S8 Project

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View S8 Project as PDF for free.

More details

  • Words: 206
  • Pages: 1
Important Points to be noted for S8 Project 1.

S8 project Duration starts from 5th of April, 2007.

2.

Interim Project Review will be in the last week of April and final evaluation , review and submission of reports towards the end of May. (Exact Dates to be announced later )

3.

Internal project batches should have a minimum attendance of 3 days per week.(Any further relaxation on the no of days will be strictly subject to the approval of the Guide, but will not be less than 2 Days/ week). External batches should produce the complete Attendance Certificate from their project firm on completion of the project.

4. Attendance should be given to their respective guides. 5.

Weekly Status should be reported to their respective guides by all the batches (Both Internal & External). External batches may collect the email Ids and phone numbers of their respective guides before moving out for project. Project Marks are awarded on the basis of these evaluations also.

6.

Individual Contribution of the students will be tested.

7. External projects will be visited by the respective guides either during the project duration or after completion at their project sites and the visits should be arranged by the respective batches.

Related Documents

S8 Project
November 2019 9
S8
December 2019 6
S8.docx
June 2020 3
S8-tarea.pdf
April 2020 3
Phil S8 Web_pdf
July 2020 4