Sample Man-hour Costing

  • Uploaded by: Marlo Aristorenas
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Sample Man-hour Costing as PDF for free.

More details

  • Words: 1,270
  • Pages: 3
Sheet: Drawing #

Sheet: Drawing #

# A00 1 2 3 4 5

# A01 1 2 2 3 4 5 6 5

Description Cover Page Perspective Location Map Vicinity Map General Notes Table of Contents

Description Architectural Plans Site Development Plan Ground Floor Plan Second Floor Plan Roof Deck Ground Floor Reflected Ceiling Plan 2nd Floor Reflected Ceiling Plan Ground Floor Pattern 2nd Floor Pattern

Manhours

Scale NTS NTS NTS n/a n/a

Rate PHP 400.00 PHP 100.00 PHP 100.00 PHP 100.00 PHP 100.00

Hours 10 1 1 0.5 0.25

PHP PHP PHP PHP PHP

Amount 4,000.00 100.00 100.00 50.00 25.00

Total

12.75

PHP

4,275.00

Hours 2 3 3 1 2 2 1 1

PHP PHP PHP PHP PHP PHP PHP PHP

Amount 240.00 360.00 360.00 120.00 240.00 240.00 120.00 120.00

15

PHP

1,800.00

Hours 3 3 2 2 2 2

PHP PHP PHP PHP PHP PHP

Amount 360.00 360.00 240.00 240.00 240.00 240.00

14

PHP

1,680.00

Hours 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25

PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP

Amount 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00

15

PHP

1,800.00

Manhours

Scale 1:100 1:101 1: 100 1: 100 1:100 1:100 1:100 1:100

Rate PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 Total

Sheet: Drawing #

# A02 1 2 3 4 5 6

Description Section & Elevation Cross Section Longitudinal Section Front Elevation Left Side Elevation Right Side Elevation Rear Elevation

Manhours

Scale 1:100 1: 100 1: 100 1:100 1:100 1:100

Rate PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 Total

Sheet: Drawing #

# A03 1 2 3 4 5 6 7 8 5 6 7 8

Description Room Detail - 01 Living Area - Wall Section - A Living Area - Wall Section - B Living Area - Wall Section - C Living Area - Wall Section - D Dinning Room - Wall Section - A Dinning Room - Wall Section - B Dinning Room - Wall Section - C Dinning Room - Wall Section - D Kitchen Area - Wall Section - A Kitchen Area - Wall Section - B Kitchen Area - Wall Section - C Kitchen Area - Wall Section - D

Manhours

Scale 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50

PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP

Rate 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00

Total

Sheet: Drawing #

# A04 1 2 3 4 5 6 7 8 5 6 7 8

Description Room Detail - 02 Master BR - Wall Section - A Master BR - Wall Section - B Master BR - Wall Section - C Master BR - Wall Section - D BEDROOM 01 - Wall Section - A BEDROOM 01 - Wall Section - B BEDROOM 01 - Wall Section - C BEDROOM 01 - Wall Section - D BEDROOM 02 - Wall Section - A BEDROOM 02 - Wall Section - B BEDROOM 02 - Wall Section - C BEDROOM 02 - Wall Section - D

Manhours

Scale 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50

Rate PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 Total

Sheet: Drawing #

# A05 1 2 3 4 5 6 7 8 5 6 7 8

Description T & B Detail T & B 01 - Wall Section - A T & B 01 - Wall Section - B T & B 01 - Wall Section - C T & B 01 - Wall Section - D T & B 02 - Wall Section - A T & B 02 - Wall Section - B T & B 02 - Wall Section - C T & B 02 - Wall Section - D Laundry - Wall Section - A Laundry - Wall Section - B Laundry - Wall Section - C Laundry - Wall Section - D

Rate PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 Total

Sheet: Drawing #

# A06 1 2 3 4 5 6 7 8 5 6 7 8 9 10 11 12

Description Windows & Door Schedule Door 1 (Elevation / Plan / Detail) Door 2(Elevation / Plan / Detail) Door 3 (Elevation / Plan / Detail) Door 4 (Elevation / Plan / Detail) Door 5 (Elevation / Plan / Detail) Door 6 (Elevation / Plan / Detail) Door 7 (Elevation / Plan / Detail) Window 1 (Elevation / Plan / Detail) Window 2 (Elevation / Plan / Detail) Window 3 (Elevation / Plan / Detail) Window 4 (Elevation / Plan / Detail) Window 5 (Elevation / Plan / Detail) Window 6 (Elevation / Plan / Detail) Window 7 (Elevation / Plan / Detail) Window 8 (Elevation / Plan / Detail) Window 9 (Elevation / Plan / Detail)

15

PHP

1,800.00

Hours 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25

PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP

Amount 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00

15

PHP

1,800.00

Manhours

Scale 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20

PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP

Amount 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00

Manhours

Scale 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50 1:50

Hours 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25

Rate PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00 PHP 120.00

Hours 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Amount PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP PHP

90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00

13 14 15 16 17 14

Window 10 (Elevation / Plan / Detail) Window 11 (Elevation / Plan / Detail) Window 12 (Elevation / Plan / Detail) Window 13 (Elevation / Plan / Detail) Window 14 (Elevation / Plan / Detail) Window 15 (Elevation / Plan / Detail)

1:20 1:20 1:20 1:20 1:20 1:20

PHP PHP PHP PHP PHP PHP

120.00 120.00 120.00 120.00 120.00 120.00

Total

Sheet: Drawing #

# A07 1 2 3 4 5

Description Stair Detail & Water Tank Detail Stair Plan Stair Section Stail Blow-up Detail (1-2-3-4) Water Tank Plan Water Tank Section Stail Blow-up Detail (1-2-3-4)

PHP PHP PHP PHP PHP PHP

90.00 90.00 90.00 90.00 90.00 90.00

16.5

PHP

1,980.00

Hours 1 2 2 1 2 2

PHP PHP PHP PHP PHP PHP

Amount 120.00 240.00 240.00 120.00 240.00 240.00

10

PHP

1,200.00

113.25 PHP

16,335.00

Manhours

Scale 1: 20 1:20 1:10 1:20 1:20 1:10

0.75 0.75 0.75 0.75 0.75 0.75

PHP PHP PHP PHP PHP PHP

Rate 120.00 120.00 120.00 120.00 120.00 120.00

Total Grand Total

-------------8 hours / day 14.15625 or Note: Tracing Printing / Blueprint is not included… Additional - Php 150 per sheet Tracing Printing Additonal - Php 12 per Blueprint Copy

Turnover:

14Days

Early Turover: 10 Days Discount: *Free Advance Hard Copy

PHP

16,000.00

A3 size only

Related Documents

Sample Man-hour Costing
August 2019 24
Costing
December 2019 40
Costing
November 2019 42
Costing
November 2019 39
Costing
November 2019 42

More Documents from ""

Planning Office Space
August 2019 16
Sample Man-hour Costing
August 2019 24
Ump Cv Template_hmc.docx
December 2019 23
Gajes Eco Tourism.docx
December 2019 13
Speech.docx
December 2019 12