Reversed Water Meter Cases By Zamboanga Water.docx

  • Uploaded by: Yusop B. Masdal
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Reversed Water Meter Cases By Zamboanga Water.docx as PDF for free.

More details

  • Words: 307
  • Pages: 1
REVERSED WATER METER BY ZWCI SUBCONTRACTORS IN 2017-2018 1.

Case No. 5298

Account Name PULA, HUSSIN

Account No. 1060575

Account Location Sto, Nino, Putik, Z.C.

Date Apprehended October 19, 2017

2.

5337

BEJERANO, ISABEL

1011657

November 16, 2017

0650993

Guiwan, Zamboanga City Mampang, Z.C.

3.

5395

4.

5396

5.

5394

6.

5383

NASALUDDIN, HJI. ANNISA A. SAAVEDRA, REYNALDO BARRA, KAISAR USMAN ROMERO, TERESITA

0655190

Mampang, Z.C.

January 09, 2018

0660190

Mampang, Z.C.

January 09, 2018

1911536

Southcom Village, Z.C.

7.

4839

TOPACIO, MA. LUISA

1910887

Southcom Village

March 05, 2017

8.

5490

ODENCIO, TERESITA T.

1919258

Upper Calarian, Z.C.

March 15, 2018

9.

5466

OLIVEROS, EMILIANO

1980077

Malagutay, Z.C.

February 23, 2018

10.

5583

JACINTO, TERESITA

1858450

San Roque, Z.C.

May 28, 2018

11.

5624

TOMBOKON, TOMAS

1858450

Talon-talon, Z.C.

12.

5710

1340319

13.

5807

DUMAGAL, FRANCISCO LAWAMA, GLENDA G.

14.

5824

15.

5851

BERNARDO, CECILIO B. BENITO, EUGENIA

Prepared by:

Date:

YUSOP B. MASDAL Legal Assistant II

March 5, 2019

November 16, 2017

December 20, 2017

Subcontractor McTel Engineering Services McTel Engineering Services McTel Engineering Services McTel Engineering Services McTel Engineering Services McTel Engineering Services CEG Engineering Services

and and and and and and

Pilrey Construction Trading Co. Pilrey Construction Co.

and

and

June 28, 2018

McTel Engineering Services AGE Solar

Pasonanca, Z.C.

August 24, 2019

Pilrey Construction Co.

1010058

Guiwan, Z.C.

October 16, 2019

Pilrey Construction Co.

0815173

Tugbungan, Z.C.

October 19, 2019

CEG Engineering Services

0732254

Tugbungan, Z.C.

November 14, 2018

AGE Solar

Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter Positive Meter

Remarks Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Reversed

Water

Related Documents


More Documents from ""