CV.BAKTI MULIA UTAMA

MEDICAL GASES – EQUIPMENT – INSTALASI GAS MEDIS DEPOT PEMASARAN OXYGEN MEDIS Perum Bumi Citra Saguling Blok A.26 Jl.Saguling Babakan – Kawalu – Kota Tasikmalaya HP. 085 283 773 661 – 0821 2803 6106

Hal : Penawaran Instalasi Gas Medis

Tasikmalaya 22 November 2018 Kepada Yth : PT.PUNCAK TIMUR PAPUA U/P H Deden BANDUNG

Dengan Hormat Bersama ini kami mengajukan penawaran pekerjaan Instalasi gas Medis Sebagi berikut :

NO

URAIAN PEKERJAAN

1 ĦH

RKS & SPESIFIKASI

2

3

SATU AN

VOLUM E

4

5

set

1.000

HARGA

JUMLAH

SATUAN

HARGA

Rp

RP.

6

7

PEKERJAAN INSTALASI GAS MEDIS

A

Pekerjaan Oxigen (O2 )

1

CENTRAL OKSIGEN Digital Automatic Change Over Gas Manifold Produk PRES INDONESIA

65.000.000

65.000.000

Kapasitas : Double Row @ 4 tabung x 2 Max. Flow : 140 Nm3/Hr Out Pressure : 0 – 5 Kg/ cm2 - Pressure Regulator ,Digital Pressure Regulator - Header

2

Instalasi lantai 1

a

Instalasi Pemipaan Tembaga standart AS (Donnect ke Instalasi eksisting ) - Diamter 32 mm (1 1/8 ") ASTM B 819 BRASCO KOREA

m

8.000

450.000

3.600.000

- Diameter 20 mm ( 7/8 “) ASTM B 819 BRASCO KOREA

m

30.000

320.000

9.600.000

- Diameter 17 mm (5/8 “) ASTM B 819 BRASCO KOREA

m

31.000

210.000

6.510.000

- Diameter 15 mm (3/8 “) ASTM B 819 BRASCO KOREA

m

70.000

95.000

6.650.000

b

Outlet Gas screw connect c/w Wallbox & Flushplate

bh

13.000

1.200.000

15.600.000

c

Ball Valve Dia .1 1/8”

bh

1.000

350.000

350.000

d

Fitting : Tee,Elbow , Reducer Union dll dan Alat Bantu

Is

1.000

8.500.000

8.500.000

e

Intsalasi alrm Medis Gas PRODUK PRES INDONESIA

Unit

1.000

3.000.000

3.000.000

JUMLAH PEKERJAAN INTSALASI GAS MEDIS RP.

118.810.000

Pembayaran 1. Dp 30 % SPK Diterima 2. 50 % Setelah barang sampai lokasi 3. 20 % Setelah Pekerjaan Selesai 100 %

Hormat Kami , CV.BAKTI MULIA UTAMA

DADANG SUKAMANA OWNER

Central Oxygen Manual Regulator Haris Amerika

Central Oxygen Manual Regulator Haris Amerika

Central Oxygen Manual Regulator Haris Amerika

Central Oxygen Manual Regulator Haris Amerika