UPDATED 21.01.2009 Grade of concrete M25, ESP Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Location of concrete

23-Apr-08

ESPS19,S20,T19,T20,M19,M 20

1

Weight of sample Sized 150 mm x Density of Compressive 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

Average Average Density of Density of Average Standard Compressive concrete in concrete in compressive deviation 3 3 strength in Kg / M for the Kg / M for ten strength of the kg/cm2 sample samples sample in Kg/cm2

8851.00

2622.52

980.00

43.56

426.84

8807.00

2609.48

980.00

43.56

426.84

8803.00

2608.30

990.00

44.00

431.20

8913.00

2640.89

1050.00

46.67

457.33

8885.00

2632.59

1100.00

48.89

479.11

6

8869.00

2627.85

1000.00

44.44

435.56

7

8700.00

2577.78

1100.00

48.89

479.11

8711.00

2581.04

1050.00

46.67

457.33

9

8858.00

2624.59

1000.00

44.44

435.56

10

8732.00

2587.26

910.00

40.44

396.36

8760.00

2595.56

940.00

41.78

409.42

12

8949.00

2651.56

850.00

37.78

370.22

13

8791.00

2604.74

820.00

36.44

357.16

8613.00

2552.00

740.00

32.89

322.31

8664.00

2567.11

800.00

35.56

348.44

8751.00

2592.89

975.00

43.33

424.67

8710.00

2580.74

920.00

40.89

400.71

8789.00

2604.15

850.00

37.78

370.22

8640.00

2560.00

990.00

44.00

431.20

8640.00

2560.00

990.00

44.00

431.20

2 3 4 5

8

11

14

23-Apr-08

24-Apr-08

26-Apr-08

26-Apr-08

ESPS19,S20,T19,T20,M19,M 20

ESP-Footing-T3,VB-313,B12

ESP-P,Q,R,S, TM-18

ESP-P,Q,R,S, TM-18

15 16 17

1-May-08

ESPM17,T17,S17,R17,Q17,F 1,F-2-4 with beam

18 19 20

1-May-08

ESP-M14,T14,S14 with beam

428.30

2613.43

457.33

2633.78

457.33

2594.47

392.00

2611.46

342.64

2574.62

398.53

2592.59

429.75

2554.86

1-May-08

ESP-M14,T14,S14 with beam

21

8588.00

2544.59

980.00

43.56

426.84

22

8630.00

2557.04

940.00

41.78

409.42

8869.00

2627.85

950.00

42.22

413.78

8862.00

2625.78

890.00

39.56

387.64

8880.00

2631.11

1000.00

44.44

435.56

8816.00

2612.15

960.00

42.67

418.13

8709.00

2580.44

880.00

39.11

383.29

8707.00

2579.85

900.00

40.00

392.00

8749.00

2592.30

860.00

38.22

374.58

8781.00

2601.78

900.00

40.00

392.00

8739.00

2589.33

840.00

37.33

365.87

8821.00

2613.63

850.00

37.78

370.22

8666.00

2567.70

1000.00

44.44

435.56

8773.00

2599.41

1040.00

46.22

452.98

8558.00

2535.70

1030.00

45.78

448.62

8661.00

2566.22

950.00

42.22

413.78

8823.00

2614.22

920.00

40.89

400.71

8707.00

2579.85

820.00

36.44

357.16

8772.00

2599.11

910.00

40.44

396.36

8544.00

2531.56

650.00

28.89

283.11

8700.00

2577.78

710.00

31.56

309.24

42

8747.00

2591.70

600.00

26.67

261.33

43

8624.00

2555.26

820.00

36.44

357.16

8561.00

2536.59

790.00

35.11

344.09

8797.00

2606.52

800.00

35.56

348.44

23

2-May-08

ESP-M14,T14,S14 with beam

24 25 26

3-May-08

27 28 29

3-May-08

30

ESP-R14,Q14 with beam,F1-1no.,F22nos.&M16-15,T1615,P16-15,F4-2nos.,S1516 with beam,F-5-2nos.

ESP-R14,Q14 with beam,F1-1no.,F22nos.&M16-15,T1615,P16-15,F4-2nos.,S1516 with beam,F-5-2nos.

429.75

2554.86

403.61

2603.56

412.33

2607.90

386.19

2591.31

3.76 31 32

5-May-08

ESP-G15,16,R15,16,F52nos.with beam

33 34 35

7-May-08

ESP-P13,Q13,R13 with beam.F1-01no.,F201no.,F3-01no.

36 37 38

8-May-08

ESP-T13,T13,M13 with beam

39 40 41

44 45

9-May-08

10-May-08

ESP-P11,Q11,Column P20,Q20,R20,S20,T20,M 20,BQ-2 wall

ESP-R11,S11,T11,M11

390.55

2590.22

438.46

2567.11

384.74

2597.73

284.56

2567.01

349.90

2566.12

46

8680.00

2571.85

1020.00

45.33

444.27

8763.00

2596.44

1030.00

45.78

448.62

8693.00

2575.70

1030.00

45.78

448.62

8781.00

2601.78

1000.00

44.44

435.56

8797.00

2606.52

990.00

44.00

431.20

8765.00

2597.04

960.00

42.67

418.13

8539.00

2530.07

910.00

40.44

396.36

8486.00

2514.37

920.00

40.89

400.71

8593.00

2546.07

900.00

40.00

392.00

8697.00

2576.89

910.00

40.44

396.36

8689.00

2574.52

920.00

40.89

400.71

8755.00

2594.07

910.00

40.44

396.36

8643.00

2560.89

930.00

41.33

405.07

8599.00

2547.85

1130.00

50.22

492.18

60

8553.00

2534.22

900.00

40.00

392.00

61

8681.00

2572.15

990.00

44.00

431.20

8695.00

2576.30

980.00

43.56

426.84

8555.00

2534.81

990.00

44.00

431.20

8537.00

2529.48

840.00

37.33

365.87

8582.00

2542.81

900.00

40.00

392.00

8585.00

2543.70

900.00

40.00

392.00

8427.00

2496.89

1050.00

46.67

457.33

8540.00

2530.37

1030.00

45.78

448.62

8607.00

2550.22

1050.00

46.67

457.33

8479.00

2512.30

1060.00

47.11

461.69

47

12-May-08

ESP-Column T15,16, M15,16 1st lift

48 49 50

13-May-08

ESP-P12,Q12,R12,S12 with beam

51 52 53

17-May-08

54

ESP-S16,R16 wall & Pedestal 1st lift.M17 to M19 wall & Pedestal 1st lift.

55 56

19-May-08

ESP-T17 to T19 wall & Pedestal 1st lift.

57 58 59

62

23-May-08

28-May-08

ESP-SR-17 to SR-19 wall & pedestal

ESP-SR14 to SR-12 with Column 1st lift

63 64 65

31-May-08

ESP-J12 to 14 wall & column 1st lift.

66 67 68

2-Jun-08

ESP-M12 to 14 wall & column 1st lift.

69 70 3-Jun-08

ESP-Q12 to 14 wall & column 1st lift.

447.17

2581.33

428.30

2601.78

396.36

2530.17

397.81

2581.83

429.75

2547.65 5.24

429.75

2561.09

383.29

2538.67

454.43

2525.83

458.79

2540.25

3-Jun-08

ESP-Q12 to 14 wall & column 1st lift.

8533.00

2528.30

1050.00

46.67

457.33

8708.00

2580.15

1050.00

46.67

457.33

8731.00

2586.96

890.00

39.56

387.64

8606.00

2549.93

870.00

38.67

378.93

8496.00

2517.33

890.00

39.56

387.64

8432.00

2498.37

740.00

32.89

322.31

8421.00

2495.11

810.00

36.00

352.80

8259.00

2447.11

870.00

38.67

378.93

8459.00

2506.37

850.00

37.78

370.22

8512.00

2522.07

860.00

38.22

374.58

81

8310.00

2462.22

800.00

35.56

348.44

82

8425.00

2496.30

710.00

31.56

309.24

8415.00

2493.33

780.00

34.67

339.73

84

8525.00

2525.93

750.00

33.33

326.67

85

8546.00

2532.15

900.00

40.00

392.00

8477.00

2511.70

980.00

43.56

426.84

8444.00

2501.93

960.00

42.67

418.13

8571.00

2539.56

920.00

40.89

400.71

8595.00

2546.67

910.00

40.44

396.36

90

8562.00

2536.89

950.00

42.22

413.78

91

8692.00

2575.41

1030.00

45.78

448.62

8657.00

2565.04

990.00

44.00

431.20

8620.00

2554.07

970.00

43.11

422.49

71 72 73 74

6-Jun-08

ESP-P12 to 14 wall & column 1st lift.

75 76 77

27-Jun-08

ESP 16P, 16 Q,R,S,T,M .

78 79 80

83

86

28-Jun-08

2-Jul-08

7-Jul-08

ESP 17P, 17 Q,R,S,T,M .

ESP Pedestal MP13 .

ESP Pedestal MP 11 .

87 88 89

92 93 94 95

9-Jul-08

12-Jul-08

ESP Wall R13,14, Q13,14,M12,13,T12 ,13 ,S12,13

ESPWall -G12-13,P1213,S11top lift

458.79

2540.25

384.74

2551.41

351.35

2480.20

364.41

2496.89

325.21

2505.19

412.33

2515.26

403.61

2541.04 4.45

434.10

2564.84

96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

41.92

8.96

Degree of quality control is Good

40.28

13.00

Degree of quality control is Good

40.49

10.99

Degree of quality control is Good

UPDATED 21.01.2009 Grade of concrete M30, TG , Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

23-Jun-08

TG Raft Unit No 6

1 2 3 4 5

23-Jun-08

TG Raft Unit No 6

6 7 8

23-Jun-08

TG Raft Unit No 6

9 10 11

23-Jun-08

TG Raft Unit No 6

12 13 14

24-Jun-08

TG Raft Unit No 6

15 16 17

24-Jun-08

TG Raft Unit No 6

18 19 20

24-Jun-08

TG Raft Unit No 6

Compressive strength in kg/cm2

8329.00

2467.85

1010.00

44.89

439.91

8399.00

2488.59

1120.00

49.78

487.82

8275.00

2451.85

1100.00

48.89

479.11

8508.00

2520.89

1000.00

44.44

435.56

8453.00

2504.59

990.00

44.00

431.20

8598.00

2547.56

1060.00

47.11

461.69

8737.00

2588.74

830.00

36.89

361.51

8695.00

2576.30

870.00

38.67

378.93

8694.00

2576.00

890.00

39.56

387.64

8792.00

2605.04

890.00

39.56

387.64

8720.00

2583.70

850.00

37.78

370.22

8857.00

2624.30

790.00

35.11

344.09

8588.00

2544.59

930.00

41.33

405.07

8576.00

2541.04

870.00

38.67

378.93

8514.00

2522.67

860.00

38.22

374.58

8586.00

2544.00

900.00

40.00

392.00

8528.00

2526.81

900.00

40.00

392.00

8541.00

2530.67

950.00

42.22

413.78

8509.00

2521.19

900.00

40.00

392.00

8480.00

2512.59

990.00

44.00

431.20

Average Standard compressive deviation strength of the sample in Kg/cm2

468.95

442.81

376.03

367.32

386.19

399.26

419.59

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

24-Jun-08

TG Raft Unit No 6

419.59

21

8628.00

2556.44

1000.00

44.44

435.56

22

8496.00

2517.33

960.00

42.67

418.13

8556.00

2535.11

910.00

40.44

396.36

24

8599.00

2547.85

980.00

43.56

426.84

25

8454.00

2504.89

1030.00

45.78

448.62

8675.00

2570.37

1100.00

48.89

479.11

27

8560.00

2536.30

1100.00

48.89

479.11

28

8425.00

2496.30

1050.00

46.67

457.33

8550.00

2533.33

1040.00

46.22

452.98

30

8479.00

2512.30

1030.00

45.78

448.62

31

8675.00

2570.37

900.00

40.00

392.00

8611.00

2551.41

690.00

30.67

300.53

33

8604.00

2549.33

950.00

42.22

413.78

34

8562.00

2536.89

1030.00

45.78

448.62

8464.00

2507.85

950.00

42.22

413.78

36

8618.00

2553.48

1080.00

48.00

470.40

37

8503.00

2519.41

910.00

40.44

396.36

8606.00

2549.93

990.00

44.00

431.20

39

8482.00

2513.19

740.00

32.89

322.31

40

8575.00

2540.74

940.00

41.78

409.42

8647.00

2562.07

920.00

40.89

400.71

8540.00

2530.37

900.00

40.00

392.00

8343.00

2472.00

1050.00

46.67

457.33

8483.00

2513.48

910.00

40.44

396.36

8392.00

2486.52

900.00

40.00

392.00

23

26

29

32

35

38

41

24-Jun-08

24-Jun-08

24-Jun-08

24-Jun-08

24-Jun-08

24-Jun-08

24-Jun-08

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

42 43 44 45

24-Jun-08

TG Raft Unit No 6

413.78

468.95

452.98 4.00

368.77

444.27

383.29

400.71

415.23

42.81

9.33

Degree of Quality control is good

46

8643.00

2560.89

1010.00

44.89

439.91

8554.00

2534.52

1000.00

44.44

435.56

8640.00

2560.00

1020.00

45.33

444.27

8743.00

2590.52

980.00

43.56

426.84

8550.00

2533.33

970.00

43.11

422.49

8693.00

2575.70

910.00

40.44

396.36

8341.00

2471.41

990.00

44.00

431.20

8570.00

2539.26

910.00

40.44

396.36

8583.00

2543.11

900.00

40.00

392.00

8707.00

2579.85

960.00

42.67

418.13

8633.00

2557.93

980.00

43.56

426.84

8730.00

2586.67

890.00

39.56

387.64

8642.00

2560.59

800.00

35.56

348.44

8677.00

2570.96

940.00

41.78

409.42

8624.00

2555.26

900.00

40.00

392.00

8682.00

2572.44

900.00

40.00

392.00

8642.00

2560.59

960.00

42.67

418.13

63

8536.00

2529.19

900.00

40.00

392.00

64

8333.00

2469.04

910.00

40.44

396.36

8522.00

2525.04

990.00

44.00

431.20

66

8742.00

2590.22

990.00

44.00

431.20

67

8567.00

2538.37

970.00

43.11

422.49

8699.00

2577.48

940.00

41.78

409.42

69

8599.00

2547.85

990.00

44.00

431.20

70

8406.00

2490.67

990.00

44.00

431.20

47

25-Jun-08

TG Raft Unit No 6

48 49 50

25-Jun-08

TG Raft Unit No 6

51 52 53

25-Jun-08

TG Raft Unit No 6

54 55 56

25-Jun-08

TG Raft Unit No 6

57 58 59

25-Jun-08

TG Raft Unit No 6

60 61 62

65

68

25-Jun-08

25-Jun-08

25-Jun-08

25-Jun-08

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

TG Raft Unit No 6

439.91

415.23

406.52

410.87

383.29 3.69

400.71

419.59

421.04

428.30

41.51

8.89

Degree of Quality control is good

71

25-Jun-08

TG Raft Unit No 6

72 73 74

25-Jun-08

TG Raft Unit No 6

75 76 77 78

25-Jun-08

TG Raft Unit No 6

8311.00

2462.52

980.00

43.56

426.84

8307.00

2461.33

980.00

43.56

426.84

8849.00

2621.93

920.00

40.89

400.71

8661.00

2566.22

960.00

42.67

418.13

8635.00

2558.52

990.00

44.00

431.20

8476.00

2511.41

920.00

40.89

400.71

8553.00

2534.22

900.00

40.00

392.00

8664.00

2567.11

900.00

40.00

392.00

428.30

416.68

394.90 1.67

42.20

3.95

SD and CoV are calculated for 18 observations . Degree of Quality control is good

UPDATED 21.01.2009 Grade of concrete M30, TG , Unit No 8 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8502.00

2519.11

980.00

43.56

426.84

8530.00

2527.41

920.00

40.89

400.71

3

8640.00

2560.00

950.00

42.22

413.78

4

8520.00

2524.44

990.00

44.00

431.20

8680.00

2571.85

910.00

40.44

396.36

6

8550.00

2533.33

900.00

40.00

392.00

7

8512.00

2522.07

890.00

39.56

387.64

8520.00

2524.44

900.00

40.00

392.00

9

8490.00

2515.56

890.00

39.56

387.64

10

8470.00

2509.63

870.00

38.67

378.93

8490.00

2515.56

880.00

39.11

383.29

12

8572.00

2539.85

900.00

40.00

392.00

13

8560.00

2536.30

980.00

43.56

426.84

8658.00

2565.33

970.00

43.11

422.49

15

8556.00

2535.11

1000.00

44.44

435.56

16

8510.00

2521.48

890.00

39.56

387.64

8530.00

2527.41

990.00

44.00

431.20

18

8640.00

2560.00

980.00

43.56

426.84

19

8660.00

2565.93

930.00

41.33

405.07

8583.00

2543.11

980.00

43.56

426.84

2

5

8

11

14

17

20

5-Nov-08

5-Nov-08

5-Nov-08

5-Nov-08

5-Nov-08

5-Nov-08

5-Nov-08

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

Average Standard compressive deviation strength of the sample in Kg/cm2

413.78

406.52

389.10

384.74

428.30

415.23

418.13

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

5-Nov-08

TG Raft Unit No 8

418.13

21

8780.00

2601.48

970.00

43.11

422.49

22

8396.00

2487.70

910.00

40.44

396.36

8386.00

2484.74

900.00

40.00

392.00

24

8336.00

2469.93

990.00

44.00

431.20

25

8259.00

2447.11

890.00

39.56

387.64

8375.00

2481.48

880.00

39.11

383.29

27

8385.00

2484.44

950.00

42.22

413.78

28

8360.00

2477.04

870.00

38.67

378.93

8398.00

2488.30

960.00

42.67

418.13

30

8341.00

2471.41

940.00

41.78

409.42

31

8422.00

2495.41

860.00

38.22

374.58

8377.00

2482.07

890.00

39.56

387.64

33

8468.00

2509.04

900.00

40.00

392.00

34

8508.00

2520.89

900.00

40.00

392.00

8568.00

2538.67

910.00

40.44

396.36

36

8498.00

2517.93

960.00

42.67

418.13

37

8459.00

2506.37

880.00

39.11

383.29

8462.00

2507.26

920.00

40.89

400.71

39

8532.00

2528.00

890.00

39.56

387.64

40

8615.00

2552.59

860.00

38.22

374.58

8523.00

2525.33

840.00

37.33

365.87

8569.00

2538.96

890.00

39.56

387.64

8580.00

2542.22

880.00

39.11

383.29

8669.00

2568.59

920.00

40.89

400.71

8532.00

2528.00

960.00

42.67

418.13

23

26

29

32

35

38

41

6-Nov-08

6-Nov-08

6-Nov-08

6-Nov-08

6-Nov-08

6-Nov-08

6-Nov-08

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

42 43 44 45

6-Nov-08

TG Raft Unit No 8

406.52

394.90

402.16 1.91

384.74

402.16

390.55

376.03

400.71

41.42

4.62

Degree of Quality control is good

46

8598.00

2547.56

870.00

38.67

378.93

8427.00

2496.89

920.00

40.89

400.71

8411.00

2492.15

900.00

40.00

392.00

8522.00

2525.04

1000.00

44.44

435.56

8483.00

2513.48

970.00

43.11

422.49

8474.00

2510.81

920.00

40.89

400.71

8463.00

2507.56

880.00

39.11

383.29

8366.00

2478.81

890.00

39.56

387.64

8322.00

2465.78

970.00

43.11

422.49

8412.00

2492.44

910.00

40.44

396.36

8326.00

2466.96

990.00

44.00

431.20

8349.00

2473.78

990.00

44.00

431.20

8633.00

2557.93

950.00

42.22

413.78

8355.00

2475.56

970.00

43.11

422.49

8321.00

2465.48

980.00

43.56

426.84

8300.00

2459.26

900.00

40.00

392.00

8252.00

2445.04

920.00

40.89

400.71

63

8173.00

2421.63

900.00

40.00

392.00

64

8267.00

2449.48

900.00

40.00

392.00

8357.00

2476.15

940.00

41.78

409.42

66

8197.00

2428.74

910.00

40.44

396.36

67

8287.00

2455.41

960.00

42.67

418.13

8535.00

2528.89

910.00

40.44

396.36

8121.00

2406.22

930.00

41.33

405.07

47

6-Nov-08

TG Raft Unit No 8

48 49 50

6-Nov-08

TG Raft Unit No 8

51 52 53

6-Nov-08

TG Raft Unit No 8

54 55 56

6-Nov-08

TG Raft Unit No 8

57 58 59

7-Nov-08

TG Raft Unit No 8

60 61 62

65

68 69

7-Nov-08

7-Nov-08

7-Nov-08

TG Raft Unit No 8

TG Raft Unit No 8

TG Raft Unit No 8

390.55

419.59

397.81

419.59

421.04 1.98

40.84

4.84

Degree of Quality control is good

4.55

SD and CoV are calculated for 9 observations . Degree of Quality control is good

394.90

399.26

406.52 0.93

20.42

UPDATED 21.01.2009 Grade of concrete M30, Boiler,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

23-May-08

BoilerFooting J-4

1

Compressive strength in kg/cm2

8620.00

2554.07

950.00

42.22

413.78

8535.00

2528.89

890.00

39.56

387.64

8821.00

2613.63

700.00

31.11

304.89

8837.00

2618.37

760.00

33.78

331.02

8686.00

2573.63

890.00

39.56

387.64

8784.00

2602.67

1050.00

46.67

457.33

8446.00

2502.52

920.00

40.89

400.71

8744.00

2590.81

900.00

40.00

392.00

8540.00

2530.37

900.00

40.00

392.00

8556.00

2535.11

1050.00

46.67

457.33

8672.00

2569.48

1020.00

45.33

444.27

8693.00

2575.70

1020.00

45.33

444.27

8762.00

2596.15

980.00

43.56

426.84

8653.00

2563.85

980.00

43.56

426.84

8776.00

2600.30

990.00

44.00

431.20

8691.00

2575.11

1050.00

46.67

457.33

8714.00

2581.93

1040.00

46.22

452.98

18

8700.00

2577.78

1040.00

46.22

452.98

19

8379.00

2482.67

1020.00

45.33

444.27

8512.00

2522.07

1030.00

45.78

448.62

2 3 4 5

24-May-08

BoilerJ9(J,B), J9(M,B48)

6 7 8

24-May-08

BoilerJ9(J,B), J9(M,B48)

9 10 11

26-May-08

Boiler-J10(B-24-M) with beam

12 13 14

27-May-08

15

BoilerFooting J3(B-41-M) with beam, T3(B-7-M) with beam

16 17

20

28-May-08

28-May-08

Boiler-J-5( B38.5-T)

Boiler-J5(B38.5J)

Average Standard compressive deviation strength of the sample in Kg/cm2

368.77

392.00

394.90

448.62

428.30

454.43

449.35

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

28-May-08

Boiler-J5(B38.5J)

449.35

21

8494.00

2516.74

1045.00

46.44

455.16

22

8648.00

2562.37

990.00

44.00

431.20

8659.00

2565.63

980.00

43.56

426.84

24

8563.00

2537.19

980.00

43.56

426.84

25

8617.00

2553.19

1030.00

45.78

448.62

8459.00

2506.37

1020.00

45.33

444.27

27

8625.00

2555.56

1000.00

44.44

435.56

28

8871.00

2628.44

1020.00

45.33

444.27

8790.00

2604.44

1000.00

44.44

435.56

30

8634.00

2558.22

990.00

44.00

431.20

31

8681.00

2572.15

1000.00

44.44

435.56

8736.00

2588.44

980.00

43.56

426.84

33

8641.00

2560.30

910.00

40.44

396.36

34

8699.00

2577.48

930.00

41.33

405.07

8732.00

2587.26

960.00

42.67

418.13

36

8655.00

2564.44

980.00

43.56

426.84

37

8648.00

2562.37

1070.00

47.56

466.04

8691.00

2575.11

990.00

44.00

431.20

39

8739.00

2589.33

1130.00

50.22

492.18

40

8506.00

2520.30

1100.00

48.89

479.11

8679.00

2571.56

1050.00

46.67

457.33

8532.00

2528.00

970.00

43.11

422.49

8590.00

2545.19

910.00

40.44

396.36

8638.00

2559.41

910.00

40.44

396.36

8726.00

2585.48

840.00

37.33

365.87

23

26

29

32

35

38

41

28-May-08

28-May-08

29-May-08

31-May-08

31-May-08

31-May-08

31-May-08

Boiler-J5(B38.5J)

Boiler-J5(B38.5J)

Boiler-J-6 with beam

Boiler-J5(B38.5-K)

Boiler-J5(B38.5-K)

Boiler-J5(B38.5-K)

Boiler-J5(B38.5-K)

42 43 44 45

2-Jun-08

BoilerJ7(B48-L) with beam

428.30

442.81

437.01 3.69

419.59

416.68

463.14

452.98

386.19

43.31

8.51

Degree of Quality control is good

46

8295.00

2457.78

940.00

41.78

409.42

8533.00

2528.30

1000.00

44.44

435.56

8529.00

2527.11

780.00

34.67

339.73

8624.00

2555.26

800.00

35.56

348.44

8555.00

2534.81

880.00

39.11

383.29

51

8602.00

2548.74

870.00

38.67

378.93

52

8711.00

2581.04

1000.00

44.44

435.56

8452.00

2504.30

970.00

43.11

422.49

54

8833.00

2617.19

930.00

41.33

405.07

55

8367.00

2479.11

1060.00

47.11

461.69

8574.00

2540.44

1030.00

45.78

448.62

57

8616.00

2552.89

1040.00

46.22

452.98

58

8934.00

2647.11

1090.00

48.44

474.76

8545.00

2531.85

1000.00

44.44

435.56

8417.00

2493.93

1010.00

44.89

439.91

8396.00

2487.70

920.00

40.89

400.71

8500.00

2518.52

900.00

40.00

392.00

63

8448.00

2503.11

900.00

40.00

392.00

64

8566.00

2538.07

920.00

40.89

400.71

8244.00

2442.67

900.00

40.00

392.00

66

8468.00

2509.04

940.00

41.78

409.42

67

8530.00

2527.41

980.00

43.56

426.84

8629.00

2556.74

920.00

40.89

400.71

69

8559.00

2536.00

915.00

40.67

398.53

70

8503.00

2519.41

720.00

32.00

313.60

47

2-Jun-08

BoilerJ7(B48-L) with beam

48 49 50

53

56

59

2-Jun-08

4-Jun-08

4-Jun-08

4-Jun-08

BoilerJ7(B48-L) with beam

Boiler-J5

Boiler-J5

Boiler-J5

60 61 62

65

68

6-Jun-08

6-Jun-08

6-Jun-08

7-Jun-08

Boiler-J5-K with beam

Boiler-J5-K with beam

Boiler-J5-K with beam

Boiler J5-K with beam

394.90

370.22

421.04

454.43

450.07 3.79

394.90

400.71

408.70

310.70

43.16

8.78

Degree of Quality control is good

71

7-Jun-08

Boiler J5-K with beam

72 73 74

9-Jun-08

Boiler-J5 Raft

75 76 77

9-Jun-08

Boiler-J5 Raft

78 79 80

9-Jun-08

Boiler-J5 Raft

81 82 83

9-Jun-08

Boiler-J5 Raft

84 85 86

3-Jul-08

Boiler-J8 Raft L Grid

87 88 89

3-Jul-08

Boiler-J8 Raft L Grid

90 91 92

3-Jul-08

Boiler-J8 Raft L Grid

93 94 95

3-Jul-08

Boiler-J8 Raft L Grid

8683.00

2572.74

700.00

31.11

304.89

8612.00

2551.70

720.00

32.00

313.60

8525.00

2525.93

860.00

38.22

374.58

8619.00

2553.78

810.00

36.00

352.80

8456.00

2505.48

800.00

35.56

348.44

8655.00

2564.44

940.00

41.78

409.42

8525.00

2525.93

1050.00

46.67

457.33

8795.00

2605.93

960.00

42.67

418.13

8551.00

2533.63

750.00

33.33

326.67

8646.00

2561.78

800.00

35.56

348.44

8498.00

2517.93

920.00

40.89

400.71

8516.00

2523.26

870.00

38.67

378.93

8434.00

2498.96

900.00

40.00

392.00

8509.00

2521.19

890.00

39.56

387.64

8642.00

2560.59

1050.00

46.67

457.33

8625.00

2555.56

1030.00

45.78

448.62

8656.00

2564.74

1060.00

47.11

461.69

8462.00

2507.26

1010.00

44.89

439.91

8545.00

2531.85

1060.00

47.11

461.69

8798.00

2606.81

1000.00

44.44

435.56

8727.00

2585.78

990.00

44.00

431.20

8703.00

2578.67

1000.00

44.44

435.56

8618.00

2553.48

1020.00

45.33

444.27

8557.00

2535.41

1020.00

45.33

444.27

8516.00

2523.26

1030.00

45.78

448.62

310.70

358.61

428.30

358.61

386.19

455.88

445.72 4.57

437.01

445.72

44.81

44.02

Degree of Quality control is good

3-Jul-08

Boiler-J8 Raft L Grid

445.72

96

8562.00

2536.89

1020.00

45.33

444.27

97

8565.00

2537.78

1030.00

45.78

448.62

8499.00

2518.22

1010.00

44.89

439.91

99

8537.00

2529.48

1000.00

44.44

435.56

100

8604.00

2549.33

790.00

35.11

344.09

8567.00

2538.37

1010.00

44.89

439.91

102

8560.00

2536.30

980.00

43.56

426.84

103

8550.00

2533.33

1000.00

44.44

435.56

8680.00

2571.85

1040.00

46.22

452.98

105

8480.00

2512.59

1070.00

47.56

466.04

106

8594.00

2546.37

1000.00

44.44

435.56

8618.00

2553.48

1050.00

46.67

457.33

108

8595.00

2546.67

1030.00

45.78

448.62

109

8577.00

2541.33

1010.00

44.89

439.91

8633.00

2557.93

970.00

43.11

422.49

111

8421.00

2495.11

1000.00

44.44

435.56

112

8478.00

2512.00

1100.00

48.89

479.11

8366.00

2478.81

1060.00

47.11

461.69

114

8439.00

2500.44

1040.00

46.22

452.98

115

8480.00

2512.59

910.00

40.44

396.36

8470.00

2509.63

950.00

42.22

413.78

8438.00

2500.15

990.00

44.00

431.20

8411.00

2492.15

990.00

44.00

431.20

8607.00

2550.22

1010.00

44.89

439.91

8369.00

2479.70

990.00

44.00

431.20

98

101

104

107

110

113

116

4-Jul-08

4-Jul-08

4-Jul-08

4-Jul-08

4-Jul-08

4-Jul-08

4-Jul-08

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

Boiler-J8 Raft L Grid

117 118 119 120

5-Jul-08

Boiler-J8 Raft L Grid

441.36

403.61

451.53

447.17

432.65

464.59

413.78

434.10 2.40

23.51

17.80

Degree of Quality control is good

121

8651.00

2563.26

1000.00

44.44

435.56

8454.00

2504.89

980.00

43.56

426.84

8467.00

2508.74

980.00

43.56

426.84

8867.00

2627.26

900.00

40.00

392.00

8453.00

2504.59

970.00

43.11

422.49

8539.00

2530.07

960.00

42.67

418.13

8475.00

2511.11

950.00

42.22

413.78

8497.00

2517.63

960.00

42.67

418.13

8415.00

2493.33

990.00

44.00

431.20

8729.00

2586.37

890.00

39.56

387.64

8571.00

2539.56

900.00

40.00

392.00

8590.00

2545.19

900.00

40.00

392.00

8467.00

2508.74

1000.00

44.44

435.56

8373.00

2480.89

1040.00

46.22

452.98

8568.00

2538.67

890.00

39.56

387.64

8472.00

2510.22

1010.00

44.89

439.91

8481.00

2512.89

1050.00

46.67

457.33

138

8583.00

2543.11

900.00

40.00

392.00

139

8675.00

2570.37

980.00

43.56

426.84

8623.00

2554.96

950.00

42.22

413.78

141

8751.00

2592.89

900.00

40.00

392.00

142

8585.00

2543.70

980.00

43.56

426.84

8604.00

2549.33

940.00

41.78

409.42

144

8429.00

2497.48

990.00

44.00

431.20

145

8650.00

2562.96

920.00

40.89

400.71

122

5-Jul-08

Boiler-J8 Raft L Grid

123 124 125

5-Jul-08

Boiler-J8 Raft L Grid

126 127 128

5-Jul-08

Boiler-J8 Raft L Grid

129 130 131

5-Jul-08

Boiler-J8 Raft L Grid

132 133 134

14-Jul-08

Boiler-J1 Raft

135 136 137

140

143

14-Jul-08

14-Jul-08

14-Jul-08

15-Jul-08

Boiler-J1 Raft

Boiler-J1 Raft

Boiler-J1 Raft

Boiler-J1 Raft

429.75

410.87

421.04

390.55

425.39

429.75

410.87

422.49

415.23

2.19

21.42

11.66

Degree of Quality control is good

146

15-Jul-08

Boiler-J1 Raft

147 148 149

15-Jul-08

Boiler-J1 Raft

150 151 152

15-Jul-08

Boiler-J1 Raft

153 154 155

15-Jul-08

Boiler-J1 Raft

156 157 158

18-Jul-08

Boiler Raft BO-B48 Grid

159 160 161

19-Jul-08

Boiler Raft BO-B48 Grid

162 163 164

24-Jul-08

Wall BO [LM]

165 166 167

31-Jul-08

Boiler-J1 Raft Beam

168 169 170

31-Jul-08

Boiler-J1 Raft Beam

8461.00

2506.96

960.00

42.67

418.13

8271.00

2450.67

980.00

43.56

426.84

8334.00

2469.33

1010.00

44.89

439.91

8710.00

2580.74

850.00

37.78

370.22

8585.00

2543.70

1000.00

44.44

435.56

8513.00

2522.37

950.00

42.22

413.78

8605.00

2549.63

1000.00

44.44

435.56

8420.00

2494.81

970.00

43.11

422.49

8453.00

2504.59

990.00

44.00

431.20

8507.00

2520.59

1000.00

44.44

435.56

8491.00

2515.85

990.00

44.00

431.20

8686.00

2573.63

1020.00

45.33

444.27

8752.00

2593.19

1000.00

44.44

435.56

8678.00

2571.26

970.00

43.11

422.49

8520.00

2524.44

890.00

39.56

387.64

8642.00

2560.59

800.00

35.56

348.44

8515.00

2522.96

890.00

39.56

387.64

8638.00

2559.41

1050.00

46.67

457.33

8484.00

2513.78

1040.00

46.22

452.98

8716.00

2582.52

940.00

41.78

409.42

8489.00

2515.26

1000.00

44.44

435.56

8617.00

2553.19

970.00

43.11

422.49

8928.00

2645.33

990.00

44.00

431.20

8618.00

2553.48

980.00

43.56

426.84

8904.00

2638.22

950.00

42.22

413.78

415.23

415.23 2.19

423.94

432.65

434.10

374.58

439.91

429.75

434.10

21.42

11.66

Degree of Quality control is good

31-Jul-08

Boiler-J1 Raft Beam

434.10

171

8458.00

2506.07

1060.00

47.11

461.69

172

8733.00

2587.56

970.00

43.11

422.49

8548.00

2532.74

1100.00

48.89

479.11

174

8539.00

2530.07

1000.00

44.44

435.56

175

8778.00

2600.89

900.00

40.00

392.00

8759.00

2595.26

940.00

41.78

409.42

177

9013.00

2670.52

970.00

43.11

422.49

178

8758.00

2594.96

920.00

40.89

400.71

8848.00

2621.63

900.00

40.00

392.00

180

8777.00

2600.59

990.00

44.00

431.20

181

8636.00

2558.81

760.00

33.78

331.02

8849.00

2621.93

800.00

35.56

348.44

183

8630.00

2557.04

940.00

41.78

409.42

184

8522.00

2525.04

920.00

40.89

400.71

8693.00

2575.70

960.00

42.67

418.13

186

8522.00

2525.04

760.00

33.78

331.02

187

8614.00

2552.30

930.00

41.33

405.07

8650.00

2562.96

850.00

37.78

370.22

8573.00

2540.15

700.00

31.11

304.89

8670.00

2568.89

920.00

40.89

400.71

8563.00

2537.19

950.00

42.22

413.78

8396.00

2487.70

980.00

43.56

426.84

8360.00

2477.04

1010.00

44.89

439.91

8233.00

2439.41

970.00

43.11

422.49

8358.00

2476.44

940.00

41.78

409.42

173

176

179

182

185

188

31-Jul-08

31-Jul-08

1-Aug-08

1-Aug-08

1-Aug-08

1-Aug-08

Boiler-J1 Raft Beam

Boiler-J1 Raft Beam

Boiler-J1 Raft Beam

Boiler-J1 Raft Beam

Boiler-J1 Raft Beam

Boiler-J1 Raft Beam

189 190 191

8-Aug-08

Boiler J-2 Raft B24 Grid

192 193 194 195

2-Oct-08

Shear Wall J6 -J7

445.72

407.97

407.97 2.63

362.96

383.29

360.06

413.78

423.94

25.77

21.04

Degree of Quality control is good

196

8111.00

2403.26

1000.00

44.44

435.56

8223.00

2436.44

1020.00

45.33

444.27

8123.00

2406.81

930.00

41.33

405.07

8297.00

2458.37

1120.00

49.78

487.82

8399.00

2488.59

1100.00

48.89

479.11

8277.00

2452.44

1150.00

51.11

500.89

8452.00

2504.30

1040.00

46.22

452.98

8338.00

2470.52

1080.00

48.00

470.40

8321.00

2465.48

900.00

40.00

392.00

8335.00

2469.63

1070.00

47.56

466.04

8474.00

2510.81

1000.00

44.44

435.56

8503.00

2519.41

1010.00

44.89

439.91

8541.00

2530.67

1110.00

49.33

483.47

8466.00

2508.44

1020.00

45.33

444.27

8530.00

2527.41

960.00

42.67

418.13

8440.00

2500.74

890.00

39.56

387.64

8390.00

2485.93

850.00

37.78

370.22

8332.00

2468.74

960.00

42.67

418.13

8245.00

2442.96

890.00

39.56

387.64

8329.00

2467.85

810.00

36.00

352.80

216

8264.00

2448.59

890.00

39.56

387.64

217

8322.00

2465.78

1020.00

45.33

444.27

8320.00

2465.19

1010.00

44.89

439.91

219

8352.00

2474.67

1050.00

46.67

457.33

220

8421.00

2495.11

980.00

43.56

426.84

8264.00

2448.59

830.00

36.89

361.51

197

6-Oct-08

Shear Wall J5 -J8

198 199 200

7-Oct-08

201 202 203

7-Oct-08

204 205 206

7-Oct-08

207 208 209

7-Oct-08

210

Mass PCC on undergroun d Silo

Mass PCC on undergroun d Silo

Mass PCC on undergroun d Silo

Mass PCC on undergroun d Silo

211 212

10-Oct-08

Shear wall between J8 J7

213 214 215

218

221

10-Oct-08

Shear wall between J8 J7

13-Oct-08

14-Oct-08

Slag Silo

428.30

489.27

438.46

447.17

448.62 4.86

392.00

376.03

447.17

413.78

47.65

40.84

Degree of Quality control is good

14-Oct-08

Slag Silo

413.78

222

8344.00

2472.30

1040.00

46.22

452.98

223

8272.00

2450.96

1030.00

45.78

448.62

8293.00

2457.19

1030.00

45.78

448.62

225

8287.00

2455.41

1020.00

45.33

444.27

226

8218.00

2434.96

890.00

39.56

387.64

8234.00

2439.70

920.00

40.89

400.71

8223.00

2436.44

890.00

39.56

387.64

229

940.00

41.78

409.42

230

940.00

41.78

409.42

231

940.00

41.78

409.42

232

940.00

41.78

409.42

233

940.00

41.78

409.42

234

940.00

41.78

409.42

235

940.00

41.78

409.42

236

940.00

41.78

409.42

237

940.00

41.78

409.42

238

940.00

41.78

409.42

239

940.00

41.78

409.42

240

940.00

41.78

409.42

224

227 228

14-Oct-08

1-Nov-08

Slag Silo

Slag Silo

413.78

447.17

392.00

409.42

409.42

409.42 2.71

26.55

22.57

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 18 observations therefore 12 observations are presumed as an average.

UPDATED 22.01.2009 Grade of concrete M30, Boiler,Unit No 8 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8274.00

2451.56

900.00

40.00

392.00

8213.00

2433.48

920.00

40.89

400.71

3

8345.00

2472.59

980.00

43.56

426.84

4

8179.00

2423.41

990.00

44.00

431.20

8390.00

2485.93

970.00

43.11

422.49

6

8177.00

2422.81

910.00

40.44

396.36

7

8381.00

2483.26

1000.00

44.44

435.56

8436.00

2499.56

980.00

43.56

426.84

8356.00

2475.85

970.00

43.11

422.49

8253.00

2445.33

920.00

40.89

400.71

8246.00

2443.26

950.00

42.22

413.78

8113.00

2403.85

970.00

43.11

422.49

8273.00

2451.26

910.00

40.44

396.36

8178.00

2423.11

930.00

41.33

405.07

8265.00

2448.89

940.00

41.78

409.42

8748.00

2592.00

920.00

40.89

400.71

8293.00

2457.19

940.00

41.78

409.42

8359.00

2476.74

920.00

40.89

400.71

8333.00

2469.04

980.00

43.56

426.84

8383.00

2483.85

1000.00

44.44

435.56

2

5

8

29-Sep-08

29-Sep-08

2-Oct-08

BoilerFooting J-2

BoilerFooting J-2

BoilerFooting J-7

9 10 11

2-Oct-08

BoilerFooting J-7

12 13 14

2-Oct-08

BoilerFooting J-7

15 16 17

3-Oct-08

BoilerFooting J-12

18 19 20

3-Oct-08

BoilerFooting J-12

Average Standard compressive deviation strength of the sample in Kg/cm2

406.52

416.68

428.30

412.33

403.61

403.61

434.10

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

3-Oct-08

BoilerFooting J-12

434.10

21

8261.00

2447.70

1010.00

44.89

439.91

22

8230.00

2438.52

970.00

43.11

422.49

8284.00

2454.52

1030.00

45.78

448.62

24

8449.00

2503.41

990.00

44.00

431.20

25

8316.00

2464.00

930.00

41.33

405.07

8278.00

2452.74

910.00

40.44

396.36

27

8354.00

2475.26

970.00

43.11

422.49

28

8281.00

2453.63

920.00

40.89

400.71

8167.00

2419.85

950.00

42.22

413.78

30

8405.00

2490.37

910.00

40.44

396.36

31

8254.00

2445.63

920.00

40.89

400.71

8626.00

2555.85

1000.00

44.44

435.56

33

8221.00

2435.85

940.00

41.78

409.42

34

8368.00

2479.41

940.00

41.78

409.42

8481.00

2512.89

940.00

41.78

409.42

36

8588.00

2544.59

960.00

42.67

418.13

37

8149.00

2414.52

990.00

44.00

431.20

8266.00

2449.19

960.00

42.67

418.13

39

8247.00

2443.56

960.00

42.67

418.13

40

8318.00

2464.59

980.00

43.56

426.84

8770.00

2598.52

1000.00

44.44

435.56

8313.00

2463.11

1010.00

44.89

439.91

8133.00

2409.78

1020.00

45.33

444.27

8159.00

2417.48

970.00

43.11

422.49

8234.00

2439.70

990.00

44.00

431.20

23

26

29

32

35

38

41

3-Oct-08

3-Oct-08

4-Oct-08

4-Oct-08

8-Oct-08

8-Oct-08

10-Oct-08

BoilerFooting J-12

BoilerFooting J-12

BoilerFooting J-12

BoilerFooting J-12

BoilerFooting J-7

BoilerFooting J-7

BoilerFooting J-11

42 43 44 45

10-Oct-08

BoilerFooting J-11

434.10

407.97

403.61 1.59

415.23

412.33

422.49

434.10

432.65

42.36

3.75

Degree of Quality control is good

46

8205.00

2431.11

1050.00

46.67

457.33

8203.00

2430.52

1100.00

48.89

479.11

8251.00

2444.74

1080.00

48.00

470.40

8294.00

2457.48

930.00

41.33

405.07

8265.00

2448.89

1200.00

53.33

522.67

8444.00

2501.93

1050.00

46.67

457.33

8400.00

2488.89

1060.00

47.11

461.69

8337.00

2470.22

1010.00

44.89

439.91

8248.00

2443.85

990.00

44.00

431.20

8337.00

2470.22

1000.00

44.44

435.56

8596.00

2546.96

1000.00

44.44

435.56

8280.00

2453.33

1020.00

45.33

444.27

8347.00

2473.19

1000.00

44.44

435.56

8375.00

2481.48

1020.00

45.33

444.27

8260.00

2447.41

990.00

44.00

431.20

8303.00

2460.15

1060.00

47.11

461.69

8475.00

2511.11

950.00

42.22

413.78

63

8454.00

2504.89

1030.00

45.78

448.62

64

8156.00

2416.59

910.00

40.44

396.36

8245.00

2442.96

940.00

41.78

409.42

66

8195.00

2428.15

910.00

40.44

396.36

67

8266.00

2449.19

920.00

40.89

400.71

8315.00

2463.70

850.00

37.78

370.22

69

8268.00

2449.78

880.00

39.11

383.29

70

8527.00

2526.52

830.00

36.89

361.51

47

10-Oct-08

BoilerFooting J-11

48 49 50

13-Oct-08

BoilerFooting J-4

51 52 53

13-Oct-08

BoilerFooting J-4

54 55 56

15-Oct-08

BoilerFooting J-5

57 58 59

15-Oct-08

BoilerFooting J-5

60 61 62

65

68

15-Oct-08

16-Oct-08

16-Oct-08

16-Oct-08

BoilerFooting J-5

BoilerFooting J-11

BoilerFooting J-11

BoilerFooting J-11

468.95

461.69

444.27

438.46

437.01 2.54

441.36

400.71

384.74

390.55

44.56

5.70

Degree of Quality control is good

71

16-Oct-08

BoilerFooting J-11

72 73 74

17-Oct-08

BoilerFooting J-1

75 76 77

17-Oct-08

BoilerFooting J-1

78 79 80

17-Oct-08

BoilerFooting J-1

81 82 83

17-Oct-08

BoilerFooting J-1

84 85 86

18-Oct-08

BoilerFooting J-1

87 88 89

18-Oct-08

BoilerFooting J-1

90 91 92

18-Oct-08

BoilerFooting J-1

93 94 95

18-Oct-08

BoilerFooting J-1

8381.00

2483.26

1010.00

44.89

439.91

8411.00

2492.15

850.00

37.78

370.22

8463.00

2507.56

960.00

42.67

418.13

8158.00

2417.19

950.00

42.22

413.78

8429.00

2497.48

980.00

43.56

426.84

8289.00

2456.00

920.00

40.89

400.71

8551.00

2533.63

960.00

42.67

418.13

8334.00

2469.33

970.00

43.11

422.49

8326.00

2466.96

910.00

40.44

396.36

8453.00

2504.59

900.00

40.00

392.00

8293.00

2457.19

930.00

41.33

405.07

8465.00

2508.15

890.00

39.56

387.64

8232.00

2439.11

960.00

42.67

418.13

8446.00

2502.52

900.00

40.00

392.00

8378.00

2482.37

1030.00

45.78

448.62

8400.00

2488.89

1050.00

46.67

457.33

8336.00

2469.93

1060.00

47.11

461.69

8381.00

2483.26

920.00

40.89

400.71

8733.00

2587.56

750.00

33.33

326.67

8344.00

2472.30

890.00

39.56

387.64

8366.00

2478.81

900.00

40.00

392.00

8454.00

2504.89

1000.00

44.44

435.56

8242.00

2442.07

850.00

37.78

370.22

8395.00

2487.41

870.00

38.67

378.93

8579.00

2541.93

980.00

43.56

426.84

390.55

419.59

413.78

397.81

399.26

455.88

371.67 3.15

399.26

377.48

41.59

7.57

Degree of Quality control is good

18-Oct-08

BoilerFooting J-1

377.48

96

8482.00

2513.19

750.00

33.33

326.67

97

8384.00

2484.15

1200.00

53.33

522.67

8323.00

2466.07

800.00

35.56

348.44

99

8343.00

2472.00

1030.00

45.78

448.62

100

8205.00

2431.11

1010.00

44.89

439.91

8258.00

2446.81

950.00

42.22

413.78

102

8296.00

2458.07

930.00

41.33

405.07

103

8279.00

2453.04

1030.00

45.78

448.62

8276.00

2452.15

920.00

40.89

400.71

105

8344.00

2472.30

950.00

42.22

413.78

106

8230.00

2438.52

1000.00

44.44

435.56

8346.00

2472.89

1020.00

45.33

444.27

8192.00

2427.26

1000.00

44.44

435.56

8422.00

2495.41

980.00

43.56

426.84

8309.00

2461.93

960.00

42.67

418.13

8445.00

2502.22

990.00

44.00

431.20

8470.00

2509.63

880.00

39.11

383.29

8407.00

2490.96

890.00

39.56

387.64

8341.00

2471.41

860.00

38.22

374.58

8452.00

2504.30

910.00

40.44

396.36

8375.00

2481.48

940.00

41.78

409.42

8316.00

2464.00

910.00

40.44

396.36

8425.00

2496.30

900.00

40.00

392.00

8316.00

2464.00

920.00

40.89

400.71

8385.00

2484.44

870.00

38.67

378.93

98

101

104

107

18-Oct-08

22-Oct-08

22-Oct-08

22-Oct-08

BoilerFooting J-1

BoilerFooting J-5

BoilerFooting J-5

BoilerFooting J-5

108 109 110

22-Oct-08

BoilerFooting J-5 B 38.5

111 112 113

31-Oct-08

BoilerFooting J-5 B 9.5

114 115 116

31-Oct-08

BoilerFooting J-5 B 9.5

117 118 119 120

31-Oct-08

BoilerFooting J-5 B 9.5

439.91

419.59

421.04

438.46

425.39

381.84

400.71

390.55 3.73

41.78

8.93

Degree of Quality control is good

121

8394.00

2487.11

980.00

43.56

426.84

8481.00

2512.89

920.00

40.89

400.71

8377.00

2482.07

900.00

40.00

392.00

8558.00

2535.70

900.00

40.00

392.00

8436.00

2499.56

890.00

39.56

387.64

8392.00

2486.52

890.00

39.56

387.64

8369.00

2479.70

920.00

40.89

400.71

8387.00

2485.04

900.00

40.00

392.00

8476.00

2511.41

890.00

39.56

387.64

8480.00

2512.59

980.00

43.56

426.84

8460.00

2506.67

970.00

43.11

422.49

8550.00

2533.33

910.00

40.44

396.36

8452.00

2504.30

890.00

39.56

387.64

8315.00

2463.70

950.00

42.22

413.78

8498.00

2517.93

940.00

41.78

409.42

8316.00

2464.00

1040.00

46.22

452.98

8448.00

2503.11

1060.00

47.11

461.69

138

8354.00

2475.26

980.00

43.56

426.84

139

8280.00

2453.33

990.00

44.00

431.20

8385.00

2484.44

1020.00

45.33

444.27

141

8270.00

2450.37

1000.00

44.44

435.56

142

7967.00

2360.59

930.00

41.33

405.07

7992.00

2368.00

990.00

44.00

431.20

144

8013.00

2374.22

980.00

43.56

426.84

145

8320.00

2465.19

920.00

40.89

400.71

122

4-Nov-08

BoilerFooting J-12

123 124 125

4-Nov-08

BoilerFooting J-12

126 127 128

4-Nov-08

BoilerFooting J-12

129 130 131

5-Nov-08

BoilerFooting J-12

132 133 134

5-Nov-08

BoilerFooting J-12

135 136 137

140

143

17-Nov-08

17-Nov-08

19-Nov-08

21-Nov-08

BoilerFooting J-5

BoilerFooting J-5

BoilerFooting J-9

BoilerFooting J-8

406.52

389.10

393.45

415.23

403.61

447.17

437.01

421.04

409.42

2.30

42.40

5.43

Degree of Quality control is good

146

21-Nov-08

BoilerFooting J-8

147 148 149

21-Nov-08

BoilerFooting J-8

150 151 152

21-Nov-08

BoilerFooting J-8

153 154 155

21-Nov-08

BoilerFooting J-8

156 157 158

21-Nov-08

BoilerFooting J-8

159 160 161

21-Nov-08

BoilerFooting J-8

162 163 164

21-Nov-08

BoilerFooting J-8

165 166 167

21-Nov-08

BoilerFooting J-8

168 169 170

21-Nov-08

BoilerFooting J-8

8629.00

2556.74

900.00

40.00

392.00

8538.00

2529.78

1000.00

44.44

435.56

8432.00

2498.37

930.00

41.33

405.07

8453.00

2504.59

1020.00

45.33

444.27

8562.00

2536.89

1030.00

45.78

448.62

8237.00

2440.59

990.00

44.00

431.20

8333.00

2469.04

910.00

40.44

396.36

8579.00

2541.93

1010.00

44.89

439.91

8629.00

2556.74

1040.00

46.22

452.98

8597.00

2547.26

980.00

43.56

426.84

8366.00

2478.81

1010.00

44.89

439.91

8356.00

2475.85

990.00

44.00

431.20

8426.00

2496.59

1020.00

45.33

444.27

8322.00

2465.78

970.00

43.11

422.49

8633.00

2557.93

1030.00

45.78

448.62

8523.00

2525.33

1010.00

44.89

439.91

8426.00

2496.59

940.00

41.78

409.42

8399.00

2488.59

1010.00

44.89

439.91

8433.00

2498.67

960.00

42.67

418.13

8566.00

2538.07

980.00

43.56

426.84

8353.00

2474.96

950.00

42.22

413.78

8623.00

2554.96

950.00

42.22

413.78

8377.00

2482.07

970.00

43.11

422.49

8327.00

2467.26

930.00

41.33

405.07

8357.00

2476.15

940.00

41.78

409.42

409.42

432.65 2.30

422.49

439.91

432.65

432.65

428.30

416.68

418.13

42.40

5.43

Degree of Quality control is good

21-Nov-08

BoilerFooting J-8

418.13

171

8432.00

2498.37

1010.00

44.89

439.91

172

8456.00

2505.48

950.00

42.22

413.78

8336.00

2469.93

990.00

44.00

431.20

174

8359.00

2476.74

1020.00

45.33

444.27

175

8430.00

2497.78

940.00

41.78

409.42

8560.00

2536.30

1010.00

44.89

439.91

177

8532.00

2528.00

970.00

43.11

422.49

178

8620.00

2554.07

950.00

42.22

413.78

8630.00

2557.04

1020.00

45.33

444.27

180

8540.00

2530.37

940.00

41.78

409.42

181

8333.00

2469.04

960.00

42.67

418.13

8433.00

2498.67

920.00

40.89

400.71

183

8539.00

2530.07

910.00

40.44

396.36

184

8323.00

2466.07

1000.00

44.44

435.56

8426.00

2496.59

1030.00

45.78

448.62

186

8201.00

2429.93

980.00

43.56

426.84

187

8530.00

2527.41

920.00

40.89

400.71

8560.00

2536.30

950.00

42.22

413.78

189

8430.00

2497.78

970.00

43.11

422.49

190

8320.00

2465.19

990.00

44.00

431.20

8630.00

2557.04

990.00

44.00

431.20

8559.00

2536.00

970.00

43.11

422.49

8301.00

2459.56

960.00

42.67

418.13

8196.00

2428.44

900.00

40.00

392.00

8389.00

2485.63

990.00

44.00

431.20

173

176

179

182

185

188

191

21-Nov-08

22-Nov-08

22-Nov-08

22-Nov-08

22-Nov-08

22-Nov-08

22-Nov-08

BoilerFooting J-8

BoilerFooting J-8

BoilerFooting J-8

BoilerFooting J-8

BoilerFooting J-8

BoilerFooting J-8

BoilerFooting J-8

192 193 194 195

26-Nov-08

BoilerFooting Between J 2 and J 11

429.75

423.94

422.49 1.54

405.07

437.01

412.33

428.30

413.78

43.54

3.53

Degree of Quality control is good

196

960.00

42.67

418.13

197

960.00

42.67

418.13

198

960.00

42.67

418.13

199

960.00

42.67

418.13

200

960.00

42.67

418.13

201

960.00

42.67

418.13

202

960.00

42.67

418.13

203

960.00

42.67

418.13

204

960.00

42.67

418.13

205

960.00

42.67

418.13

206

960.00

42.67

418.13

207

960.00

42.67

418.13

208

960.00

42.67

418.13

209

960.00

42.67

418.13

210

960.00

42.67

418.13

418.13

418.13

418.13

418.13

418.13 1.14

42.73

2.67

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 15 observations therefore 15 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, A Row ,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8649.00

2562.67

860.00

38.22

374.58

8627.00

2556.15

880.00

39.11

383.29

3

8540.00

2530.37

890.00

39.56

387.64

4

8635.00

2558.52

890.00

39.56

387.64

8529.00

2527.11

890.00

39.56

387.64

6

8560.00

2536.30

870.00

38.67

378.93

7

8613.00

2552.00

840.00

37.33

365.87

8544.00

2531.56

740.00

32.89

322.31

9

8564.00

2537.48

800.00

35.56

348.44

10

8447.00

2502.81

890.00

39.56

387.64

8453.00

2504.59

860.00

38.22

374.58

12

8719.00

2583.41

840.00

37.33

365.87

13

8468.00

2509.04

880.00

39.11

383.29

8692.00

2575.41

890.00

39.56

387.64

15

8891.00

2634.37

890.00

39.56

387.64

16

8468.00

2509.04

880.00

39.11

383.29

8692.00

2575.41

890.00

39.56

387.64

18

8891.00

2634.37

890.00

39.56

387.64

19

8637.00

2559.11

810.00

36.00

352.80

8561.00

2536.59

820.00

36.44

357.16

2

5

8

11

14

17

20

12-Jun-08

12-Jun-08

12-Jun-08

12-Jun-08

12-Jun-08

12-Jun-08

17-Jun-08

A -Row J2

A -Row J2

A -Row J2

A -Row J2

A -Row J2

A -Row J2

A -Row J1

Average Standard compressive deviation strength of the sample in Kg/cm2

381.84

384.74

345.54

376.03

386.19

386.19

373.13

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

17-Jun-08

A -Row J1

373.13

21

8584.00

2543.41

940.00

41.78

409.42

22

8475.00

2511.11

850.00

37.78

370.22

8541.00

2530.67

990.00

44.00

431.20

24

8398.00

2488.30

920.00

40.89

400.71

25

8571.00

2539.56

990.00

44.00

431.20

8592.00

2545.78

950.00

42.22

413.78

27

8650.00

2562.96

990.00

44.00

431.20

28

8538.00

2529.78

1000.00

44.44

435.56

8684.00

2573.04

970.00

43.11

422.49

30

8719.00

2583.41

980.00

43.56

426.84

31

8447.00

2502.81

980.00

43.56

426.84

8574.00

2540.44

1000.00

44.44

435.56

33

8689.00

2574.52

1010.00

44.89

439.91

34

8646.00

2561.78

1020.00

45.33

444.27

8682.00

2572.44

970.00

43.11

422.49

36

8682.00

2572.44

1000.00

44.44

435.56

37

8673.00

2569.78

1000.00

44.44

435.56

8461.00

2506.96

1040.00

46.22

452.98

39

8710.00

2580.74

1010.00

44.89

439.91

40

8453.00

2504.59

950.00

42.22

413.78

8526.00

2526.22

820.00

36.44

357.16

42

8628.00

2556.44

900.00

40.00

392.00

43

8590.00

2545.19

960.00

42.67

418.13

8498.00

2517.93

910.00

40.44

396.36

8578.00

2541.63

820.00

36.44

357.16

23

26

29

32

35

38

41

44 45

17-Jun-08

17-Jun-08

17-Jun-08

17-Jun-08

17-Jun-08

18-Jun-08

28-Jun-08

28-Jun-08

A -Row J1

A -Row J1

A -Row J1

A -Row J1

A -Row J1

A -Row J1

A -Row J2

A -Row J2

400.71

425.39

428.30 2.79

434.10

434.10

442.81

387.64

390.55

39.67

7.04

Degree of Quality control is good

46

8584.00

2543.41

1000.00

44.44

435.56

8460.00

2506.67

1040.00

46.22

452.98

48

8408.00

2491.26

1060.00

47.11

461.69

49

8367.00

2479.11

990.00

44.00

431.20

8412.00

2492.44

990.00

44.00

431.20

51

8264.00

2448.59

1000.00

44.44

435.56

52

8436.00

2499.56

990.00

44.00

431.20

8476.00

2511.41

950.00

42.22

413.78

54

8518.00

2523.85

950.00

42.22

413.78

55

8524.00

2525.63

980.00

43.56

426.84

8595.00

2546.67

960.00

42.67

418.13

57

8436.00

2499.56

940.00

41.78

409.42

58

8756.00

2594.37

990.00

44.00

431.20

8555.00

2534.81

1000.00

44.44

435.56

60

8692.00

2575.41

1020.00

45.33

444.27

61

8520.00

2524.44

960.00

42.67

418.13

8514.00

2522.67

950.00

42.22

413.78

63

8642.00

2560.59

910.00

40.44

396.36

64

8647.00

2562.07

990.00

44.00

431.20

8543.00

2531.26

970.00

43.11

422.49

66

8619.00

2553.78

950.00

42.22

413.78

67

8626.00

2555.85

980.00

43.56

426.84

8594.00

2546.37

1000.00

44.44

435.56

69

8596.00

2546.96

980.00

43.56

426.84

70

8620.00

2554.07

960.00

42.67

418.13

47

50

53

56

59

62

65

68

23-Aug-08

29-Aug-08

2-Sep-08

2-Sep-08

2-Sep-08

2-Sep-08

2-Sep-08

3-Sep-08

4-Sep-08

A -Row J1

A -Row J3

A -Row J7

A -Row J7

A -Row J7

A -Row J7

A -Row J7

A -Row J7

J7 Raft

450.07

432.65

419.59

418.13

437.01 2.45

409.42

422.49

429.75

419.59

43.33

5.66

Degree of Quality control is good

71

8484.00

2513.78

980.00

43.56

426.84

72

8600.00

2548.15

950.00

42.22

413.78

73

8687.00

2573.93

980.00

43.56

426.84

8588.00

2544.59

930.00

41.33

405.07

75

8372.00

2480.59

970.00

43.11

422.49

76

8447.00

2502.81

950.00

42.22

413.78

8244.00

2442.67

970.00

43.11

422.49

78

8305.00

2460.74

970.00

43.11

422.49

79

8498.00

2517.93

930.00

41.33

405.07

8354.00

2475.26

910.00

40.44

396.36

81

8352.00

2474.67

960.00

42.67

418.13

82

8179.00

2423.41

960.00

42.67

418.13

8304.00

2460.44

920.00

40.89

400.71

8568.00

2538.67

950.00

42.22

413.78

8561.00

2536.59

1020.00

45.33

444.27

8693.00

2575.70

1000.00

44.44

435.56

8537.00

2529.48

1000.00

44.44

435.56

8403.00

2489.78

1080.00

48.00

470.40

8418.00

2494.22

1020.00

45.33

444.27

8381.00

2483.26

1050.00

46.67

457.33

8403.00

2489.78

960.00

42.67

418.13

8377.00

2494.22

980.00

43.56

426.84

8394.00

2483.26

1000.00

44.44

435.56

8496.00

2489.78

990.00

44.00

431.20

8411.00

2482.07

950.00

42.22

413.78

74

77

80

83

4-Sep-08

4-Sep-08

4-Sep-08

4-Sep-08

4-Sep-08

J7 Raft

J7 Raft

J7 Raft

J7 Raft

J7 Raft

84 85 86

9-Sep-08

J8 Raft Grid 13 with beam

87 88 89

9-Sep-08

J8 Raft Grid 13 with beam

90 91 92

10-Sep-08

J8 Raft Grid 13 with beam

93 94 95

10-Sep-08

J8 Raft Grid 13 with beam

419.59

418.13

419.59

406.52

410.87

438.46

457.33 1.70

426.84

423.94

16.62

10.20

Degree of Quality control is good

10-Sep-08

J8 Raft Grid 13 with beam

96

423.94 8378.00

2487.11

980.00

43.56

426.84

8504.00

2517.33

1250.00

55.56

544.44

8438.00

2492.15

1150.00

51.11

500.89

8426.00

2482.37

1170.00

52.00

509.60

8419.00

2519.70

1100.00

48.89

479.11

8383.00

2500.15

1050.00

46.67

457.33

8394.00

2496.59

1000.00

44.44

435.56

8513.00

2494.52

1000.00

44.44

435.56

8479.00

2483.85

990.00

44.00

431.20

8429.00

2487.11

980.00

43.56

426.84

8397.00

2522.37

990.00

44.00

431.20

8331.00

2512.30

960.00

42.67

418.13

108

8377.00

2497.48

950.00

42.22

413.78

109

8459.00

2488.00

930.00

41.33

405.07

8298.00

2468.44

990.00

44.00

431.20

111

8378.00

2482.07

900.00

40.00

392.00

112

8422.00

2506.37

950.00

42.22

413.78

8467.00

2458.67

1030.00

45.78

448.62

8315.00

2482.37

1010.00

44.89

439.91

115

0.00

1010.00

44.89

439.91

116

0.00

1010.00

44.89

439.91

117

0.00

1010.00

44.89

439.91

118

0.00

1010.00

44.89

439.91

119

0.00

1010.00

44.89

439.91

120

0.00

1010.00

44.89

439.91

97 98

11-Sep-08

J8 Raft Grid 13 with beam

99 100 101

11-Sep-08

J8 Raft Grid 13 with beam

102 103 104

11-Sep-08

J8 Raft Grid 13 with beam

105 106 107

110

113 114

11-Sep-08

24-Sep-08

25-Nov-08

J8 Raft Grid 13 with beam

J1 Raft Grid 12

Shear wall J2 Raft

518.31

457.33

431.20

421.04

409.42

434.10

439.91

439.91 3.22

31.51

10.20

Degree of Quality control is good .Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 24 observations therefore 06 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, B Row, Unit No 6

Sr.No.

Date of Casting

Cube compressive strength at age of 28 days Weight of sample Average Location of Sized 150 mm x Density of Standard Compressive Compressive compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in deviation strength in strength of the in gms N /mm2 kg/cm2 sample in Kg/cm2

1

8509.00

2521.19

880.00

39.11

383.29

8516.00

2523.26

960.00

42.67

418.13

3

8414.00

2493.04

910.00

40.44

396.36

4

8406.00

2490.67

950.00

42.22

413.78

8454.00

2504.89

920.00

40.89

400.71

6

8396.00

2487.70

910.00

40.44

396.36

7

8599.00

2547.85

870.00

38.67

378.93

8599.00

2547.85

950.00

42.22

413.78

9

8551.00

2533.63

870.00

38.67

378.93

10

8513.00

2522.37

950.00

42.22

413.78

8489.00

2515.26

980.00

43.56

426.84

12

8639.00

2559.70

930.00

41.33

405.07

13

8713.00

2581.63

1030.00

45.78

448.62

8691.00

2575.11

1000.00

44.44

435.56

8717.00

2582.81

1020.00

45.33

444.27

8472.00

2510.22

950.00

42.22

413.78

8389.00

2485.63

800.00

35.56

348.44

8325.00

2466.67

850.00

37.78

370.22

8447.00

2502.81

1010.00

44.89

439.91

8423.00

2495.70

810.00

36.00

352.80

8303.00

2460.15

1050.00

46.67

457.33

2

5

8

11

14

6-Aug-08

B-Row

6-Aug-08

7-Aug-08

7-Aug-08

9-Aug-08

15 16 17

13-Sep-08

J4 Raft Grid 13

18 19 20 21

19-Sep-08

J6 Raft Grid 14,15,16 with beam

399.26

403.61

390.55

415.23

442.81

377.48

416.68

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

22

8502.00

2519.11

1010.00

44.89

439.91

8459.00

2506.37

1050.00

46.67

457.33

8580.00

2542.22

1100.00

48.89

479.11

8399.00

2488.59

900.00

40.00

392.00

8537.00

2529.48

1090.00

48.44

474.76

8264.00

2448.59

1030.00

45.78

448.62

8616.00

2552.89

870.00

38.67

378.93

8547.00

2532.44

890.00

39.56

387.64

8694.00

2576.00

990.00

44.00

431.20

8434.00

2498.96

930.00

41.33

405.07

8356.00

2475.85

980.00

43.56

426.84

8348.00

2473.48

1000.00

44.44

435.56

8543.00

2531.26

890.00

39.56

387.64

8434.00

2498.96

900.00

40.00

392.00

36

8429.00

2497.48

950.00

42.22

413.78

37

8337.00

2470.22

1100.00

48.89

479.11

8303.00

2460.15

960.00

42.67

418.13

39

8358.00

2476.44

1080.00

48.00

470.40

40

8454.00

2504.89

1060.00

47.11

461.69

8402.00

2489.48

900.00

40.00

392.00

42

8339.00

2470.81

1100.00

48.89

479.11

43

8505.00

2520.00

1000.00

44.44

435.56

8571.00

2539.56

980.00

43.56

426.84

45

8554.00

2534.52

1030.00

45.78

448.62

46

8493.00

2516.44

1040.00

46.22

452.98

23

19-Sep-08

J6 Raft Grid 14,15,16 with beam

24 25 26

20-Sep-08

J6 Raft Grid 14,15,16 with beam

27 28 29

20-Sep-08

J6 Raft Grid 14,15,16 with beam

30 31 32

20-Sep-08

J6 Raft Grid 14,15,16 with beam

33 34 35

38

41

44

20-Sep-08

20-Oct-08

20-Oct-08

21-Oct-08

21-Oct-08

J6 Raft Grid 14,15,16 with beam

J14 Raft

J14 Raft

J14 Raft

J14 Raft

458.79

438.46

399.26 3.49

422.49

397.81

455.88

444.27

437.01

450.07

42.27

8.26

Degree of Quality control is good

47

21-Oct-08

J14 Raft

8391.00

2486.22

1010.00

44.89

439.91

8535.00

2528.89

1050.00

46.67

457.33

8320.00

2465.19

920.00

40.89

400.71

8569.00

2538.96

960.00

42.67

418.13

8436.00

2499.56

960.00

42.67

418.13

52

990.00

44.00

431.20

53

990.00

44.00

431.20

54

990.00

44.00

431.20

55

990.00

44.00

431.20

56

990.00

44.00

431.20

57

990.00

44.00

431.20

58

990.00

44.00

431.20

59

990.00

44.00

431.20

60

990.00

44.00

431.20

48 49 50 51

27-Nov-08

Shear wall Grid 12 13

450.07

412.33

431.20

431.20

431.20 2.40

44.01

5.46

Degree of Quality control is good .Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 21 observations therefore 09 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, C Row ,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1 2

5-Sep-08

C -Row J8 with beam

3 4 5

5-Sep-08

C -Row J8 with beam

6 7 8

5-Sep-08

C -Row J8 with beam

9 10 11

6-Sep-08

C -Row J8 with beam

12 13 14

6-Sep-08

C -Row J8 with beam

15 16 17

6-Sep-08

C -Row J8 with beam

18 19 20

6-Sep-08

C -Row J8 with beam

Compressive strength in kg/cm2

8494.00

2516.74

1000.00

44.44

435.56

8604.00

2549.33

990.00

44.00

431.20

8594.00

2546.37

1000.00

44.44

435.56

8606.00

2549.93

930.00

41.33

405.07

8688.00

2574.22

940.00

41.78

409.42

8644.00

2561.19

890.00

39.56

387.64

8508.00

2520.89

840.00

37.33

365.87

8692.00

2575.41

840.00

37.33

365.87

8644.00

2561.19

960.00

42.67

418.13

8782.00

2602.07

970.00

43.11

422.49

8630.00

2557.04

990.00

44.00

431.20

8698.00

2577.19

950.00

42.22

413.78

8580.00

2542.22

920.00

40.89

400.71

8584.00

2543.41

960.00

42.67

418.13

8481.00

2512.89

920.00

40.89

400.71

8438.00

2500.15

920.00

40.89

400.71

8388.00

2485.33

900.00

40.00

392.00

8369.00

2479.70

930.00

41.33

405.07

8538.00

2529.78

990.00

44.00

431.20

8463.00

2507.56

920.00

40.89

400.71

Average Standard compressive deviation strength of the sample in Kg/cm2

434.10

400.71

383.29

422.49

406.52

399.26

418.13

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

6-Sep-08

C -Row J8 with beam

418.13

21

8330.00

2468.15

970.00

43.11

422.49

22

8428.00

2497.19

970.00

43.11

422.49

8362.00

2477.63

940.00

41.78

409.42

24

8600.00

2548.15

900.00

40.00

392.00

25

8393.00

2486.81

900.00

40.00

392.00

8538.00

2529.78

930.00

41.33

405.07

27

8682.00

2572.44

960.00

42.67

418.13

28

8482.00

2513.19

980.00

43.56

426.84

8589.00

2544.89

960.00

42.67

418.13

8487.00

2514.67

940.00

41.78

409.42

8321.00

2465.48

910.00

40.44

396.36

8334.00

2469.33

900.00

40.00

392.00

8275.00

2451.85

900.00

40.00

392.00

8413.00

2492.74

930.00

41.33

405.07

8531.00

2527.70

890.00

39.56

387.64

8445.00

2502.22

900.00

40.00

392.00

8442.00

2501.33

910.00

40.44

396.36

8491.00

2515.85

930.00

41.33

405.07

8218.00

2434.96

900.00

40.00

392.00

8042.00

2382.81

890.00

39.56

387.64

8145.00

2413.33

940.00

41.78

409.42

8136.00

2410.67

950.00

42.22

413.78

8235.00

2440.00

1010.00

44.89

439.91

8336.00

2469.93

1020.00

45.33

444.27

8266.00

2449.19

1000.00

44.44

435.56

23

26

29

6-Sep-08

6-Sep-08

6-Sep-08

C -Row J8 with beam

C -Row J8 with beam

C -Row J8 with beam

30 31 32

22-Sep-08

33 34 35

22-Sep-08

36 37 38

22-Sep-08

39 40 41

22-Sep-08

42 43 44 45

23-Sep-08

J9 -Raft Grid 13,14,15 ,16 with beam

J9 -Raft Grid 13,14,15 ,16 with beam

J9 -Raft Grid 13,14,15 ,16 with beam

J9 -Raft Grid 13,14,15 ,16 with beam

J9 -Raft Grid 13,14,15 ,16 with beam

407.97

405.07

418.13 1.84

393.45

394.90

397.81

403.61

439.91

41.79

4.41

Degree of Quality control is good

46

8301.00

2459.56

1050.00

46.67

457.33

8440.00

2500.74

1000.00

44.44

435.56

8249.00

2444.15

1040.00

46.22

452.98

8466.00

2508.44

1000.00

44.44

435.56

8249.00

2444.15

980.00

43.56

426.84

8378.00

2482.37

1010.00

44.89

439.91

8423.00

2495.70

800.00

35.56

348.44

8332.00

2468.74

870.00

38.67

378.93

8338.00

2470.52

740.00

32.89

322.31

8324.00

2466.37

810.00

36.00

352.80

8480.00

2512.59

830.00

36.89

361.51

8392.00

2486.52

830.00

36.89

361.51

58

1090.00

48.44

474.76

59

1090.00

48.44

474.76

60

1090.00

48.44

474.76

47

23-Sep-08

48 49 50

23-Sep-08

51

J9 -Raft Grid 13,14,15 ,16 with beam

J9 -Raft Grid 13,14,15 ,16 with beam

52 53

20-Oct-08

J1A -Raft with beam

54 55 56 57

20-Oct-08

J1A -Raft with beam

448.62

434.10

349.90

358.61

474.76 4.02

41.79

9.62

Degree of Quality control is good.Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 27 observations therefore 03 observations are presumed as an average.

Updated 02.10.2008

UPDATED 21.01.2009 Grade of concrete M30, D Row,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8515.00

2522.96

950.00

42.22

413.78

8676.00

2570.67

900.00

40.00

392.00

3

8559.00

2536.00

920.00

40.89

400.71

4

8438.00

2500.15

910.00

40.44

396.36

8334.00

2469.33

930.00

41.33

405.07

6

8401.00

2489.19

880.00

39.11

383.29

7

8436.00

2499.56

890.00

39.56

387.64

8404.00

2490.07

970.00

43.11

422.49

9

8442.00

2501.33

930.00

41.33

405.07

10

8616.00

2552.89

920.00

40.89

400.71

8505.00

2520.00

960.00

42.67

418.13

12

8536.00

2529.19

1000.00

44.44

435.56

13

8644.00

2561.19

900.00

40.00

392.00

8581.00

2542.52

970.00

43.11

422.49

15

8554.00

2534.52

950.00

42.22

413.78

16

8549.00

2533.04

980.00

43.56

426.84

8671.00

2569.19

960.00

42.67

418.13

18

8665.00

2567.41

1010.00

44.89

439.91

19

8372.00

2480.59

850.00

37.78

370.22

8514.00

2522.67

900.00

40.00

392.00

2

5

8

11

14

17

20

27-Aug-08

27-Aug-08

27-Aug-08

27-Aug-08

27-Aug-08

27-Aug-08

28-Aug-08

D -Row J10

D -Row J10

D -Row J10

D -Row J10

D -Row J10

D -Row J10

D -Row J10

Average Standard compressive deviation strength of the sample in Kg/cm2

402.16

394.90

405.07

418.13

409.42

428.30

387.64

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

28-Aug-08

D -Row J10

387.64

21

8409.00

2491.56

920.00

40.89

400.71

22

8573.00

2540.15

930.00

41.33

405.07

8573.00

2540.15

910.00

40.44

396.36

24

8503.00

2519.41

940.00

41.78

409.42

25

8447.00

2502.81

750.00

33.33

326.67

8484.00

2513.78

950.00

42.22

413.78

27

8492.00

2516.15

900.00

40.00

392.00

28

8306.00

2461.04

870.00

38.67

378.93

8465.00

2508.15

930.00

41.33

405.07

30

8293.00

2457.19

850.00

37.78

370.22

31

8506.00

2520.30

840.00

37.33

365.87

8316.00

2464.00

910.00

40.44

396.36

33

8350.00

2474.07

880.00

39.11

383.29

34

8556.00

2535.11

960.00

42.67

418.13

8487.00

2514.67

920.00

40.89

400.71

36

8389.00

2485.63

870.00

38.67

378.93

37

8424.00

2496.00

910.00

40.44

396.36

8357.00

2476.15

980.00

43.56

426.84

39

8639.00

2559.70

990.00

44.00

431.20

40

8420.00

2494.81

960.00

42.67

418.13

8653.00

2563.85

930.00

41.33

405.07

8494.00

2516.74

900.00

40.00

392.00

8301.00

2459.56

950.00

42.22

413.78

8409.00

2491.56

990.00

44.00

431.20

8347.00

2473.19

910.00

40.44

396.36

23

26

29

32

35

38

41

28-Aug-08

26-Sep-08

26-Sep-08

26-Sep-08

26-Sep-08

27-Sep-08

27-Sep-08

D -Row J10

J10 Raft Grid 1

J10 Raft Grid 1

J10 Raft Grid 1

J10 Raft Grid 1

J10 Raft Grid 1

J10 Raft Grid 1

42 43 44 45

27-Sep-08

J10 Raft Grid 1

403.61

377.48

384.74 2.26

381.84

399.26

418.13

405.07

413.78

40.93

5.53

Degree of Quality control is good.

46

8406.00

2490.67

910.00

40.44

396.36

8278.00

2452.74

900.00

40.00

392.00

8410.00

2491.85

910.00

40.44

396.36

8281.00

2453.63

960.00

42.67

418.13

8159.00

2417.48

930.00

41.33

405.07

8332.00

2468.74

900.00

40.00

392.00

8525.00

2525.93

920.00

40.89

400.71

8602.00

2548.74

970.00

43.11

422.49

8447.00

2502.81

900.00

40.00

392.00

55

0.00

920.00

40.89

400.71

56

0.00

920.00

40.89

400.71

57

0.00

920.00

40.89

400.71

58

0.00

920.00

40.89

400.71

59

0.00

920.00

40.89

400.71

60

0.00

920.00

40.89

400.71

47

27-Sep-08

J10 Raft Grid 1

48 49 50

27-Sep-08

J10 Raft Grid 1

51 52 53 54

27-Sep-08

J10 Raft Grid 1

394.90

405.07

405.07

400.71

400.71 1.52

41.07

3.70

Degree of Quality control is good Based on calculation with figures appearing in Bold Red which are presumtive figures. In actual there are 24 observations therefore 6 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, N Row,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8559.00

2536.00

950.00

42.22

413.78

8663.00

2566.81

820.00

36.44

357.16

3

8645.00

2561.48

900.00

40.00

392.00

4

8535.00

2528.89

1000.00

44.44

435.56

8545.00

2531.85

960.00

42.67

418.13

6

8601.00

2548.44

980.00

43.56

426.84

7

8556.00

2535.11

980.00

43.56

426.84

8613.00

2552.00

990.00

44.00

431.20

9

8637.00

2559.11

1000.00

44.44

435.56

10

8670.00

2568.89

1010.00

44.89

439.91

8720.00

2583.70

950.00

42.22

413.78

12

8597.00

2547.26

970.00

43.11

422.49

13

8633.00

2557.93

920.00

40.89

400.71

8682.00

2572.44

950.00

42.22

413.78

15

8608.00

2550.52

970.00

43.11

422.49

16

8610.00

2551.11

1100.00

48.89

479.11

8738.00

2589.04

1000.00

44.44

435.56

18

8688.00

2574.22

1040.00

46.22

452.98

19

8781.00

2601.78

1020.00

45.33

444.27

8800.00

2607.41

1080.00

48.00

470.40

2

5

8

11

14

17

20

19-Aug-08

19-Aug-08

19-Aug-08

19-Aug-08

20-Aug-08

20-Aug-08

20-Aug-08

N-row J11 J12 Raft

N-row J11 J12 Raft

N-row J11 J12 Raft

N-row J11 J12 Raft

N-row J11 J12 Raft

N-row J11 J12 Raft

N-row J11 J12 Raft

Average Standard compressive deviation strength of the sample in Kg/cm2

387.64

426.84

431.20

425.39

412.33

455.88

454.43

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

20-Aug-08

N-row J11 J12 Raft

454.43

21

8737.00

2588.74

1030.00

45.78

448.62

22

8858.00

2624.59

1000.00

44.44

435.56

8585.00

2543.70

980.00

43.56

426.84

24

8648.00

2562.37

960.00

42.67

418.13

25

8632.00

2557.63

1000.00

44.44

435.56

8566.00

2538.07

980.00

43.56

426.84

27

8735.00

2588.15

970.00

43.11

422.49

28

8378.00

2482.37

840.00

37.33

365.87

8534.00

2528.59

880.00

39.11

383.29

30

8594.00

2546.37

940.00

41.78

409.42

31

8633.00

2557.93

920.00

40.89

400.71

8642.00

2560.59

950.00

42.22

413.78

33

8634.00

2558.22

880.00

39.11

383.29

34

8632.00

2557.63

850.00

37.78

370.22

8610.00

2551.11

870.00

38.67

378.93

36

8596.00

2546.96

900.00

40.00

392.00

37

8681.00

2572.15

920.00

40.89

400.71

8839.00

2618.96

900.00

40.00

392.00

39

8634.00

2558.22

910.00

40.44

396.36

40

8723.00

2584.59

1010.00

44.89

439.91

8785.00

2602.96

930.00

41.33

405.07

8741.00

2589.93

920.00

40.89

400.71

8586.00

2544.00

960.00

42.67

418.13

8624.00

2555.26

940.00

41.78

409.42

8574.00

2540.44

980.00

43.56

426.84

23

26

29

32

35

38

41

20-Aug-08

25-Aug-08

25-Aug-08

25-Aug-08

25-Aug-08

25-Aug-08

26-Aug-08

N-row J11 J12 Raft

N-row J11 Raft

N-row J11 Raft

N-row J11 Raft

N-row J11 Raft

N-row J11 Raft

N-row J12 Raft

42 43 44 45

26-Aug-08

N-row J12 Raft

426.84

428.30

386.19 2.66

399.26

380.39

396.36

415.23

418.13

43.21

6.16

Degree of Quality control is good

46

8554.00

2534.52

1000.00

44.44

435.56

8580.00

2542.22

990.00

44.00

431.20

8581.00

2542.52

970.00

43.11

422.49

8557.00

2535.41

920.00

40.89

400.71

8627.00

2556.15

940.00

41.78

409.42

8577.00

2541.33

930.00

41.33

405.07

8699.00

2577.48

1020.00

45.33

444.27

8790.00

2604.44

1000.00

44.44

435.56

8788.00

2603.85

950.00

42.22

413.78

55

0.00

940.00

41.78

409.42

56

0.00

940.00

41.78

409.42

57

0.00

940.00

41.78

409.42

58

0.00

940.00

41.78

409.42

59

0.00

940.00

41.78

409.42

60

0.00

940.00

41.78

409.42

47

26-Aug-08

N-row J12 Raft

48 49 50

26-Aug-08

N-row J12 Raft

51 52 53 54

26-Aug-08

N-row J12 Raft

429.75

405.07

431.20

409.42

409.42 1.78

41.78

4.26

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 24 observations therefore 6 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, CCB ,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8513.00

2522.37

1210.00

53.78

527.02

8603.00

2549.04

1280.00

56.89

557.51

3

8431.00

2498.07

1200.00

53.33

522.67

4

8633.00

2557.93

1150.00

51.11

500.89

8864.00

2626.37

1170.00

52.00

509.60

6

8631.00

2557.33

1130.00

50.22

492.18

7

8660.00

2565.93

1010.00

44.89

439.91

8586.00

2544.00

1050.00

46.67

457.33

9

8724.00

2584.89

1100.00

48.89

479.11

10

8813.00

2611.26

1020.00

45.33

444.27

8621.00

2554.37

1070.00

47.56

466.04

12

8470.00

2509.63

1000.00

44.44

435.56

13

8741.00

2589.93

800.00

35.56

348.44

8730.00

2586.67

1000.00

44.44

435.56

15

8798.00

2606.81

950.00

42.22

413.78

16

8710.00

2580.74

1010.00

44.89

439.91

8751.00

2592.89

980.00

43.56

426.84

18

8923.00

2643.85

960.00

42.67

418.13

19

8681.00

2572.15

1020.00

45.33

444.27

8698.00

2577.19

1000.00

44.44

435.56

2

5

8

11

14

17

20

17-Jul-08

17-Jul-08

17-Jul-08

17-Jul-08

23-Jul-08

23-Jul-08

23-Jul-08

J1Raft

J1Raft

J1Raft

J1Raft

J2 Raft

J2 Raft

J2 Raft

Average Standard compressive deviation strength of the sample in Kg/cm2

535.73

500.89

458.79

448.62

399.26

428.30

434.10

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

23-Jul-08

J2 Raft

434.10

21

8871.00

2628.44

970.00

43.11

422.49

22

8789.00

2604.15

1030.00

45.78

448.62

8731.00

2586.96

980.00

43.56

426.84

24

8906.00

2638.81

990.00

44.00

431.20

25

8724.00

2584.89

1000.00

44.44

435.56

8775.00

2600.00

1000.00

44.44

435.56

27

8876.00

2629.93

1010.00

44.89

439.91

28

8710.00

2580.74

910.00

40.44

396.36

8764.00

2596.74

950.00

42.22

413.78

30

8647.00

2562.07

790.00

35.11

344.09

31

8578.00

2541.63

960.00

42.67

418.13

8819.00

2613.04

980.00

43.56

426.84

33

8813.00

2611.26

990.00

44.00

431.20

34

8740.00

2589.63

900.00

40.00

392.00

8661.00

2566.22

980.00

43.56

426.84

36

8612.00

2551.70

960.00

42.67

418.13

37

8779.00

2601.19

970.00

43.11

422.49

8798.00

2606.81

980.00

43.56

426.84

39

8956.00

2653.63

1020.00

45.33

444.27

40

8568.00

2538.67

970.00

43.11

422.49

8548.00

2532.74

990.00

44.00

431.20

42

8514.00

2522.67

980.00

43.56

426.84

43

8422.00

2495.41

900.00

40.00

392.00

8417.00

2493.93

1030.00

45.78

448.62

8316.00

2464.00

980.00

43.56

426.84

23

26

29

32

35

38

41

44 45

23-Jul-08

25-Jul-08

25-Jul-08

25-Jul-08

25-Jul-08

26-Jul-08

26-Jul-08

23-Oct-08

J2 Raft

J3 Raft

J3 Raft

J3 Raft

J3 Raft

J2Raft

J2Raft

J4 Raft

435.56

437.01

384.74 4.76

425.39

412.33

431.20

426.84

422.49

45.54

10.45

Degree of Quality control is good

46

8303.00

2460.15

990.00

44.00

431.20

8672.00

2569.48

1010.00

44.89

439.91

48

8376.00

2481.78

980.00

43.56

426.84

49

8343.00

2472.00

950.00

42.22

413.78

8316.00

2464.00

970.00

43.11

422.49

51

8310.00

2462.22

1000.00

44.44

435.56

52

8315.00

2463.70

1010.00

44.89

439.91

8380.00

2482.96

1040.00

46.22

452.98

54

8335.00

2469.63

1000.00

44.44

435.56

55

8481.00

2512.89

1000.00

44.44

435.56

8517.00

2523.56

930.00

41.33

405.07

57

8335.00

2469.63

910.00

40.44

396.36

58

8456.00

2505.48

1020.00

45.33

444.27

8491.00

2515.85

960.00

42.67

418.13

60

8471.00

2509.93

1000.00

44.44

435.56

61

8310.00

2462.22

940.00

41.78

409.42

8322.00

2465.78

980.00

43.56

426.84

63

8275.00

2451.85

970.00

43.11

422.49

64

8530.00

2527.41

910.00

40.44

396.36

8482.00

2513.19

940.00

41.78

409.42

66

8245.00

2442.96

900.00

40.00

392.00

67

8550.00

2533.33

970.00

43.11

422.49

8547.00

2532.44

950.00

42.22

413.78

8629.00

2556.74

960.00

42.67

418.13

8306.00

2461.04

920.00

40.89

400.71

47

50

53

56

59

62

65

68

23-Oct-08

23-Oct-08

23-Oct-08

24-Oct-08

24-Oct-08

24-Oct-08

24-Oct-08

24-Oct-08

J4 Raft

J4 Raft

J4 Raft

J4 Raft

J4 Raft

J4 Raft

J4 Raft

J4 Raft

69 70 30-Oct-08

J2 foundation shear wall Grid 2/D

432.65

423.94

442.81

412.33

432.65 1.56

419.59

399.26

418.13

413.78

43.50

3.58

Degree of Quality control is good

71

J2 foundation shear wall Grid 2/D

8236.00

2440.30

930.00

41.33

405.07

8117.00

2405.04

1000.00

44.44

435.56

73

0.00

940.00

41.78

409.42

74

0.00

940.00

41.78

409.42

75

0.00

940.00

41.78

409.42

76

0.00

940.00

41.78

409.42

77

0.00

940.00

41.78

409.42

78

0.00

940.00

41.78

409.42

79

0.00

940.00

41.78

409.42

80

0.00

940.00

41.78

409.42

81

0.00

940.00

41.78

409.42

82

0.00

940.00

41.78

409.42

83

0.00

940.00

41.78

409.42

84

0.00

940.00

41.78

409.42

85

0.00

940.00

41.78

409.42

86

0.00

940.00

41.78

409.42

87

0.00

940.00

41.78

409.42

88

0.00

940.00

41.78

409.42

89

0.00

940.00

41.78

409.42

90

0.00

940.00

41.78

409.42

72

30-Oct-08

413.78

409.42

409.42

409.42

409.42

409.42

409.42 0.83

41.91

1.99

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 12 observations therefore 18 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, Main Plant Building ,Unit No 6

Sr.No.

Date of Casting

Cube compressive strength at age of 28 days Weight of sample Average Location of Sized 150 mm x Density of Standard Compressive Compressive compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in deviation strength in strength of the in gms N /mm2 kg/cm2 sample in Kg/cm2

20-Aug-08

J4R aft with beam

1

8828.00

2615.70

960.00

42.67

418.13

8712.00

2581.33

980.00

43.56

426.84

8661.00

2566.22

1050.00

46.67

457.33

8633.00

2557.93

950.00

42.22

413.78

8674.00

2570.07

970.00

43.11

422.49

8640.00

2560.00

990.00

44.00

431.20

8642.00

2560.59

980.00

43.56

426.84

8650.00

2562.96

920.00

40.89

400.71

8590.00

2545.19

1010.00

44.89

439.91

8528.00

2526.81

970.00

43.11

422.49

8645.00

2561.48

1020.00

45.33

444.27

8703.00

2578.67

920.00

40.89

400.71

8508.00

2520.89

1000.00

44.44

435.56

8772.00

2599.11

980.00

43.56

426.84

8546.00

2532.15

1010.00

44.89

439.91

16

0.00

980.00

43.56

426.84

17

0.00

980.00

43.56

426.84

18

0.00

980.00

43.56

426.84

19

0.00

980.00

43.56

426.84

20

0.00

980.00

43.56

426.84

21

0.00

980.00

43.56

426.84

2 3 4 5

20-Aug-08

J4R aft with beam

6 7 8

20-Aug-08

J4R aft with beam

9 10 11

21-Aug-08

J4R aft with beam

12 13 14 15

21-Aug-08

J4R aft with beam

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

434.10

422.49

422.49

422.49

434.10

426.84

426.84

Degree of Quality control

22

0.00

980.00

43.56

426.84

23

0.00

980.00

43.56

426.84

24

0.00

980.00

43.56

426.84

25

0.00

980.00

43.56

426.84

26

0.00

980.00

43.56

426.84

27

0.00

980.00

43.56

426.84

28

0.00

980.00

43.56

426.84

29

0.00

980.00

43.56

426.84

30

0.00

980.00

43.56

426.84

426.84

426.84

426.84 1.09

43.57

2.51

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 15 observations therefore 15 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, FD Fan ,P A Fan,ID Fan,Coal Mill,Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8333.00

2469.04

990.00

44.00

431.20

8375.00

2481.48

940.00

41.78

409.42

3

8314.00

2463.41

960.00

42.67

418.13

4

8318.00

2464.59

900.00

40.00

392.00

8412.00

2492.44

1050.00

46.67

457.33

6

8188.00

2426.07

960.00

42.67

418.13

7

8158.00

2417.19

960.00

42.67

418.13

8266.00

2449.19

1020.00

45.33

444.27

9

8361.00

2477.33

990.00

44.00

431.20

10

8486.00

2514.37

980.00

43.56

426.84

8453.00

2504.59

900.00

40.00

392.00

12

8244.00

2442.67

920.00

40.89

400.71

13

8320.00

2465.19

940.00

41.78

409.42

8316.00

2464.00

980.00

43.56

426.84

15

8357.00

2476.15

950.00

42.22

413.78

16

8336.00

2469.93

900.00

40.00

392.00

8420.00

2494.81

940.00

41.78

409.42

8449.00

2503.41

1000.00

44.44

435.56

8390.00

2485.93

1040.00

46.22

452.98

8427.00

2496.89

970.00

43.11

422.49

2

5

8

11

14

17

27-Oct-08

27-Oct-08

30-Oct-08

30-Oct-08

30-Oct-08

11-Nov-08

FD Fan

FD Fan J1 J2

FD Fan

FD Fan

FD Fan

FD Fan J2 with beam

18 19 20

11-Nov-08

FD Fan J2 with beam

Average Standard compressive deviation strength of the sample in Kg/cm2

419.59

422.49

431.20

406.52

416.68

412.33

434.10

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

11-Nov-08

FD Fan J2 with beam

434.10

21

8392.00

2486.52

980.00

43.56

426.84

22

8620.00

2554.07

1010.00

44.89

439.91

8530.00

2527.41

970.00

43.11

422.49

24

8329.00

2467.85

940.00

41.78

409.42

25

8532.00

2528.00

1000.00

44.44

435.56

8446.00

2502.52

960.00

42.67

418.13

27

8509.00

2521.19

1060.00

47.11

461.69

28

8174.00

2421.93

950.00

42.22

413.78

8068.00

2390.52

900.00

40.00

392.00

8182.00

2424.30

880.00

39.11

383.29

8543.00

2531.26

920.00

40.89

400.71

8469.00

2509.33

990.00

44.00

431.20

8320.00

2465.19

920.00

40.89

400.71

8540.00

2530.37

1010.00

44.89

439.91

8539.00

2530.07

970.00

43.11

422.49

8362.00

2477.63

970.00

43.11

422.49

8329.00

2467.85

900.00

40.00

392.00

8356.00

2475.85

860.00

38.22

374.58

8388.00

2485.33

930.00

41.33

405.07

8536.00

2529.19

900.00

40.00

392.00

8432.00

2498.37

990.00

44.00

431.20

8569.00

2538.96

960.00

42.67

418.13

8569.00

2538.96

890.00

39.56

387.64

8438.00

2500.15

910.00

40.44

396.36

8469.00

2509.33

930.00

41.33

405.07

23

26

29

24-Nov-08

24-Nov-08

26-Nov-08

FD Fan J4 with beam

FD Fan J4 with beam

FD Fan J3

30 31 32

29-Nov-08

33 34 35

29-Nov-08

36 37 38

1-Dec-08

39 40 41

3-Dec-08

42

Coal mill foundation CD 13 and 14

Coal mill foundation CD 13 and 14

CCB unit 6 Connecting wall grid 12 and 13 Coal mill foundation second lift CD 18 and 17

43 44 45

4-Dec-08

CW Pit RCC Wall

423.94

438.46

396.36 2.03

410.87

428.30

390.55

413.78

396.36

42.87

4.74

Degree of Quality control is good

46 47

4-Dec-08

CW Pit RCC Wall

48 49 50

4-Dec-08

CW Pit RCC Wall

51 52 53

5-Dec-08

54 55 56

5-Dec-08

57 58 59

5-Dec-08

60 61 62

6-Dec-08

63 64 65

6-Dec-08

66 67 68

11-Dec-08

69 70 11-Dec-08

Coal mill foundation CD 16 and 15

Coal mill foundation CD 16 and 15

Coal mill foundation CD 16 and 15

Coal mill foundation CD 15 and 14

Coal mill foundation CD 15 and 14

Coal mill foundation CD 17 and 16

Coal mill foundation CD 17 and 16

8580.00

2542.22

940.00

41.78

409.42

8568.00

2538.67

980.00

43.56

426.84

8329.00

2467.85

950.00

42.22

413.78

8336.00

2469.93

900.00

40.00

392.00

8389.00

2485.63

860.00

38.22

374.58

8201.00

2429.93

940.00

41.78

409.42

8439.00

2500.44

980.00

43.56

426.84

8567.00

2538.37

930.00

41.33

405.07

8533.00

2528.30

910.00

40.44

396.36

8469.00

2509.33

1020.00

45.33

444.27

8331.00

2468.44

940.00

41.78

409.42

8325.00

2466.67

980.00

43.56

426.84

8365.00

2478.52

950.00

42.22

413.78

8469.00

2509.33

1000.00

44.44

435.56

8430.00

2497.78

970.00

43.11

422.49

8462.00

2507.26

1010.00

44.89

439.91

8381.00

2483.26

1030.00

45.78

448.62

8459.00

2506.37

970.00

43.11

422.49

8321.00

2465.48

980.00

43.56

426.84

8372.00

2480.59

1020.00

45.33

444.27

8360.00

2477.04

1000.00

44.44

435.56

8515.00

2522.96

910.00

40.44

396.36

8469.00

2509.33

970.00

43.11

422.49

8319.00

2464.89

970.00

43.11

422.49

8370.00

2480.00

930.00

41.33

405.07

416.68

392.00

409.42

426.84

423.94 1.86

437.01

435.56

413.78

409.42

41.93

4.43

Degree of Quality control is good

71

11-Dec-08

Coal mill foundation CD 17 and 16

8407.00

2490.96

950.00

42.22

413.78

8425.00

2496.30

940.00

41.78

409.42

8426.00

2496.59

900.00

40.00

392.00

8402.00

2489.48

960.00

42.67

418.13

8327.00

2467.26

970.00

43.11

422.49

8351.00

2474.37

1020.00

45.33

444.27

8405.00

2490.37

980.00

43.56

426.84

8485.00

2514.07

1000.00

44.44

435.56

79

0.00

970.00

43.11

422.49

80

0.00

970.00

43.11

422.49

81

0.00

970.00

43.11

422.49

82

0.00

970.00

43.11

422.49

83

0.00

970.00

43.11

422.49

84

0.00

970.00

43.11

422.49

85

0.00

970.00

43.11

422.49

86

0.00

970.00

43.11

422.49

87

0.00

970.00

43.11

422.49

88

0.00

970.00

43.11

422.49

89

0.00

970.00

43.11

422.49

90

0.00

970.00

43.11

422.49

72 73 74

11-Dec-08

75 76 77 78

11-Dec-08

Coal mill foundation CD 17 and 16

Coal mill foundation CD 17 and 16

409.42

410.87

435.56

422.49

422.49

422.49

422.49 1.27

43.19

2.94

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 18 observations therefore 12 observations are presumed as an average.

Updated 02.10.2008

UPDATED 26.01.2009 Grade of concrete M30, CHP , Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

11-Nov-08

Coal Mill Raft CD 19 - 18

1 2 3 4 5

11-Nov-08

Coal Mill Raft CD 19 - 18

6 7 8

12-Nov-08

Coal Mill Raft CD 18 - 17

9 10 11

12-Nov-08

Coal Mill Raft CD 18 - 17

12 13 14

13-Nov-08

Coal Mill Raft CD 16 - 15

15 16 17

18-Nov-08

Coal Mill Raft CD 15 - 14

18 19 20

18-Nov-08

Coal Mill Raft CD 15 - 14

Compressive strength in kg/cm2

8420.00

2494.81

1050.00

46.67

457.33

8382.00

2483.56

1020.00

45.33

444.27

8469.00

2509.33

1070.00

47.56

466.04

8315.00

2463.70

1020.00

45.33

444.27

8361.00

2477.33

980.00

43.56

426.84

8352.00

2474.67

1030.00

45.78

448.62

8202.00

2430.22

880.00

39.11

383.29

8155.00

2416.30

900.00

40.00

392.00

8215.00

2434.07

960.00

42.67

418.13

8216.00

2434.37

1040.00

46.22

452.98

8270.00

2450.37

980.00

43.56

426.84

8239.00

2441.19

1000.00

44.44

435.56

8219.00

2435.26

900.00

40.00

392.00

8063.00

2389.04

950.00

42.22

413.78

8205.00

2431.11

1030.00

45.78

448.62

8377.00

2482.07

900.00

40.00

392.00

8206.00

2431.41

940.00

41.78

409.42

8283.00

2454.22

890.00

39.56

387.64

8442.00

2501.33

910.00

40.44

396.36

8360.00

2477.04

920.00

40.89

400.71

Average Standard compressive deviation strength of the sample in Kg/cm2

455.88

439.91

397.81

438.46

418.13

396.36

412.33

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

18-Nov-08

Coal Mill Raft CD 15 - 14

21

412.33 8454.00

2504.89

1010.00

44.89

439.91

8132.00

2409.48

930.00

41.33

405.07

8368.00

2479.41

890.00

39.56

387.64

8289.00

2456.00

880.00

39.11

383.29

8266.00

2449.19

940.00

41.78

409.42

8362.00

2477.63

900.00

40.00

392.00

8235.00

2440.00

920.00

40.89

400.71

8332.00

2468.74

1010.00

44.89

439.91

8269.00

2450.07

1000.00

44.44

435.56

8456.00

2505.48

1050.00

46.67

457.33

8392.00

2486.52

980.00

43.56

426.84

8326.00

2466.96

930.00

41.33

405.07

8456.00

2505.48

970.00

43.11

422.49

34

0.00

0.00

0.00

0.00

35

0.00

0.00

0.00

0.00

36

0.00

0.00

0.00

0.00

37

0.00

0.00

0.00

0.00

38

0.00

0.00

0.00

0.00

39

0.00

0.00

0.00

0.00

40

0.00

0.00

0.00

0.00

41

0.00

0.00

0.00

0.00

42

0.00

0.00

0.00

0.00

43

0.00

0.00

0.00

0.00

44

0.00

0.00

0.00

0.00

45

0.00

0.00

0.00

0.00

22 23

19-Nov-08

Coal Mill Raft CD 14 - 13

24 25 26

19-Nov-08

Coal Mill Raft CD 14 - 13

27 28 29

24-Nov-08

Coal Mill Raft CD 17 - 16

30 31 32 33

24-Nov-08

Coal Mill Raft CD 17 - 16

392.00

400.71

444.27 2.67

418.13

0.00

0.00

0.00

0.00

42.81

6.24

Degree of Quality control is good

46

0.00

0.00

0.00

0.00

47

0.00

0.00

0.00

0.00

48

0.00

0.00

0.00

0.00

49

0.00

0.00

0.00

0.00

50

0.00

0.00

0.00

0.00

51

0.00

0.00

0.00

0.00

52

0.00

0.00

0.00

0.00

53

0.00

0.00

0.00

0.00

54

0.00

0.00

0.00

0.00

55

0.00

0.00

0.00

0.00

56

0.00

0.00

0.00

0.00

57

0.00

0.00

0.00

0.00

58

0.00

0.00

0.00

0.00

59

0.00

0.00

0.00

0.00

60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 13.02

4.27

305.21

UPDATED 21.01.2009 Grade of concrete M35, APL Culvert Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8421.00

2495.11

1120.00

49.78

487.82

8475.00

2511.11

1110.00

49.33

483.47

3

8495.00

2517.04

1080.00

48.00

470.40

4

8633.00

2557.93

830.00

36.89

361.51

8620.00

2554.07

950.00

42.22

413.78

6

8580.00

2542.22

1000.00

44.44

435.56

7

8530.00

2527.41

990.00

44.00

431.20

8420.00

2494.81

970.00

43.11

422.49

9

8550.00

2533.33

1010.00

44.89

439.91

10

8570.00

2539.26

940.00

41.78

409.42

8709.00

2580.44

900.00

40.00

392.00

12

8649.00

2562.67

1100.00

48.89

479.11

13

8665.00

2567.41

970.00

43.11

422.49

8645.00

2561.48

1040.00

46.22

452.98

15

8573.00

2540.15

980.00

43.56

426.84

16

8656.00

2564.74

1000.00

44.44

435.56

8621.00

2554.37

970.00

43.11

422.49

8618.00

2553.48

990.00

44.00

431.20

8452.00

2504.30

1000.00

44.44

435.56

8480.00

2512.59

1020.00

45.33

444.27

2

5

8

11

14

17

22-Aug-08

22-Aug-08

22-Aug-08

22-Aug-08

22-Aug-08

22-Aug-08

APL Culvert

APL Culvert

APL Culvert

APL Culvert

APL Culvert

APL Culvert

18 19 20

10-Sep-08

FGD Culvert 1 st and 2 nd wall from South side

Average Standard compressive deviation strength of the sample in Kg/cm2

480.56

403.61

431.20

426.84

434.10

429.75

437.01

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

10-Sep-08 21

FGD Culvert 1 st and 2 nd wall from South side

8508.00

2520.89

990.00

44.00

431.20

8415.00

2493.33

920.00

40.89

400.71

8436.00

2499.56

990.00

44.00

431.20

8400.00

2488.89

890.00

39.56

387.64

8325.00

2466.67

900.00

40.00

392.00

8462.00

2507.26

990.00

44.00

431.20

8390.00

2485.93

1020.00

45.33

444.27

8311.00

2462.52

1030.00

45.78

448.62

8230.00

2438.52

1020.00

45.33

444.27

8288.00

2455.70

1100.00

48.89

479.11

FGD Culvert 6 th , 7 th and 8 th wall from South side

8319.00

2464.89

1000.00

44.44

435.56

8429.00

2497.48

1030.00

45.78

448.62

8449.00

2503.41

1050.00

46.67

457.33

FGD Culvert 6 th , 7 th and 8 th wall from South side

8225.00

2437.04

1060.00

47.11

461.69

8260.00

2447.41

1040.00

46.22

452.98

8369.00

2479.70

980.00

43.56

426.84

8326.00

2466.96

950.00

42.22

413.78

8395.00

2487.41

1000.00

44.44

435.56

8255.00

2445.93

980.00

43.56

426.84

8308.00

2461.63

930.00

41.33

405.07

8310.00

2462.22

970.00

43.11

422.49

8090.00

2397.04

990.00

44.00

431.20

8361.00

2477.33

990.00

44.00

431.20

8497.00

2517.63

1000.00

44.44

435.56

8568.00

2538.67

980.00

43.56

426.84

22 23

11-Sep-08

24 25 26

27-Sep-08

27

FGD Culvert 3 rd , 4 th and 5 th wall from South side

28 29

29-Sep-08

30 31 32

7-Oct-08

33 34 35

7-Oct-08

36 37 38

15-Oct-08

Raft of drain besides L3 L4

39 40 41

15-Oct-08

Raft of drain besides L3 L4

42 43 44 45

16-Oct-08

437.01

Top slab of L7 L8 Culvert

406.52

422.49

457.33 3.01

447.17

447.17

425.39

419.59

431.20

44.18

6.81

Degree of Quality control is good .

46

8356.00

2475.85

1010.00

44.89

439.91

8394.00

2487.11

960.00

42.67

418.13

8320.00

2465.19

980.00

43.56

426.84

Top slab of FGD Culvert 3rd , 4 th, 5 th and 6 th span

8583.00

2543.11

1160.00

51.56

505.24

8672.00

2569.48

1100.00

48.89

479.11

8679.00

2571.56

1020.00

45.33

444.27

Top slab of FGD Culvert 3rd , 4 th, 5 th and 6 th span

8813.00

2611.26

1080.00

48.00

470.40

8687.00

2573.93

1180.00

52.44

513.96

8735.00

2588.15

1150.00

51.11

500.89

Top slab of FGD Culvert 7 th, 8 th and 9th span

8395.00

2487.41

1030.00

45.78

448.62

8407.00

2490.96

990.00

44.00

431.20

8416.00

2493.63

950.00

42.22

413.78

Top slab of FGD Culvert 7 th, 8 th and 9th span

8243.00

2442.37

1000.00

44.44

435.56

8155.00

2416.30

1020.00

45.33

444.27

8158.00

2417.19

1000.00

44.44

435.56

Top slab of FGD Culvert 7 th, 8 th and 9th span

8362.00

2477.63

1040.00

46.22

452.98

8173.00

2421.63

1010.00

44.89

439.91

8242.00

2442.07

1050.00

46.67

457.33

64

1030.00

45.78

448.62

65

1030.00

45.78

448.62

66

1030.00

45.78

448.62

67

1030.00

45.78

448.62

68

1030.00

45.78

448.62

69

1030.00

45.78

448.62

70

1030.00

45.78

448.62

47

16-Oct-08

Top slab of L7 L8 Culvert

48 49 50

21-Oct-08

51 52 53

21-Oct-08

54 55 56

25-Oct-08

57 58 59

25-Oct-08

60 61 62 63

25-Oct-08

428.30

476.21

495.08

431.20

438.46 2.74

450.07

448.62

448.62

448.62

45.30

6.05

Degree of Quality control is good

71

1030.00

45.78

448.62

72

1030.00

45.78

448.62

73

1030.00

45.78

448.62

74

1030.00

45.78

448.62

75

1030.00

45.78

448.62

76

1030.00

45.78

448.62

77

1030.00

45.78

448.62

78

1030.00

45.78

448.62

79

1030.00

45.78

448.62

80

1030.00

45.78

448.62

81

1030.00

45.78

448.62

82

1030.00

45.78

448.62

83

1030.00

45.78

448.62

84

1030.00

45.78

448.62

85

1030.00

45.78

448.62

86

1030.00

45.78

448.62

87

1030.00

45.78

448.62

88

1030.00

45.78

448.62

89

1030.00

45.78

448.62

90

1030.00

45.78

448.62

448.62

448.62

448.62

448.62

448.62

448.62

448.62 0.25

45.79

0.54

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 03 observations therefore 27 observations are presumed as an average.

Updated 21.01.2009 Grade of concrete M35, Shangdong Culvert, Unit No 6 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8499.00

2518.22

970.00

43.11

422.49

8612.00

2551.70

1000.00

44.44

435.56

3

8550.00

2533.33

960.00

42.67

418.13

4

8556.00

2535.11

970.00

43.11

422.49

8600.00

2548.15

700.00

31.11

304.89

6

8613.00

2552.00

790.00

35.11

344.09

7

8519.00

2524.15

1100.00

48.89

479.11

8509.00

2521.19

1110.00

49.33

483.47

9

8579.00

2541.93

1020.00

45.33

444.27

10

8691.00

2575.11

920.00

40.89

400.71

8717.00

2582.81

1010.00

44.89

439.91

12

8580.00

2542.22

1000.00

44.44

435.56

13

8411.00

2492.15

990.00

44.00

431.20

8448.00

2503.11

980.00

43.56

426.84

15

8278.00

2452.74

990.00

44.00

431.20

16

8497.00

2517.63

1000.00

44.44

435.56

8579.00

2541.93

990.00

44.00

431.20

8586.00

2544.00

960.00

42.67

418.13

8554.00

2534.52

1000.00

44.44

435.56

8459.00

2506.37

990.00

44.00

431.20

2

5

8

11

14

17

28-Aug-08

28-Aug-08

28-Aug-08

30-Aug-08

30-Aug-08

30-Aug-08

Culvert CW Pipe line

Culvert CW Pipe line

Culvert CW Pipe line

Culvert CW Pipe line

Culvert CW Pipe line

Culvert CW Pipe line

18 19 20

30-Aug-08

Culvert CW Pipe line

Average Standard compressive deviation strength of the sample in Kg/cm2

425.39

357.16

468.95

425.39

429.75

428.30

428.30

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

30-Aug-08

Culvert CW Pipe line

21 22 23

9-Sep-08

Raft of Box Culvert L5 L6

24 25 26

13-Sep-08

Box culvert for CW Pipes

27 28 29

13-Sep-08

Box culvert for CW Pipes

30 31 32

22-Sep-08

Box culvert for CW Pipes

33 34 35

23-Sep-08

Box culvert for CW Pipes

36 37 38

25-Sep-08

Box culvert for CW PipesL1 L2

39 40 41

30-Sep-08

Box culvert for CW PipesL1 L2

42 43 44 45

2-Oct-08

Culvert CW Pipe line 3 rd and 4 th wall

428.30 8577.00

2541.33

960.00

42.67

418.13

8366.00

2478.81

1000.00

44.44

435.56

8234.00

2439.70

990.00

44.00

431.20

8185.00

2425.19

980.00

43.56

426.84

8464.00

2507.85

920.00

40.89

400.71

8309.00

2461.93

820.00

36.44

357.16

8286.00

2455.11

940.00

41.78

409.42

8299.00

2458.96

900.00

40.00

392.00

8276.00

2452.15

820.00

36.44

357.16

8308.00

2461.63

900.00

40.00

392.00

8207.00

2431.70

960.00

42.67

418.13

8292.00

2456.89

990.00

44.00

431.20

8348.00

2473.48

1020.00

45.33

444.27

8611.00

2551.41

990.00

44.00

431.20

8406.00

2490.67

930.00

41.33

405.07

8593.00

2546.07

980.00

43.56

426.84

8530.00

2527.41

920.00

40.89

400.71

8580.00

2542.22

900.00

40.00

392.00

8400.00

2488.89

930.00

41.33

405.07

8303.00

2460.15

1010.00

44.89

439.91

8250.00

2444.44

980.00

43.56

426.84

8329.00

2467.85

970.00

43.11

422.49

8460.00

2506.67

980.00

43.56

426.84

8340.00

2471.11

960.00

42.67

418.13

8378.00

2482.37

1010.00

44.89

439.91

431.20

389.10

380.39 3.76

431.20

421.04

399.26

429.75

428.30

42.49

8.85

Degree of Quality control is good

46 47

4-Oct-08

Culvert CW Pipe line 5 th wall

48 49 50

13-Oct-08

Raft of drain besides L3 L4

51 52 53

17-Oct-08

Wall of drain besides L5 L6

54 55 56

20-Oct-08

Wall of drain besides L3 L4

57 58 59

22-Oct-08

Wall L1 L2 1st lift

60 61 62

22-Oct-08

Wall L1 L2 1st lift

63 64 65

25-Oct-08

Top slab of CW Culvert L3 with wall

66 67 68

25-Oct-08

Top slab of CW Culvert L3 with wall

69 70 26-Oct-08

Top slab of CW Culvert L3 with wall

8406.00

2490.67

1040.00

46.22

452.98

8536.00

2529.19

1050.00

46.67

457.33

8383.00

2483.85

1080.00

48.00

470.40

8347.00

2473.19

900.00

40.00

392.00

8205.00

2431.11

990.00

44.00

431.20

8324.00

2466.37

920.00

40.89

400.71

8275.00

2451.85

970.00

43.11

422.49

8453.00

2504.59

990.00

44.00

431.20

8289.00

2456.00

980.00

43.56

426.84

8716.00

2582.52

990.00

44.00

431.20

8408.00

2491.26

590.00

26.22

256.98

8598.00

2547.56

990.00

44.00

431.20

8491.00

2515.85

1070.00

47.56

466.04

8226.00

2437.33

1120.00

49.78

487.82

8308.00

2461.63

1100.00

48.89

479.11

8381.00

2483.26

1000.00

44.44

435.56

8323.00

2466.07

1030.00

45.78

448.62

8254.00

2445.63

1020.00

45.33

444.27

8133.00

2409.78

1010.00

44.89

439.91

8237.00

2440.59

980.00

43.56

426.84

8355.00

2475.56

1060.00

47.11

461.69

8495.00

2517.04

1030.00

45.78

448.62

8221.00

2435.85

1050.00

46.67

457.33

8300.00

2459.26

990.00

44.00

431.20

8480.00

2512.59

1030.00

45.78

448.62

460.24

407.97

426.84

373.13

477.66 4.06

442.81

442.81

445.72

451.53

43.42

9.36

Degree of Quality control is good

71

26-Oct-08

Top slab of CW Culvert L3 with wall

72 73 74

27-Oct-08

Top slab of CW Culvert L3 with wall

75 76 77

30-Oct-08

78 79 80

31-Oct-08

81

Top slab of drain besides L5 L6

Wall of Drain besides L3, L4

82 83

1-Nov-08

Top slab of CW Culvert L 4 with wall

84 85 86

1-Nov-08

Top slab of CW Culvert L 4 with wall

87 88 89

1-Nov-08

Top slab of CW Culvert L 4 with wall

90 91 92

3-Nov-08

Top slab of CW Pipe L7 L8

93 94 95

3-Nov-08

Top slab of CW Pipe L7 L8

8413.00

2492.74

1080.00

48.00

470.40

8444.00

2501.93

1000.00

44.44

435.56

8152.00

2415.41

980.00

43.56

426.84

8150.00

2414.81

1010.00

44.89

439.91

8206.00

2431.41

1030.00

45.78

448.62

8259.00

2447.11

1010.00

44.89

439.91

8806.00

2609.19

1060.00

47.11

461.69

8330.00

2468.15

1040.00

46.22

452.98

8398.00

2488.30

940.00

41.78

409.42

8530.00

2527.41

990.00

44.00

431.20

8502.00

2519.11

1020.00

45.33

444.27

8504.00

2519.70

1010.00

44.89

439.91

8279.00

2453.04

1000.00

44.44

435.56

8487.00

2514.67

1000.00

44.44

435.56

8265.00

2448.89

940.00

41.78

409.42

8229.00

2438.22

980.00

43.56

426.84

8203.00

2430.52

960.00

42.67

418.13

8346.00

2472.89

960.00

42.67

418.13

8406.00

2490.67

980.00

43.56

426.84

8353.00

2474.96

990.00

44.00

431.20

8291.00

2456.59

990.00

44.00

431.20

8383.00

2483.85

980.00

43.56

426.84

8291.00

2456.59

960.00

42.67

418.13

8286.00

2455.11

960.00

42.67

418.13

8243.00

2442.37

980.00

43.56

426.84

451.53

438.46

451.53

428.30

437.01

418.13

425.39 1.52

425.39

423.94

44.71

3.39

Degree of Quality control is good

3-Nov-08

Top slab of CW Pipe L7 L8

96 97 98

8-Nov-08

99 100 101

8-Nov-08

102 103 104

12-Nov-08

105

Top slab of Drain besides L3 L4

Top slab of Drain besides L3 L4

Wall of RCC Drain besides L5 L6

106 107

18-Nov-08

Culvert L1 L2 Top slab with wall

108 109 110

18-Nov-08

Culvert L1 L2 Top slab with wall

111 112 113

19-Nov-08

114 115 116

24-Nov-08

117

Raft of RCC Drain besides L1 L2

Wall of RCC Drain besides L1 L2

118 119 120

25-Nov-08

Culvert L1 L2 Top slab with wall

423.94 8250.00

2444.44

980.00

43.56

426.84

8326.00

2466.96

920.00

40.89

400.71

8340.00

2471.11

930.00

41.33

405.07

8401.00

2489.19

960.00

42.67

418.13

8456.00

2505.48

980.00

43.56

426.84

8368.00

2479.41

1000.00

44.44

435.56

8356.00

2475.85

970.00

43.11

422.49

8296.00

2458.07

980.00

43.56

426.84

8408.00

2491.26

1020.00

45.33

444.27

8421.00

2495.11

1010.00

44.89

439.91

8138.00

2411.26

1050.00

46.67

457.33

7915.00

2345.19

1000.00

44.44

435.56

7884.00

2336.00

980.00

43.56

426.84

7998.00

2369.78

1030.00

45.78

448.62

8042.00

2382.81

1050.00

46.67

457.33

7935.00

2351.11

980.00

43.56

426.84

8236.00

2440.30

1000.00

44.44

435.56

8287.00

2455.41

970.00

43.11

422.49

8332.00

2468.74

1020.00

45.33

444.27

8369.00

2479.70

1010.00

44.89

439.91

8456.00

2505.48

1010.00

44.89

439.91

8536.00

2529.19

1090.00

48.44

474.76

8139.00

2411.56

1100.00

48.89

479.11

8515.00

2522.96

1120.00

49.78

487.82

8284.00

2454.52

1140.00

50.67

496.53

407.97

428.30

437.01

439.91

444.27

434.10

451.53

487.82 2.32

44.70

5.19

Degree of Quality control is good

121

8179.00

2423.41

1000.00

44.44

435.56

8168.00

2420.15

990.00

44.00

431.20

8182.00

2424.30

1080.00

48.00

470.40

8162.00

2418.37

1050.00

46.67

457.33

8176.00

2422.52

1030.00

45.78

448.62

8202.00

2430.22

1040.00

46.22

452.98

8568.00

2538.67

1120.00

49.78

487.82

8547.00

2532.44

1180.00

52.44

513.96

8438.00

2500.15

1080.00

48.00

470.40

130

1000.00

44.44

435.56

131

1000.00

44.44

435.56

132

1000.00

44.44

435.56

133

1000.00

44.44

435.56

134

1000.00

44.44

435.56

135

1000.00

44.44

435.56

136

1000.00

44.44

435.56

137

1000.00

44.44

435.56

138

1000.00

44.44

435.56

139

1000.00

44.44

435.56

140

1000.00

44.44

435.56

141

1000.00

44.44

435.56

142

1000.00

44.44

435.56

143

1000.00

44.44

435.56

144

1000.00

44.44

435.56

145

1000.00

44.44

435.56

122

25-Nov-08

Culvert L1 L2 Top slab with wall

123 124 125

26-Nov-08

126

Top slab of RCC Drain besides L1 L2

127 128 129

13-Dec-08

Top slab of RCC Drain

445.72

452.98

490.73

435.56

435.56

435.56

435.56

435.56

435.56

1.92

45.29

4.23

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 06 observations therefore 24 observations are presumed as an average.

146

1000.00

44.44

435.56

147

1000.00

44.44

435.56

148

1000.00

44.44

435.56

149

1000.00

44.44

435.56

150

1000.00

44.44

435.56

435.56

435.56 1.92

45.29

4.23

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 06 observations therefore 24 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M35, Intake Pump House Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Weight of sample Location of Sized 150 mm x Density of Compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in in gms N /mm2

1

Compressive strength in kg/cm2

8268.00

2449.78

1050.00

46.67

457.33

8312.00

2462.81

1010.00

44.89

439.91

3

8361.00

2477.33

1080.00

48.00

470.40

4

8349.00

2473.78

1000.00

44.44

435.56

8381.00

2483.26

990.00

44.00

431.20

6

8277.00

2452.44

1030.00

45.78

448.62

7

8265.00

2448.89

1040.00

46.22

452.98

8243.00

2442.37

980.00

43.56

426.84

9

8307.00

2461.33

990.00

44.00

431.20

10

8253.00

2445.33

1070.00

47.56

466.04

8340.00

2471.11

1020.00

45.33

444.27

12

8381.00

2483.26

1000.00

44.44

435.56

13

8229.00

2438.22

980.00

43.56

426.84

8375.00

2481.48

990.00

44.00

431.20

15

8254.00

2445.63

970.00

43.11

422.49

16

8378.00

2482.37

960.00

42.67

418.13

8326.00

2466.96

1060.00

47.11

461.69

18

8416.00

2493.63

1040.00

46.22

452.98

19

8324.00

2466.37

980.00

43.56

426.84

8478.00

2512.00

950.00

42.22

413.78

2

5

8

11

14

17

20

14-Nov-08

14-Nov-08

14-Nov-08

15-Nov-08

15-Nov-08

15-Nov-08

15-Nov-08

Intake Pump House raft

Intake Pump House raft

Intake Pump House raft

Intake Pump House raft

Intake Pump House raft

Intake Pump House raft

Intake Pump House raft

Average Standard compressive deviation strength of the sample in Kg/cm2

455.88

438.46

437.01

448.62

426.84

444.27

425.39

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

15-Nov-08

Intake Pump House raft

425.39

21

8359.00

2476.74

1000.00

44.44

435.56

22

8592.00

2545.78

950.00

42.22

413.78

8317.00

2464.30

990.00

44.00

431.20

24

8483.00

2513.48

1010.00

44.89

439.91

25

8330.00

2468.15

980.00

43.56

426.84

8417.00

2493.93

1030.00

45.78

448.62

27

8369.00

2479.70

970.00

43.11

422.49

28

8380.00

2482.96

1020.00

45.33

444.27

8462.00

2507.26

1040.00

46.22

452.98

30

8490.00

2515.56

1000.00

44.44

435.56

31

8392.00

2486.52

960.00

42.67

418.13

8359.00

2476.74

990.00

44.00

431.20

33

8512.00

2522.07

1010.00

44.89

439.91

34

8471.00

2509.93

1050.00

46.67

457.33

8527.00

2526.52

1030.00

45.78

448.62

36

8357.00

2476.15

1080.00

48.00

470.40

37

8316.00

2464.00

1020.00

45.33

444.27

8492.00

2516.15

1070.00

47.56

466.04

39

8437.00

2499.85

1100.00

48.89

479.11

40

8550.00

2533.33

1150.00

51.11

500.89

8483.00

2513.48

1110.00

49.33

483.47

42

8269.00

2450.07

1170.00

52.00

509.60

43

8403.00

2489.78

1070.00

47.56

466.04

8289.00

2456.00

1130.00

50.22

492.18

8619.00

2553.78

1090.00

48.44

474.76

23

26

29

32

35

38

41

44 45

15-Nov-08

15-Nov-08

15-Nov-08

15-Nov-08

15-Nov-08

15-Nov-08

12-Dec-08

12-Dec-08

Intake Pump House raft

Intake Pump House Raft

Intake Pump House Raft

Intake Pump House Raft

Intake Pump House Raft

Intake Pump House Raft

Wall

428.30

432.65

444.27 1.53

429.75

458.79

463.14

497.99

477.66

44.71

3.42

Degree of Quality control is good

46

8316.00

2464.00

1050.00

46.67

457.33

8358.00

2476.44

1120.00

49.78

487.82

8306.00

2461.04

1030.00

45.78

448.62

49

0.00

1060.00

47.11

461.69

50

0.00

1060.00

47.11

461.69

51

0.00

1060.00

47.11

461.69

52

0.00

1060.00

47.11

461.69

53

0.00

1060.00

47.11

461.69

54

0.00

1060.00

47.11

461.69

55

0.00

1060.00

47.11

461.69

56

0.00

1060.00

47.11

461.69

57

0.00

1060.00

47.11

461.69

58

0.00

1060.00

47.11

461.69

59

0.00

1060.00

47.11

461.69

60

0.00

1060.00

47.11

461.69

47 48

12-Dec-08

464.59

461.69

461.69

461.69

461.69 1.93

47.33

4.07

Degree of Quality control is good based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 18 observations therefore 12 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M40 , TG Pedestals, Unit No 6

Sr.No.

Date of Casting

Cube compressive strength at age of 28 days Weight of sample Average Location of Sized 150 mm x Density of Standard Compressive Compressive compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in deviation strength in strength of the in gms N /mm2 kg/cm2 sample in Kg/cm2

10-Jul-08

TG Unit No 6 pedestal 1st Lift D1

1 2 3 4 5

11-Jul-08

TG Unit No 6 pedestal 1st Lift E1

6 7 8

12-Jul-08

TG Unit No 6 pedestal 1st Lift C1

9 10 11

16-Jul-08

TG Unit No 6 pedestal 1st Lift B1

12 13 14

18-Jul-08

TG Unit No 6 pedestal 1st Lift D2

15 16 17

19-Jul-08

TG Unit No 6 pedestal 1st Lift E2

18 19 20 21

24-Jul-08

TG Unit No 6 pedestal 1st Lift B2

8623.00

2554.96

1320.00

58.67

574.93

8615.00

2552.59

1100.00

48.89

479.11

8468.00

2509.04

1250.00

55.56

544.44

8471.00

2509.93

1140.00

50.67

496.53

8352.00

2474.67

1150.00

51.11

500.89

8510.00

2521.48

1210.00

53.78

527.02

8522.00

2525.04

1100.00

48.89

479.11

8608.00

2550.52

1200.00

53.33

522.67

8621.00

2554.37

1070.00

47.56

466.04

8541.00

2530.67

1100.00

48.89

479.11

8584.00

2543.41

1170.00

52.00

509.60

8401.00

2489.19

1080.00

48.00

470.40

8680.00

2571.85

1120.00

49.78

487.82

8797.00

2606.52

1190.00

52.89

518.31

8664.00

2567.11

1150.00

51.11

500.89

8519.00

2524.15

1150.00

51.11

500.89

8609.00

2550.81

1080.00

48.00

470.40

8694.00

2576.00

1100.00

48.89

479.11

8855.00

2623.70

1010.00

44.89

439.91

8591.00

2545.48

960.00

42.67

418.13

8688.00

2574.22

850.00

37.78

370.22

532.83

508.15

489.27

486.37

502.34

483.47

409.42

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

22 23

25-Jul-08

TG Unit No 6 pedestal 1st Lift D1

24 25 26

11-Aug-08

TG Unit No 6 pedestal

27 28 29

23-Aug-08

TG Unit No 6 pedestal

30 31 32

18-Oct-08

TG Unit No 6 pedestal 2nd Lift E2

33 34 35

31-Oct-08

TG Unit No 6 pedestal D1

36 37 38

3-Nov-08

TG Unit No 6 pedestal D1

39 40 41

4-Nov-08

TG Unit No 6 pedestal D1

42 43 44

14-Nov-08

TG Unit No 6 pedestal 2nd lift B1

45 46 18-Nov-08

TG Unit No 6 pedestal 1st lift A2

8402.00

2489.48

1120.00

49.78

487.82

8516.00

2523.26

900.00

40.00

392.00

8494.00

2516.74

1120.00

49.78

487.82

8580.00

2542.22

920.00

40.89

400.71

8531.00

2527.70

1100.00

48.89

479.11

8671.00

2569.19

1140.00

50.67

496.53

8480.00

2512.59

1180.00

52.44

513.96

8431.00

2498.07

1150.00

51.11

500.89

8588.00

2544.59

1170.00

52.00

509.60

8466.00

2508.44

990.00

44.00

431.20

8349.00

2473.78

990.00

44.00

431.20

8337.00

2470.22

980.00

43.56

426.84

8402.00

2489.48

1070.00

47.56

466.04

8475.00

2511.11

1090.00

48.44

474.76

8397.00

2488.00

1130.00

50.22

492.18

8203.00

2430.52

1100.00

48.89

479.11

8281.00

2453.63

1090.00

48.44

474.76

8291.00

2456.59

1120.00

49.78

487.82

8227.00

2437.63

1120.00

49.78

487.82

8287.00

2455.41

1090.00

48.44

474.76

8228.00

2437.93

1100.00

48.89

479.11

8350.00

2474.07

1090.00

48.44

474.76

8384.00

2484.15

1120.00

49.78

487.82

8291.00

2456.59

1070.00

47.56

466.04

8118.00

2405.33

1150.00

51.11

500.89

455.88

458.79

508.15 4.47

429.75

477.66

480.56

480.56

476.21

468.95

49.33

9.06

Degree of Quality control is good

47

18-Nov-08

TG Unit No 6 pedestal 1st lift A2

8279.00

2453.04

1020.00

45.33

444.27

8295.00

2457.78

1060.00

47.11

461.69

8332.00

2468.74

1100.00

48.89

479.11

8291.00

2456.59

1080.00

48.00

470.40

8376.00

2481.78

1140.00

50.67

496.53

52

0.00

1090.00

48.44

474.76

53

0.00

1090.00

48.44

474.76

54

0.00

1090.00

48.44

474.76

55

0.00

1090.00

48.44

474.76

56

0.00

1090.00

48.44

474.76

57

0.00

1090.00

48.44

474.76

58

0.00

1090.00

48.44

474.76

59

0.00

1090.00

48.44

474.76

60

0.00

1090.00

48.44

474.76

48 49 50 51

20-Nov-08

TG Unit No 6 pedestal 2nd lift A2

468.95

482.01

474.76

474.76

474.76 1.81

48.16

3.77

Degree of Quality control is good Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 21 observations therefore 09 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M40 , Boiler Pedestals, [ A,B C D,and N ] Unit No 6

Sr.No.

Date of Casting

Cube compressive strength at age of 28 days Weight of sample Average Location of Sized 150 mm x Density of Standard Compressive Compressive compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in deviation strength in strength of the in gms N /mm2 kg/cm2 sample in Kg/cm2

12-Jun-08

Unit No 6 Boiler Pedestal B48 -J

1 2 3 4 5

19-Jun-08

6 7 8

27-Jun-08

9 10 11

28-Jun-08

8645.00

2561.48

1030.00

45.78

448.62

8415.00

2493.33

1000.00

44.44

435.56

8544.00

2531.56

950.00

42.22

413.78

8707.00

2579.85

970.00

43.11

422.49

8607.00

2550.22

1060.00

47.11

461.69

8621.00

2554.37

1010.00

44.89

439.91

Unit No 6 Boiler Pedestal KB- 9.5 - J5, J10-B 25 M

8255.00

2445.93

910.00

40.44

396.36

8424.00

2496.00

820.00

36.44

357.16

8427.00

2496.89

930.00

41.33

405.07

Unit No 6 Boiler Pedestal B7 M , J3

8272.00

2450.96

870.00

38.67

378.93

8316.00

2464.00

820.00

36.44

357.16

8362.00

2477.63

990.00

44.00

431.20

8491.00

2515.85

890.00

39.56

387.64

8435.00

2499.26

900.00

40.00

392.00

8530.00

2527.41

920.00

40.89

400.71

8109.00

2402.67

970.00

43.11

422.49

8287.00

2455.41

1020.00

45.33

444.27

8319.00

2464.89

1030.00

45.78

448.62

8304.00

2460.44

1000.00

44.44

435.56

8314.00

2463.41

1060.00

47.11

461.69

8239.00

2441.19

1020.00

45.33

444.27

Unit No 6 Boiler Pedestal B38.5 - J

12 13 14

25-Sep-08

Unit No 6 Boiler Pedestal J 11

15 16 17

29-Sep-08

Unit No 6 Boiler Pedestal

18 19 20 21

30-Sep-08

Unit No 6 Boiler Pedestal

432.65

441.36

386.19

389.10

393.45

438.46

447.17

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

22

8421.00

2495.11

920.00

40.89

400.71

8264.00

2448.59

1030.00

45.78

448.62

8344.00

2472.30

920.00

40.89

400.71

8420.00

2494.81

1120.00

49.78

487.82

8465.00

2508.15

1100.00

48.89

479.11

8346.00

2472.89

1150.00

51.11

500.89

8231.00

2438.81

910.00

40.44

396.36

8385.00

2484.44

1000.00

44.44

435.56

8416.00

2493.63

900.00

40.00

392.00

8323.00

2466.07

1030.00

45.78

448.62

8409.00

2491.56

1080.00

48.00

470.40

8324.00

2466.37

1090.00

48.44

474.76

0.00

960.00

42.67

418.13

0.00

990.00

44.00

431.20

0.00

990.00

44.00

431.20

0.00

1020.00

45.33

444.27

0.00

1170.00

52.00

509.60

39

0.00

1120.00

49.78

487.82

40

0.00

1050.00

46.67

457.33

0.00

1020.00

45.33

444.27

42

0.00

1010.00

44.89

439.91

43

0.00

1040.00

46.22

452.98

0.00

1080.00

48.00

470.40

45

0.00

1090.00

48.44

474.76

46

0.00

1130.00

50.22

492.18

23

14-Oct-08

J-9 Pedestal Grid B 0 Final lift

24 25 26

17-Oct-08

Unit No 6 Boiler Pedestal J7 , J9

27 28 29

18-Oct-08

Unit No 6 Boiler Pedestal J1

30 31 32

20-Oct-08

J1 Pedestal Grid B0 Final lift

33 34 35

25-Oct-08

36 37 38

41

44

27-Oct-08

1-Nov-08

3-Nov-08

4-Nov-08

AB Bay Grid 2A

J 2 Pedestal

J 1 Pedestal

416.68

489.27

407.97 3.65

464.59

426.84

480.56

447.17

466.04

489.27

43.29

8.44

Degree of Quality control is good .

47

4-Nov-08

48 49 50

12-Nov-08

Pedastal, Grid 12 -13 C - Row

51 52 53

25-Nov-08

54

Unit No 6 Boiler Pedestal 3, Grid 15 16 17

55 56

25-Nov-08

D Row, 4 , Grid 14 15 and 16

57 58 59

26-Nov-08

D Row, 1, Grid 13

60 61 62

3-Dec-08

A Row pedestal Grid 12

63 64 65

5-Dec-08

66

A Row Grid 13 A J 2 and J 8 footing

67 68

8-Dec-08

A Row Grid 14 A J 2 footing

69 70 71

11-Dec-08

Grid 19 B J 2 and J 4 Pedestal

0.00

1100.00

48.89

479.11

0.00

1140.00

50.67

496.53

0.00

1080.00

48.00

470.40

0.00

1050.00

46.67

457.33

0.00

1030.00

45.78

448.62

0.00

1090.00

48.44

474.76

0.00

1110.00

49.33

483.47

0.00

1150.00

51.11

500.89

0.00

1150.00

51.11

500.89

0.00

1120.00

49.78

487.82

0.00

1100.00

48.89

479.11

0.00

1060.00

47.11

461.69

0.00

1100.00

48.89

479.11

0.00

1120.00

49.78

487.82

0.00

1100.00

48.89

479.11

0.00

1030.00

45.78

448.62

0.00

1140.00

50.67

496.53

0.00

1080.00

48.00

470.40

0.00

1130.00

50.22

492.18

0.00

1070.00

47.56

466.04

0.00

1050.00

46.67

457.33

0.00

1090.00

48.44

474.76

0.00

1120.00

49.78

487.82

0.00

1030.00

45.78

448.62

0.00

1100.00

48.89

479.11

489.27

458.79

486.37

489.27

476.21 2.37

474.76

476.21

473.30

464.59

47.81

4.95

Degree of Quality control is good

11-Dec-08

Grid 19 B J 2 and J 4 Pedestal

464.59

72

0.00

1070.00

47.56

466.04

73

0.00

1080.00

48.00

470.40

74

0.00

1080.00

48.00

470.40

75

0.00

1080.00

48.00

470.40

76

0.00

1080.00

48.00

470.40

77

0.00

1080.00

48.00

470.40

78

0.00

1080.00

48.00

470.40

79

0.00

1080.00

48.00

470.40

80

0.00

1080.00

48.00

470.40

81

0.00

1080.00

48.00

470.40

82

0.00

1080.00

48.00

470.40

83

0.00

1080.00

48.00

470.40

84

0.00

1080.00

48.00

470.40

85

0.00

1080.00

48.00

470.40

86

0.00

1080.00

48.00

470.40

87

0.00

1080.00

48.00

470.40

88

0.00

1080.00

48.00

470.40

89

0.00

1080.00

48.00

470.40

90

0.00

1080.00

48.00

470.40

470.40

470.40

470.40

470.40

470.40

470.40 1.00

48.07

2.08

Degree of Quality control is good .Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 12 observations therefore 18 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M40 , Boiler Pedestals, [ A,B C D,and N ] Unit No 8

Sr.No.

Date of Casting

Cube compressive strength at age of 28 days Weight of sample Average Location of Sized 150 mm x Density of Standard Compressive Compressive compressive concrete 150 mm x 150 mm concrete in Kg / M3 Load in KN strength in deviation strength in strength of the in gms N /mm2 kg/cm2 sample in Kg/cm2

25-Nov-08

Pedestal J2 - J10

1

8129.00

2408.59

1080.00

48.00

470.40

8145.00

2413.33

1110.00

49.33

483.47

3

8417.00

2493.93

1090.00

48.44

474.76

4

8356.00

2475.85

1080.00

48.00

470.40

8436.00

2499.56

1090.00

48.44

474.76

6

8322.00

2465.78

1060.00

47.11

461.69

7

8207.00

2431.70

1070.00

47.56

466.04

8286.00

2455.11

1120.00

49.78

487.82

8359.00

2476.74

1100.00

48.89

479.11

8362.00

2477.63

1090.00

48.44

474.76

8426.00

2496.59

1130.00

50.22

492.18

8341.00

2471.41

1070.00

47.56

466.04

8351.00

2474.37

1060.00

47.11

461.69

8443.00

2501.63

1130.00

50.22

492.18

8287.00

2455.41

1090.00

48.44

474.76

16

0.00

1090.00

48.44

474.76

17

0.00

1090.00

48.44

474.76

18

0.00

1090.00

48.44

474.76

19

0.00

1090.00

48.44

474.76

20

0.00

1090.00

48.44

474.76

21

0.00

1090.00

48.44

474.76

2

5

8

27-Nov-08

5-Dec-08

Pedestal J6

Pedestal J5

9 10 11

6-Dec-08

Pedestal J9 Grid B0

12 13 14 15

11-Dec-08

Pedestal J4 Grid B0

Average of Coefficient of CCS in variation N/mm 2

Result and remarks

476.21

468.95

477.66

477.66

476.21

474.76

474.76

Degree of Quality control

22

0.00

1090.00

48.44

474.76

23

0.00

1090.00

48.44

474.76

24

0.00

1090.00

48.44

474.76

25

0.00

1090.00

48.44

474.76

26

0.00

1090.00

48.44

474.76

27

0.00

1090.00

48.44

474.76

28

0.00

1090.00

48.44

474.76

29

0.00

1090.00

48.44

474.76

30

0.00

1090.00

48.44

474.76

474.76

474.76

474.76 0.71

48.47

1.46

Degree of Quality control is good .Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are15 observations therefore 15 observations are presumed as an average.

UPDATED 20.01.2009 Grade of concrete M25, Chimney Raft Phase III

Sr.No.

Date of Casting

Location of concrete

1

Cube compressive strength at age of 28 days Weight of sample Sized Density of Average Compressiv Compressive 150 mm x 150 concrete in Kg / compressive Load in KN e strength in strength in mm x 150 mm in M3 strength of the N /mm2 kg/cm2 gms sample in Kg/cm2 8401.00

2489.19

750.00

33.33

326.67

8336.00

2469.93

780.00

34.67

339.73

3

8292.00

2456.89

800.00

35.56

348.44

4

8326.00

2466.96

760.00

33.78

331.02

8456.00

2505.48

710.00

31.56

309.24

6

8329.00

2467.85

740.00

32.89

322.31

7

8320.00

2465.19

760.00

33.78

331.02

8369.00

2479.70

780.00

34.67

339.73

9

8456.00

2505.48

730.00

32.44

317.96

10

8536.00

2529.19

810.00

36.00

352.80

8469.00

2509.33

770.00

34.22

335.38

12

8538.00

2529.78

750.00

33.33

326.67

13

8582.00

2542.81

760.00

33.78

331.02

8463.00

2507.56

720.00

32.00

313.60

15

8465.00

2508.15

670.00

29.78

291.82

16

8530.00

2527.41

790.00

35.11

344.09

8620.00

2554.07

800.00

35.56

348.44

18

8321.00

2465.48

730.00

32.44

317.96

19

8538.00

2529.78

770.00

34.22

335.38

8469.00

2509.33

760.00

33.78

331.02

2

5

8

11

14

17

20

1-Dec-08

1-Dec-08

1-Dec-08

1-Dec-08

2-Dec-08

2-Dec-08

2-Dec-08

Segment I

Segment I

Segment I

Segment I

Segment I

Segment I

Segment I

338.28

320.86

329.57

338.28

312.15

336.83

332.47

Standard deviation

Average of CCS in N/mm 2

Coefficient of variation

Result and remarks

2-Dec-08

Segment I

332.47

21

8438.00

2500.15

760.00

33.78

331.02

22

8332.00

2468.74

720.00

32.00

313.60

8456.00

2505.48

750.00

33.33

326.67

24

8320.00

2465.19

740.00

32.89

322.31

25

8320.00

2465.19

770.00

34.22

335.38

8531.00

2527.70

710.00

31.56

309.24

27

8469.00

2509.33

720.00

32.00

313.60

28

8438.00

2500.15

760.00

33.78

331.02

8467.00

2508.74

790.00

35.11

344.09

30

8430.00

2497.78

820.00

36.44

357.16

31

8320.00

2465.19

750.00

33.33

326.67

8311.00

2462.52

810.00

36.00

352.80

33

8269.00

2450.07

770.00

34.22

335.38

34

8102.00

2400.59

750.00

33.33

326.67

8216.00

2434.37

790.00

35.11

344.09

36

8328.00

2467.56

830.00

36.89

361.51

37

8333.00

2469.04

760.00

33.78

331.02

8345.00

2472.59

780.00

34.67

339.73

39

8202.00

2430.22

730.00

32.44

317.96

40

8530.00

2527.41

810.00

36.00

352.80

8460.00

2506.67

780.00

34.67

339.73

42

8321.00

2465.48

780.00

34.67

339.73

43

8332.00

2468.74

740.00

32.89

322.31

8269.00

2450.07

760.00

33.78

331.02

8357.00

2476.15

780.00

34.67

339.73

23

26

29

32

35

38

41

44 45

2-Dec-08

2-Dec-08

2-Dec-08

2-Dec-08

2-Dec-08

2-Dec-08

3-Dec-08

3-Dec-08

Segment I

Segment I

Segment I

Segment I

Segment I

Segment I

Segment I

Segment I

320.86

319.41

344.09 1.49

338.28

344.09

329.57

344.09

331.02

33.60

4.43

Degree of quality control is Good

46

8538.00

2529.78

720.00

32.00

313.60

8569.00

2538.96

730.00

32.44

317.96

48

8438.00

2500.15

750.00

33.33

326.67

49

8395.00

2487.41

820.00

36.44

357.16

8456.00

2505.48

800.00

35.56

348.44

51

8328.00

2467.56

790.00

35.11

344.09

52

8260.00

2447.41

770.00

34.22

335.38

8249.00

2444.15

780.00

34.67

339.73

54

8310.00

2462.22

810.00

36.00

352.80

55

8366.00

2478.81

740.00

32.89

322.31

8327.00

2467.26

760.00

33.78

331.02

57

8370.00

2480.00

710.00

31.56

309.24

58

8359.00

2476.74

700.00

31.11

304.89

8394.00

2487.11

750.00

33.33

326.67

60

8432.00

2498.37

720.00

32.00

313.60

61

8596.00

2546.96

760.00

33.78

331.02

8299.00

2458.96

740.00

32.89

322.31

8439.00

2500.44

740.00

32.89

322.31

8237.00

2440.59

720.00

32.00

313.60

8302.00

2459.85

690.00

30.67

300.53

8381.00

2483.26

750.00

33.33

326.67

8436.00

2499.56

710.00

31.56

309.24

8261.00

2447.70

770.00

34.22

335.38

8419.00

2494.52

780.00

34.67

339.73

8075.00

2392.59

760.00

33.78

331.02

47

50

53

56

59

62

3-Dec-08

8-Dec-08

8-Dec-08

8-Dec-08

8-Dec-08

9-Dec-08

Segment I

Segment II

Segment II

Segment II

Segment II

Segment II

63 64 65

9-Dec-08

Segment II

66 67 68

9-Dec-08

Segment II

69 70 9-Dec-08

Segment II

319.41

349.90

342.64

320.86

315.05 1.50

325.21

313.60

328.12

333.93

34.03

4.40

Degree of quality control is Good

8295.00

2457.78

800.00

35.56

348.44

8282.00

2453.93

740.00

32.89

322.31

8488.00

2514.96

730.00

32.44

317.96

8508.00

2520.89

710.00

31.56

309.24

8363.00

2477.93

800.00

35.56

348.44

8151.00

2415.11

780.00

34.67

339.73

8229.00

2438.22

840.00

37.33

365.87

8249.00

2444.15

820.00

36.44

357.16

8472.00

2510.22

830.00

36.89

361.51

8445.00

2502.22

850.00

37.78

370.22

81

8490.00

2515.56

840.00

37.33

365.87

82

8521.00

2524.74

780.00

34.67

339.73

8521.00

2524.74

810.00

36.00

352.80

84

8571.00

2539.56

840.00

37.33

365.87

85

8404.00

2490.07

790.00

35.11

344.09

8596.00

2546.96

860.00

38.22

374.58

87

8482.00

2513.19

800.00

35.56

348.44

88

8514.00

2522.67

770.00

34.22

335.38

8680.00

2571.85

790.00

35.11

344.09

90

8767.00

2597.63

750.00

33.33

326.67

91

8727.00

2585.78

740.00

32.89

322.31

8723.00

2584.59

790.00

35.11

344.09

8414.00

2493.04

760.00

33.78

331.02

8685.00

2573.33

780.00

34.67

339.73

8537.00

2529.48

760.00

33.78

331.02

71

9-Dec-08

Segment II

72 73 74

9-Dec-08

Segment II

75 76 77

9-Dec-08

Segment II

78 79 80

83

86

89

92

9-Dec-08

9-Dec-08

9-Dec-08

9-Dec-08

9-Dec-08

Segment II

Segment II

Segment II

Segment II

Segment II

93 94 95

10-Dec-08

Segment II

333.93

325.21

354.25

365.87

352.80

355.70

335.38 2.02

332.47

336.83

34.59

5.84

Degree of quality control is Good

10-Dec-08

Segment II

96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120

10-Dec-08

Segment II

336.83 8611.00

2551.41

780.00

34.67

339.73

8500.00

2518.52

740.00

32.89

322.31

8528.00

2526.81

770.00

34.22

335.38

8594.00

2546.37

800.00

35.56

348.44

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

0.00

760.00

33.78

331.02

335.38

331.02

331.02

331.02

331.02

331.02

331.02

331.02 0.52

33.90

1.54

Degree of quality control is Good.Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 9 observations therefore 21 observations are presumed as an average.

UPDATED 21.01.2009 Grade of concrete M30, CCB ,Unit No 8 Cube compressive strength at age of 28 days

Sr.No.

Date of Casting

Location of concrete

1

Weight of sample Density of Sized 150 mm x Compressive concrete in Kg / 150 mm x 150 mm Load in KN strength in M3 in gms N /mm2

Compressive strength in kg/cm2

8195.00

2428.15

920.00

40.89

400.71

8325.00

2466.67

900.00

40.00

392.00

3

8121.00

2406.22

940.00

41.78

409.42

4

8277.00

2452.44

930.00

41.33

405.07

8298.00

2458.67

910.00

40.44

396.36

6

8316.00

2464.00

910.00

40.44

396.36

7

8350.00

2474.07

970.00

43.11

422.49

8217.00

2434.67

940.00

41.78

409.42

9

8326.00

2466.96

910.00

40.44

396.36

10

8266.00

2449.19

950.00

42.22

413.78

8388.00

2485.33

910.00

40.44

396.36

12

8208.00

2432.00

940.00

41.78

409.42

13

8329.00

2467.85

980.00

43.56

426.84

8347.00

2473.19

960.00

42.67

418.13

8316.00

2464.00

960.00

42.67

418.13

16

0.00

930.00

41.33

405.07

17

0.00

930.00

41.33

405.07

18

0.00

930.00

41.33

405.07

19

0.00

930.00

41.33

405.07

20

0.00

930.00

41.33

405.07

21

0.00

930.00

41.33

405.07

2

5

8

11

14 15

10-Dec-08

10-Dec-08

10-Dec-08

10-Dec-08

12-Dec-08

CCB J1

CCB J1

CCB J1

CCB J1

CCB J5

Average compressive strength of the sample in Kg/cm2

Standard deviation

Average of Coefficient CCS in of variation N/mm 2

Result and remarks

400.71

399.26

409.42

406.52

421.04

405.07

405.07

Degree of Quality control

22

0.00

930.00

41.33

405.07

23

0.00

930.00

41.33

405.07

24

0.00

930.00

41.33

405.07

25

0.00

930.00

41.33

405.07

26

0.00

930.00

41.33

405.07

27

0.00

930.00

41.33

405.07

28

0.00

930.00

41.33

405.07

29

0.00

930.00

41.33

405.07

30

0.00

930.00

41.33

405.07

405.07

405.07

405.07 0.78

41.45

1.89

Degree of Quality control is good .Based on calculation with figures appearing in Bold red which are presumtive figures. In actual there are 15 observations therefore 15 observations are presumed as an average.

Updated 02.10.2008

Related Documents

Sd And Cov Simplex
December 2019 11
Sd And Cov Gdc
December 2019 15
Simplex
August 2019 27
Simplex
May 2020 21
Simplex
November 2019 34
All-cov
October 2019 25

More Documents from ""