Six Sigma Questionnaire.doc

  • Uploaded by: CharanjeetSinghKhanuja
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Six Sigma Questionnaire.doc as PDF for free.

More details

  • Words: 1,550
  • Pages: 12
TÜV INDIA PRIVATE LIMITED APPLICATION for

CERTIFICATION / RE – CERTIFICATION According to : (Tick mark as applicable) 

ISO 9001:2008



ISO 9001:2015



ISO 14001:2004



ISO 14001:2015



OHSAS 18001:2007



ISO 50001:2011



ISO 22000



FSSC 22000



HACCP



FAMI QS



BRC



BRC IOP



ISO /TS 29001



ISO 29990



ISO 27001

 ISO 20000-1

 ISO 22301

Integrated management system :  Yes  No (Tick mark as applicable)

TÜV INDIA PRIVATE LIMITED 801, Raheja Plaza – I, L.BS Marg, Ghatkopar (W), Mumbai 400 086 Tel : 022-66477000 Fax : 022-6647009 E-Mail: [email protected] Visit us at www.tuv-nord.com/in QF-01

Rev. 11/06.04.2017

Page 1 of 12

Questionnaire for the preparation of an offer

QF-01

Rev. 11/06.04.2017

Page 2 of 12

Questionnaire for the preparation of an offer

This questionnaire is intended as a self-description of your company. The questionnaire helps TÜV India Pvt Ltd to estimate the scope of and resulting effort involved in the performance of a certification I.

General Questions

Company: Unit Corporate/ Legal Entity Address: Phone: Head Office:

Fax: _____________________________________________________________

Top Management Name: Phone:

Fax:

Email: Management Representative Name / Dept.: Phone:

Fax:

Email: Accreditation Desired

DAkkS

NABCB*

Others

* (For ISO 9001, ISO 14001, OHSAS 18001, ISO 22000, ISO 50000 only)

Consultancy By Scope of Management System: (Text on certificate, description of activities regarding products or services, e.g.: “design, production and sales of…”) ______________________________________________________ ______________________________________________________ ______________________________________________________ Please attach Organization Chart Please attach simple process flow chart.

QF-01

Rev. 11/06.04.2017

Page 3 of 12

Questionnaire for the preparation of an offer

II.

Basic Questions

A. Raw Materials :

______________________________________________________

______________________________________________________ Is Raw Material supplied by your customer?

yes

no

B. Does the company have Product design responsibility?

yes

no

If no : ( Who is responsible): C Number of employees

HO/ Central functions Location 1 location

Location 2

Break Up of Employee management count: research/development/design employees in all the other departments ( Manufacturing, stores, sales, purchase, QC, dispatch, Training etc.) Regular Employees Total (A) Contract employees - Part time / Seasonal employees Temporary unskilled / Subcontractor’s employee

Others

Total (B)

Grand Total

(A+B)

For additional site information, submit an annex D. No. of sites / subsidiaries:

___________________________________________

Addresses of sites / subsidiaries/ warehouse/ Regional Offices / Branch Offices /Sales offices**

No. of employees Regular Others*

Comments

* other employees (subcontractors, seasonal workers, part-timers, etc.) QF-01

Rev. 11/06.04.2017

Page 4 of 12

Questionnaire for the preparation of an offer

**do these Offices carry out any activities which are to be audited (Contract Review, Purchasing, Servicing, Training, Storage/ Godowns). E. Operation of temporary sites (e. g.: building sites, projects):  Yes

 No

No. of temporary locations:__________ ( Please attach the list with location, activity, employees) Outsourced Processes ( if any) ___________________________________________________ F.

Has the company and/or have the sites been certified against any Management System Certification? If yes, then specify e.g. ISO 9001, ISO 14001, OHSAS (by which Certification Body, and Validity of the Certificate ( Please attach copy of the certificate)

Is the environmental management system / OHSAS integrated into an existing certified management system? (e. g.: ISO 9001, TS 16949)?  Yes

 No

G. Information on Shift is Mandatory Site I

Site II

Head Office

No. of Employees not in Shift No. of Employees in First Shift No. of Employees in Second Shift No. of Employees in Third Shift We herewith confirm the completeness and accuracy of the information given above and in any annexes which may be attached. We agree that this information may be stored for the purposes of drafting an offer and processing any resulting order or transactions. H. Names of clients in Petroleum oil & Natural Gas Sector(Required for ISO/ TS 29001) _____________________________________________________________________________ ______________________________________________________________________________

Place/Date

Name, Function

Signature*)

*) Mandatory only if it is hard copy.

QF-01

Rev. 11/06.04.2017

Page 5 of 12

Questionnaire for the preparation of an offer

Annex I ( EMS) Area of the location (m2 or hectare):_____________________________________ Significant environmental impacts of the activities, products and services of the organisation (e. g.: waste, hazardous waste, waste water, emissions [air pollution, noise], soil contamination):

Operation of environmentally relevant facilities (e. g.: sewage treatment plant, landfill, waste treatment plant, electroplating):

Is the organisation located in a water protection area or in a landscape conservation area?  Yes  No Operation of temporary sites (e. g.: building sites, projects):  Yes  No No. of temporary locations:__________

Place/Date

Name, Function

Signature*)

*) Mandatory only if it is hard copy.

QF-01

Rev. 11/06.04.2017

Page 6 of 12

Questionnaire for the preparation of an offer

Annex II (Food Safety) Product Category (names) Number of processes included in HACCP studies Number of production lines for the relevant products or product families. Seasonal Products Months of Production Out sourced Processes (give details) Area of Production facility ( sq. meters)

Tick where applicable

YES

Is there a HACCP team? Does the team avail of the required knowledge? No of HACCP Studies Have HACCP studies been performed for  Raw materials (incl. packaging)  Intermediate products  End products Does HACCP STUDY compromise the following steps? 1. analysis of risk potential for the area under observation

2. Specification of manageable number of CCP’S 3. List of critical limits for each CCP 4. System for monitoring CCP’s 5. Documentation of monitoring procedure 6. Are PRP’s and OPRP’s identified? PLANT ENVIRONMENT Are the immediate surrounding environments congenial for plant operations (with respect to safety from contamination?)

Place/Date Name, Function *) Mandatory only if it is hard copy. QF-01

Rev. 11/06.04.2017

Signature*)

Page 7 of 12

NO

Questionnaire for the preparation of an offer

Annex III (Information Security Standards) Description of the organization groups / Locations referring to the certification of the ISMS: Number of locations: ___________________ Location in certificatio n scope (LOC)

Full postal address

Total Manpower (contractua l/payroll)

Application development & maintenance staff

Details about IT-installation in the organisation: LOC

Workstations/ Laptops/PC

Servers

Legal requirements

Sector specific risk

Network & encryption technology

Details on the IT-security relevance of the company Please state the important IT-security aspects at each location

Please list out the applicable legal, statutory and regulatory requirements for your organization.

ure We herewith confirm the completeness and accuracy of the information given above

Place/Date Name, Function *) Mandatory only if it is hard copy.

QF-01

Rev. 11/06.04.2017

Signature*)

Page 8 of 12

Questionnaire for the preparation of an offer

Annex IV (Health & Safety Standard) 1. OHS-relevant plant and machinery / manufacturing processes / activities at the location

(What OHS-relevant plant and machinery / manufacturing processes / activities are there at the location?)

2. Construction sites / Workshops / Subcontractor activities at the location (What internal / external / workshops are operated by the location, what subcontractors work at

the location?)

QF-01

Rev. 11/06.04.2017

Page 9 of 12

Questionnaire for the preparation of an offer

3. Hazards at the location What major hazards - mechanical hazards, electrical hazards, hazardous substances (e.g. gases, vapours, aerosols, liquids), fire and explosion hazard, thermal hazard, biological hazard (e.g. infection by means of microorganisms, virus or biological manufacturing substances. Hazards from special physical effects (e.g. noise, radiation, electromagnetic fields) hazard from working conditions (e.g. climate, lighting), physical strain (e.g. through movement or remaining in the same position), and other risk factors - are present at the location, taking internal / external construction sites and work shops particularly into

consideration.

We herewith confirm the completeness and accuracy of the information given above

Place/Date

Name, Function

Signature*)

*) Mandatory only if it is hard copy.

QF-01

Rev. 11/06.04.2017

Page 10 of 12

Questionnaire for the preparation of an offer

Annex V (EnMS) (ENERGY MANAGEMENT SYSTEM) (as per ISO 50001:2011) Information required for preparation of offer: Type of ENERGY used: (kindly indicate appropriate) Sr. No.

Type of ENERGY used

Consumption / Annum (MWH / annum)

01

Total Electrical Energy consumed in one year (including equipment / machinery operation, lighting, compressed air, electrical heating, etc.)

Consumption / Annum (TJ / annum)

Conversion Factor : 1 MWH = 0.0036 TJ (Tera Joules)

Sr. No.

Type of ENERGY used

Consumption / Annum (Tonnes / annum)

02

Total Amount of Fuel used for any purpose (including Coal, Diesel, Furnace Oil, Light Diesel Oil, Petrol, LPG, CNG, PNG)

Consumption / Annum (TJ / annum)

Conversion Factor : 1 Tonne = 1.162 MWH = 0.0041 TJ (Tera Joules)

Sr. No.

Number of energy sources

Type of energy sources

Sr. No.

Number of significant energy usage (SEUs)

Type of significant energy usage (SEUs)

Details of Employees Sr. No. 01 02 03 04

Type of Employee Top Management Management Representative (for EnMS) Energy Management Team (or EnMS Co-ordinators) *Employees whose work will have impact on EnMS

Number of Employees

* Employees such as Furnace Operators, Supervisors, Engineers except helpers, etc.

Are you part of the Perform-Achieve-Trade (PAT) energy efficiency cap-and-trade scheme of the Bureau of Energy Efficiency (BEE) of India? Yes / No Is your organization certified to EMS (Environmental Management System) as per ISO 14001 standard? Yes/ No. QF-01

Rev. 11/06.04.2017

Page 11 of 12

Questionnaire for the preparation of an offer

Please attach: 1. Process flow diagram 2. Utility flow diagram 3. Copy of valid EMS Certificate We herewith confirm the completeness and accuracy of the information given above .

Place/Date

QF-01

Name, Function

Rev. 11/06.04.2017

Signature

Page 12 of 12

Related Documents

Six Sigma
June 2020 27
Six Sigma
November 2019 12
Six Sigma
June 2020 5
Six Sigma
June 2020 5
Six Sigma
May 2020 5
Six Sigma
April 2020 13

More Documents from "Anurag Huria"