Rencana Kontrak Konstr

  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rencana Kontrak Konstr as PDF for free.

More details

  • Words: 114
  • Pages: 2
FORM OB 11

When completed, this document can be used as evidence to satisfy the requirements of clauses 1.15 and 1.15.1 of the RFS Standard.

Main engine maintenance and repair record Vessel Name Check Coolant level V belt tension Oil level Exhaust gas Battery charge (alternator) Warning light (oil pressure) Warning light (temperature) Battery charge (alternator)

PLN Name of person(s) responsible and positions

FORM OB 11

Date

Repair type

Vessel Name

Carried out by

signed

PLN

……. hours running checks/actions Check/Action Lube oil change Oil filter replacement Gear box oil replacement Fuel filter change Engine mount check Shaft coupling check Hose integrity check Hose clip condition and tightness

Name of person(s) responsible and positions

Related Documents

Rencana Kontrak Konstr
August 2019 3
Kontrak
April 2020 48
Rencana
June 2020 31
Kontrak Pemb
June 2020 26