CITY OF RICHMOND ENGINEERING SERVICES DEPARTMENT RICHMOND GREENWAY-EAST SEGMENT CML-5137 (035) NOVEMBER 10, 2008 ADDENDUM No.1 This addendum No. 1 shall be considered as a part of the project specifications for the abovementioned project as though it has been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those on the original documents, this Addendum shall govern and take precedence. Contractors are hereby notified that they shall make any necessary adjustments in their proposals on account of this Addendum. It will be construed that each proposal is submitted with full knowledge of all modifications and supplemental data specified herein. Contractors shall acknowledge receipt of this addendum in the space provided on the Proposal. Several items were discussed at the PreBid Meeting held on 11/7/08. Below are supplementary instructions that require minor adjustments of the Contract Details. All Bidder Questions have been posted to the Bid On Line. All Bidders must register to this service for their bids to be considered. Where no further clarification to a Bidders Question is provided, the item is to be Bid as shown on the plans or specified in the specifications. 1. On the Bid Schedule Form, Eliminate Item #9, Class 2 Aggregate Base, from Base Bid. This item of Class 2 Aggregate Base shall be bid as Alternative 1 line item and included in the Total Bid including Alternative 1 only. Refer to Detail 1 and Detail 2 on sheet D1. Subgrade elevation will remain the same whether Alternative 1 is accepted or eliminated. Finish Grade of the Bike Trail will vary depending on whether Alternative 1 is accepted or eliminated. A revised Bid Schedule Form is attached to this Addendum 1. 2. Revise Sheet E-3 to eliminate the two (2 ea) bridge mounted electroliers at Station 142+90 and 144+00. Substitute 1 typical Holophane Electrolier installed per Detail l on sheet E-5. Engineer shall determine exact location of the additional Holophane Electrolier prior to construction. Change Item No. 28, Lighting Electroliers & Base, to 48 each instead of 47 each. Since no pay item was included for the 2 each bridge mounted Electroliers, no adjustment of the Bid Schedule Form is necessary to reflect the deleted bridge mounted Electroliers. 3. Bidders have found difficulty obtaining price quotes from PG&E for Electrical Service and EBMUD for Water Service for the project in a timely fashion. Therefore, Bidders shall include an allowance for these utility fees in the various contract items accordingly: PG&E Utility Connection Fee $50,000 EBMUD Connection Fee $30,000 Addendum 1- Richmond Greenway-Ease Segment CML-5127 (035)
Page 1 of 3
When actual invoices from the Utility services are received following utility connection the contract will be adjusted to reflect actual costs. Contractor shall expedite applications for utility services as a first item of work following Contract Award. Contractor shall furnish evidence of request for new service application for PG&E Services and EBMUD Service to the Resident Engineer. 4. Contract Item 6, Clearing and Grubbing, shall be performed between BART Right of Way on the North and City Right of Way on the South of the project for the entire length from Carlson Blvd to San Pablo Blvd. Trees with a trunk diameter of greater than six inches (6”) shall remain in place and undisturbed. 5. This project has an excess amount of Roadway Excavation and it is the Contractors responsibility to dispose of it outside of the City’s right of way. Any soil testing required by the potential receiver of excess Roadway Excavation will be the contractor’s responsibility. 6. The Project Funding Signs described in Section 10-1.08 will not be required on this project. Since this item was not included in the original Bid Schedule, no adjustment or action is necessary for Project Funding Signs.
END OF ADDENDUM 1
Attachments to Addendum 1: A. Revised Bid Schedule Form to be completed and submitted with Bid Package
Addendum 1- Richmond Greenway-Ease Segment CML-5127 (035)
Page 2 of 3
Attachment A
Addendum 1- Richmond Greenway-Ease Segment CML-5127 (035)
Page 3 of 3
CENTRAL RICHMOND GREENWAY BIKE/PEDESTRIAN TRAIL PHASE 1B - EAST SEGMENT FEDERAL AID PROJECT NO. CML-5137(035) Engineer's Estimate
Description
Unit
Quantity
1
Mobilization
LS
1
2
Record of Survey
LS
1
3
Traffic Control
LS
1
4
Stormwater Pollution Control
5
3" AC Pavement
6
Clearing and Grubbing
LS
1
7
Roadway Excavation
CY
1,869
Bid Item
8
Adjust SD Manhole/ Junction Box to Grade
9
Class 2 Aggregate Base
10 11
LS
1
TON
1,005
LS
1
TON
2,950
Decomposed Granite
CY
241
Install Sign Posts
EA
46
12
Install Signs
EA
92
13
Remove Signs
EA
5
14
Install 4" Painted Metal Bollards
EA
14
15
Thermoplastic Pavement Legends & Markings
SF
151
16
Thermoplastic 4" Solid Yellow Stripe
LF
1,070
17
Thermoplastic 6" Solid White Line (Bike Stop Bar)
LF
25
18
Joint Trench - Electrical & Irrigation
LF
6,258
19
Landscape
LS
1
20
Irrigation
LS
1
21
6' High Chainlink Fence
LF
6,258
22
3' High Wood Barrier Fence (Redwood)
LF
246.5
23
Kiosk Sign
EA
4
24
Wayfinding Sign
EA
4
25
Neighborhood Maps
EA
3
26
Precast Concrete Benches
EA
2
27
Precast Concrete Bicycle Rack
EA
2
28
Lighting Electroliers & Base
EA
48
29
Special Lighting Electroliers & Base on 2:1 Slope
EA
3
30
Pullbox
EA
55
31
Lighting Conduit & Wiring
LF
6,258
32
Electrical Conduit & Wiring
LF
287
33
Lighting Service/Controller Cabinet & Base
EA
2
34
Irrigation Service/Controller Cabinet & Base
EA
1
TON
2950
Unit Price Total Price (In Figures) (In Figures)
Total Bid excluding Alternative 1 35
Alternative 1- Class 2 Aggregate Base Total Bid including Alternative 1
Total