Costing

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Costing as PDF for free.

More details

  • Words: 118
  • Pages: 1
TRANSAFE CONSULT SDN BHD (750025-D) M&E Consulting Engineers Rujukan Kami: Tarikh : MITGGROUP SDN BHD 2A, JALAN LIKU B8/B 40100 SHAH ALAM DATE : 14 SEPT 07 ATTN : RADEN MOHD PUJASETI ASNAWI FAX : 55101626

PROPOSED OFFICE BUILDING WITH PARKING FACILITIES AT TECHNOLOGY PARK MALAYSIA FOR TETUAN SMART DRIVE ENTERPRISE SDN BHD M&E REQUIREMENT - ESTIMATED COSTING 100,000.0 INTERNAL PLUMBING

0

AIR CONDITIONING SYSTEM

0

FIRE FIGHTING SYSTEM

0

ELECTRICAL SERVICES

0

LIFT

0

TELECOMM FACILITIES

0

CCTV

0

PUBLIC ADDRESS SYSTEM

0

MISC - CONSULTING FEES (8%)

0

TOTAL

0

1,500,000.0 400,000.0 1,500,000.0 300,000.0 80,000.0 80,000.0 60,000.0 321,600.0 4,341,600.0

Lot 2-3-31E, Wisma Rampai, Taman Sri Rampai, 53300 Kuala Lumpur. Tel 41467446 Fax 41083030 Email : [email protected]

Related Documents

Costing
December 2019 40
Costing
November 2019 42
Costing
November 2019 39
Costing
November 2019 42