Rotating Bridge Mechanism System.doc

  • Uploaded by: pathare shubhangi parashuram
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rotating Bridge Mechanism System.doc as PDF for free.

More details

  • Words: 333
  • Pages: 2
Rotating bridge mechanism system Abstract A swing bridge is a movable bridge that has as its primary structural support a vertical locating pin and support ring, usually at or near to its center of gravity, about which the turning span can then pivot horizontally as shown in the animated illustration to the right. Small swing bridges as found over canals may be pivoted. Rotating Bridge Automation Project Purpose the aim for this project is to create a three dimensional model of a rotating or swinging bridge similar to the one in Northwick Town England What is a Rotating Bridge? A swing bridge is a movable bridge that has as its primary structural support a vertical locating pin and support ring which allows it to pivot horizontally. Advantages The chances of collisions is greatly reduced in the presence of a rotating bridge. The bridge requires no counterweights so its complete weight is significantly reduced.

Diagram of rotating bridge mechanism system

Advantages 1. 2. 3. 4. 5. 6. 7.

The bridge mechanism has very low error. The size of project made by is more suitable for bridge system. The cost of machine is less.( proto type model ) It is easy to make. It has low maintenance. The system has worked fully switched operated. Weight of machine is less.

Disadvantages

1. Being semiautomatic we cannot neglect at least one operator. 2. Electric power is most important for project operating. Technical specification:1. Selection of the motor system. 2. Selection of the moving pipe system. 3. Selection of the plate. 4. Selection of the rotary motion system. Machine required for completion of above project:1. ARC Welding Machine, 2. Drilling Machine, Grinder, Parts lists:1. Motor

=1

2. Rotating part

=1

3. Lock linkage

=1

4. Plate

=1

5. Operator handle

=1

6. Mounting Fabrication = 1 Application of project:1. In any river bridge purpose. 2. Can be used in civil workshop. Salient features:1. High accuracy. 2. Simple in operation. 3. No skilled manpower required. 4. Fully automation. *******

Related Documents

Mechanism
December 2019 34
Mechanism
June 2020 16
Bridge
June 2020 31
Bridge
June 2020 30
Bridge
November 2019 54

More Documents from ""

Final Project Report.docx
November 2019 2
Chap 01a.pdf
October 2019 16
Anish (53) (3).docx
May 2020 4
Admit Card.pdf
October 2019 20
Kinetics
October 2019 27