Tabelhasilpemboran.docx

  • Uploaded by: Al Alabi
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tabelhasilpemboran.docx as PDF for free.

More details

  • Words: 206
  • Pages: 1
TABEL OF DRILLING RESULT

NO.

HOLE NO.

01 02

KIU-01 KIU-02

COORDINATE LONGITUDE (E) LATITUDE (S) 117⁰ 03’ 04.8” 0⁰ 13’ 03.1” 117⁰ 03’ 06.9” 0⁰ 13’ 16.3”

03 04 05

KIU-03 KIU-04 KIU-05

117⁰ 03’ 06.3” 117⁰ 03’ 07.2” 117⁰ 03’ 15.2”

0⁰ 13’ 28.4” 0⁰ 13’ 38.2” 0⁰ 13’ 36.9”

06 07

KIU-06 KIU-07

117⁰ 02’ 19.8” 117⁰ 02’ 32.4”

0⁰ 14’ 36.7” 0⁰ 14’ 36.8”

08 09 10 11

KIU-08 KIU-09 KIU-10 KIU-11

117⁰ 117⁰ 117⁰ 117⁰

0⁰ 0⁰ 0⁰ 0⁰

02’ 02’ 03’ 03’

19.9” 45.0” 00.1” 15.2”

14’ 14’ 14’ 14’

36.9” 36.9” 35.2” 33.7”

DRILL MACHINE : JACRO, NQ SIZE DRILLING CONTRACTOR : CV. BUMI BERSAMA - SAMARINDA

COAL THICKNESS (M) 0.60 0.80 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.50 0.40 0.80 0.40

DEPTH (M)

TOTAL DEPTH (M)

DATE OF DRILLING

1.40 49.20 36.00 46.50 9.00 12.40 20.10 18.00 20.90 34.10 44.25 22.50 8.20 07.50

41.0 60.0

17 – 19 MAR 20 – 24 MAR

60.0 60.0 60.0

25 – 27 MAR 28 – 31 MAR 01 – 03 APR

60.0 60.0

07 – 09 APR 10 – 14 APR

60.0 22.5 60.0 60.0

15 – 17 APR 18 APR 19 – 21 APR 22 – 24 APR

More Documents from "Al Alabi"

Tabelhasilpemboran.docx
November 2019 0
Pergub.1.2018.pdf
November 2019 0
Bab Iv
June 2020 62
B A B I
June 2020 42