Renovation

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Renovation as PDF for free.

More details

  • Words: 136
  • Pages: 1
Project: Proposed Renovation Subject: Scope of Work and Cost Estimate Description Civil Works 1. Floor Tiles 30 x 30 2. Portland Cement 3. ABC Grout/Filler

Unit ea bags bags

Qty Unit Cost

Total

1,000.0 10.0 28.0

27.50 230.00 85.00

27,500.00 2,300.00 2,380.00

Painting Work 1. Acrylic Concrete Sealer 2. Acrylic Semi-Gloss Latex 3. Concrete Neutralizers 4. Tinting Color 5. Paint Brush 2" 6. Paint Brush 3" 7. Sand Paper 8. Paint Roller 9. Roller Pan

gal gal gal tin ea ea ea ea ea

16.0 32.0 8.0 4.0 2.0 3.0 50.0 3.0 3.0

350.00 410.00 360.00 85.00 35.00 40.00 10.00 90.00 180.00

5,600.00 13,120.00 2,880.00 340.00 70.00 120.00 500.00 270.00 540.00

Miscellaneous 1. Consumable Hardware

lot

1.0

6,000.00

6,000.00

Material Cost Labor Cost @ 30% Overhead Cost @ 20%

Total Estimated Cost

61,620.00 17,229.00 14,931.80

93,780.80

Related Documents

Renovation
November 2019 23
Renovation
November 2019 12
Renovation September 2008
October 2019 8