Renovation works Status of Novus pharmaceuticals Limited

Sl No. Task Name % of Completion Cl sheet roofing with MS angle 1 (a) MS angle for Prayer Room, Imam,s Room, Engineering Store, Wastage Storage Room, Shade for Main Store, Stability Chamber Room. Retention Sample Room and (b) White normal Ct sheet for Prayer Room, Imam's Room, Engineering Store, Wastage Storage Room, Stability Chamber Room and Retention Sample (c) Color Cl sheet for Car parking, Shade for main Store (d) Labor Charges for CI sheet Roofing with Roof Trussf Brick Work: for remaining superstructure walls of (a) Prayer Room, (b) lmam's Room, (c) 2 Engineering Store, (d) Wastage Storage Room, (e) Shade for Main Store (f) Stability Chamber Room, (g) Retention Sample Room and (h) Car Parking 10% (a), (f) & (g) Plasterwork for remaining superstructure walls of (a) Prayer Room, (b) lmam's Room, (c) 3 Engineering Store, (d) Wastage Storage Room, (e) Shade for Main Store (f) Stability Chamber Room, (g) Retention Sample Room and (h) Car Parking Fixing of false ceiling in purified (a) Water Plant Room, (b) Prayer Room, (c) Stability Chamber 4 Room, (d) Retention At angle Sample Room Internal electrification works in purified (a) Water Plant Room, (b) Prayer Room, (c) Stability 5 Chamber Room, (d) Retention Sample Room Sanitary work: replacement of 7 nos. basin, 8 nos. padestral, 6 no mirror, and laying of water line 6 for Purified Water plant Room and prayer Room Thai Aluminum work: swing door and fixed partition 0f liquid building. sliding window for (a) 7 Retention Sample Room, (b) Stability Chamber Room, (c) Prayer Room, (d) Imam's Room, Painting work: Ground Floor & First Floor 50% 8 Plastic door works 9 Land developments 10 Duct work 11 Hardware materials 12 Carrying charge 13 Filling sand 14 Tiles work 15 80% (a), (b) & (c) CC work: for (a) Prayer Room, (b) lmam's Room, (c) Engineering Store, (d) Wastage Storage 16 Room, (e) Shade for Main Store & (f) Car parking Internal Road 17 Internal electrification work: (additional work as per inspection meeting minutes) replacement of 18 existing accessories with industrial type plugs and sockets Miscellaneous Cost 19

Signature

Remarks