Resume Husni

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume Husni as PDF for free.

More details

  • Words: 1,412
  • Pages: 4
PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

HUSNI SULAIMAN TECHNICAL DIRECTOR Position:

Technical Director/Principal Engineer

Years of Experiences:

10

Qualifications:

BSEng in Chemical Engineering with Minor in Mathematics University of Pennsylvania, Philadelphia, USA

Nationality:

Malaysian

Age:

32

PROFESSIONAL EXPERIENCES May 2005 - present

Technical Director/Principal Engineer – Scientige Sdn Bhd, Kuala Lumpur, Malaysia

Nov 1998 – Apr 2005

Facilities Surveillance Engineer – Exxonmobil Exploration and Production Malaysia Inc.

May 2005 – Present SCIENTIGE SDN BHD Project Manager Project Manager for the following projects: 1. Benefit Study & Optimization for Samarang Platform (PCSB-SKO) – On-Going project. 2. Simulation Model Conversion for Petronas Carigali Sdn Bhd – Sarawak Operations from HYSYS to Simsci Pro II. The following facilities covered under the project: a. Bayan b. Bakau c. BNGB d. D-18 e. Tukau f. West Lutong 3. Equipment Based Pressure Relief Device Analysis for PSR-1 and PSR-2 of Petronas Penapisan (Melaka) Sdn Bhd. 4. Provision of Data Management for Petronas Risk Based Inspection (P-RBI) for Petronas Carigali Sdn Bhd – Sarawak Operations. 5. Provision for Area Development Plan for 14 gas fields for Petronas Carigali Sdn Bhd Senior Engineer

Scientige Sdn Bhd

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Balingian Line Re-Routing For Gas Supply Improvement to MLNG HAZOP team leader for the review of the new system design of rerouting the gas to a lower pressure system. Facilitated the session to identify risk associated with process, operation and maintenance. Prepared HAZOP report and markup PFD and P&ID for HAZOP items identification. Senior Process Engineer Area Development Plan (ADP) – Peninsular Gas Fields Development Project for Petronas Carigali Sdn Bhd Senior Process Engineer and Assistant Project Manager for the pre-conceptual studies for the development of 14 new gas platforms. Responsible for technical work and project management aspect that includes preparing and presenting progress report and project schedule. Facilitated concept selection workshop by providing technical guidance and expertise that resulted in 24 different network conceptual options. Simulated pipeline and equipment sizing using Berwanger’s OGM software. Involved in researching and cataloguing technology solution for CO2, H2S and mercury removal. Key personnel for presenting preliminary and final result to client on 24 different network options and ranking methodology. Petronas Penapisan Melaka (M) Sdn Bhd – Equipment Based Relief Valve Analysis for PSR-1 & PSR-2 Senior Process Engineer and Assistant Project Manager for the equipment based relief valve analysis for over 1500+ units of relief valve at both PSR-1 & PSR-2. Involved in data collection, project guideline discussion and population of relief valve data equipment-byequipment into Berwanger’s PPM software. Responsible for coordinating technical progress presentation. Development of Pressure Relief Device Guideline for Petronas Carigali Sdn Bhd Senior Process Engineer and Assistant Project Manager for developing technical, operations and maintenance guideline for pressure relief devices based on industry practise as per API, ASME & DIERS requirement. Involved in preparation of project schedule and progress report. Responsible for data collection, preparing preliminary guideline format and presenting preliminary project background to client. Relief Valve Analysis for Bay Way Refinery New Jersey and Marathon Oil Gas Plant in USA Project Manager for the Malaysian office for the equipment based relief valve analysis for over 1000+ units of relief valve at both Bay Way Refinery and Marathon Oil Gas Plant. Responsible for coordinating project between Malaysia-Houston and supervising 6 process engineers in Malaysian office for execution of the project. Involved in initial data acquisition, technical review and updating progress of the project. Oct 2002 – Apr 2006 EXXONMOBIL PRODUCTION AND EXPLORATION MALAYSIA INC.

Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Facilities Surveillance Engineer Nov 1998 – Apr 2005 Primary responsibilities are: 1. 2. 3. 4. 5. 6.

Providing day-to-day facilities engineering technical support to Guntong field (1998 – 2001), Larut-A platform, Semangkok/Irong Barat field (2001-2003) and Terengganu Crude Oil Terminal (TCOT) (2003 – 2005) Analyzing key parameters and recommending action plan in order to maximize production, reduce operation cost and increase safety standard Identifying opportunities to be presented and matured as projects Managing multiple small, technical retrofit projects for field Performing Risk Assessment and HAZOP Prioritizing asset workplan in accordance to company focus area and business plan

Asset Business Plan Development Lead engineer responsible to assist Operation Superintendent in developing Guntong field (1999 & 2000) and TCOT (2004) yearly business plan. Identify key focus areas in order to align with company’s guiding principles. Creating specific objectives for the upcoming year projects, uptime target, resource availability and expenditure profile. Plant Shutdown Activities Field engineer for coordinating platform shutdown activities for Guntong field (1999 – 2000). Responsible to ensure smooth shutdown, timely back online and overall safe execution. This is achieved by initiating team discussion, providing technical support during platform shutdown and start up, and also implementing SIMOP procedures and safety initiatives. Guntong D & Tabu B Gaslift Facilities Lead the enhanced oil recovery (EOR) project that contributed 10 kbd of oil to the company in 1999. Designed and installed the topside gaslift facilities which includes the gaslift monitoring system (GLMS) and the safety protection device per API 14C requirement. Involved in preparation of procedure and executing the Tabu-B gas lift pipeline dewatering and commissioning prior to start-up of the Tabu-B gaslift facilities. Guntong D Dehydration Module Design Support and Commissioning Key interface between operations and project department for the project that enables processing of associated gas for Guntong D per specification for sales of gas in 2000. Heavily involved from during refinement of detailed design until startup and commissioning. Contributed in the development of Design Basis Memorandum and Engineering Technical Data Book and participated in various design and operability risk assessment prior to construction. Led the Platform Safety Startup Review (PSSR), preparation of startup procedures and table-top startup simulation for offshore personnel. Larut-A New Platform Design Support and Commisioning Key interface between operations and project department for the project that involves integrating of processing facilities such as water injection system, gas compression and sales system, gas dehydration system and cooling water facilities in 2000 to 2002. Heavily involved during the refinement of the detailed design until startup and commissioning. Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Involved in Alarm & Shutdown Matrix review and water injection/gas compression/gas dehydration system package review. Contributed in the development of Design Basis Memorandum and Engineering Technical Data Book and participated in various design and operability risk assessment prior to installation. Led the Platform Safety Startup Review (PSSR), preparation of startup procedures and table-top startup simulation for offshore personnel. Lead the start up activities for the first oil, MOL pump, gas dehydration system, produced water system, cooling water system and water injection system. New Contract for Production Chemical Lead contracting engineer for initiatives to bid for new drag reducing agent, demulsifier and water clarifier chemical in 2002 - 2005. Responsible for developing technical assessment criteria based on recent field data, technical chemical analyses procedure based on ASTM methods and executing “lab test” of chemical analyses at platform. Involved in the overall technical assessment of chemical vendors and presentation to Petronas committee for establishing long term contract. TCOT Produced Water Skimmer Pit Re-Commissioning Lead and coordinate re-comissioning activities of the produced water skimmer pit after fire incident in 2004. Responsible to ensure safe and timely start up, all incident investigation recommendations were closed out. Initiatives include grounding of electrical equipment, major piping and transportation to prevent electric sparks and reduction of condensate draining into the skimmer pit by re-designing piping. PROFESSIONAL TRAINING & COURSE • Surface Facilities Design • Process Design School • Practical Aspects of Control Instrumentations • Gycol Dehydration System • ABB DCS Graphic Configuration • Risk Assessment Level 2 • HYSYS, FEP, DESC, Berwanger’s OGM & PPM • Oil & gas industry standard codes i.e API 14C, API RP 500, etc • Technical Writing Skills • 7 Habits of Highly Effective People EDUCATION & TRAINING BSEng in Chemical Engineering with Minor in Mathematics University of Pennsylvania, Philadelphia, USA. 1994 – 1998

Scientige Sdn. Bhd.

process

Related Documents