TABEL OF DRILLING RESULT
NO.
HOLE NO.
01 02
KIU-01 KIU-02
COORDINATE LONGITUDE (E) LATITUDE (S) 117⁰ 03’ 04.8” 0⁰ 13’ 03.1” 117⁰ 03’ 06.9” 0⁰ 13’ 16.3”
03 04 05
KIU-03 KIU-04 KIU-05
117⁰ 03’ 06.3” 117⁰ 03’ 07.2” 117⁰ 03’ 15.2”
0⁰ 13’ 28.4” 0⁰ 13’ 38.2” 0⁰ 13’ 36.9”
06 07
KIU-06 KIU-07
117⁰ 02’ 19.8” 117⁰ 02’ 32.4”
0⁰ 14’ 36.7” 0⁰ 14’ 36.8”
08 09 10 11
KIU-08 KIU-09 KIU-10 KIU-11
117⁰ 117⁰ 117⁰ 117⁰
0⁰ 0⁰ 0⁰ 0⁰
02’ 02’ 03’ 03’
19.9” 45.0” 00.1” 15.2”
14’ 14’ 14’ 14’
36.9” 36.9” 35.2” 33.7”
DRILL MACHINE : JACRO, NQ SIZE DRILLING CONTRACTOR : CV. BUMI BERSAMA - SAMARINDA
COAL THICKNESS (M) 0.60 0.80 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.50 0.40 0.80 0.40
DEPTH (M)
TOTAL DEPTH (M)
DATE OF DRILLING
1.40 49.20 36.00 46.50 9.00 12.40 20.10 18.00 20.90 34.10 44.25 22.50 8.20 07.50
41.0 60.0
17 – 19 MAR 20 – 24 MAR
60.0 60.0 60.0
25 – 27 MAR 28 – 31 MAR 01 – 03 APR
60.0 60.0
07 – 09 APR 10 – 14 APR
60.0 22.5 60.0 60.0
15 – 17 APR 18 APR 19 – 21 APR 22 – 24 APR