Resume Updated

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume Updated as PDF for free.

More details

  • Words: 2,617
  • Pages: 7
RESUME Dr.Malcolm J Mudge FSAIMM,GSSA,SME,AIMME

Project Management, Metallurgical Positions, and Consultant. Full Time Positions. Relocate Anywhere.

Career Summaries: From Prof. of mining and metallurgy to operational manager and C.E.O., Developed confidence and in sight into integral aspects of mining companies. Equally capable of hands on approach which is appealing at times when training and developing personal relationships at work, in the management role. Capable of heavy eqpt. operation for assessment of operators etc. Computer literate. Speak several languages. Efficient at SAG and Ball Milling assignments. Considerable experience in alluvial mining and alluvial eqpt., together with DMS experience. Certified GIA Diamond assessments, Geophysical studies on Diamond deposits, Project set-up for operation-DRC. Zambian cassiterite assessmrent and process design following geological studies on Alluvial recovery. Director of Green Machine Corp.- Copper gold in DRC and Australia.

Major Capabilities: Management capabilities, Milling problems, training, operational, commissioning, design to drafting stages, excellent interpersonal relations. Committed to whatever project unconditionally. Mill Manager and Chief Metallurgist-Lega Dembi-Ethiopia-opencut gold mine Ability to adapt to any climate from Amazon to Northern winters. Multi-lingual:English, Portuguese, French, Spanish, Pidgen, Italian Alluvial experience in Indonesia, South America, Ethiopia, Congo, South Africa, Australia on Gold and diamonds and Tin. Extensive geophysical studies for alluvial deposits.

CONTENTS:

• • • • • • •

Contact address and private details Education Courses Undertaken. Work History Seminaries Given Publications References

Malcolm John Mudge,FSAIMM

Name:

GSSA, SME,AIMME 33 Star Road, Selcourt, Springs 1596 Gauteng, South Africa +27 72 477 3273 Email: [email protected] Status: Single Passport: Australian E7071918 2 year work visa to Sth Africa Languages: English, Spanish, French, Portuguese, Thai, Chinese (some). 2003 2002 1993-1996 1965-1972 Australia. 1966

Commenced MBA Phoenix University Arizona Completed PhD in Metallurgical Engineering/Met Tech and PhD. Environmental Eng. in Univ. California PhD Ext Met., Geology- Cuenca Sch. Mines Ecuador and Sao Paolo, Brasil resp. School of Applied Science N.S.W. Dept.Tech.Education, Winner of University N.S.W. Metallography exhibit. Metals

Society of N.S.W.

1975.1978

School of Mines, Western Australia.

Leisure activities: Squash, Skiing, Reading, Prospecting, Writing. Health: Good Height: 170cms Weight: 55kgs.

WORK HISTORY: Deswik Technologies: Research Deswik Process Engineering.

and development, EPCM,

Copper, Platinum, Gold Dumps recoveries Mill commissioning. Lab testwork. Plant design. ZMI Gold projects on Arsenopyrite recovery. Merrill Crowe designs for dry tails. Magnetite studies for LIMS and WHIMS on Hematite.

Employer: Rio Tinto Alcan Engineering. Manager feasibility Studies Brisbane.-Alumina engineering at Gove Peninsular N.T. Employer: Engenium Senior Process Engineer, Iron ore. Perth. Iron Ore deposits at atlas mine Feasibilities. Employer: CEO-Exec. Dir. DRC Copper, Cobalt, Gold project Precious metal limited-LSX. Plus market. Pink sheet- Nasdeq- New York. Refineries in Tanzania for Tanzanian Govt. project. Commodotity Trading in Ghana, DRC, Moz. and Tanzania. CEO of copper company.- greenmachinecorp.com – Lubumbashi copper projects on 5 leases. Full reposnsibilities. Bemex Corp.: Senior Met. Project Technical Management. Gold and base metal metallurgy and operations thru-out Australia Metallex: Director Mining and Exploration-Angola Concessions. Contract position.

Employer: Angola Resources. Manager Luanda . Logistics and management of project. Employer: Self employer mineral processing consultant 2003-2005 Reponsibilities: Design, management and commissioning of Diamond plants, Platinum tails reprocessing, ERGO gold recovery upgrades using Deswick Fine grinding mills, Platinum study in Burundi. Diamond studies, Fine milling Technologies, Manganex Manganese study and feasibility study. Employer: Manhattan Mining Equipment-Sth. Africa

Position: Process Product Geological Manager Period: 2002-2003 18months Reponsibilities: Ensure total product and processes are correct metallurgically for the conducted proiject. Design, Commmissioning,Quality control. Design and manufacture of new equipment. Equipment sizings and operation servicing. Design of large scale copper gold project in Mauratania. Large Kaolin project in Saudi Arabia. Conversion of FAG to WET SAG MILL. Design of 700 tph coal treatment plant using DMS for BHP Billiton project in S.A. Delivery of paper on Feasibilty studies at international conference on mining in Jburg. Sept-Oct. Operations in Botswanna, Rwanda, Mozambique, Saudi , Geophysical Studies for diamond alluvials,. Conferences at SAIMM, GSSA 2001: Project Manager- Employed working on Diamond project in Congo . Complete technical input from mining to processing and administration. 8 months 2001: Consultant metallurgical duties PT KOBA TIN Indonesia. Review and recommend operating changes to improve quality and quantity. Review mining and all processing to obtain 75% Sn values in product and produce large volumes of ingot and anode quality tin for export. Change flotation reagent to increase recovery of lead in froth to prevent contamination. Change mill arrangement to increase grind efficiency. D. Geldard Director Koba Tin, Trantek-Indonesia and Technical Resources-Australia. Hamish Bohannan-Gallery Gold M.D. 3 months

2000: Resident Manager-Project Manager: North Korea Developing Mining Alluvial and tailings projects, pressure jigs and centrifugal concentration set-up, lab. Set up and maint. And eqpt organisation. Working with Nth Korean Senate Refer Gekko Systems 8months 1999 Contract metallurgical services Yandan Mine - Ross Mining. Central Qld. Australia. - 2 months - mathematical modeling of metallurgical. balances using Excel flowsheets development. Analysis of polymetallic treatment options for Arsenical pyrite ore types. Daily consumables and reagent usage for weekly reporting. Incorporation of heap leach stats for met. balance. 6 months 1998 Plant manager Plant commissioning duties and Training of local workforce. OH&S Amazon region of Sth. America Hampton Court Resources, Installation of Equipment for Alluvial op, and laboratory setup. Electrical set-up and modifications. Training of local and professional workforce in operation and maint. of plant and accessories. Installation of electrical circuits and load sharing capabilities for gensets. Assessment of Case Poclain excavators for open cut mining operations. Cost study and Feasibility. 8 months 1994-1998: President & Chief Executive Officer Minera Gowanda S.A. Prospectus and research development for alluvial ore deposit in Ecuador. ¨Maria¨ alluvial concession-Esmeraldas. Complete bankable document- Engineering study incl. cash flows and organisational charting. Company administration. Selection of heavy eqpt. Etc. Research into recovery of gold/platinum/base metals in

polymetallic black sand. Development of computer generated cost studies and assessments. refer Peter Howe AC Howe and Assoc. Toronto. Various concessions in Ecuador Assessment and Feasibility Studies. 5 years Project Manager - Imodiesel Spain- Portovelo Busa Site Development of CIP process Technical Advisor to Amlatminas Stock market prospectus issue. Plant commissioning Amerbrit Ecuador. Ball Mill And cyclone installation and training in use of cyclones and mills. Hydrogen Isotope Geochemical Studies in Ecuador. A study of epithermal systems utilising lab. studies of local water for determination of origin of mineralisation and transport mechanism for an evolving mineral source. 1997-Commissioning Manager- Client Representative:- Commissioning and Training workforce at San Gregorio plant in Rivera, Uruguay for 3 months. Supervision of contractors and Minproc engineers. On site modifications to gold room and gold room pouring techniques. Rea Gold- Interpreter for Minpro operators in training roles. RSM View experience-Rockwell programs.Mr.Dennis Thomas, Mr Z Zigmundowsky-Minproc Perth. 1995-1996: Consultant Mineral Processing Engineer Eeximcor Afrique - Minpro Toronto Canada- Senegal. Ball mill installation. Construction of mobile crush/screening plant in Senegal West Africa Site preparation, leveling and installation. Fire assay lab eqpt ordering and set up for analysis. Minpro Int.Canada Installation of milling eqpt. Ball mill Cyclones etc. with pumps. Commission and trials to production level. 5 months Senegal Delivery of paper for environmental group/Swiss Govt. in Ecuador on Environmental Contamination. Use of common decontaminating agents for cyanide destruction and cost studies related to same. Presentation of papers and demonstrations for public and gov’t agencies in Ecuador. 1995-Selected by Projeconsult of Germany to conduct surveys and artesinal studies in Ghana for Govt. of Ghana over 2 year period. . 1994: Chief Technical Officer for Minroca S.A.¨La Tigrera¨ concession-El Oro. Design and feasibility study 5000 tpd operation.¨Guisme¨ concesion-Zamora Full feasibility study with costs included. Technical Director of Corporación ¨La Plata¨ S.A.. Assessment of various areas for investment purposes. Complete geological assessment of site. Advising investment companies on three major projects in Ecuador. Design of small treatment plant in Portovelo. 1993- 1994: Assessments of: Bella Rica-Ponce Enriquez Research into polymetallic ore treatment routesArsenopyrite and chalcocyite treatment Full geological study. High temp. epithermel ore body. 12 months Portovelo- El Oro Region-Low temp. Epithermal ore zones in Granodiorite. Rio Santiago-Esmeraldas Minera Gowanda Rio Payamino & Shapano-Amazon Region Heavy Eqpt management and procurement. Operation and supervision of alluvial operation. Design of Concentration module with Goldfields of Salt Lake City. Heavy eqpt. Management and control. 8 months Granda Centeno. Edwardo Granda CEO-Teleamazonas Ecuador Author of "Mining, Geological and Metallurgical aspects in Ecuador" 200 page text for students World Bank Washington.U.S.A. , Cenda (Swiss Govt Project Ecuador)

Visiting Professor of Mining and Metallurgy Universidad Central del Ecuador-Quito Presenter of several Seminars in Ecuador-

1993-1994: Visiting Professor Universidad Católica del Azuay-Cuenca University Central of Quito. Universidad del Azuay-Cuenca Universidad Técnica de Machala-Machala-Primero seminario Aurifero-Orenses. 1993-1994: Technical Manager Mining-Metallurgy ¨Granda Centeno¨ Group ¨Minera Pucabarranco¨ - Amazon Region of Ecuador Project management 4400tpd Complete construction of camp and workshops. Road construction for 35 kms. Design of Recovery modules for alluvial recuperation of Gold, Diamonds and Platinum in SLC Utah Assessor of various Projects in Bella Rica 1991-1993: Design and Installation of Three Crushing & screening & C.I.P. Plants in Ecuador. Fabrication of tanks, process units and commission. Low cost assemblies. 1991-1993: South American Representative for Alluvial Mining, Technology and Services- Australia. Project engineering Services Mr. Allan Russell Amtas-Perth 1992: Consultant Design Eng. Geolabs CIP Plant in PonceEnriquez construction, commission and operational training for min.processing plant,construction with local workforce under strict supervision and control. 1 year 1991: Project Manager Filanbanco-Minera Gribipe. Feasibility of Gaby Project Ecuador Construction of mineral processing laboratory. Road construction 15 kms. 1 year Portovelo Sands Treatment Design Abalta S.A. Heap leach project Chief Consultant Project Engineer Gowanda- Esmeraldas region Ecuador 1989-1990: Project Management Govt. of Ethiopia. Ethiopian Mineral Resource Development Corporation. Lega Dembi Project. Mill Manager/Chief metallurgist Commissioning, Training and supervision of Engineering company - Davy-Mckee Stockton England-Modifications to plant to upgrade for correct operational status. 30% increase in output on commissioning. Govt. of Ethiopia. Commission and operate all plant and ancillary operations. Install and commission nuclear density units and train locals in safe work practice. Install and commission gravity circuit and train locals in mercury use and its properties. Distillation training and detection of mercury gases. Development of daily log sheets and balances for gold call and reagent usage. 1 year 1988-1990 : Emperor Gold Mines Project Management, Metallurgy Fiji. Phillips shaft modeling for JV. Research and mineralogy into Black Sands of Ecuador AMDEL Dr Doug Mason. CIP approval and implementation for J.V. Oversee offshore units for reporting to board. Upgrade CIP for higher thruput. Board representation at WMC meetings. Conduct research into polymetallic sand treatment. Oversee daily operations. CIP and Flotation of Cu Gold ore.- Allan Loosely Emperor Gold Fiji. Conduct inspection and inventory for plant purchase-TC8- and removal of eqpt.( Kirfield Eng-Perth) 2 years 1990-PNG Mill Manager Nuigini Mining Kainantu Papua New Guinea Nuigini Gold Project technical control. Implementation of gravity circuit. Manufacturing of eqpt. NDT of ball milling eqpt.locally for upgrades. Ian Gouldie or Gavin Thomas 1 year 1984-1985: Consultant-Project Metallurgical Manager Mill Manager TC8 Mine Central Australia Frank Steel Operation and decommissioning, relining and storage of CIP plant and workshops. Scheduling decommissioning. Inventory control. Upgrade to satisfactory handover for sale. 9 months Manager Frank Steel

EPAC Engineering Freeport McMoran, - Perth Australia. Consultant for Karonie plant assessment and selection of construction company. Ivan Saracic EPAC Perth. Nord Resources Australia. Plant Supt. 4000 tpd plant budget and supervisory control. 9 months Horseshoe Lights Project - Barrack Mines. Mr.Jack Cashman Consultant plant supt. and Cu/Au studies. 6 months Mitchell Cotts Engineering Gold Processing-Project Mill Supt. Patricia projectKalgoorlie Mr. Jock Muir 1 year Broken Hill Metals Geological sampling for feasibility studies- design work on circuit. Flowsheet development for C H Dodds – Perth Bamboo Creek JV Mill Supt. Complete operation of CIP plant. Mill upgrade study. Pilbarra region of WA. 1 year. 1974-1982: Conzinc-Rio-Tinto CRA Hamersley Iron Raw Materials Metallurgist-Mineralogist Development Dept. Dampier. Iron ore beneficiation studies.Pellatising Plant metallurgist. Geological-Metallurgical assessments of major ore fields DTA/TGA studies, Mineralogy, Material balances Tom Price C concentrator studies and testwork. Author of several company reports to managing director. XRD Studies. Microscopy. Co-worker with Commonwealth Scientific Industrial Research Organisation on several research projects. Production of training manual distributed thru/out CRA for mineral processing lab. techniques. Differential thermo and gravimetric thermo analysis for mineralogical determinations. Pilot plant operation and studies. XRD tests to assess mineral components. Heavy media separation trials. Heavy liquid separations, Clereci,TBE,MI,Bromoform. Laboratory management for testwork. Several capital applications for major pilot plant eqpt.Flotation of Taconite ores (BIF) Pellet plant mineralogy. Noel Poetschka-Karrinup, Doug McKenna, City Beach Perth. Perth 8 years 1975-1982: Founding Branch Secretary-Aust. Inst. of Mining and Metallurgy Aus.IMM. Dampier-Wickham Branch Liaison with visiting dignitaries and conferences. Organisational duties for Institute matters in area. Ian Burston Perth 5 years International Heavy Haul Rail Conference Local Administration and Organisation Australian Institute of Mining and Metallurgy 1965-1974 BHP Trainee Metallurgist Iron and Steelmaking Blast furnace foreman. Galvanising metallurgist, Metallographic studies. Sinter plant metallurgist on Raw materials management. Winner BEST IN CLASS metallography exhibit Univ. NSW Metals Society Physical testing laboratory experience Trainee metallurgist. 8 years Seminaries and Lectures 2002- Nasrec Conference SAIMM BEE seminar. GSSA-Diamond Mining and processes. SAIMM Conference on Small Scale Mining. 1992-1995 Seminary in Politecnica Nacional-Quito-Publication Seminary Catholic University & University of Azuay-Cuenca -Mining and Metallurgy Visiting professor of Mining Metallurgy and Geology Final year geology students. Central University Quito Primero Seminario Aurifero University of Machala 1978- Development of Iron Ore Deposit of the Pilbara,600 million years. Hamersley Iron site lectures. The development of hematite ore deposits from original pyritic assemblages and transformation stages over 600M years. Publications: SAIMM-Various GSSA- Various

Author and presentation of university text: "Mining, Geology and Metallurgy in Ecuador" 300 page text on Ecuadorian mining and an introduction to recent processing techniques and procedures in mining A.Craig World Bank Washington USA. Preparation of feasibility studies for foreign company reporting.- University text for 6th year students of geology and mining. Training manual publication for lab. Techniques dist. To all CRA affiliates. 1980 Assessment of Banded Iron Formations - CRA 1978 Effects of Ericson Cone Heavy Media Concentration - CRA 1977 Beasley River Iron Ore Formations - Hamersley Iron 1980 Mining Metallurgy and Geology of Ecuador - 1994 World Bank. Segundo Seminario Aurifero - Escuela Politecnica Quito 1991 Primario Seminario Aurifero Machala 1993 - Univ. Tech. Machala Assessment of Mt Chanar and Pyrton Deposits Hamersley Range - CRA 1980 Treatment of Arsenopyrites in Ecuador 1995 - Filanbanco Feasibility Studies - Preparation and Delivery. - Cuenca University 1994 Prospectus Minera Gowanda Concession 1997 - Quito Ecuador Namuldi Deposit Mineralogy Hamersley Iron - 1980 Coal Assessment in Ecuador - Potential zones and drill interpretations. Overview of Ecuadorian mineral possibilites and political effects on the mining industry. A Geological/Metallurgical Assessment of a Large Volcanic Exhalative Deposit in Ecuador-La Plata.PhD manuscript. Comprehensive Training manual for mineral development laboratory Hamersley Iron 1979 Cyanide Destruction System-A low Cost Alternative to Dumping .Cenda-Swiss Gov't. Conf.1995 Gowanda Releases Proven Reserves. World Mining Journal 1995 Courses: Chandler Mcleod Training courses on work psychology assessments Hewlett Packard computer training on PDP8 Petroleum and Geological Assessments - Environmental issues in Ecuador X-Ray diffraction Application to mineralogy, DTA/TGA analysis Work safety Issues and management Computer studies using basic language for Hewlett Packard. Adaptation of basic to mass flow studies mathematical modeling Various courses and seminaries organised by AusIMM W.A. School of Radiation-Radiation Safety, Officer RSO.Grade1 Various conferences in Canada (PDAC) Toronto, Lima, Santiago, Miami. Flotation utilisation in Ecuador- Problem solving and optimisation. -1995. REFEREES: John Ellis West Australian Mines Dept. Perth 61-8-92223101 Darryl Harris OutoKumpo Perth Mr. McKnight. Ex minister for mines-Canada 1-416-860-1868 David Salary Minpro Int. Toronto Canada 1-905-847-5915 (Home Phone)

Peter Brook-PMT Q’Land tel: 61-7-55746629 Ray Simpson Perth W.A 61-8--9331351 Paul Matthews River Diamonds S.Africa +27-11-9735303 Jan Franke- AMCL Canada and Brisbane +61 438 7500 887 IMC Anthony Ogilivy Thompson London +44 20 7350 4602 Chris Rule-Anglo plats- Jburg. Marek Dworzanowski-AngloGold-27-11 638 5000

Related Documents

Resume Updated
May 2020 23
Resume - Updated
June 2020 13
Resume Updated
May 2020 12
Resume Updated
November 2019 23
Resume Updated
July 2020 12
Updated Resume
April 2020 18