Resume (32) Revised 01012008

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume (32) Revised 01012008 as PDF for free.

More details

  • Words: 10,967
  • Pages: 29
RESUME Personal Particulars: Name: I.C. No.: Address: Telephone: E-mail address: Age: Place of birth: Sex: Marital Status: Nationality: Race: Religion: Health: Interests: Height / Weight: Language Spoken: Language Written: Preferred Work Location / Town: KWSP / EPF No.: LHDN / Income Tax No.: Perkeso / Socso No.:

Joseph Johnson Packiaraj 680519-10-6605 (New) A 1093199 (Blue) (Old) 23, Lorong Kerongsang 10D, Bandar Puteri, 41200 Klang, Selangor Darul Ehsan. +6012-2862610 (HP) [email protected] 39 (Born 19/05/1968) Kuala Lumpur Male Married Malaysian Indian Christian Excellent Table tennis, badminton, soccer, volleyball 1.69 m / 68 kg English / Bahasa Malaysia / Bahasa Tamil English / Bahasa Malaysia / Bahasa Tamil Anywhere 12632860 SG01262501-09 P6722611Y

Education: 1975 - 1980 1981 - 1983 1984 - 1987 1988 - 1988 1989 - 1992 1993 - 1998

1999 - 2000

Computer Literacy:

Training:

S. R. K. La Salle, Brickfields, Kuala Lumpur. S. M. Taman SEA, Sea Park, Petaling Jaya. S. M. Teknik, Bandar Tun Razak, Kuala Lumpur. Kolej Damansara Utama, Petaling Jaya. Fakulti Sains, Universiti Malaya, Kuala Lumpur. Diploma In Technology (Mechanical and Manufacturing Engineering) Division Of Mechanical Engineering, School Of Technology, Kolej Tunku Abdul Rahman, Kuala Lumpur. Bachelor of Engineering (Mechanical Design and Technology) Faculty Of Engineering, Science and Technology, University of Northumbria at Newcastle, Newcastle upon Tyne, United Kingdom. Working knowledge of AutoCAD 2002, LAN, Microsoft Office (Word, Excel, Power Point, Project, Publisher), Lotus 123, DBASE, FORTRAN, C++, AutoLISP, IDEAS, Lusas Modeller 13.2 and Macromedia Authorware 6.0.

Joseph Johnson Packiaraj

1996 (May - July)

29th. August 1998

21st. January 2003

28th. January 2003

2nd. July 2003

9401126.doc

LI-Zainal Sdn. Bhd. (LI-Zainal Sdn. Bhd. is a M & E consultancy firm.) Trainee Engineer Reporting to the Chief Engineer, I was part of a team of five assigned to complete detailed electrical engineering (lighting, lightning, small power / switch socket outlet, PA-MATV system and telephone system) design for factories and condominiums. Welding Procedure Specification (QC Department, Tepat Teknik Sdn. Bhd.) - Basic Understanding and Selection (Arc Welding - shielded metal arc welding (SMAW), submerged arc welding (SAW), gas tungsten arc welding (GTAW), gas metal arc welding (GMAW), flux cored arc welding (FCAW)). Institut Keselamatan dan Kesihatan Pekerjaan Negara (IKKPN) / National Institute of Occupational Safety and Health (NIOSH) Induksi Keselamatan dan Kesihatan Untuk Pekerja Binaan (No. siri: SCW/102159) Lembaga Pembangunan Industri Pembinaan Malaysia / Construction Industry Development Board Malaysia Card No.: W91280120030002 (AD2(0) Management) Expiry: 6th. November 2009. ISO 9001:2000 Awareness Training (Shapadu Energy and Engineering Sdn. Bhd. (42495-W))

Career: 22-Jun-1992 - 7-Jul-1993

1997 (April - June)

4-Jul-1998 - 21-Sep-1999

18/10/2008

Royal Selangor International, Kuala Lumpur. (Royal Selangor, formerly known as Selangor Pewter Company, is the world’s largest pewter factory.) Technician (Manufacturing) (Permanent) Reporting to the Industrial Engineering Engineer, I was part of a team of three assigned to conduct, compile and update work study measurements, update production floor layout, design jigs and fixtures for the production floor to increase output, investigate technical problems with moulds and recommend solutions and provide cost quotation for new orders. Participated in the Suggestions Week. LI-Zainal Sdn. Bhd. (LI-Zainal Sdn. Bhd. is a M & E consultancy firm.) Trainee Engineer (Temporary) Reporting to the Chief Engineer, I was part of a team of five assigned to complete detailed mechanical engineering (air-conditioning, cold water plumbing, fire protection and sanitary plumbing) design for factories and condominiums. Tepat Teknik Sdn. Bhd. (153032-W) (Tepat Teknik Sdn. Bhd. is a subsidiary of MMC Corporation Bhd.) Workshop Supervisor (Permanent)

Page 2 of 29

Joseph Johnson Packiaraj

16-Apr-2001 - 15-Nov-2001

18/10/2008

9401126.doc

Reporting to the Senior Operations Manager, I was part of a team of seven assigned to plan the job for fabrication according to standard of production engineering; prepare flow chart of the project and liaise with project engineer and workshop manager to achieve the schedule; coordinate with contractor supervisor on the work provided as per contract / tender; monitor the manpower for each work performed and review the manpower loading with workshop manager; provide feedback to project engineer and workshop manager on the issues pertaining to production workload; provide assistance to inventory and classify the inventory for priority of work deem necessary; prepare work method for critical activities; prepare and revise job plan involved to meet client’s requirement; assist workshop manager and project engineer on problem solving solution; collect all information pertaining to engineering activities for value engineering decision; review all process production for improvement; actively participate all management activities on cost control and cost reports; assist on maintenance of plant and machineries. To ensure and verify that all in-process inspections and testing requirements, material inspections and audits, production works are accomplished in accordance with the agreed ITP and SOP, including witness, inspection (To liaise with the production team on inspection requirement, and work with the QC Coordinator on the full utilization of inspection resources, both from internal and external.) and recording and maintaining manufacturing data (updated and compiled as required); review of material and inspection certificates from suppliers and NDE contractors respectively; to report any deviations (NCR internally and externally) to the QC Coordinator / QC Manager if any; to assist in the close-out of these deviations, if any, before end of project; To support the QC Coordinator in other inspection activities as may be required. Amalgamated Metal Builders (M) Sdn. Bhd.(326994-M) (Amalgamated Metal Builders (M) Sdn. Bhd. is a subsidiary of Permodalan Usahasama Nasional Berhad.) Project Engineer (Permanent) Reporting to the Project Manager and Production Manager, I was part of a team of seven assigned to review and understand clearly project specification, technical and commercial clarification during bidding stage and AMB’s work scope; plan overall project schedule including engineering, procurement and fabrication; receive material specification and bill of material from Engineering and issue for approval and procurement; work out bill of material and material specification required and issue for approval and procurement; send an inquiry for quotation

Page 3 of 29

Joseph Johnson Packiaraj

1-Jul-2002 - 3-Apr-2004

9-Aug-2004 - 8-Aug-2005

18/10/2008

9401126.doc

to the potential supplier; evaluate quotation from supplier and advise purchasing department for issuance of Purchase Order; monitor closely all the activities involved in the project schedule and ensure the project performed “on track”; ensure quality of work and project requirement comply during fabrication; make on follow up or new plan to rectify the problem of pressure vessels, heat exchangers, bullet tanks, storage tanks, modular process skid units, flare system, material handling equipment, piping works, boilers, loading arms (top, bottom & marine) and structural steelworks. Shapadu Energy and Engineering Sdn. Bhd. (42495-W) (Shapadu Energy and Engineering Sdn. Bhd. is a subsidiary of Shapadu Corporation Sdn. Bhd. (116721M), certified to the ISO 9001:2000 under Certificate No.: 0549-2003-AQ-SIN-RVA by Det Norske Veritas AS Sdn. Bhd. on 30th. September 2003.) Project Engineer (Contract) Reporting to the General Manager and Commercial Manager, I was part of a team of three assigned to prepare, follow-up, clarify for Queries and conduct postmortems on Screenings, Pre-Qualifications Reports, Bids, Tenders and Project Proposal; co-ordinate relevant technical and commercial matters with supporting departments in the Oil & Gas Division, specialists and sub-contractors in the field of Project Management, Construction of Petrochemical Plant and Gas Pipeline, Hook-Up & Commissioning, Operation & Maintenance of Onshore & Offshore Plants, Marine Services and EPCC (Engineering, Procurement, Construction, Commissioning); makes decisions independently concerning problems within the discipline on the project; represents the discipline on the project and with the client to resolve technical questions and as required to coordinate work. MMC Oil & Gas Engineering Sdn. Bhd. (125442-W) (MMC Oil & Gas Engineering Sdn. Bhd. is a subsidiary of MMC Corporation Bhd.) Project Engineering Assistant (Contract) Reporting to the Project Manager and Engineering Manager, I was part of a team of seven assigned to report to the Project Sponsor for all matters relating to this project and dedicated to the project; to ensure that the project is being implemented in accordance with this Project Execution & Quality Plan (PEQP); to review the contractual requirements and initiate effective planning of manpower, tasks and responsibilities together with time scales in order to fulfil the contract; to monitor and review the performance of the project against the contractual requirements and maintain records of deviation or changes to contractual requirement; to act as

Page 4 of 29

Joseph Johnson Packiaraj

10-Aug-2005 - 9-Aug-2006

22-Jan-07 - 26-Jul-07

18/10/2008

9401126.doc

focal point for all formal communication between company and client including those for approval of technical queries, design change request etc.; to ensure an effective feed forward and feed back communication loop through the timely liaison with client counterparts; for the approval of all timesheet and overtime authorisation; for the approval of all project documents and drawings prior to issue to client; to maintain the public relations (PR) to ensure harmonious working relationship between MMC O&G, CTOC and subcontractors. Aker Kvaerner Process Systems Asia Pac Sdn. Bhd. (216207-T) Procurement Engineer (Contract) Reporting to the Procurement Manager, I was part of a team of three assigned to processing of projects requisitions and sales / proposals requisitions, on Subcontracted Labour Services, Tagged (Engineered), Untagged (Non-Engineered), Consumable items & Logistics; issuing of inquiries and follow-ups including Technical Clarifications; Technical Evaluation of the supplier quotations / technical and commercial evaluations (for sales / proposals requisitions); compilation of evaluation documents including relevant check list; negotiations with vendors; vendor performance recommendations; retention of records on pricing for tagged items; retention of technical specifications of quotes for firm bids; follow up with sales on bid submissions and their outcomes; maintenance of RFQ log and updates; to produce appropriate reports & recommendations. Advance Marine Services Sdn. Bhd. (656652-M) Senior Project Engineer (Permanent) Reporting to the Director, I am part of a team of seven assigned to Project Management Plan {Initiating [Project Initiation (Identify goals and objectives, Document project costs and benefits, Develop project charter)]; Planning [Define scope (Develop strategies and plans, Conduct planning workshop, Research previous experience, Define scope, Develop high-level work breakdown structure, Build detailed work breakdown structure, Document project costs and benefits, Specify deliverables and acceptance criteria, Document assumptions); Document Project Support Plans (Document risk management plan, Document configuration management plan, Document data management plan, Document communications management plan); Develop Project Schedule (Develop resource plans, Prepare project estimates, Defines dependencies and develop project schedule, Document assumptions, Conduct peer review); Develop Financial Plan (Prepare financial plan)]}

Page 5 of 29

Joseph Johnson Packiaraj

01-Sep-07 - present

9401126.doc

KKB Engineering Berhad. (26495-D) Manager (Engineering) (Contract) Reporting to the Group Manager (Commercial & Project) and/or Assistant Group Manager (Engineering) and Group Manager (HR & Business Services) (administrative matters), I am part of a team of twenty assigned to oversee the general administration of the Engineering and Planning Department (function, personnel and control procedures), in its operation and process for the Steel Fabrication, Hot-Dip Galvanising and Construction businesses of the Company for duties including but are not limited to Ensure design compliance and technical clarifications, material suitability including quantity takeoff, preparing, checking and approving engineering drawings in co-ordination with the Drafting Section, and to ensure proper co-ordination with respective plants in accordance with relevant Work Order / Assignment and its respective timely execution and completion; attend to meeting(s) and site(s) visit(s) as and when jobs or works required; Involved and to give my active participation in the Company’s Group Enterprise Resource Planning, IT Project, its implementation, system operation and to ensure that the system’s procedures are fully complied with at all times; orientate and brief employees on the Company’s Quality Policy, IT Policy, HSE Policy and other requirements as and when required; ensure compliance with the Company’s Quality Management System and HSE Policies of the Company; provide training to subordinates within the department or company as and when required and to ensure Training Programme and Analysis are carried out, and to supervise on-job training including any other duties that may be assigned by the Assistant Group Manager (Engineering) or Company’s nominee(s) from time to time.

Projects Executed: 1. Project: Petronas Centralised Utilities Facilities, Kertih, Terengganu, Malaysia (CT 6266) Client: Petronas Equipment: Tube Panel Assembly (6 units of 18 tube panels each i.e. Boiler (1 panel), Superheater (3 panels) & Economiser (14 panels)) Steam Drum (6 units) Material: SA 36, SA 106 Gr. B, SA-106 Gr. C, SA 182, SA 234 Gr. WPB, SA 333, SA 516 Gr. 70, Equipment design code: ASME VIII div 1 & 2 2. Project: Yetagon, Singapore (CT6297) Client: Peerless Manufacturing Company, Singapore. Equipment: H.P. Fuel Gas Filter (2 units) H.P. Fuel Gas Scrubber (1 unit) Material: SA 36, SA 105N, SA 106 Gr. B, SA 516 Gr. 70, SA 234 Gr. WPB, Equipment design code: ASME VIII div 1 & 2

18/10/2008

Page 6 of 29

Joseph Johnson Packiaraj

9401126.doc

3. Project: Formosa Plastics, Taiwan (CT 6298) Client: Deltak Corporation, U.S.A. Equipment: Tube Panel Assembly (4 units) Superheater (2 units) Economiser (1 unit) Material: SA 36, SA-105N, SA 106 Gr. B, SA 106 Gr. C, SA 182, SA 516 Gr. 70, SA 333 Equipment design code: ASME VIII div 1 & 2 4. Project: Chemical Company Malaysia (CT 6324) Client: Chemical Company Malaysia Equipment: Separator Material: SA 36, SA-105N, SA 516 Gr. 70 Equipment design code: ASME VIII div 1 & 2 5. Project: Chemical Company Malaysia (CT 6325) Client: Chemical Company Malaysia Equipment: Catalyst tank Material: SA 36, SA-105N, SA 516 Gr. 70 Equipment design code: ASME VIII div 1 & 2 6. Project: PolyVinyl Chloride Plant, Kertih, Terengganu, Malaysia (CT 6344) Client: Technip Geoproduction (M) Sdn. Bhd. Equipment: Scrubber, VCM Day Tank, Material: SA 36, SA-105N, SA-106 Gr. B, SA-106 Gr. C, SA 234 Gr. WPB, SA 333, SA 516 Gr. 70 Equipment design code: ASME VIII div 1 & 2 Work Scope: Reporting to the Senior Operations Manager, I was part of a team of seven assigned to prepare BQ (MTO), arrange for material identification with client, client representative and authorised inspector, supervise fabrication, assign qualified welders, prepare daily and weekly production progress reports, prepare and arrange for NDE (non-destructive examination) inspection, prepare and arrange for PWHT (post weld heat treatment), prepare and arrange for hydrostatic test witnessing and signing of pressure test certificate with client, client representative and authorised inspector, prepare and arrange for painting, prepare engineering documents, manufacturing data reports and inspection release certificate, prepare and arrange for delivery of pressure vessels, structural steelworks and HRSG boiler tube panel assembly to site. 7. Project: Petronas MLNG Tiga, Bintulu, Sarawak. (P113) Client: JGC Corporation, Japan Equipment: Exhaust Stack (9 units) Material: A 36, A 307 Gr. B, A516 Gr. 60, A 563 Gr. A, Equipment design code: AWS D 1.1 8. Project: Indian Oil Corporation Ltd., Barauni, India (Bharat Heavy Plates & Vessels, Mumbai, India) (P135) Client: Kanon Loading Equipment (M) Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: Insulated / Jacketed Top Loading Arm (2"/2" jacketed 3" - 3 units) Material: A-105, A-106 Gr. B, A 234 Gr. WPB

18/10/2008

Page 7 of 29

Joseph Johnson Packiaraj

9401126.doc

Equipment design code: St 35.5, St 35.6, St 35.8, RSt 37.2 9. Project: BP Ningbo Huadong Co. Ltd. LPG BBT [Chiyoda Corporation (Japan)] (P138) Client: Kanon Loading Equipment (M) Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: Marine Loading Arm (8" - 3 units, 12" - 2 units) Bottom Loading Arm (2" - 10 units, 3" - 10 units) Material: AISI 316, A-333 Gr. 6, A-350 Gr. LF 2, A-420 Gr. WPL 6, A-516 Gr. 60. Equipment design code: St 35.5, St 35.6, St 35.8, RSt 37.2 10. Project: PGB Gas Processing Plant Complex B, Paka, Terengganu, Malaysia (P141) Client: Petronas Gas Berhad, Paka, Terengganu, Malaysia Equipment: High Pressure Flash Drum (1 unit) Material: AISI 316 L, A 36, SA 36, SA 53 Gr. B, SA 105, A-105N, SA 105 + SS 316 L, A-106 Gr. B, SA 193 BH7, SA 193 B8, SA 193 BH8, SA 194 2H, SA 194 8, A 234 Gr. WPB, SA 240 Gr. 316 L, SA 240 T 304, SA 312 Gr. 316 L, SA 479 Gr. 316 L, SA 516 Gr. 70, SS 304, SS 316 L, SS 400, BRONZE, Equipment design code: ASME VIII div 1 11. Project: BPC - BDO (BASF Petronas Sdn. Bhd. / Kvaerner Petrominco Engineering Sdn. Bhd.) (P142) Client: BASF Petronas Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: Top Loading Arm (3" - 1 unit) Material: AISI 304 L, AISI 316 L, Equipment design code: St 35.5, St 35.6, St 35.8, RSt 37.2 12. Project: MTBE Malaysia Sdn. Bhd., Kuantan, Pahang, Malaysia (P148) Client: MTBE Malaysia Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: Polypropelene-Propane Splitter Reboiler / Condenser (EB 228.1) Material: SA 105 N, SA 106 Gr. B, SA 179, SA 193 B7, SA 194 2H, SA 336, SA 36, SA 516 Gr. 60, Equipment design code: ASME VIII div 1 + TEMA R 13. Project: Saudi Aramco, Jeddah, Saudi Arabia (P149) Client: Kanon Loading Equipment (M) Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: Top Loading Arm (4" - 4 units) Material: A-105, A-106 Gr. B, A 234 Gr. WPB Equipment design code: St 35.5, St 35.6, St 35.8, RSt 37.2 14. Project: MTBE Malaysia Sdn. Bhd., Kuantan, Pahang, Malaysia (P152) Client: MTBE Malaysia Sdn. Bhd., Kuantan, Pahang, Malaysia Equipment: L.P. Ground Flare Seal Drum (D 1304) H.P. Ground Flare Drum (D 1308) [A 105, A 106 Gr. B] Hydrogen Preheater (E 3201) [A 36, A 105, A 106 Gr B, A 193 Gr B7, A 194 Gr 2H, A 285 Gr C, A 307 Gr B, A 563 Gr A, A 516 Gr 70] Material: A 36, A 105, A 106 Gr B, A 193 Gr B7, A 194 Gr 2H, A 285 Gr C, A 307 Gr B, A 563 Gr A, A 516 Gr 70 Equipment design code: ASME VIII div 1 Work Scope: Reporting to the Project Manager and Production Manager, I was part of a team of seven assigned to prepare BQ (MTO), arrange for material identification with client, client representative and authorised inspector, supervise fabrication,

18/10/2008

Page 8 of 29

Joseph Johnson Packiaraj

9401126.doc

assign qualified welders, prepare daily and weekly production progress reports, prepare and arrange for NDE (non-destructive examination) inspection, prepare and arrange for PWHT (post weld heat treatment), prepare and arrange for hydrostatic test witnessing and signing of pressure test certificate with client, client representative and authorised inspector, prepare and arrange for painting, prepare engineering documents, manufacturing data reports and inspection release certificate, prepare and arrange for delivery of pressure vessels, loading arms (top, bottom & marine) and structural steelworks to site. 15.Project: Questionnaire for Turnaround Contractors (2nd. July 2002 - 5th. July 2002) Client: PETRONAS Gas Berhad (SEEN/PQ 10-02) 16.Project: Invitation to Bid (Provision for the fabrication, testing and commissioning of Bekok-C Kongsberg generator lube oil coolers (2nd. July 2002 - 11th. July 2002)) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/TEN 13-02) 17.Project: Pre-qualification Questionnaire (Provision for turnaround, routine maintenance and project construction works at Port Dickson refinery.) (29th. July 2002 - 12th. August 2002) Client: Esso Malaysia Berhad. (SEEN/PQ 12-02) 18.Project: Invitation to Bid (Fabrication Of Module 2 (East / West Piperack) And Module 3 (North / South Piperack) For East Bunga Raya Platform) (Tender No.: P22042) (5 th. September 2002 - 20th. September 2002) Bid Clarification No.1 Bid Clarification No.2 Bid Clarification No.3 Bid Clarification No.4 Bid Clarification No.5 Client: Talisman Malaysia Limited (SEEN/TEN 16-02) 19.Project: Invitation To Bid (CO2 MRR 249 - Module 1 Boilers 1F 5110 / 20 / 30 Rejuvenation / Revamp) (2nd. September 2002 - 27th. September 2002) Bid Clarification No.1 (4th. October 2002 - 9th. October 2002) Bid Clarification No.2 - General (8th. October 2002 - 14th. October 2002) Bid Clarification No.3 (14th. October 2002 - 18th. October 2002) Client: Malaysia LNG Sdn. Bhd. (SEEN/TEN 13-02) 20.Project: Invitation to Bid (Provision of Hook-up and Commissioning services (Block PM3 commercial arrangement area phase 2 & 3 development project (Provision For The Fabrication Of Duplex Stainless Steel (DSS) Pipe Spool For Bunga Raya A Annexe Platform)) (P22048) (9th. September 2002 - 24th. September 2002) Bid Clarification No.1 Bid Clarification No.2 Bid Clarification No.3 Bid Clarification No.4 Bid Clarification No.5 Client: Talisman Malaysia Limited (SEEN/TEN 15-02) 21.Project: Invitation to Bid (Provision of Hook-up and Commissioning services (Block PM3 commercial arrangement area phase 2 & 3 development project (Provision For The

18/10/2008

Page 9 of 29

Joseph Johnson Packiaraj

9401126.doc

Fabrication Of Carbon Steel (CS) Pipe Spool For Bunga Raya A Annexe Platform)) (P22049) (9th. September 2002 - 24th. September 2002) Bid Clarification No.1 Bid Clarification No.2 Bid Clarification No.3 Bid Clarification No.4 Bid Clarification No.5 Client: Talisman Malaysia Limited (SEEN/TEN 14-02) 22.Project: Invitation to Bid (Provision of Clockspring Technology and Services on Tapis-A Tapis-B Gas Risers (Agreement No.: FSE289)) (12th. November 2002 - 20th. November 2002) Client: ExxonMobil Exploration and Production Malaysia Inc. (SEEN/TEN 18-02) 23.Project: Pre-qualification Questionnaire (Provision For Engineering, Procurement And Construction Contractor Batam Distribution Network, Ancillary Facilities, Civil Works Project (Gas Transmission And Distribution Project) At Sumatera, Indonesia) (11th. October 2002 - 11th. December 2002) Clarification No. 1 (29th. January 2003 - 31st. January 2003) Clarification No. 2 (12th. February 2003 - 14th. February 2003) Client: PT. Perusahaan Gas Negara (PERSERO) (SEEN/PQ 15-02) 24.Project: Provision For The Supply, Delivery Testing And Commissioning Of Laboratory Equipment (Packages 9-2, 9-12 & 9-14) for Universiti Teknologi PETRONAS Development at Bandar Seri Iskandar, Perak Darul Ridzuan (20th. January 2003 - 30th. September 2004) Client: Malaysian International Trading Corp. (Japan) Sdn. Bhd. 25.Project: Invitation to Bid (Hook-up Commissioning of Angsi Phase III Project for Angsi Phase III Development Project (Tender No.: CH2/C2/2002/DAS/198)) (26th. November 2002 - 16th. January 2003) Technical Clarification No. SH-01 (27th. January - 5th. February 2003) Technical Clarification No. SH-02 (7th. February - 14th. February 2003) Technical Clarification No. SH-03 (18th. February - 24th. February 2003) Technical Clarification No. SH-04 (19th. February - 24th. February 2003)1 Technical Clarification No. SH-05 (25th. February - 27th. February 2003)1 Client: PETRONAS Carigali Sdn. Bhd. (SEEN/TEN 20-02) 26.Project: Pre-qualification Questionnaire (Supply Of Air Fin Gas Coolers For Guntung E Platform) (20th. January 2003 - 24th. January 2003) Client: ExxonMobil Exploration and Production Malaysia Inc. (SEEN/PQ 01-03) 27.Project: Screening Exercise (Provision Of General Maintenance Services) (28th. January 2003 - 5th. February 2003) Client: Talisman Malaysia Limited (SEEN/INQ 01-03) 28.Project: Screening Exercise (Provision For Crane Maintenance Service For Block PM-3 Commercial Arrangement Area (CAA) Phase 2 & 3 Operations) (29 th. January 2003 - 7th. February 2003) Client: Talisman Malaysia Limited (SEEN/INQ 02-03)

18/10/2008

Page 10 of 29

Joseph Johnson Packiaraj

9401126.doc

29.Project: Screening Exercise (Provision For Crane Maintenance Service For Block PM-3 Commercial Arrangement Area (CAA) Phase 2 & 3 Operations) (19th. February 2003 25th. February 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/INQ 03-03) 30.Project: Market Survey (Transportation And Installation Of Offshore Facilities) (24th. February 2003 - 27th. February 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/PQ 02-03) 31.Project: Pre-qualification Questionnaire (Provision Of Supply, Fabrication And Installation For Sprinkler Piping System At Bekok-C And Duyong Living Quarters (Tender No.: P2/C1/F417)) (26th. February 2003 - 10th. March 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/PQ 03-03) 32.Project: Invitation to Bid (Mechanical Work - Module 2 & 3) (C03MRR185) (26 th. February 2003 - 21st. April 2003) Bid Clarification No.1 - Mandatory (6th. May 2003 - 12th. May 2003) Bid Clarification No.2 (16th. May 2003 - 23rd. May 2003) Bid Clarification No.3 (30th. May 2003 - 12th. June 2003) Client: Malaysia LNG Sdn. Bhd. (SEEN/TEN 05-03) 33.Project: Pre-qualification Questionnaire (Independent Oil Terminal Project - Package 3 Bulk Terminal / Package 4 LPG Facilities) (26th. February 2003 - 10th. March 2003) Client: OGP Technical Services Sdn. Bhd. (SEEN/PQ 04-03) 34.Project: Inquiry (Availability Of Resources) (7th. March 2003 - 10th. March 2003) Client: Sarawak Shell Berhad. (SEEN/INQ 04-03) 35.Project: Pre-qualification Questionnaire (Provision for Fabrication & Repair of Mechanical Parts and Mechanical Equipments at PETRONAS Penapisan (T) Sdn. Bhd. refinery. (Quotation No.: B6-03-0018)) (26th. March 2003 - 27th. March 2003) Client: PETRONAS Penapisan (T) Sdn. Bhd. (SEEN/PQ 05-03) 36.Project: Invitation to Bid (Procurement, Construction and Commissioning of MLNG-DUA Ucarsol AP814) (26th. March 2003 - 4th. April 2003) Technical Clarification Ref. No. PCC1-1 To PCC1-12 (8th. April 2003 - 9th. April 2003) Techno Commercial Meeting (10th. April 2003) Pre Award meeting (14th. April 2003) Letter Of Award (16th. April 2003) Client: Malaysia LNG Sdn. Bhd. (SEEN/TEN 07-03) 37.Project: Pre-qualification Questionnaire (SM4-01.1 Mechanical & Electrical Engineering Construction Work - Major Mechanical Engineering) (27th. March 2003 - 1st. April 2003) Client: Petroliam Nasional Bhd. (SEEN/PQ 06-03) 38.Project: Invitation to Bid (Heat Exchanger Equipment DOSH Turnaround 2004 - 2006 Overhaul Work - C03E4005) (14th. April 2003 - 19th. June 2003) Client: Malaysia LNG Sdn. Bhd. (SEEN/TEN 08-03)

18/10/2008

Page 11 of 29

Joseph Johnson Packiaraj

9401126.doc

39.Project: Invitation to Bid (Offshore Construction and Maintenance (Tender No.: C020359/SCO)) (14th. April 2003 - 30th. June 2003) Client: Brunei Shell Petroleum Co. Sdn. Bhd. (SEEN/TEN 11-03) 40.Project: Pre-qualification Questionnaire (Contractors for Plant Maintenance Work) (23rd. April 2003 - 30th. April 2003) Client: Optimal Chemicals Sdn. Bhd. (SEEN/PQ 07-03) 41.Project: Pre-Bid Inquiry (Provision for Installation of Scour Air Blower for Wim Fine Filter at Dulang-B, PETRONAS Carigali (PCSB-PMO) (Tender No.: P3/S0/F038)) (6th. May 2003 - 8th. May 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/INQ 05-03) 42.Project: Inquiry (Request For Company Profile) (12th. May 2003 - 19th. May 2003) Client: PETRONAS Fertilizer (Kedah) Sdn. Bhd. (SEEN/INQ 06-03) 43.Project: Invitation to Bid (Provision for Installation of Scour Air Blower for Wim Fine Filter at Dulang-B (Tender No.: P3/S0/F038)) (21st. May 2003 - 26th. May 2003) Technical Clarification No.1 (29th. May 2003 - 2nd. June 2003) Technical Clarification No.2 (22nd. September 2003 - 29th. September 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/TEN 12-03) 44.Project: Inquiry (Screening Exercise - General Maintenance Work) (27th. May 2003 - 29th. May 2003) Client: Talisman Malaysia Limited. (SEEN/INQ 08-03) 45.Project: Invitation to Bid (Provision Of Supply, Fabrication and Installation for Sprinkler Piping System at Bekok-C and Duyong Living Quarters. (Tender No.: P2/C3/F417)) (6th. June 2003 - 16th. June 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/TEN 13-03) 46.Project: Inquiry (Survey On Related Onshore Fabrication Services for Carigali Projects) (16th. June 2003 - 23rd. June 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/INQ 09-03) 47.Project: Invitation to Bid (Provision Of Services To Disconnect, Tow to Shipyard & Back and Hook-up the “Dai Hung 01” FPU and “Dai Hung Calm” at VSP’s Dai Hung Oilfield). (23rd. June 2003 - 7th. July 2003) Client: Petrovietnam Technical Services Company (SEEN/TEN 14-03) 48.Project: Invitation to Bid (Provision of Hook-up and Commissioning services (Block PM3 commercial arrangement area phase 2 & 3 development project (Provision Of Crane Maintenance and Services For Phase 2 & 3 Operations)). (24th. June 2003 - 23rd. July 2003) Bid Clarification No.1 (25th. July 2003 - 29th. July 2003) Bid Clarification No.2 (31st. July 2003 - 1st. August 2003) Bid Clarification No.3 (1st. August 2003 - 6th. August 2003) Bid Clarification No.4 (15th. August 2003 - 18th. August 2003) Bid Clarification No.5 (22nd August 2003 - 25th. August 2003) Bid Clarification No.7 (2nd September 2003 - 4th. September 2003) Client: Talisman Malaysia Limited (SEEN/TEN 15-03)

18/10/2008

Page 12 of 29

Joseph Johnson Packiaraj

9401126.doc

49.Project: Invitation to Bid (Provision of Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) for Gas Lift Compressor & Modification Work RBDP-A Gaslift Project). (16th. June 2003 - 23rd. July 2003) Client: EPC Oil & Gas Sdn. Bhd. (SEEN/TEN 16-03) 50.Project: Invitation to Bid (2004 - 2006 Transportation and Installation of Offshore Facilities (Tender No.: DU3472 (EMEPMI), Tender No.: 590720 (SSB/SSPC), Contract No.: CH2/C3/2003/DCE/032 (PCSB)). (16th. June 2003 - 11th. August 2003) Client: EMEPMI, PETRONAS Carigali Sdn. Bhd., Sarawak Shell Bhd. & Sabah Shell Petroleum Co. (SEEN/TEN 17-03) 51.Project: Inquiry (Provision Of Construction For Relocation Of Facilities Affected by Lutong Refinery Company (LRC) Closure (Phase 1) at Miri Crude Oil Terminal (MCOT) (27th. June 2003 - 2nd. July 2003) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/INQ 10-03) 52.Project: Pre-qualification Questionnaire (De-Preservation, Re-Testing, Re-Commissioning And Start-Up For The Cakerawala Gas Development Project) (12th. July 2003 - 27th. July 2003) Client: Carigali-Triton Operating Company Sdn. Bhd. (SEEN/PQ 08-03) 53.Project: Pre-qualification Questionnaire (D903 Roof Restoration Project) (4th. August 2003 - 10th. August 2003) Client: PETRONAS Penapisan (T) Sdn. Bhd. (SEEN/PQ 09-03) 54.Project: Invitation to Bid (Provision to manufacture, Supply, Install and Commission of 480kW Multipac Microturbine at Sabah Gas Terminal (SBGAST) (Tender No.: S03/R/041)) (21st. August 2003 - 26th. August 2003) Client: PETRONAS Carigali Sdn. Bhd. - Sabah Operation (SEEN/TEN 18-03) 55.Project: Invitation to Bid (Gas Transmission and Distribution Project, Indonesia / Batam Distribution Network Pipeline Project) (29th. August 2003 - 29th. October 2003) Client: PT Perusahaan Gas Negara (PERSERO), Indonesia (SEEN/TEN 19-03) 56.Project: Pre-qualification Exercise (Waste Water Treatment Plant (Phase 1) Upgrading) (11th. September 2003 - 15th. September 2003) Client: PETRONAS Penapisan (T) Sdn. Bhd. (SEEN/PQ 10-03) 57.Project: Pre-qualification Questionnaire (Jetty Damage Repairs (Grid JH-10) at SRC Port Dickson, Negeri Sembilan, Malaysia) (11th. August 2003 - 22nd. September 2003) Client: Shell Refining Company (Federation of Malaya) Berhad (SEEN/PQ 11-03) 58.Project: Pre-qualification Questionnaire (Contract For Engineering, Procurement & Construction of Steel Structure and Ancillary Work (Contract No.: CSR MM/03-097)) (11th. September 2003 - 18th. September 2003 / 27th. October - 7th. November 2003) Client: MTBE Malaysia Sdn. Bhd. / Polypropylene Malaysia Sdn. Bhd. (SEEN/PQ 12-03) 59.Project: Market Survey (Provision of Engineering and Construction Services for MURPHY’s West Patricia Development Projects (Phase 2)) (19th. September 2003 - 26th. September 2003)

18/10/2008

Page 13 of 29

Joseph Johnson Packiaraj

9401126.doc

Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/INQ 11-03) 60.Project: Pre-qualification exercise - The Tender of Procurement, Construction and Commissioning for the Installation of Additional Air Compressor Package at GPP 5 & 6, Gas Processing Plant Complex B, Kg. Tok Arun, Jalan Santong, Paka, Dungun, Terengganu Darul Iman (18th. September 2003 - 23rd. September 2003) Client: PETRONAS Gas Berhad (SEEN/PQ 13-03) 61.Project: Invitation to Bid (Procurement, Construction and Commissioning of MLNG C1103 Sulfinol Column Conversion Project) (19th. September 2003 - 24th. September 2003) Client: OGP Technical Services Sdn. Bhd. (SEEN/TEN 20-03) 62.Project: Invitation to Bid (Fabrication of SKA-A Topsides for Sabah Shell Petroleum Co. Ltd. (SSPC) (Subcontracting Works for Offshore Hook-Up and Commissioning (HUC))) (Contract No.: TN590537) (15th. September 2003 - 16th. September 2003) (Ignored) Client: Brooke Dockyard and Engineering Works Corporation (SEEN/TEN 21-03) 63.Project: Invitation to Bid (Independent Oil Terminal Project, Senari, Kuching - Package 4LPG Bottling Facilities (Subcontracting Works For 1. 3 nos Bullet Type LPG Tanks & 2. Filling Hall Equipment)) (14th. August (dated) / 25th. September (fax) 2003 - 30th. September 2003) Client: Brooke Dockyard and Engineering Works Corporation (SEEN/TEN 22-03) 64.Project: Pre-qualification Inquiry (Provision of Fabrication of Vent / Flare Tripod and Bridges for Bunga Raya E (BR-E) (Tender No.: P38011) (25 th. September 2003 - 3rd. October 2003) Client: Talisman Malaysia Limited (SEEN/PQ 14-03) 65.Project: Invitation to Bid (Services For Flare Tip Change Out (Yetagun Field Capacity Upgrade - Phase 3) (26th. September 2003 - 2nd. October 2003) Client: Premier Petroleum Myanmar Limited / Ranhill Worley Sdn. Bhd. (SEEN/TEN 2303) 66.Project: Pre-qualification Exercise (Engineering, Procurement, Construction and Commissioning (EPCC) for Melut Basin Oil Development Project) (14th. September 2003 - 12th. October 2003) Client: Petrodar Operating Company Ltd. (PDOC) (SEEN/PQ 15-03) 67.Project: Invitation to Bid (Provision For Hook-Up and Commissioning of Carigali Facilities for year 2004 - 2007 (Tender No.: CH2/C3/2003/DCE/142)) (24 th. September 2003 - 27th. October 2003) Technical Clarification No.1 (3rd. November 2003 - 7th. November 2003) Technical Clarification No.2 (12th. November 2003 - 17th. November 2003) Technical Clarification No.3 (18th. November 2003 - 21st. November 2003) Technical Clarification No.4 (21st. November 2003 - 3rd. December 2003) Technical Clarification No.5 (12th. December 2003 - 16th. December 2003) Technical Clarification No.6 (18th. December 2003 - 26th. December 2003) Technical Clarification No.7 (30th. December 2003 - 2nd. January 2004) Technical Clarification No.8 (16th. February 2004 - 18th. February 2004) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/TEN 24-03)

18/10/2008

Page 14 of 29

Joseph Johnson Packiaraj

9401126.doc

68.Project: Market Survey (Fabrication of Wellhead Production Platform B (WP-PB)) (8th. August 2003 - 15th. August 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/INQ 12-03) 69.Project: Market Survey (Provision for the Supply of Floating Flare System for WPPA Revisit - West Patricia Development Project) (17h. August 2003 - 21st. August 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/INQ 13-03) 70.Project: Market Survey (Provision for the Hook-Up and Commissioning Services of Wellhead Production Platform B (WP-PB) for West Patricia Development Project Phase II) (28th. October 2003 - 3rd. November 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/INQ 14-03) 71.Project: Screening (Provision of One Derrick Lay Barge (DLB) Spread for Jintan / M1 24” Diameter Pipe Laying Project) (30th. October 2003 - 5th. November 2003) Client: Sarawak Shell Berhad. (SEEN/INQ 15-03) 72.Project: Pre-qualification Questionnaire (Notice Of Interest To Participate in Tender Exercise (Provision Of Tugboat Services)) (29th. October 2003 - 5th. November 2003) Client: Shell Refining Company (Federation of Malaya) Berhad (SEEN/INQ 17-03) 73.Project: Screening Exercise (Provision of Fabrication and Installation Work for BSTAB 1 & 2 Rejuvenation Project) (29th. October 2003 - 5th. November 2003) Client: Sarawak Shell Berhad. (SEEN/PQ 16-03) 74.Project: Invitation to Bid (Engineering, Procurement, Construction And Commissioning Of Putrajaya Precinct 5 District Cooling Plant Project (Chilled Water Distribution Pipeline)) (4th. November 2003 - 16th. December 2003) Client: Putrajaya Holdings Sdn. Bhd. (SEEN/TEN 25-03) 75.Project: Invitation to Bid (EPCC of Filter Installation at Propane & Butane Line at PDH / MTBE Meter Station, Gebeng (Tender No.: PGB03/TOD/TC3/TES/006)) (4th. November 2003 - 2nd. December 2003) Technical Clarification No.1 (30th. January 2004 - 3rd. February 2004) Technical Clarification Meeting (4th. February 2004) Technical Clarification No.2 (30th. January 2004 - 3rd. February 2004) Technical Clarification No.3 (18th. February 2004 - 24th. February 2004) Client: PETRONAS Gas Bhd. (SEEN/TEN 26-03) 76.Project: Inquiry (Updating Database) (3rd. November 2003 - A.S.A.P.) Client: OGP Technical Services Sdn. Bhd. (SEEN/INQ 16-03) 77.Project: Request For Quotation (ITQ No.: 101778) (Provision of manpower, equipment, machinery and material to undertake the maintenance repainting works of existing product tanks at PDB Pasir Gudang Bulk Depot.) (11th. November 2003 - 20th. November 2003). Client: PETRONAS Dagangan Berhad. (SEEN/RFQ 01-03)

18/10/2008

Page 15 of 29

Joseph Johnson Packiaraj

9401126.doc

78.Project: Request For Quotation (To Service U-200 Overhead Crane’s Motors) (17th. November 2003 - 24th. November 2003) Client: PETRONAS Methanol (Labuan) Sdn. Bhd. (SEEN/RFQ 02-03) 79.Project: Invitation to Bid (Provision for Engineering and Construction Services for West Patricia A (WP-PA) Platform Revisit for Phase II West Patricia Development Project) (13th. November 2003 - 12th. December 2003) Technical Clarification Fax (TCF) No. 401/SEE/01 (15th. December 2003 19th. December 2003) Technical Clarification Fax (TCF) No. 401/SEE/02 (16th. December 2003 19th. December 2003) Technical Clarification Fax (TCF) No. 401/SEE/03 (16th. December 2003 19th. December 2003) Technical Clarification Fax (TCF) No. 401/SEE/01A (18th. December 2003 22nd. December 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/TEN 27-03) 80.Project: Invitation to Bid (Provision of Workshop and Warehouse Services for West Patricia Production Operations (Murphy/2003/WPOC/205)) (19th. November 2003 - 10th. December 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/TEN 28-03) 81.Project: Invitation to Bid (Provision of General Maintenance Services for PM-3 CAA Phase 2 and 3 Operations (Tender No.: O31010)) (20 th. November 2003 - 15th. December 2003) Bid Clarification No. 1 (12th. January 2004 - 16th. January 2004) Client: Talisman Malaysia Limited (SEEN/TEN 29-03) 82.Project: Invitation to Bid (Provision Of General Mechanical Services For PM-3 Commercial Arrangement Area (CAA) Phase 2 & 3 Operations (Tender No.: O31011)) (4th. November 2003 - 2nd. December 2003) Bid Clarification No. 1 (19th. December 2003 - 26th. December 2003) Client: Talisman Malaysia Limited (SEEN/TEN 30-03) 83.Project: Invitation to Bid (Provision Of Construction For Relocation Of Facilities Affected by Lutong Refinery Company (LRC) Closure (Phase 1) at Miri Crude Oil Terminal (MCOT) (1st. December 2003 - 29th. December 2003) Bid Clarification No. 1 (5th. January 2004 - 7th. January 2004) Client: PETRONAS Carigali Sdn. Bhd. Sdn. Bhd. (SEEN/TEN 31-03) 84.Project: Pre-qualification Questionnaire (Pre-qualification Exercise for KR-2 2004 Turnaround Main Mechanical Contract) (19th. November 2003 - 30th. November 2003) Client: PETRONAS Penapisan (Terengganu) Sdn. Bhd. (SEEN/PQ 17-03) 85.Project: Screening (Engineering, Procurement, Construction And Commissioning Of The Proposed Jet A-1 and Diesel Pipeline Modification Works at Jetty and Tank Farm Area at Prai Bulk Depot, Pulau Pinang) (19th. November 2003 - 30th. November 2003) Client: PETRONAS Dagangan Berhad. (SEEN/PQ 18-03)

18/10/2008

Page 16 of 29

Joseph Johnson Packiaraj

9401126.doc

86.Project: Pre-qualification Exercise (Procurement, Construction of Stadis Injection Facility at KR-1) (23rd. December 2003 - 28th. December 2003) Client: PETRONAS Penapisan (Terengganu) Sdn. Bhd. (SEEN/PQ 19-03) 87.Project: Invitation to Bid (Provision For The Supply Of Floating Flare (24 th. December 2003 - 5th. January 2004) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/TEN 32-03) 88.Project: Invitation to Bid (Procurement, Construction and Commissioning of MLNG Solvent Storage Tank Project) (24th. December 2003 - 7th. January 2004) Bid Clarification No. SEEN-01, SEEN-02, SEEN-03, SEEN-04, SEEN-05, (8th. January 2004 - 12th. January 2004) Bid Clarification No. SEEN-06, SEEN-07, SEEN-08 (9th. January 2004 - 12th. January 2004) Letter Of Award (19th. January 2004) Kick-off Meeting (20th. January 2004) Client: OGP Technical Services Sdn. Bhd. (SEEN/TEN 33-03) 89.Project: Invitation to Bid (Engineering, Procurement, Construction and Commissioning (EPCC) of Export Pipeline for Melut Basin Oil Development Project (Tender No.: PDOC/31/03-147)) (Partner: Punj Lloyd Ltd.) (7th. December 2003 - 7th. March 2004) Client: Petrodar Operating Company Ltd. (PDOC) (SEEN/TEN 01-04) 90.Project: Invitation to Bid (Price Agreement For The Supply And Delivery Of Steel Linepipe) (7th. December 2003 - 14th. January 2004) Technical Clarification No.1 (17th. February 2004 - 24th. February 2004) Client: Gas Malaysia Sdn. Bhd. (SEEN/TEN01-04) 91.Project: Invitation to Bid (Supply, Construction, Fabrication, Delivery at Site, Erection, Testing, Calibration And Guarantee of four (4) Units Storage Tanks c/w Piping Works and Ancillary Works for Kuantan Oleochemical Bulking Installation at Kuantan Port Area, Kuantan, Pahang) (Tender No.: 02/01/04/B) (13th. January 2004 - 26th. January 2004) Client: Felda Holdings Sdn. Bhd. (Felda Bulkers Sdn. Bhd. / Felda Engineering Services Sdn. Bhd.) (SEEN/TEN 02-04) 92.Project: Questionnaire (Contractor’s Assessment / Capability Audit for Turnaround Works) (16th, January 2004 - 30th. January 2004) Client: OGP Technical Services Sdn. Bhd. (SEEN/ INQ 01-04) 93.Project: Screening Exercise (Provision of Engineering, Procurement and Construction (EPC) Services for EMEPMI Retrofit Projects) (14th. January 2004 - 27th. January 2004) Client: ExxonMobil Exploration and Production Malaysia Inc. (SEEN/ PQ 01-04) 94.Project: Screening Questionnaire (The Supply, Fabrication and Maintenance of Steel Pallets) (19th. January 2004 - 26th. January 2004) Client: PETRONAS Dagangan Berhad. (SEEN/ PQ 02-04) 95.Project: Invitation To Quote (New Flushed Water Tank Project for MLNG) (9th. January 2004 - 21st. January 2004) Client: OGP Technical Services Sdn. Bhd. (SEEN/ INQ 01-04)

18/10/2008

Page 17 of 29

Joseph Johnson Packiaraj

9401126.doc

96.Project: Questionnaire (e-Procurement Platform (On-line Bidding (eRFx))) (16th. January 2004 - 19th. January 2004) Client: ExxonMobil Exploration and Production Malaysia Inc. (SEEN/ INQ 02-04) 97.Project: Market Survey (Provision of Minor Fabrication Work for Phase II West Patricia Development Project) (16th. January 2004 - 20th. January 2004) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/ INQ 03-04) 98.Project: Pre-Qualification Questionnaire (Contractor’s Assessment / Capability Audit For Turnaround Works) (16th. January 2004 - 20th. January 2004) Client: OGP Melaka Regional Office (SEEN/ INQ 04-04) 99.Project: Screening Exercise (Phase 2 Procurement, Construction & Commissioning Package for Carigali OGT Back-Up of Common Facilities Project) (21st. January 2004 28th. January 2004) Client: PETRONAS Carigali Sdn. Bhd. (SEEN/ PQ 03-04) 100.Project: Request For Quotation (Fabrication of SMA Shake Out Laboratory with Lifting Lug, Equipped with Air Cond., Fume Hood, Lighting, Smoke Detectors and Others Per Attached Semangkok-A Shake Out Laboratory Specifications. (Requisition No.: 00326674/01)) (26th. January 2004 - 3rd. February 2004) Client: ExxonMobil Exploration and Production Malaysia Inc. (SEEN/ RFQ 01-04) 101.Project: Screening Inquiry (Contract For The Transportation And Installation Of BRE Launch Jacket, Vent Tripod And Bridges For Block PM-3 Commercial Arrangement Area) (30th. January 2004 - 6th. February 2004) Client: Talisman Malaysia Limited (SEEN/ PQ 04-04) 102.Project: Screening Exercise (Provision Of Offshore Major Maintenance, Construction, Hook-up and Commissioning and Services) (5th. February 2004 - 11th. February 2004) Client: Sarawak Shell Berhad (SEEN/ PQ 05-04) 103.Project: Invitation to Bid (ITB For The Price Agreement For The Appointment Term Manufacturer(s) For The Supply, Fabrication, Maintenance And Delivery Of LPG Cylinder Steel pallets for PETRONAS Dagangan Berhad.) (9th. February 2004 - 1st. March 2004) Client: PETRONAS Dagangan Berhad. (SEEN/ TEN 03-04) 104.Project: Market Survey (Provision of Engineering and Construction Services for WP-IA Platform Revisit for MURPHY’s West Patricia Development Projects (Phase 2)) (10 th. February 2004 - 18th. February 2004) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/ INQ 05-04) 105.Project: Market Survey (Provision of Fabrication and Deployment of Pipelines for Phase II West Patricia Development Project) (13th. February 2004 - 18th. February 2004) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/ INQ 06-04)

18/10/2008

Page 18 of 29

Joseph Johnson Packiaraj

9401126.doc

106.Project: Invitation to Bid (Engineering, Procurement, Construction and Commissioning (EPCC) of Marine Terminal Facilities for Melut Basin Oil Development Project (Tender No.: PDOC/31/03-149)) (Partner: Punj Lloyd Ltd.) (7th. December 2003 - 15th. March 2004) Client: Petrodar Operating Company Ltd. (PDOC) (SEEN/ TEN 04-04) 107.Project: Pre-Qualification Exercise (Tender For Insulation, Grit Blasting & Painting, Scaffolding and Plant Civil Works) (18th. February 2004 - 27th. February 2004) Client: PETRONAS Penapisan (Melaka) Sdn. Bhd. (SEEN/ PQ 06-04) 108.Project: Pre-Qualification Exercise (Euro 2M Project) (19th. February 2004 - 26th. February 2004) Client: PETRONAS Penapisan (Melaka) Sdn. Bhd. (SEEN/ PQ 07-04) 109.Project: Request For Quotation (Repair of hoist Crane at Block H, J & K, PRSS Bangi) (19th. February 2004 - 26th. February 2004) Client: PETRONAS Research & Scientific Services Sdn. Bhd. (SEEN/ RFQ 02-04) 110.Project: Pre-Tender Market Survey (Provision of Conductor Coating Services for TML Drilling Program) (20th. February 2004 - 25th. February 2004) Client: Talisman Malaysia Limited. (SEEN/ INQ 07-04) 111.Project: Invitation to Bid (Contract For The Procurement, Construction and Commissioning of Solvent Storage Tank and Related Equipment at PETRONAS LNG Complex) (23rd. February 2004 - 25th. February 2004) Client: OGP Technical Services Sdn. Bhd. (SEEN/ TEN 05-04) 112.Project: Request For Quotation (Installation of New Deck Extension at Bunga Seroja-A (BS-A) Wellhead Riser Platform (BS-A WHRP)) (24th. February 2004 - 1st. March 2004) Client: Haven Engineering (M) Sdn. Bhd. (SEEN/ RFQ 03-04) 113.Project: Invitation to Bid (Provision of Underwater Services (West Patricia Development & Production Operations) (Tender No.: MURPHY/2004/WPOC/208)) (4th. March 2004 22nd. March 2004) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SEEN/ TEN 06-04) 114.Project: Invitation to Bid (FPSO Installation for MISC FPSO Project (Contract No.: MISC/OIC/1005, Invitation To Bid No.: TCM 54/2003-FPSO) (for Shapadu Rockwater Sdn. Bhd. (161138-P)/ Subsea 7 (Singapore) Pte. Ltd.) (19th. May 2003 - 9th. June 2003) Technical Clarification No.1 (13th. June 2003 - 18th. June 2003) Technical Clarification No.2 (13th. June 2003 - 18th. June 2003) Technical Clarification No.3 (18th. June 2003 - 20/24th. June 2003) Technical Clarification No.1A (26th. June 2003 - 27th. June 2003 / 2nd. July 2003) Technical Clarification No.2A (30th. June 2003 - 1st. July 2003) Technical Clarification No.3A (1st. July 2003 - 2nd. July 2003) Technical Clarification No.3B (7th. July 2003 - 9th. July 2003) Technical Clarification No.1B (7th. July 2003 - 9th. July 2003) Technical Clarification No.2B (10th. July 2003 - 10th. July 2003) Technical and Unpriced Commercial Clarification Meeting (23rd. July 2003)

18/10/2008

Page 19 of 29

Joseph Johnson Packiaraj

9401126.doc

Client: Malaysia International Shipping Corporation Sdn. Bhd. (SRW/TEN 01-03) 115.Project: Pre-qualification Questionnaire (Notice Of Interest To Participate In Tender Exercise (Diving Services) (for Shapadu Rockwater Sdn. Bhd.) (19 th. June 2003 - 30th. June 2003) Client: Shell Refining Company (Federation of Malaya) Berhad (SRW/PQ 01-03) 116.Project: Invitation to Bid (Provision of Diving Services (Tender No.: SV03013)) (for Shapadu Rockwater Sdn. Bhd. / Master-Tech Diving Services (S) Pte. Ltd.) (1st. October 2003 - 30th. October 2003) Online Bidding (1st. January 2004. - 1st. January 2004) Client: Shell Refining Company (Federation of Malaya) Berhad (SRW/TEN 02-03) 117.Project: Market Survey (Provision for Underwater, Maintenance & Inspection of Pipelines & Subsea Structure for West Patricia Development & Production Operations.) (for Shapadu Rockwater Sdn. Bhd. / Subsea 7 (Singapore) Pte. Ltd.) (1st. December 2003 - 8th. December 2003) Client: MURPHY Sarawak Oil Co. Ltd. / MURPHY Sabah Oil Co. Ltd. / MURPHY Peninsular Malaysia Oil Co. Ltd. (SRW/PQ 01-03) Work Scope: Reporting to the General Manager and Contract & Procurement Manager (Head of Proposal & Procurement), I was part of a team of three assigned to review the bid document carefully and understand the specified scope of work; To review the commercial terms & conditions in the bid document and compare this with the company's standard terms and conditions. All deviations shall be specified as exceptions in the bid proposal unless agreed by the Estimation Manager; To ensure the completeness of the bid document and if incomplete, missing documents or information shall be obtained from the client; To provide relevant documents to the Technical Department when technical support for the bid proposal is required; To carry out an accurate take-off for material and subcontract services based on the scope of work specified in the bid document; To prepare the cost estimate based on the department's estimation format i.e. specific to the product; To propose alternative bid proposals to arrive at a better cost option for the Estimation Manager to consider; To prepare the bid proposal and submit on or before the client's closing date and time; To present the draft bid proposal and cost estimate to the Estimation Manager for acceptance; To ensure the confidentiality of the bidded price at all stages of the bidding process; To respond to all clarifications issued by the client; To assist the Contract Manager to clarify any issues on the scope of work when the project tile is handed over to the Operation's Department. 118.Project: Provision for Detailed Engineering Design for PM 305 South Angsi A (SAA) Development Project (Contract No. P 31253) (9th. February 2004 - June 2005) Client: Talisman Malaysia Limited (P 31253 / TML-A-1073) 119.Project: B12 Conceptual and Detailed Design (SSB) (Contract No. 590933) (9th. September 2004 - August 2005) Client: Sarawak Shell Berhad (590933 / SSB-A-1119) 120.Project: Detailed Design Study for 20” Pipeline for SMR-A Platform (4th. January 2005 ongoing) Client: TL Offshore Sdn. Bhd. (TLO-A-1190)

18/10/2008

Page 20 of 29

Joseph Johnson Packiaraj

9401126.doc

121.Project: Provision of AutoPlant Software, Computer Hardware & Autoplant for Operator for TML SAA Project (24th. June 2005 - 24th. August 2005) Client: Talisman Malaysia Limited (MMHE-A-1209) 122.Project: Provision for Pipeline Engineering Design Assistance (Service Agreement No.: CH2/SO/2005/DFE/103) (15th. July 2005 - ongoing) Client: Petronas Carigali Sdn. Bhd. (PCSB-A-1225) 123.Project: Invitation to Bid (Propose Input for Engineering Design of (1) EPCC of Natural gas Pipeline to Amsteel, Bukit Raja, Klang & (2) EPCC of Natural Gas Pipeline to Megasteel, Banting) (9th. September 2004 - 15th. September 2004) Client: MMC Engineering Services Sdn. Bhd. (MMCE-B-1160) 124.Project: Invitation to Bid (Package 2 - Engineering, Procurement, Construction and Commissioning of Central Processing Facilities (CPF) for Thar Jath Development Project) (16th. September 2004 - 26th. October 2004) Technical Clarification No.1 ( December 2005 - 5th. December 2004) Technical Clarification No.2 (1st. December 2004 - 5th. December 2004) Technical Clarification No.3 (2nd. December 2004 - 6th. December 2004) Technical Clarification No.4 (5th. December 2004 - 8th. December 2004) Technical Clarification No.5 (6th. December 2004 - 9th. December 2004) Technical Clarification No.6 (7th. December 2004 - 10th. December 2004) Technical Clarification No.7 (9th. December 2004 - 12th. December 2004) Client: White Nile (5B) Petroleum Operating Company Limited (MMCES-B-1168) 125.Project: Invitation to Bid (Package 3 - Engineering, Procurement, Construction and Commissioning of Field Surface Facilities (FSF) for Thar Jath Development Project) (16th. September 2004 - 26th. October 2004) Technical Clarification No.1 (December 2005 - 5th. December 2004) Technical Clarification No.2 (1st. December 2004 - 5th. December 2004) Technical Clarification No.3 (5th. December 2004 - 8th. December 2004) Technical Clarification No.4 (9th. December 2004 - 12th. December 2004) Client: White Nile (5B) Petroleum Operating Company Limited (MMCES-B-1169) 126.Project: Invitation to Bid (Package 4 - Engineering, Procurement, Construction and Commissioning of Export Pipeline (EP) for Thar Jath Development Project) (16th. September 2004 - 26th. October 2004) Technical Clarification No.1 (29th. October 2004 - 31st. October 2004) Client: White Nile (5B) Petroleum Operating Company Limited (MMCES-B-1170) 127.Project: Invitation to Bid (Detailed Design Services for Baram Pipeline Replacement) (Contract No. CH2/C5/2003/DCE/146, Work Order Request No. DBA/2005/002) (5 th. May 2005 - 18th. May 2005) Client: Petronas Carigali Sdn. Bhd. (PCSB-B-1212) 128.Project: Invitation to Bid (Front End Design (FEED) Services for Sumandak Integrated Development - Phase 2 (Sumandak Selatan Processing and Gas Platform (SUPG-B), Sumandak Tepi Drilling Platform (SUJT-C) & Interconnecting Pipelines & Tie-ins to Existing Facilities)) (2nd. June 2005 - 20th. June 2005) (Work Order Request No. DSK/2005/003)

18/10/2008

Page 21 of 29

Joseph Johnson Packiaraj

9401126.doc

Technical Clarification No.1 (22nd. June 2005 - 24th. June 2005) Technical Clarification No.2 (24th. June 2005 - 27th. June 2005) Technical Clarification No.3 (27th.June 2005 - 29th. June 2005) Technical Clarification No.4 (28th. June 2005 - 30th. June 2005) Technical Clarification No.5 (30th. June 2005 - 1st. July 2005) Technical Clarification No.6 (4th. July 2005 - 5th. July 2005) Technical Clarification No.7 (4th. July 2005- 5th. July 2005) Technical Clarification No.8 (6th. July 2005 - 7th. July 2005) Technical Clarification No.9 (6th. July 2005- 7th. July 2005) Client: Petronas Carigali Sdn. Bhd. (PCSB-B-1218) Work Scope: Reporting to the Project Manager and Engineering Manager, I was part of a team of seven assigned to report to the Project Sponsor for all matters relating to this project and dedicated to the project; to ensure that the project is being implemented in accordance with this Project Execution & Quality Plan (PEQP); to review the contractual requirements and initiate effective planning of manpower, tasks and responsibilities together with time scales in order to fulfil the contract; to monitor and review the performance of the project against the contractual requirements and maintain records of deviation or changes to contractual requirement; to act as focal point for all formal communication between company and client including those for approval of technical queries, design change request etc.; to ensure an effective feed forward and feed back communication loop through the timely liaison with client counterparts; for the approval of all timesheet and overtime authorisation; for the approval of all project documents and drawings prior to issue to client; to maintain the public relations (PR) to ensure harmonious working relationship between MMC O&G, CTOC and subcontractors. 129.Project: MEG Package for Otway (P-2158) (dd-mm-yy - dd-mm-yy) Client: Technip Geoproduction (M) Sdn. Bhd. 130.Project: F23 Glycol Regeneration Package (P-2172) (18th. May 2005 - 7th. Jun 2006) Client: Sarawak Shell Berhad, Malaysia. 131.Project: Chemical Injection Pump Package (P-2182) (18th. Feb 2005 - 16th. Aug 2005) Client: HL Engineering Sdn. Bhd. 132.Project: Kikeh Subsea Development Project (P-2187) (7th. Mar 2005 - 19th. May 2006) Client: Aker Kvaerner Subsea / KOP / Murphy. 133.Project: Fuel Gas Package (P-2192) (29th. Apr 2005 - 30th. Nov 2005) Client: KNOC 134.Project: Winch (P-2193) (30th. Oct 2005 - 6th. May 2006) Client: Pusnes. 135.Project: Nitrogen Package (P-2194) (9th. May 2005 - 9th. Oct 2005) Client: Devon Energy. 136.Project: O-8230 Vessel Repairs (P-2195) (14th. Jun 2005 - 20th. Feb 2006) Client: Petronas Ammonia Sdn. Bhd.

18/10/2008

Page 22 of 29

Joseph Johnson Packiaraj

9401126.doc

137.Project: Espedarte SUL FPSO RJS-409 (Seawater Filter / Water Treatment, Deaerator & SRU Package) (P-2196) (21st. Jun 2005 - 8th. Mar 2006) Client: MODEC International LLC / Petrobras. 138.Project: Espedarte SUL FPSO RJS-409 (TEG Package) (P-2197) (22nd. Jun 2005 - 20th. Mar 2006) Client: MODEC International LLC / Petrobras. 139.Project: Espedarte SUL FPSO RJS-409 (Production Separators Package) (P-2198) (22nd. Jun 2005 - 8th. Mar 2006) Client: MODEC International LLC / Petrobras. 140.Project: West Berani Bootstrap Mast (P-2199) (21st. Jul 2005 - 1st. May 2006) Client: MH Pyramid 141.Project: Marlim Sul Field Development (P-2200) (dd-mm-yy - 6th. Feb 2006) Client: AKPS, US. 142.Project: Jingemia (Separator & Scrubber) (P-2201) 15th. Aug 2005 - 17th. Dec 2005) Client: Origin Energy. 143.Project: Maersk High Efficiency Derrick Main Steel Structure #1. (P-2202 / 3 / 4) (2 nd. Sep 2005 - 1st. Aug 2006 (#1), 1st. Mar 2007 (#2)) Client: Aker Kvaerner MH AS. 144.Project: Stybarrow Development Project. (P-2209) (dd-mm-yy - 1st. Sep 2006) Client: MODEC International / Mitsui Engineering & Shipbuilding Co. Ltd. 145.Project: Mohobilondo Field Development (TEG Package / Glycol Regeneration Package L-UA-601). (P-2213) (dd-mm-yy - dd-mm-yy) Client: AKPSF / Total E & P Congo / Hyundai Heavy Industries. 146.Project: Mohobilondo Field Development. (P-2214) (13th. Jan 2006 - 6th. Nov 2006) Client: Total E & P Congo / Hyundai Heavy Industries. 147.Project: Bootstrap Mast T-10. (P-2216) (dd-mm-yy - 31st. Oct 2006) Client: MH Pyramid. 148.Project: MH Pyramid. (P-2218) (dd-mm-yy - Apr 2006) Client: MH Pyramid. 149.Project: Kikeh Mudmat Weldment. (P-2219) (dd-mm-yy - dd-mm-yy) Client: . . . Work Scope: Reporting to the Procurement Manager, I was part of a team of three assigned to processing of projects requisitions and sales / proposals requisitions, on Subcontracted Labour Services (Engineering / Technical Services; Fabrication Labour (Piping, structural & vessel); Services (Forming / rolling / machining); Galvanising; Heat treatment; Insulation (Material & Labour); NDT / X-Ray; Test Equipment Hire; Third Party Certification), Tagged (Engineered

18/10/2008

Page 23 of 29

Joseph Johnson Packiaraj

9401126.doc

(Anodes & reference electrodes; Blowers; Burner / Heater; Calibration gauges; Closure; Compressors / generators; Control Panel; Electrical cable; Electrical cable tray, glands & fittings; Electrical junction boxes; Filter vessels & elements; Garnet (Media); Heater & thyristor panel; Instrumentation; Lights & fixtures; Orifice Plates; Spare parts; Spectacle blinds; Strainers; Tube fittings; Tubing; Tubing fixtures; Valves (Check, control. actuated, shutdown, ON-OFF, instrumentation, manual & relief))), Untagged (Bolts, Nuts, Fasteners; Dished ends; Gaskets; Grating; Ladders & Platforms; Name Plates, Tags & Signwriting; Nozzles (forged); Pipe & Fitting (Carbon steel, GRE & stainless steel); Plates (Carbon steel & stainless steel); Structural steel (Carbon steel & stainless steel)); Consumable (gases, disc (cutting, flap, grinding, sanding), cutting nozzle, electrode, paint, paint markers, solvent, contact tip, carbon brush, glove, spray paint, tapes, ) items; Logistics ( Duty / Custom charges, Freight (Air & Sea), Lifting beams, slings & shackles, Packing / crates, Transportation - Local); issuing of inquiries and follow-ups including Technical Clarifications; Technical Evaluation of the supplier quotations / technical and commercial evaluations (for sales / proposals requisitions); compilation of evaluation documents including relevant check list; negotiations with vendors; vendor performance recommendations; retention of records on pricing for tagged items; retention of technical specifications of quotes for firm bids; follow up with sales on bid submissions and their outcomes; maintenance of RFQ log and updates; to produce appropriate reports & recommendations; As Project Expediting Co-ordinator, prepared the Expediting Procedure in line with the contractual requirements of the project; Liaised with the Lead Engineers, Package Engineers, Buyers, Inspection Coordinator, Logistics Coordinator, Planning Coordinator in the various activities starting from issuance of the Material Requisition for Purchase (MRP) by package engineers, Purchase Order issuance, arranging for Kick-Off Meetings with vendors, follow-up progress of packages, up to delivery to Site; Ensured expeditors effected timely submissions of 1st issue engineering and inspection documents by vendors and relevant timely review by engineers and return of the same to vendors; Liaised with Inspection Coordinator, ensuring Pre-Inspection Meeting takes place in good time to allow timely start of fabrication activities to take place at vendor’s facilities; Monitoring expediting follow-up by the Expeditors, reporting any slippages or delays to the PMT and Planning; Reading Inspection reports and following various Inspection activities closely, looking out for NCRs and observations; Liaising with the Document Controller in ensuring timely drawings & documents submissions by vendors, observing the review cycle duration by engineers & timely return of the same, to the vendors; Planning and executing shipments with Logistics Coordinator; Supervising a team of Expeditors, training and assisting them in the daily execution of their various expediting duties; Reporting to Project Procurement Manager on constraints faced in the execution of expediting duties and enlisting his assistance in resolving issues with vendors, concerned departments and also within the department, wherever very difficult situations arose; Assist Project Procurement Manager in the Monthly Progress Reporting for expediting portion; Liaise with various Aker Kvaerner centres worldwide, to enlist their assistance in expediting vendors in their respective geographical areas. Prepare Inter-Group Purchase Orders and relevant Expediting Assignment Letters to the relevant centre; For Inter-Group Purchase Orders to these centres, issued the manhours and submitted monthly manhours’ report to the Cost Control

18/10/2008

Page 24 of 29

Joseph Johnson Packiaraj

9401126.doc

Department; Coordinated with the relevant centres to obtain the required Expediting Reports after the Expediting Assignments are carried out per the stipulated frequency in the Assignment Letters; Attended Weekly Progress Meetings to update on current expediting developments and work on Site; Check the weekly issue of the P.O. & Expediting Status with the Expeditors before transmittal to relevant departments; Participate in the periodic Internal Audits; Arrange for meetings with vendors who face problems with document submissions, execution of the purchase order, payment issues and also progress slippages. Rectified problems and also reduced slippages and in some cases, even brought the package back to original schedule; As an Expeditor, expedited items after purchase order issuance to the suppliers; Monitored the progress through Monthly Progress Report submissions, the Production Schedules, performed desk expediting and also source expediting to supplier’s premises to assess actual Progress of the Purchase Order, and report to Project Director and Project Procurement Manager. Prepared comprehensive Expediting Visit reports for distribution; Liaised with company appointed Forwarder in all shipment matters; Assist Logistics in preparing Proforma Invoices according to the Price Book; Liaised with QA Department for relevant document submissions by suppliers; Liaised with QC Section and Client for Critical Witness and Final Inspections at supplier’s premises; Assisted package engineers in expediting documents other than the 1st issue documents, when they faced difficulty in obtaining these from the vendors; Followed through all shipments until delivery at Site; Requested Site for Receiving Reports and any OS & D (Overages, Shortages & Damage) Reports; Liaised with vendors for quick delivery of Shortage or Damaged items to Site to closeout the OS & D Report; Filled out Penalty Sheets for errant vendors and submitted to PMT for their ultimate decision. 150.Project: Proposed Cutting and Assembly Workshop at Plo. 3, Jalan Pekeliling, Pasir Gudang, Johor Darul Takzim. (02-Feb-07 - present) Client: Malaysia Marine and Heavy Engineering. 151.Project: Gumusut / Kakap Semi-FPS (Hull (New Skid Beam (Boxed-up))). (02-Feb-07 present) Client: Malaysia Marine and Heavy Engineering. Work Scope: Reporting to the Director, I am part of a team of seven assigned to Project Management Plan {Initiating [Project Initiation (Identify goals and objectives, Document project costs and benefits, Develop project charter)]; Planning [Define scope (Develop strategies and plans, Conduct planning workshop, Research previous experience, Define scope, Develop high-level work breakdown structure, Build detailed work breakdown structure, Document project costs and benefits, Specify deliverables and acceptance criteria, Document assumptions); Document Project Support Plans (Document risk management plan, Document configuration management plan, Document data management plan, Document communications management plan); Develop Project Schedule (Develop resource plans, Prepare project estimates, Defines dependencies and develop project schedule, Document assumptions, Conduct peer review); Develop Financial Plan (Prepare financial plan)]}.

18/10/2008

Page 25 of 29

Joseph Johnson Packiaraj

9401126.doc

152.Project: Malaysia Mukah 2 X 135 MW Coal-Fired Power Plant (The Supply Fabricate & Erection of Structural Steelwork (Including Roof Covering, Wall Cladding and Accessories) to Coal Shed for the Proposed Coal-Fired Power Station, Mukah Division, Sarawak) (Contract No.: CNTR/2200/07/326, Sales Order No.: 7001483, Work Order No.: 146181, RM13,265,921.03) (08-Aug-07 - 07-Apr-08) & Coal Handling Related Structures (Contract No.: CNTR/2200/07/355, Sales Order No.: 7002538, Work Order No.: 163096, RM6,500,000.00) (dd-mm-yy - dd-mm-yy)) (08-Aug-07 - 07-Apr-08) Client: China National Machinery & Equipment Import & Export Corp. (CMEC) / PPES (Sarawak) Sdn. Bhd. 153.Project: Proposed Extension to Existing Food and Consumer Products Warehouse (Sales Order No.: P4/07, Work Order No.: 157016, RM1,577,347.20) (03-Oct-07 - present) Client: Tang Container and Services Sdn. Bhd. 154.Project: . . . (01-Sep-07 - dd-mm-yy / present) Client: . . . Work Scope: Reporting to the Group Manager (Commercial & Project) and/or Assistant Group Manager (Engineering) and Group Manager (HR & Business Services) (administrative matters), I am part of a team of twenty assigned to assist the Assistant Group Manager (Engineering) to oversee the general administration of the Engineering and Planning Department (function, personnel and control procedures), in its operation and process for the Steel Fabrication, Hot-Dip Galvanising and Construction businesses of the Company for duties including but are not limited to Ensure design compliance and technical clarifications, material suitability including quantity take-off, preparing, checking and approving engineering drawings in co-ordination with the Drafting Section, and to ensure proper co-ordination with respective plants in accordance with relevant Work Order / Assignment and its respective timely execution and completion; attend to meeting(s) and site(s) visit(s) as and when jobs or works required; involved and to give my active participation in the Company’s Group Enterprise Resource Planning, IT Project, its implementation, system operation and to ensure that the system’s procedures are fully complied with at all times; orientate and brief employees on the Company’s Quality Policy, IT Policy, HSE Policy and other requirements as and when required; ensure compliance with the Company’s Quality Management System and HSE Policies of the Company; provide training to subordinates within the department or company as and when required and to ensure Training Programme and Analysis are carried out, and to supervise on-job training including any other duties that may be assigned by the Assistant Group Manager (Engineering) or Company’s nominee(s) from time to time.

Personal Characteristics:

18/10/2008

Page 26 of 29

Joseph Johnson Packiaraj

Personal Qualities:

Preferred Work Style:

(Potential) Executive Qualities:

9401126.doc



Ability and willingness to get along with people and link long-range visions and concepts into daily work. • Active listener and very innovative. Well liked by peers and superiors with the ability to work effectively in a diverse workforce involving flexibility. • Cool under pressure and highly responsible. • Tactful and persevering in solving complicated problems and uncertainties. • Highly motivated with strong oral and written communication skills. • My colleagues describe me as a warm and caring person with the willingness to listen to advice and determination to achieve success. I prefer to work in a fairly organised environment, where performance can be measured with some degree of accuracy and a rewarding career. I would like to think that I am ambitious in achieving my personal and the organisation’s goal, yet realistic about my chances of completing a task with success. Having been a Cleanliness Prefect during my primary school days, as well as Treasurer (English Language Society & Sixth Form Council), Computer Instructor and Facilitator (Leadership Week) during my secondary school days, I am used to fulfilling leadership roles and decision-making.

Availability: Present salary per month: Company benefits: Expected salary per month: Notice required:

Nil Nil RM 0,000 /- (negotiable) 3 months notice. Immediately available

References: Tan Sri J. G. Daniel, 28, Jalan 16/5, Taman Tan Sri Lee Yan Lian, 46000 Petaling Jaya, Selangor Darul Ehsan. Tel: 03-79567881 (H)

18/10/2008

Dr. K. Ruby M.B.B.S. (Madras) Klinik Dan Surgeri Sri Damansara, 11, Jalan Cempaka SD 12/1, Bandar Baru Sri Damansara, 52200 Kuala Lumpur. Tel: 03-62728364 (O)

Page 27 of 29

Joseph Johnson Packiaraj

9401126.doc

References: Mr. Lok Yew Kong Senior Surveyor Lloyds Register of Shipping Tel: 03-21617571 (O) / 016-2828671 (HP) E-mail: [email protected]

Mr. Too Jhon Pheng Surveyor Det Norske Veritas AS Sdn. Bhd. Tel: 03-20502900 (O) / 019-3838302 (HP) E-mail: [email protected]

Mr. Pathmanathan Business Manager Tepat Teknik Sdn. Bhd. Tel: 03-55101721 (O) / 010-2216247 (HP)

Mr. Joshua Gnanaraj a/l G. Jesudason Maintenance Planning & Technical Support Manager Petronas Ammonia Sdn. Bhd. Tel: 09-8305230 (O) / 019-9519401(HP)

Mr. Paul Poh Teck Seng Senior Inspector Velosi (M) Sdn. Bhd. Tel: 03-56337111 (O) / 019-3806812 (HP) E-mail: [email protected]

Dato’ Pang Tsu Ming (ADUN Semambu, Kuantan, Pahang Darul Makmur) Business Development Manager Amalgamated Metal Builders (M) Sdn. Bhd. Tel: 09-5833888 (O) / 019-9867855 (HP) E-mail: [email protected]

Mr. M. R. Murugesu Assistant Administrator Degree Programmes Kolej Tafe Seremban Tel: 06-7632020 (O) / 012-6572991 (HP) E-mail: [email protected]

Mr. V. Vallayan Assistant Administrator Degree Programmes Kolej Tafe Seremban Tel: 06-7632020 (O)

Mrs. Pusphalatha Pillai Program Coordinator Mechanical & Civil Engineering Kolej Tafe Seremban Tel: 06-7632020 (O)

Mr. Monihuldin Haidar Ali Corporate Safety / Quality Manager Shapadu Energy and Engineering Sdn. Bhd. Tel: 03-55428888 (O) / 012-3032761 (HP) E-mail: [email protected]

Ir. Dzulaidin Tasrin Othman Deputy General Manager (Engineering) MMC Oil & Gas Engineering Sdn. Bhd. Tel: 03-21635380 (O) / 012-2382478 (HP)

18/10/2008

Page 28 of 29

Joseph Johnson Packiaraj

9401126.doc

Project Management Plan • Initiating o Project Initiation  Identify goals and objectives,  Document project costs and benefits,  Develop project charter • Planning o Define scope  Develop strategies and plans,  Conduct planning workshop,  Research previous experience,  Define scope,  Develop high-level work breakdown structure,  Build detailed work breakdown structure,  Document project costs and benefits,  Specify deliverables and acceptance criteria,  Document assumptions o Document Project Support Plans  Document risk management plan,  Document configuration management plan,  Document data management plan,  Document communications management plan o Develop Project Schedule  Develop resource plans,  Prepare project estimates,  Defines dependencies and develop project schedule,  Document assumptions,  Conduct peer review o Develop Financial Plan



18/10/2008

Prepare financial plan

Page 29 of 29

Related Documents