Project:Kashmir Railway Project

Date:05-05-2009

SECURITY DEPOSIT RELEASE FORM 1. Name of Work: Execution of water booth at Island platform at Anantnag Station on Qazigund Baramulla new BG Rail Line Project. 2. Name of Agency:

M/S Itoo Construction, Mandole, Anantnag.

3. LOA No: IRCON/J&K-SGR/1008/ Water Booth Ananatnag/ A-1/19517 ; dt:13.05.2008 4. Date of completion as per LOA: 28-06-2008 5. Actual date of completion:

31-12-2008

6. Date of Final Measurement:

31-12-2009

7. Date Defect Liability Period:

14-02-2009

8. Value of Work as Per LOA:

Rs. 3,71,216.72

9. Contractor’s request Letter No: 10. Value of Work after Variation:

Rs. 2,80,915.43

11. Security Deposit Deducted:

MB No:

Page No

CC:

Amount:

11

1

Rs. 16,693.00

20

2

Rs. 10,865.00 . Rs. 27,558.00

1327

Cont………………. Page 2

12. Certificate: Certified that the work has been completed satisfactorily and certified by ShriSurajit Ghosh, DM/ Civil of Ircon. 100% S.D amount i.e. Rs. 27,558.00 may be released. 13. Certified that the defect liability period is completed and there is no defect observed during the defect liability period.

(Surajit Ghosh) DM/ Civil

DGM/Civil

AGM/Civil

JGM/Finance

GM/Srinagar

Project:Kashmir Railway Project

Date:05-05-2009

SECURITY DEPOSIT RELEASE FORM 1. Name of Work: Construction of Temporary ramp for Feeding Ballast at Chainage 21/100 in phase-II on Qazigund Baramulla new BG Rail Line Project. 2. Name of Agency: M/s Hamid Bin Rashid, R/o Sursona, Batingoo, Anantnag, Kashmir. 3. LOA No:

IRCON/J&K-SGR/1008/ Temporary Ramp/20954 Dt:22.08.2008 4. Date of completion as per LOA: 21-09-2008 5. Actual date of completion:

21-09-2008

6. Date of Final Measurement:

29-09-2008

7. Date Defect Liability Period:

06-11-2008

8. Value of Work as Per LOA:

Rs. 4,64,058.13

9. Contractor’s request Letter No: 10. Value of Work after Variation:

Rs. 4,97,467.00

11. Security Deposit Deducted:

MB No:

Page No 11 .

CC: 1

1391

Amount: Rs. 49,747.00 Rs. 49,747.00

Cont………………. Page 2

12. Certificate: Certified that the work has been completed satisfactorily and certified by ShriSurajit Ghosh, DM/ Civil of Ircon. 100% S.D amount i.e. Rs. 49,747.00 may be released. 13. Certified that the defect liability period is completed and there is no defect observed during the defect liability period.

(Surajit Ghosh) DM/ Civil

DGM/Civil

AGM/Civil