`
Improving Your Bottom-Line Waste (MT) Transport/pallet (RM) Toll/trip (KA) Total trip (18pallet/trip) (KA) Treatment by KA (RM)
50 50 15 4 590
GES cost for treatment (RM)** Chemicals (30% of waste) (MT) No of pallet
2100 15 65
Client to pay KA (RM) Client to pay GES (RM) Total (RM)
41,660 63,340 105,000
Incineration + Transport and toll(KA)
124,310
Savings (RM)
19,310 (18%)
**GES cost for treatment varies based on type of sludge, quantity and client’s location •
•
GES undertakes to ensure that all wastes are disposed in accordance with EQ (Scheduled Waste) Regulations 2005. Your responsibility ends at waste storage – We manage it until disposal and the receipt of relevant legal documentation.
For any Inquiries, Please Contact
Approximately 15% Savings minimum
Incineration route does no good for the environment (It’s completely destructive – A ZERO sum game)
….. We help minimizing the Global Warming Potential
Did the planet betray us or did we betray the planet? - An inconvenient truth
What we do
Our Proven Solutions
We are in the business of working with our clients to identify all waste streams emanating from their industrial process – provide waste management strategy from generation, storage, minimization and packaging in accordance with environmental legislation.
Sludge
On-Site Treatment
Who need our services? Any industry that generates waste classified as “industrial waste” and cannot be disposed in any municipal land-fills and normally waste contains of Oil & Grease (O&G), Total Organic Compound (TOC) and/or heavy metals that exceed the permissible limits.
Packaging
Disposal (Kualiti Alam)
How does this benefit the waste generator? We are able to chemically treat the waste using our proprietary chemicals to reduce the Oil and grease (O&G), Total Organic Compound (TOC) and/or Heavy Metal content. This allows the waste to be disposed in manners other than incineration i.e. solidification/secured land-fill etc. The price differential (savings) is shared with the generators.
Landfill
Solidification
We Preserve the Environment The ‘GE Solution’ Landfill route is a natural waste treatment process that will allow for landfill rehabilitation and render the land useable over time.
Among Clients Benefited From Our Services
Invoice and Payment Options 1. Client to pay Kualiti Alam (KA) and balance pay to General Environmental Solution (GES) = Treatment cost by GES – Client pays KA [Treatment Cost by KA (after on-site treatment) + Transport + Toll]
2. Client to pay General Environment Solution (GES) and GES pay to Kualiti Alam for total cost of treatment