Target of CMPAK Network Quality Improvement 1. Key Target for Network Infrastructure LTE Category

Phase-1 Target (2018-12-31)

Phase-2 Target (2019-03-31)

Site Availability Rate

Current: PSH: 99.37%;GRN: 99.85%;FSB: Target: PSH: 99.50%;GRN: 99.90%;FSB:

99% for high revenue sites

Capacity PRB Cell BH (4/7 days)

PSH: 14.35%;GRN: 6.34%; FSB: 10.65% Target: Sector Proportion of high utilized cell <10%

Coverage

Good Outdoor Coverage(>-90) Rate: PSH=81.91%;GRN=85.75%;FSB= Target: >PSH 85%, GRN 88%

Sector Proportion of high utilized cells <8%

Good Outdoor Coverage Rate: Target:>PSH 88%, GRN 90%

3G Category

Phase-1 Target (2018-1231)

Phase-2 Target (2019-03-31)

Site Availability Rate

Current PSH: 96.99%, GRN 98% Target: PSH: 98%;GRN: (99%)

99% for high revenue sites

Capacity TCP

Current: PSH(57.70%) GRN: (52.47%) Target: Cell Proportion of high utilized cells <10%

Sector Proportion of high utilized cells <8%

Coverage RSCP

Good Outdoor Coverage (>90) PSH=99.51%, GRN=99.33% Target: Maintain or improve

Will be evaluated in Dec18

2. Key Target for User Experience LTE Category

Phase-1 Target (2018-12-31)

Customer Complaints

Reduce complains by 5%

Call Drop Rate NW BH (14 days Avg)

PSH: 0.05%;GRN:0.02%;FSB:0.03% Target: PSH 0.02%



Phase 1 incudes duration from September 18 till 31st Dec,2018.



Phase 2 1 incudes duration from Jan 19 till Mar 2019.

Phase-2 Target (2019-03-31)

3G Category

Phase-1 Target (2018-12-31)

Phase-2 Target (2019-03-31)

Customer Complaint Rate

Reduce complains by 5%

Reduce complains by 3%

Voice quality

PSH=3.7;GRN=3.9 Target: PSH=3.8;GRN=3.9

Maintain MOS 3.9

Call Drop Rate

PSH: (0.23%);GRN: 0.14%) Target: PSH 0.21, GRN 0.12

PSH 0.20, GRN Maintain 0.12

Reduce complains by 3%

Target maintain

Capacity Analysis High PRB, Low throughput::PSH City Peshawar Load Type

Throughput<3Mbps& PRB>85% (4/7 Days)

Cell Count Proportion

235

27.76%

Capacity Analysis High PRB, Low throughput::GRN City Gujranwala Load Type

Throughput<3Mbps& PRB>85% (4/7 Days

Cell Count Proportion

71

14.72%

Capacity Analysis High PRB, Low throughput::FSB City Faisalabad

Load Type

Cell Count

Proportion

Throughput<3Mbps& PRB>85% (4/7 Days)

91

11.38%