SESSION PLAN Sector
:
Electrical and Electronics
Qualification Title
:
Electrical Installation and Maintenance NC II
Unit of Competency :
Install electrical protective devices for distribution, power, lighting, auxiliary, lightning protection and grounding systems
Module Title
:
Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning protection and grounding systems
Learning Outcomes: (CBC) LO1: Plan and prepare work LO2: Install electrical protective devices LO3: Install lighting fixture and auxiliary outlet LO4: Notify completion of work A. Introduction: This unit covers the knowledge, skills and attitudes on planning and preparing work, installing electrical protective devices, lighting fixture and auxiliary outlet and notifying completion of work for distribution, power, lighting, auxiliary, lightning protection and grounding systems. B. Learning Activities: LO1:
Plan and prepare work
Learning Content
Methods
Presentation
Practice
CBLM on Electrical Installation and Maintenance NC II – Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning protection, and grounding systems.
Feedback
Date Developed: October 2018 Developed By:
Resources
Document No: EIM Core 2 Issued By:
E.D. PADULLON Date Modified: N/A Modified By:
N/A
Revision #:
Time
Instructions for the preparation of work, job and understanding Occupational Health and safety
Lecture Video presentation
read Answer Information self-check Sheet 1.1-1 1.1-1 On preparation of work, Job and understanding occupational health and safety
read Information Preparation of Sheet 1.1-2 Tools, on Materials and preparation of PPE. Tools, Materials and PPE LO2: Install Electrical Protective Devices Lecture Video presentation
Learning Content
safety and
correct procedures in installing electrical protective devices.
Work schedule
Methods Lecture, Video presentatio n, Power point presentatio n
Presentation read Information Sheet 2.2-1 on safety procedures in installing electrical protective devices.
Answer self-check 1.1-2
Practice Answer self-check 2.2.1
CBLM on Electrical Installation and Maintenance NC II – Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning protection, and grounding systems.
Compare with answer key 1.1-1
CBLM, Video presentation, Safety Standards, PEC, Building Electrician by Meralco Foundation p. 21-22
Compare with answer key 1.1-2
CBLM, video presentation, Building Electrician by Meralco p.14-17
Feedback Compare with answer key 2.2-1
Resources CBLM, electrical lay-out & estimate by Fajardo Fajardo p. 59-68, PEC, Internet link1: https://automationforum.co/electricalprotective-device-types-of-protectivedevice/
internet link2: Date Developed: October 2018 Developed By:
Document No: EIM Core 2 Issued By:
E.D. PADULLON Date Modified: N/A Modified By:
N/A
Revision #:
1.5
1.5
Time
1.5
must be met and continuous checking of quality of work must be done in accordance with the instructions and requirements. LO3:
Lecture Group discussion Power point presentatio n
Answer self-check 2.2.1
Compare with answer key 2.2-1
https://www.smu.edu/~/media/Site/ BusinessFinance/OPRM/EHS/Document s/ Electrical%20Safety.ashx?la=en
1.5
Internet link3:
https://www.ecmweb.com/ops-ampmaintenance/top-10-steps-schedulemanagement
Install lighting fixture and electrical outlet
Learning Content LO4:
read Information Sheet 2.2-1 on maintaining work schedule with quality of work.
Methods
Presentation
Practice
Feedback
Resources
Time
Presentation
Practice
Feedback
Resources
Time
Notify completion of work
Learning Content
Methods
C. Assessment Plan: D: Teacher’s Self-Reflection of the Session:
CBLM on Electrical Installation and Maintenance NC II – Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning protection, and grounding systems.
Date Developed: October 2018 Developed By:
Document No: EIM Core 2 Issued By:
E.D. PADULLON Date Modified: N/A Modified By:
N/A
Revision #:
CBLM on Electrical Installation and Maintenance NC II – Installing electrical protective devices for distribution, power, lighting, auxiliary, lightning protection, and grounding systems.
Date Developed: October 2018 Developed By:
Document No: EIM Core 2 Issued By:
E.D. PADULLON Date Modified: N/A Modified By:
N/A
Revision #: