail traffic. 17. COMPLETION PERIOD 17.1 The Contractor(s) shall have to complete the work in all respects within a period of 01 (One) year (including monsoon) from the date issue of acceptance of the tender. 17.2 The Contractor(s) will have to employ labour in full strength commensurate with working areas available. He will also arrange for materials and equipments to complete the job most expeditiously within the stipulated completion period. The Engineer's decision as to what is full strength will be final. He should also submit bar-chart for completing the work in time. 18. MAINTENANCE PERIOD The tenderer(s) shall be required to maintain the work effectively for a period of twelve months from the date of completion as per Clause No.47 of the General Conditions of Contract 1999 and no part refund of Security Deposit shall be permitted during the maintenance period mentioned above. 19. CLEARANCE OF SITE The contractor after completion of the work shall clear the site of work and tidy up the area and remove left over materials, debris etc. In case the contractor fails to do so, the same will be removed at the cost of the contractor by the Engineer's representative. Rates shall be inclusive of the work of clearing site tidying etc. after completion of the work. 20. In case the overall value of the tender by public sector undertaking of the state of Central Government is higher than the value of lowest tender up to 10% the Railway reserves the rights to give preference to such public sector undertaking ignoring the lower tenderer(s). 15.1
Signature of the Contractor
Page 10 of 24
Name of Work: Maintenance of lawn & hedge and other horticulture work in different Directorate & labs.
1. SPECIAL CONDITIONS AND SPECIFICATION 2.
The rates quoted should be inclusive of all taxes viz. Royalty, Terminal, Octroi, Trade tax, Incometax etc. and any other taxes payable to Government or any other party and no extra payment will be made on this account. 3. The contractor will be paid once in a month on the basis of certificate of satisfactory completion of the work every day from the RDSO’s nominated officials. The decision of the Engineer In charge in this regard shall be final and binding on the contractor. 4. The administration will not be responsible for the death and injury to any of the contractor’s men. The Administration will not be responsible for any road mishap or accident met by the mechanical transport, etc. inside or outside the RDSO premises. The contractor’s men will be fully responsible for any such violation. 5. In case of dispute, which may arise, concerning the agreement or tender, the decision of the Town Engineer/RDSO/Lucknow and or/Director/Civil/RDSO/Lucknow, shall be final and binding upon the contractor. 6. The contractor will not employ labour below age of 18 years. 7. In the event of labour being prevented from working in normal working hours due to dispute, Strikes, etc. in Railways, RDSO premises where the work is being carried out, the total loss in idle time and other incidental expenses will not be borne by the RDSO Administration. 8. The contractor shall at all time keep the RDSO Administration indemnified against all claims which may have been made under workmen compensation Act & rules in force for the time being. 9. All the operation of Horticulture work, under this contract shall be done daily except Sunday and three festivals in a year. The duty hours of Mali’s deployed by the contractor will start from 8:00 hrs. 17.00 hrs. 10. At least Thrityfive (35) Malis shall be deployed daily for efficient working without any fail. 11. If on any particular day No. of Malies are less than stipulated,than a penalty of Rs.100/- per day per Mali will be imposed.
Signature of the Contractor
Page 11 of 24
Special Condition for N.S.Items ykWu ewfoax dk;Z en la0 1 1- yku dh ?kkl bysDVªhd ikoj }kjk pkfyr ykWu ewoj ls gh dkVuh gksxhA fctyh dh lIykbZ jsyos }kjk Qzh esa nh tk,xhA 2- Bsdsnkj ds ikl yku dh ?kkl dkVus dh e’khu ¼ykWu ewoj½ viuh gksuh pkfg,A 3- ykWu ds fdukjksa dh ?kkl xzkl dfVax CysM ¼ryokj½ ls bl izdkj dkVuh gksaxh fd e’khu }kjk dkVh gqb ?kkl ls uhph rFkk ÅWaph u gksA 4- lkekU;r% ?kkl dk ykWu dkVus dh vko`fRr fuEu izdkj gksxh% nks ykWu dfVax ds chp vUrjky tqykb vxLr flrEcj vDV 8 fnu ls 12 fnu ds chp Z w ¼eghus esa rhu ckj ds cj fy,½ uoEcj fnlEc tuojh Qjoj 27 fnu ls 32 fnu ds chp j h ¼eghus esa ,d ckj ds fy,½ ekpZ vizS ebZ twu 13 fnu ls 17 fnu ds chp y ¼eghus esa nks ckj ds fy,½ 5- ykWu esa gj ykWu ewfoax ds ckn jklk;fud [kkn ¼;wfj;k½ dk fNM+dko 1 fd-xzk- izfr 100 oxZeh0 {ks= dh nj ls djuk gksxk ¼yku dks gjk&Hkjk j[kus ds fy,½ ftldk izcU/k Bsdsnkj dks Lo;a djuk gksxkA 6- izR;sd yku ewfoax ds dk;Z dk ys[kk&tks[kk ,d jftLVj cukdj j[kuk gksxk ftlesa funs’kky; ukfer deZpkjh rFkk Bsdsnkj ds gLrk{kj gksuk vfuok;Z gksxkA 7- dk;Z dk Hkqxrku fcuk ys[kk&tks[kk jftLVj ds ugha fd;k tk;sxk ftldks funs’kky; }kjk ukfer deZpkjh }kjk cuk;k tk,xkA 8- mijksDr vko`fr ds vykok vko’;drk gksus ij tc Hkh Bsdsnkj dks dgk tk;sxk yku ewfoax dk dk;Z djuk gksxk ftlds fy, Hkqxrku fd;k tk,xkA 9- izR;sd yku esa ?kkl dh ÅWapkbZ 40&50 fe-eh- ls vf/kd ugha gksuh pkfg,A 10- ftl ykWu esa taxy vf/kd gksxk rks Bsdsnkj dks yku dkVus ls igys funs’kky; ukfer deZpkjh ds vkns’k gksus ij ykWu dh ohfMax djuh gksxh ftldk Hkqxrku vyx ls lEcfU/kr en esa fd;k tk;sxkA 11- mijksDr vko`fRr ds vuqlkj yku ewfoax u gksus ij Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA
Signature of the Contractor
Page 12 of 24
12- yxkrkj o"kkZ ds dkj.k ykWu dh dfVax ugha gks ikrh gS rks mlds fy, Bsdsnkj ftEesnkj ugha gksxkA dfVax u gksus ij Hkqxrku ugha fd;k tk,xkA jsyos ds ikuh ls yku dh flapkbZ djuk en la0 2 1- funs’kky; ds yku dh flapkbZ funs’kky; esa yxs uyksa ls gh djuh gksxhA 2- ykuksa dh flapkbZ tc Hkh ikuh dh lIykbZ gksrh gS] mlh le; djuh gksxhA vyx ls ikuh ugha fn;k tk;sxkA 3- ikuh yxkus ds fy, ukbyksu ikbi dk Bsdsnkj dks Lo;a bartke djuk gksxkA 4- izR;sd yku ds yxk;s x;s ikuh dk ,d jftLVj esa ys[kk&tks[kk rS;kj djuk gksxkA bl jftLVj esa funs’kky; ukfer deZpkjh rFkk Bsdsnkj dk gLrk{kj gksuk t:jh gSA 5- fcuk ys[kk&tks[kk jftLVj ds Hkqxrku ugha gks ldsxkA ys[kk&tks[kk jftLVj funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 6- vizSy] ebZ] twu ds ekg esa yku esa ikuh izfr lIrkg yxkuk gksxk vDVwcj ls ekpZ rd 15 fnuksa ds vUrjky ij ikuh yxkuk gksxkA o"kkZ ds eghuksa ¼tqykbZ] vxLr] flrEcj½ esa ikuh yxkus dh dksbZ vko’;drk ugha gSA bl izdkj o"kZ esa 24 ckj ikuh yxkuk gksxkA 7- vko’;drk iM+us ij Bsdsnkj dks o"kkZ =rq esa Hkh ikuh yxkuk gksxk] ;fn o"kkZ ugha gksrh gS] ftldk Hkqxrku fd;k tk;sxkA 8- mijksDr vko`fr ds vuqlkj dk;Z u djus ij Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA 9- ikuh dh ek=k funs’kky; ukfer deZpkjh ds larks"k ds vuqlkj djuh gksxhA gst dkVus dk dk;Z en la0 3 1- gst dkVus dk dk;Z lw;ksZn; ls lw;kZLr gksus ds chp esa gh fd;k tk;sxkA 2- gst dkVus ds fy;s Bsdsnkj dks midj.kksa dh O;oLFkk Lo;a djuh gksxhA 3- gst dfVax dk dk;Z gst dkVus okyh dSaph ls gh fd;k tk;sxk] eksVh Mkykas ij mudh dVkbZ&NaVkbZ dk dk;Z xzkl dfVax CysM ¼ryokj½ ls fd;k tk ldrk gSA 4- fnu&izfrfnu ds dk;Z dk ys[kk&tks[kk ,d jftLVj esa j[kuk gksxk rFkk mlesa funs’kky; ukfer deZpkjh] Bsdsnkj ds gLrk{kj gksuk vko’;d gksxkA 5- dk;Z dk Hkqxrku ys[kk&tks[kk jftLVj ds vuqlkj gh fd;k tk;sxk ftldks funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 6- gst dfVax dk leLr dk;Z funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj gh fd;k tk;sxkA 7- gst dfVax ds ckn tks Hkh mldk eyck fudysxk mldks ,d= djds Bsdsnkj dks vius Lo;a ds lk/ku ls mlh fnu dkyksuh ls ckgj funsZf’kr LFkku ij Qsaduk gksxkA 8- gst dk Åijh fgLlk ¼Vki½ ,d ysoy esa djuk gksxk rFkk lkbt esa Hkh lh/kk dkVuk gksxkA Signature of the Contractor
Page 13 of 24
9- ;fn dVh gqbZ gst izfr fnu ugha mBkbZ xbZ rks Bsdsnkj ls ,slh fdlh f’kdk;r ds fy, izfr funs’kky; #0 10@& izfr fnu n.M fy;k tk;sxkA 10- gst dkVus dh vko`fr nks eghus esa ,d ckj gksxh ,oa nks dfVax ds chp dk vUrjky 55 ls 65 fnu ds chp gh gksuk pkfg,A 11- gst dks gjk&Hkjk j[kus gsrq vko’;drkuqlkj ikuh fn;k tk;sxk ,oa jklk;fud [kkn 1 fd-xzk- izfr 100 eh0 yEckbZ esa Mkyh tk;sxhA 12- gst mijksDr vko`fRr ds vuqlkj u dkVus ij Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA en la0 4 1- ?kkl] taxy] >kM+h dh fNykbZ rFkk dVkbZ funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj rhu ekg esa ,d ckj djuk gksxkA 2- QsfUlax ds vUnj dh ?kkl] taxy] >kM+h vkfn lHkh Nhyuh rFkk dkVuh gksxhA 3- QsfUlax ds vUnj ds {ks= dh ?kkl ;k taxy dks [kqjih ls Nhyuk gksxk] dsoy ogh taxy tks >kM+huqek gksxk mls xzkl dfVax CysM ls dkVk tk;sxkA 4- ?kkl dh fNykbZ ds ckn iwjs {ks=Qy dh QaVh ls njslh djuh gksxhA 5- fNyh ?kkl dks lkbV vfHk;Urk ds funsZ’kkuqlkj crk;s LFkku ij Bsdsnkj dks vius lk/ku ls Qsaduk gksxkA 6- bl dk;Z ds fy, Bsdsnkj dks fdlh Hkh izdkj ds vkStkj dh vkiwfrZ ugha dh tk;sxhA lHkh vkStkjksa dk Bsdsnkj dks Lo;a izcU/k djuk gksxkA 7- fd;s x;s fNykbZ ds dk;Z dk ys[kk&tks[kk ,d jftLVj esa j[kuk gksxk rFkk mlesa funs’kky; ukfer deZpkjh] Bsdsnkj ds gLrk{kj gksuk vko’;d gksxkA 8- fcuk ys[kk&tks[kk jftLVj ds Hkqxrku ugha gks ldsxk ftldks funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 9- ?kkl] taxy] >kM+h fNykbZ rFkk dVkbZ u djus ij Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA u;h gst yxkuk en la0 5 1- u;h gst ogha ij yxk;h tk;sxh tgkWa ij gst ugha gSA 2- u;h gst ds fy;s 45 lseh0 pkSM+h rFkk yEckbZ dh vko’;drkuqlkj o 20 lseh0 xgjh [kqnkbZ djds D;kjh cukuh gksxhA 3- D;kjh ls ?kkl] dadM+] iRFkj fudkyus gksaxs rFkk D;kjh lery djuh gksxhA 4- D;kjh esa gst ds c<+us ds fy;s xkscj dh [kkn ;k jklk;fud [kkn Hkh Mkyuk gksxkA 5- gst dh dfVax 15&15 lseh0 ij yxkuh gksxhA 6 flapkbZ ikuh dh vkiwfrZ ds le; ij gh djuh gksxhA 7- gst dh fujkbZ&xqM+kbZ eghus esa ,d ckj djuh gksxhA 8- ?kkl o vU; [kj&irokj tks fudysaxs mUgsa lkbV vfHk;Urk ds funsZ’kkuqlkj Qsaduk gksxkA Signature of the Contractor
Page 14 of 24
9- ikbi rFkk vU; vkStkjksa dk izcU/k Bsdsnkj dks Lo;a djuk gksxkA 10- fd;s x;s dk;Z ys[kk&tks[kk ,d jftLVj sa j[kuk gksxk rFkk mlesa funs’kky; ukfer deZpkjh] Bsdsnkj ds gLrk{kj vko’;d gksaxsA 11- fcuk ys[kk&tks[kk jftLVj ds Hkqxrku ugha gks ldsxk ftldks funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 12- gst dks gjk&Hkjk j[kus gsrq izkjEHk esa xkscj dh [kkn 1 ?ku eh0 izfr 100 eh0 yEckbZ esa Mkyh tk,xhA 13- u;h gst u yxkus dh n’kk esa Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA Uk;h yku cukuk Ekn la0 6 1- ftl txg yku cukuk gS ml txg dh ?kkl] taxy vkfn dks fdlh [kj&irokj uk’kd nok ls lq[kkuk gksxkA 2- vxj ,slk ekSle gks fd nok ls ?kkl u lw[k ik;s ;k nok u Mky ik;s rks yku ds [kj&irokjksa dks QkoM+s ls [kksn dj gh fudkyuk gksxkA 3- yku dh ?kkl lw[kus ij ikuh yxkdj yku ls tM+ksa dks rFkk dadM+ vkfn QkoM+s ls 20 lseh0 xgjh xqM+kbZ djds fudkyuk gksxkA 4- yku dh njslh djuh gksxh vkSj lkbV bathfu;j ds funsZ’kkuqlkj
Page 15 of 24
lM+d ij Ekn la0 7 1- vko’;drkuqlkj lM+d ij mxh ?kkl dks [kqjih] QkoM+k] [kj&irokj uk’kd nok vkfn ls lkQ djuk gksxkA 2- ?kkl lkQ djus dk fjdkMZ jftLVj esa j[kuk gksxkA 3- ;g jftLVj funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 4- ?kkl Bhd izdkj ls fudkyuh gksxh ftlls lM+d lkQ fn[kk;h nsA 5- ;g dk;Z o"kZ esa pkj ckj funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj fd;k tk;sxkA
yku ds pkjksa rjQ yxs ckWMZj dh dVkbZ en la0 8 1- ckMZj dSaph ls dkVuk gksxkA 2- gkbV rFkk lkbt funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj j[kuk gksxkA 3- izR;sd ckj dkVs x;s ckMZj dk jftLVj esa fjdkMZ j[kuk gksxk ftl ij laosnd rFkk funs’kky; ukfer deZpkjh dk la;qDr fujh{k.k gksxk ,oa gLrk{kj gksxkA ;g jftLVj funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxkA 4- ckMZj u dkVus dh n’kk esa Lohd`r nj ds nksxqus dh nj ls dVkSrh dh tk;sxhA 5- ckMZj dkVus dh vko`fr nks eghus esa ,d ckj gksxh ,oa nks dfVax ds chp dk vUrjky 55 fnu ls 65 fnu ds chp gksxkA en la0 9 1- funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj u;k ckMZj gh yxkuk gksxkA 2- yxk;s x;s ckMZj dk fjdkMZ jftLVj esa j[kuk gksxk ftldks funs’kky; ukfer deZpkjh }kjk cuk;k tk,xkA 3- ckMZj dh uki rHkh gksxh tc ckMZj Bhd izdkj ls feV~Vh esa yx tk;sxk vkSj laosnd ,oa funs’kky; ukfer deZpkjh ds gLrk{kj iqfLrdk esa fd, tk,axsA 4- funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj ckMZj dh dfVax] cht dh vkiwfrZ Bsdsnkj dks djuh gksxhA blds fy, vyx ls dksbZ Hkqxrku ugha fd;k tk;sxkA 5- u;k ckMZj u yxkus dh n’kk esa Lohd`r nj ds nksxqus nj ls dVkSrh dh tk;sxhA en la0 10 1- xeyksa esa ikuh ,d fnu ds vUrjky ij nsuk gksxkA xs: ls jaxkbZ eghus esa ,d ckj djuh gksxhA 2- xeyksa dh fujkbZ xqM+kbZ lIrkg esa ,d ckj djuh gksxhA 3- xkscj dh [kkn eghus esa ,d ckj Mkyuh gksxhA 4- xeyksa dh vuqj{k.k O;oLFkk Bhd u gksus dh fLFkfr esa n.M Lo:Ik #0 5@& izfr xeys dh nj ls dVkSrh dh tk;sxhA
Signature of the Contractor
Page 16 of 24
5- bl dk;Z ds fy, jftLVj esa fjdkMZ j[kuk gksxk tks funs’kky; ukfer deZpkjh }kjk cuk;k tk;sxk ,oa larks"ktud fLFkfr esa gksus ij gh Hkqxrku fd;k tk;sxkA en la0 11 ls 14 1- ikS/kksa lfgr xeys dh vkiwfrZ lkekU;r% Bsdk izkjEHk gksus ds ,d ekg ds vUnj gh djuk gksxkA 2- vkiwfrZ djus dk fnukad nks fnu igys lwfpr djuk gksxk rkfd vkiwfrZ ds fy, yk;s x;s ikS/kksa dk fujh{k.k fd;k tk ldsA ;fn xeyksa esa ikS/ks ,oa xeyk larks"ktud ugha gS rks mudks rqjUr okil ysuk gksxk vkSj okil fd, x, xeyksa dk dksbZ Hkh Hkqxrku ugha fd;k tk;sxkA 3- xeyksa esa ikS/kksa dh lkbt en esa fn, x, lkbt ds vuq:Ik gksuh pkfg;sA 4- ikS/kksa okys xeys dh ns[kHkky lEcfU/kr en esa fn;s x;s fooj.k ds vuqlkj Bsdsnkj }kjk djuh gksxh ftlds fy, vyx ls Hkqxrku fd;k tk;sxkA 5- ikS/kksa okys xeyksa dh vkiwfrZ ,d eghus esa u djus ij nsjh ds fy, #0 1&@ izfr fnu izfr xeyk dVkSrh dh tk;sxh tks lEcfU/kr en dh Lohd`r nj ds nqxqus ls vf/kd ugha gksxhA en la0 15 1- feV~Vh ds ids gq, 30 lseh0 O;kl ds xeys dh vkiwfrZ funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj vko’;drk iM+us ij djuh gksxhA en la0 16 1- isM+ksa dh dVkbZ NVkbZ dk dk;Z funs’kky; ukfer deZpkjh ds funsZ’kkuqlkj gh fd;k tk;sxkA 2- isM+ksa dh NaVkbZ u gksus ij #0 50@& izfr isM+ dh nj ls dVkSRkh dh tk;sxhA en la0 17 1- yku esa ,d fnu ds vUrjky ij >kM+w yxkuk gksxk rFkk dwM+k@iRrs bR;kfn funsZ’kkuqlkj MLVfcu esa MkysxkA 2- bl dk;Z dk ys[kk&tks[kk jftLVj esa funs’kky; ukfer deZpkjh ,oa Bsdsnkj ds gLrk{kj ds lkFk j[kk tk,xkA 3- ;fn >kM+w o"kkZ bR;kfn dh otg ls ugha yx;k tk ldrk gS rks bldk fooj.k jftLVj esa j[kk tk;sA mijksDr dkj.k ds vykok ;fn dk;Z Bsdsnkj }kjk ugha fd;k tkrk gS rks Lohd`r nj ds nksxqus nj ls dVkSrh dh tk,xhA
ekSleh Qwyksa ds ikS/ks yxkuk en la0 18 Signature of the Contractor
Page 17 of 24
1- o"kZ esa rhu ckj ekSleh Qwyksa ds ikS/ks vuqeksfnr lwph ds vuqlkj yxkus gksaxsA 2- Qwyksa ds ikS/ks ykus ds fy, D;kfj;ksa dks 20 lseh0 xgjk [kksnuk gksxk rFkk D;kfj;ksa ls ?kkl] dadM+] iRFkj vkfn fudkyus gksxs rFkk D;kfj;ka lery djds esM+ lh/kh rFkk lqUnj cukuh gksxh ftlls ns[kus esa lqUnj yxsA D;kfj;ka cukus ls igys D;kfj;ksa esa xkscj dh [kkn 1 ?ku eh0 izfr 100 oxZeh0 {ks= esa Mkyuk gksxk ftldk izcU/k Bsdsnkj Lo;a djsxkA 3- ikS/kksa dh c
Page 18 of 24
1- isM+kas dh jaxkbZ tehu ls 1 eh0 ÅWapkbZ rd vPNh DokfyVh ds pwuk ls djuh gksxh rFkk ftlesa Åij dk 200 feeh0 dh iV~Vh xs: ls jaxuh gksxhA ;g dk;Z de ls de 55 fnu rFkk vf/kd ls vf/kd 65 fnu ds vUrjky ij djuk iM+sxkA 2- bl dk;Z dk ys[kk&tks[kk jftLVj esa funs’kky; ukfer deZpkjh ,oa Bsdsnkj ds gLrk{kj ds lkFk j[kk tk,xkA 3- isM+ksa dh jaxkbZ u djus ij #0 3@& izfr isM+ dh nj ls dVkSrh dh tk;sxhA
Signature of the Contractor
Page 19 of 24
CERTIFICATE TO BE GIVEN BY THE BIDDER (Applicable in case of use of downloaded tender documents) I/We …………………………………………………………………………………. certify that I/We have checked this downloaded bid documents alongwith application form with the bid documents available online at www.rdso.gov.in and there is no discrepancy/variation/printing mistake and it is further certified that no alteration/modification has been made in the bid documents and the application for. I/We accept that the entire responsibility of ensuring that this application form along with other documents are as per original available on website is mine/ours. I/We also agree that if anything contrary is found the decision of RDSO/Administration will be final and binding on me/us. Signature of tenderer (with name & address)
Signature of the Contractor
Page 20 of 24
SCHEDULE OF ITEMS, QUANTITY & RATES Name of work: Maintenance of lawn & hedge and other horticulture work in different Directorate & labs. App. Cost. : Rs. 20,97,282.00 Earnest Money: 41,950.00 dz - l-
Date of opening: 13.01.2010 Date of completion: 1 (one) Years from the date of acceptance issued.
fooj.k ¼xSj&vuqlwph en½
Ekk=k bdkb Z
nj ¼vadks ,oa 'kCnksa esa½
dqy /kujkf’k
Ykku ewoj ls yku dh ?kkl 15 fnu ds vUrjky ls dkVuk rFkk dVh gqbZ ?kkl dks Qsduk ,oa jklk;fud [kkn Mkyuk ftlls yku iwjs o"kZ gjk fn[kk;h nsA lkbV bathfu;j ds funsZ’kkuqlkj ¼o"kZ esa 24 ckj½ 2 jsyos ds ikuh ls yku dh flapkbZ djukA vizSy] ebZ] twu esa izR;sd lIrkg rFkk vDVwcj] uoEcj] fnlEcj] tuojh] Qjojh] ekpZ esa 15 fnu ds ckn ,oa cjlkr ds ekg ¼tqykbZ] vxLr] flrEcj½ esa ikuh yxkus dh vko’;drk ugha gSA ¼o"kZ esa 24 ckj ikuh nsuk gSA½ 3 Ikgys ls yxh gqbZ gSt dks dSaph ls dkVuk ¼nksuksa lkbM rFkk Åijh fgLlk½ gSt dh eksVkbZ rFkk VkaWi dks ,d leku ry es cjkcj djuk rFkk dVh gqbZ gSt dks laosnd vius lk/ku ls lkbV bathfu;j }kjk crk;s x;s fufnZ"V LFkku ij Qsaduk vko’;drkuqlkj gSt esa [kkn Mkyuk rFkk ikuh Mkyuk ftlls gSt iwjh gjh fn[kk;h nsA ¼;g dk;Z o"kZ esa 8 ckj djuk gSA½ 4 ?kkl] taxy] >kMh vkfn dks [kqihZ] QkoMk ls Nhyuk rFkk fNyh ?kkl dks lkbV bathfu;j ds funsZ’kkuqlkj crk;s x;s LFkku ij QsadukA ¼;g dk;Z o"kZ esa 6 ckj gksxk izR;sd 3 nks ekg es ,d ckj½
7]80]6 oxZe 95-00 h0
0-41 3]20]08 4-95
7]63]3 oxZe 47-00 h0
0-06 45]80082
7]533- eh0 00
1-45 10]92285
3]17]2 oxZe 37-00 h0
1-00 3]17]23 7-00
5 ubZ gSt yxkukA blds fy, 45 lseh- rd pkSMh rFkk 10
1]832- eh0 00
4-00
1
lseh- xgjh ukyh cukuk rFkk D;kjh dh 25 lseh xgjkbZ xqMkbZ djds ?kkl] dadM] iRFkj vkfn fudkyuk xksoj dh [kkn feykdj lery djuk o nks ykbuksa esa gSt dh dfVax 15&15 lseh- dh nwjh ij yxkuk ;k gst dk cht cksukA le; ij ikuh yxkuk fujkbZ] xqMkbZ] dfVax vkfn dk;Z Bsdk ds le; rd djuk ftlls gSt gjh fn[kkbZ nsA ubZ gSt dh ÅpkbZ 45 lseh gksus ds i'pkr gh Hkqxrku fd;k tk;sxkA 6
7]32800
u;k yku cukukA ftl txg ij yku cukuk gS ml txg 25]357 oxZe 21-00 5]32]49 ds ?kkl] taxy dks [kjirokj uk'kd nok Mkydj h0 -00 7-00 lq[kkukA [kjirokj lw[kus ds ckn yku dh QkoMs ls 30 lseh- xgjh xqMkbZ djuk] [kjirokj] dadM] iRFkj fudkyuk] [kkn Mkyuk] tehu dks lery djukA ckn esa yku esa crk;h rFkk vuqeksfnr ? kkl dks 1 bap ls 2 bap dh nwjh ij yxkuk] flapkbZ djukA le;≤ ij yku ohfMax djuk ,o
Signature of the Contractor
Page 21 of 24
ewfoax djukA ikuh vkfn yxkukA yku ls fudys dwMs vkfn dks lkbV bathfu;j ds funsZ’kkuqlkj crk;s LFkku ij QsdukA 7
8
9
1 0
lM+d ij mxh ?kkl] taxy vkfn dks [kqjih] QkoMk] [kjirokj uk'kd nok Mkydj fudkyuk@ekjuk ¼lq[kkuk½ ftlls lM+d ij ?kkl] taxy fn[kkbZ u nsA ¼;g dk;Z o"kZ esa 4 ckj djuk gSA½ Ykku ds pkjks rjQ yxs ckWMZj ¼Edge½ tSls Golden durenta, Iriceen, Anthrena etc. vkfn dks dSph ls nksuks lkbM rFkk Åijh fgLlk dks vko';drkuqlkj ÅpkbZ ij dkVuk rFkk dVh gqbZ dwMs dks QsdukA lkbV bathfu;j ds funsZ’kkuqlkj ¼o"kZ esa 6 ckj½ Ykku ds pkjks rjQ vuqeksfnr u;k ckWMZj ¼Edge½ yxkuk tSls Golden durenta, Iriceen, Anthrena etc blds fy, yku ds pkjks rjQ 20 lseh pkSMh D;kjh cukuk] ?kkl vkfn fudkyuk] lery djds okmMj yxkuk] ns[kHkky djuk fujkbZ xqMkbZ djds ikuh nsuk vkSj ikS/ks ds ejus i'pkr mlds LFkku ij nwljk ikS/kk@dfVx yxkuk vkfn dk;ZA xeys esa yxs ikS/kksa dh flpkbZ] dfVax] xqMkbZ] fujkbZ o vko’;drkuqlkj ¼jklk;fud ,oa xkscj dh [kkn Mkyuk rFkk dwM+s dks lkbV bathfu;j ds funZs’kkuqlkj crk;s LFkku ij QsadukA ¼;g dk;Z lIrkg esa ,d ckj djuk gS½
Signature of the Contractor
Page 22 of 24
16]364 oxZe 0-87 h0 -00
14]23668
4]221- eh0 00
0-45
1]89945
2]947- eh0 00
5-25 15]47175
28]992 ux -00
0-71 20]58432
1 1 1 2 1 3 1 4 1 5 1 6 1 7
30 lseh vkdkj ds ,d feV~Vh ds xeys esa yxs ,d xqykc ds ikS/ks dh vkiwfrZA 45 lseh ÅWph yxHkxA 30 lseh vkdkj ds ,d feV~Vh ds xeys esa yxs ,d dzksVu ds ikS/ks dh vkiwfrZA 45 lseh ÅWph yxHkxA 30 lseh vkdkj ds ,d feV~Vh ds xeys esa yxs ,d lkbdl ds ikS/ks dh vkiwfrZA yxHkx ,d o"kZ iqjkukA 30 lseh vkdkj ds ,d feV~Vh ds xeys esa yxs ,d QuZ ds ikS/ks dh vkiwfrZA 45 lseh ÅWph yxHkxA 30 lseh vkdkj ds feV~Vh ds xeys dh vkiwfrZA
156
ux
36-66 5]71896
191
ux
45-00 8]59500
141
ux
75-00 10]57500
156
ux
33-33 5]19948
70
ux
11-42 799-40
3]582
ux
70-98 2]54]25 0-36 yku esa >kMw yxkukA ftlls lkQ lqFkjk fn[kkbZ 54]25]4 oxZe 0-02 1]08]50 nsA mlls fudys dwM+s dk fuLrkj.k 87-00 h0 9-74 isM+ks dh vkWjukesUVy NaVkbZ dk dk;ZA
vko’;drkuqlkjA
1 lnhZ] xehZ] cjlkr ds ekSle esa Qwy ds ikS/ks 8 yxkus ds fy, D;kjh rS;kj djuk D;kjh ds pkjks vksj ?
kkl Nhydj ckMZj cukuk D;kjh dks 30 lseh- xgjkbZ rd QkoMs ls xqMkbZ djuk] ?kkl rFkk vU; [kjirokj fudkyuk] [kkn feykuk ,o lery djuk] esM lqUnj rFkk lh/kh cukuk] ?kkl vkfn dks lkbV bathfu;j ds funsZ’kkuqlkj crk;s LFkku ij QsadukA vuqeksfnr lwaph ds vuqlkj gj ekSle ds ikS/kksa dh vkiwfrZ djuk rFkk D;kjh esa crk;h x;h nwjh ds vuqlkj yxkukA Qwyks dh D;kfj;ks dh lQkbZ rFkk ikuh yxkus gsrq lIrkg esa ,d ckj ekyh dks izR;sd funs’kky;@dk;kZy; esa tkuk vko’;d gSA
11]475- oxZe 6-50 74]587h0 00 50
1 9
yku ohfMax&vuko’;d ?kkl] [kjirokj dks yku ls 2]17]02 oxZe 1-25 fudkyukA h0 0-00
2 0
isM+ksa dh jaxkbZ 1 ehVj rd djukA ¼nks 13]038- ux eghus esa ,d ckj o"kZ esa 06 ckj½ 00
dqy ;ksx Say Total for NS Item (S.N. 1 to 20) Rs. 20,97,282.00
2]71]27 5-00 5-50 71]70900 20]97]2 82-26 20]97]2 82-00
In words In Fig. % age above/below/at par
Note: 1. The tenderer is required to quote rate both in words & figures. 2. Contractor to quote a single rate for all NS item i.e. %age above/below or at par for item no. 1 to 20 only. 3. Non-schedule items 20 (Twenty) only. 4. The basic Cost of quantities for N.S. items mentioned above are only approx. and subject to change as per requirement. 5. Income Tax as per rates applicable shall be deducted at source. 6. All taxes legally livable shall be borne by the contractor nothing extra will be paid. 7. Contractor should submit their PAN and Bank Account No. separately.
Signature of the Contractor
Page 23 of 24
8. Eligibility
Criteria: Tender being composite tender, only those firms/contractors who satisfy the following criteria should submit their offer for this work. 9. Turnover: Tenderer(s) should have received total contractual amount against satisfactory execution works in progress of all type of works for a minimum of 150% of advertised tender value of work during the last three financial year (ie 2006-07,2007-08&2008-09) and in current financial year, as per payment certificate from the tenderer duly issued by the officer of the concerned Govt.Department or as per audited balance sheet duly certified by Chartered Accountant. 10.Experience in similar nature work : The ternderer(s) should have successfully completed at least one similar single work for a minimum value of 35% of advertisement tender value of the work in the last three financial year (ie 200607,2007-08&2008-09) and in current financial year. Certificate from Private/individual for whom such work are executed should not be accepted. Following works will be treated as of similar nature:“Maintenance of lawn & hedge etc. and other horticulture work” a) The tenderer (s) shall submit the documentary proof in support of eligibility criteria mentioned above alongwith the Tender Form.Certificate issued by individual in his personal capacity shall not be accepted. b) The tenderer should have labour licence for Horticulture work. c) The tenderer should be registered with EPFO & ESIC. d) The tenderer should be ISO:9001 certified for Horticulture work.
(Rajiv Kumar Gupta) Town Engineer for & on behalf of President of India.
Signature of the Tenderer (with name & address)
Signature of the Contractor
Page 24 of 24