PROFILE

RAJA SURYA

An Introduction Rajasurya Engineering Enterprises, a proprietary, one of the leading concern, in the field of Engineering, Detail Engineering, Mechanical, Electrical, Civil works and Erection & Commissioning of Power Plant Equipments. Rajasurya was established in the year 1999 and today, it has grown up to a level of undertaking any challenge in to Engineering. Rajasurya is a well knit Organization aspiring to do a cost effective, efficient and reliable business.

“Time and Quality” are the principles and this alone has been the ‘Mantra’ of our development. Rajasurya has got its head quarters at Chennai, equipped with latest technological background, infrastructure and a healthy financial resource. A well-trained and experienced team of engineers is the asset of Rajasurya. Power, Petroleum and Process are the key areas in developing a nation and Rajasurya is marching firmly and successfully towards these major sectors in a remarkable way.

Our strength and facilities: 







The core group consists of talented engineers supported by a panel of specialists in various disciplines. Familiarity with ISO 9000 requirements RAJASURYA has link-ups in to manufacturing of components and to design products. Spacious office located in Chennai with all modern office equipment and Machinery.

Advantages working with RAJASURYA : All our professionals have,

 solid work experience with leading MNC’s in the areas of boilers and auxiliaries.

 Full familiarity with ASME, BS, DIN and other international codes and standards.

 Excellent contacts with Indian customers and state / central government agencies.

OUR CAPABILITIES We offer the following Services

CONSULTANCY IN POWER PLANTS & PROCESS INDUSTRIES  Detail Engineering  Piping Layout Drawings  Piping Isometric Fabrication drawings  Structural Drawings  Platforms ,Duct Supports  Platforms, Stringer, Gangway, Railings for all platforms  Preparation of Schematic Drawings,  Instrumentation Drawings, etc.,

IN CONTRACTS:  Annual Maintenance Contracts  Heavy Pumps Erection  Electrical Works  Control Panel Erection  Control Boxes Erection, Stand Fabrication  Painting Works  Oil Guns Servicing  Hot Well Erection  Condenser Tube Renewal  Hydrogen Cooler Cleaning and Erection  Baffle Plate Fabrication  Piping System Erection  Coal and Vapour Piping Erection  Dampers Erection  Erection of WIND BOX Assembly  Erection of Fans  Erection Fuel Firing system  Erection HFO System  Main steam Supports Erection  Overhauling of Pumps  Erection of Air Pre Heater Tubes  Sea Water Pipes Re Routing  Erection of Steam Blowing Piping

 HP Heater, LP Heater , Ejector, M.O. Cooler Tube Renewal and Erection

MANUFACTURING & SUPPLY  Guillotine Gates  Oil Guns for 110 MW  Tilting Spares  Coupling Bolts  Raw Coal Run back System  Oil Filters  Oil Strainer For Turbine  Semi Circular Doors for Ball Mills  Universal Coupling for Main Steam Stop valve Actuator  Water Box for 110MW Units  Water Box doors for 110MW Units  Oil Nozzle Tip  Supply of HT Studs and Nuts for control vale inter connection Pipes  Stringer Steps for Conveyor System  SS Mesh Oil Strainer  Thrust Block and Cap Nuts for Boiler Drum Man Hole Doors  Bearing Cooling Coils for 110MW Units  Modified Re Circulation Dampers for Mill Plants

 Bearing Cooling Coils for M.C. Pumps  Plat form Grills for CWS System

MAJOR RESOURCES AVAILABLE WITH RAJASURYA

Sl.No .

Category

No. of Persons

1.

Project Managers

1

2.

Deputy Project Managers

2

3.

Engineers

2

4.

Supervisors

4

5.

Material Controller

2

6.

Formen

2

7.

Fitters

3

8.

Qualified Welders

5

9.

Grinders & Gas Cutters

5

10.

Riggers

10

11.

Helpers (Semi-skilled)

10

12.

Khalasis

15

13.

Unskilled Labours

20

Note: Additional requirement of manpower in any Category shall be arranged as per work content either locally or from other areas.

OUR MACHINERY QTY. IN Sl.N

DESCRIPTION

Nos.

o 1.

Center Lathe 8 feet

01 No.

2.

Center Lathe 12 feet

01 No.

3.

Center Lathe 6 feet

01 No.

4.

Radial Drilling Machine

01 No.

5.

Portable Drilling Machine

01 No.

6.

Metal cutting machine

01 No.

7.

Shaping machine

01 No.

8.

Table grinding machine

01 No.

9.

Welding machine

03 Nos

10.

Bug Cutting machine

01 No

11.

Magnetic drilling Machine

02 Nos

Sl.No.

Name of Work

Work order / Letter Ref.

Duration

Clients Name

DESIGN ORDERS 1.

Rate contract for OFF LOADING of Engineering Drawings

BHEL:PC:PUR:RC:001 Dt:16.08.2003

1 year

BHEL-CHENNAI

2.

Rate contract for OFF LOADING of Engineering Drawings

BHEL:PC:PUR:RC:3012 Dt:27.01.2004

1 year

BHEL-CHENNAI

3.

Rate contract for OFF LOADING of Engineering Drawings

PC-450-7100019295 Dt:27.07.2006

1 year

BHEL-CHENNAI

4.

Preparation of Isometric Drawings with Details

CNT 7386/MG-16/2799 Dt:26.06.2006

6 Months

FICHTNER Consulting Engineers ( India ) P LTD.

5.

Preparation of Isometric Drawings with Details

CNT 7486/MG-16/601A Dt:26.04.2007

6 Months

FICHTNER Consulting Engineers ( India ) P LTD.

6.

Preparation of Isometric Drawings with Details

CNT 7996/MG-16/1698 Dt:12.06.2007

6 Months

FICHTNER Consulting Engineers ( India ) P LTD.

7.

Preparation of Isometric Drawings with Details

327/06

6 Months

ANDRITZ Separation ( India ) P LTD.

8.

9.

As built drawings for Fuel firing system in unit II 60 MW at ETPS As built drawings for HFO Pumping Station system in unit II 60 MW at ETPS

Dt:14.10.2006 PO/UTE/234P/UNIT-I Dt:11.11.2006 PO/UTE/248 Dt08.05.2006

SKODA / U-TECH 2 Months SKODA / U-TECH 2 Months

WORK ORDERS 1.

Dismantling & erection of HP FLUSH Pumps

2.

Dismantling & Erection of control boxes

3.

Rectification of Baffle plates R&M K1&K2 Condenser in Unit I 60 MW at ETPS

PO/ETPS/S/028 Dt:14.11.2000

1 Month

SKODA EXPORT

PO/ETPS/S/043 Dt:23.04.2001

2 Months

SKODA EXPORT

PO/R&M/EN-1/002 Dt:20.01.2003

2 Months

L&T LTD.

15 days

SKODA EXPORT

2 Months

SKODA / U-TECH

IN YEAR 2004 1.

HOT WELL painting work at ETPS

2.

Refurbishment of Ennore Thermal Power Station – Dismantling, Erection of Condenser K1 & K2 – Unit II 60MW at ETPS.

PO/ETPS/S/215/VJ/04 Dt:26.07.2004

PO / ETPS/ 215C/02 Date :15.05.2004

IN YEAR 2005 Sl.No.

Name of Work

Work order / Letter Ref.

Duration

Clients Name

1.

R&M Works in condenser at Unit – IV 110MW at ETPS

PO/UTE/4346/01 Dt:18.01.2005

3 Months

TNEB / U-TECH

2.

Fabrication & Erection of HFO Pumping station works

PO/UTE/220/HFO/UNITII/01 Dt:15.04.2005

1 Month

SKODA / U-TECH

3.

Air Pre Heater Re Tubing Work at Unit II 60MW at ETPS

PO/UTE/223/01 Dt:14.05.2005

2 Months

SKODA / U-TECH

4.

Dismantling of Old Vapour Piping and Extra work at HFO Pumping station at Unit II – 60MW at ETPS

PO/UTE/226/01 Dt:21.10.2005

1 Month

SKODA / U-TECH

5.

Erection of COAL & VAPOUR Pipe Lines of Boiler in Unit II -60 MW at ETPS

PO/UTE/226/ERE/01 Dt:07.10.2005

1 Month

SKODA / U-TECH

6.

Extra Rectification works in HFO Pumping station in Unit II 60MW at ETPS

PO/UTE/220/HFO/REC/ UNIT-II/01 Dt:29.11.2005

1 Month

SKODA / U-TECH

7.

Fabrication & erection of Steam Blowing line in Unit II 60MW at ETPS

PO/UTE/220/SB/UNITII/01 Dt:25.11.2005

1 Month

SKODA / U-TECH

8.

Fabrication Supply of COAL & VAPOUR Pipe line of Boiler at Unit II 60 MW at ETPS

PO/UTE/226CA/01 Dt:02.12.2005

1 Month

SKODA / U-TECH

9.

Modification of Pipe lines at Unit II 60 MW at ETPS

PO/UTE/226CB/01 Dt:02.12.2005

1 Month

SKODA / U-TECH

10.

Overhauling of GUILLOTINE GATES in Unit I 60 MW at ETPS

PO/UTE/220/GU/UNITI/01 Dt:24.12.2005

1 Month

SKODA / U-TECH

11.

Overhauling of HFO PUMPING Station in Unit I 60 MW at ETSP

PO/UTE/220/HFO/OH/U NIT-I/01 Dt:24.12.2005

1 Month

SKODA / U-TECH

IN YEAR 2006 Sl.No.

Name of Work

Work order / Letter Ref.

1.

Fabrication & Erection of HFO PUMPING station Skid in Unit I 60 MW at ETPS

PO/UTE/220/HFO/UNIT1/01 Dt:02.01.2006

1 Month

SKODA / U-TECH

2.

Fabrication of MS VAPOUR Pipes, MS VAPOUR Bends, & Reducers in Unit II 60 MW at ETPS

PO/UTE/4445-52/01 Dt:02.02.2006

1 Month

SKODA / U-TECH

3.

Dismantling work in COAL & VAPOUR Pipe lines in Unit I 60 MW at ETPS

PO/UTE/233/P/01 Dt:11.02.2006

1 Month

SKODA / U-TECH

4.

Fabrication & Erection of MAIN OIL COOLER Pipes, Flushing line Pipes and bend in Unit II 60 MW at ETPS

PO/UTE/236/01 Dt:08.03.2006

1 Month

SKODA / U-TECH

5.

Dismantling and devolution of STEAM BLOWING line in Unit II 60 MW at ETPS

PO/UTE/235SB/01 Dt:18.03.2006

1 Month

SKODA / U-TECH

6.

Rectification of HFO Heating Station platform & fabrication & Erection of HFO Pumping station, Return / Suction / Steam lines

PO/UTE/226/02 Dt:19.05.2006

1 Month

SKODA / U-TECH

7.

Fabrication of ATYP Flange for GUILLOTINE GATES of Unit I 60 MW at ETPS

PO/UTE/240/01 Dt:20.05.2006

1 Month

SKODA / U-TECH

8.

Air Pre Heater Re Tubing Work at Unit I 60 MW at ETPS

PO/UTE/223/02 Dt:31.05.2006

2 Months

SKODA / U-TECH

9.

Renewal of CONDENSER TUBES, Partition plates, condenser tubes at ETPS

PO/UTE/241 Dt:06.06.2006

1 Month

SKODA / U-TECH

10.

Erection of WIND BOX BURNER and Fabrication and erection of Coal and Oil Pipes of BURNER,LDO PIPES, HFO Heating station Piping

PO/UTE/245

1 Month

SKODA / U-TECH

Dt :16.06.2006

Duration

Clients Name

11.

12

13.

14. 15.

Fabrication and erection of MS VAPOUR pipes in Unit I 60 MW at ETPS

PO/UTE/247

Fabrication of wind box BURNER Frame at Unit I 60 MW at ETPS

PO/UTE/252

Fabrication and erection of COAL & VAPOUR pipes in Unit I 60 MW at ETPS

PO/UTE/226/ERE/UNIT I

Fabrication & erection of Steam Blowing line in Unit I 60MW at ETPS

PO/UTE/220/SB/UNIT-I

Dismantling and devolution of Steam Blowing line in Unit I 60MW at ETPS

1 Month

SKODA / U-TECH

1 Month

SKODA / U-TECH

1 Month

SKODA / U-TECH

1 Month

SKODA / U-TECH

1 Month

SKODA / U-TECH

Dt:20.07.2006

Dt:25.08.2006

Dt:11.11.2006

Dt:11.11.2006 PO/UTE/235 SB/UNIT-I Dt:11.11.2006

16.

Fabrication & Erection of MAIN OIL COOLER pipe flushing line pipe and bend including dismantling and normalizing

PO/UTE/236/UNIT-I Dt:11.11.2006

1 Month

SKODA / U-TECH

17.

Design, Fabrication & supply of Vapour pipe lines in Unit I 60 MW at ETPS

PO/UTE/215

1 Month

SKODA / U-TECH

Maching of PLATE HEAT EXCHANGERS Stay bolts

PO/UTE/250 Dt:10.10.2006

1 Month

SKODA / U-TECH

18.

Dt:22.11.2006

IN THE YEAR 2007 1.

Fabrication and erection of Coal and PO/UTE/256 Vapour Piping in Unit – III 110 MW Dt:24.01.2007 at ETPS

1 Month

TNEB/UTECH

2.

Maching of PLATE HEAT EXCHANGERS Stay bolts

1 Month

TNEB/UTECH

3.

Erection of Economiser Beam cooling liles

1 Month

SKODA / UTECH

PO/UTE/256A Dt:02.02.2007

Drum interval Exhaust piping Feed manifold at 8.0 M Elevation Furnace Bottom sealing Piping Erection of HDPE Piping Cyclone separator Ash drain lines Membrane water wall drain and vent 4.

ETPS – MM II Circle – conveyor division Attending modification works in heavy oil pipe lines of the OIL HANDLING plant

WCT.605/D.286 Dt:21.05.2007

1 Month

TNEB

5.

ETPS-MMI Circle – Mill plant division – Unit II Modification of vapour line – fabrication of new vapour bend removal of insulation

CE/MM-I / LT-697 Dt:14.04.2007

1 Month

TNEB

IN THE YEAR 2008 1.

ETPS MM II Circle –Conveyor Dn. OHP – Attending breakdown works in heavy oil & light oil systems of oil handling plant

WCT-753/D1828 Dt:01.03.2008

1 Month

TNEB

2.

ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates.

WCT No.1904/D.251/0 8 Dt:27.02.2008

1 Month

TNEB

3.

ETPS – Mechanical Maintenance – I Circle – Turbine Maintenance division – Fabrication of Man hole doors for Debris filters with SS Plates for unit I to V

WCT No.1896/d.225/08

1 Month

TNEB

4.

ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – fabrication and supply of Main steam stop valve actuator connecting link mechanism with universal coupling and erection in Unit III

WCT No.1847/D.126/0 8 Dt:22.01.2008

1 Month

TNEB

5.

ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – Dewatering pump house 30HP Diesel engine pump – dismantling, Inspection, Reconditioning of worn out parts testing and commissioning of the 30 HP Diesel engine

WCT No.1843/D.122/0 8

20 days

TNEB

ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV Machining of gland box oil guard bolts and Nuts, MP Inner casing studs and nuts and LP HEATER studs and OIL SERVO lock nuts

WCT No.1829/D.82/08 Dt:14.01.2008

20 days

TNEB

6.

Dt:15.02.2008

Dt:22.01.2008

7.

8.

9.

10.

11.

ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV - TG Set machining of 60 nos seal oil pump coupling bolt 2 nos, Flanges with adapter, 5 nos, Casting studs, dummy flanges pins inner thread pins 35 nos Bolt machining etc.

WCT NO. 1828/ D. 86, Dt 14.01.08

ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV Reconditioning of lub oil filters machining of iylam sheet, bolt machining and coupling bolt machining.

WCT NO. 1827/ D. 85, Dt. 14.01.08

ETPS – Mechanical Maintenance - I Circle –Mill Plant division – 110 MW Unit IV - Renewal/ Recondiioning of coal and vapour lines and bends providing additional strenthening plates in coal and vapour line and bends renewal of insulation work during shut down period

WCT NO 1961/ D. 435 Dt 18.04.08

ETPS - CWS Division - Removing, Reconditioning and Refixing of Pinion gear Shaft and assembling of gear box of cws pump No 6

WCT No-2024/D 586/08/Dt 24.06.08

ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates.

WCT No.4930/D.943/0 8 Dt.06.11.2008

20 days

TNEB

20 days

TNEB

20 days

TNEB

20 days

TNEB

30 days

TNEB

IN THE YEAR 2007 12.

ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit IV Positioning of Debris filter flab at a time intervals and online removal of debris chocked in the debris filters in 110 MW Unit IV

WCT No.2223/D.55/09

20 days

TNEB

Dt:28.01.2009

SUPPLY ORDERS 1.

2.

3.

4.

Supply of coupling bolt and nuts for cooling water main pumps. LP & HP Flush water pumps Supply of HT studs and nuts for control valves inter connection pipes Supply of stringer steps of JT 5

Supply of SS Mesh oil Strainer

PO NO. 07 S.178 D.1596/ Dt 01.12.07

2 Months

PO NO. 07 S.134 D.1576/ Dt 05.09.07

2 Months

PO NO.2007 S. 161 D. 1463/ Dt 12.11.07

2 Months

PO NO.2007 S. 182 D. 1632/ Dt 13.12.07

2 Months

TNEB

TNEB

TNEB

TNEB

IN THE YEAR 2007 1.

2.

3.

4.

5.

6.

7.

8.

9.

Supply of semi circular door

Supply of Capnut and Thrust block for drum manhole doors in unit iii and iv (110MW) Supply of Bearing and cooling coil for110 mW unit for soft water pump

Supply of main steam stop valve actuator connector with universal coupling for 110MW

PO NO. 2008 S. 71 D. 175/ Dt 05.02.08 PO NO. 2008 S. 06 D. 38 Dt 14.01.08

PO NO. 2008 S. 94 D. 241 Dt 08.02.08 PO NO. 2008 S. 44 D. 257 Dt 17.03.08

Fabrication and supply of modified recirculation flap valve for vapour fans 60 MW with self lubricating

PO NO. 2008 212 D. 367 Dt 23.04.08

Supply of MC Pump bearing and cooling coil

P.O NO. 2008 - S - 90 D - 803/08. Dt 13.05.08

Supply of M.S Fabricated platform grills

P.O.No.2008 275 D - 452/08.Dt 23.05.08

SS guide Roller with Bracket Pin and bush for travelling water

ETPS - CWS Specn No 2238/ PO No 2008 423/D 556/08 /DT 03.07.08

Design fabrication supply and erection of WATER CHAMBER for K1 & K2 Condenser Unit V 110 MW

2 Months

2 Months

2 Months

2 Months

2 Months

2 Months

3 Months

3 Months

TNEB

TNEB

TNEB

TNEB

TNEB

TNEB

TNEB

TNEB

6 Months

IN THE YEAR 2008 1.

2.

Fabrication, Supply errection with supporting and commissioning of silenser for CBD with vent and drain arrangement for unit iv ( 110 MW ) Boiler

P.O.No.2009- 06 D050/09 Dt.17.01.09

Supply of Ignitor guide tube assembly for Unit V 110 MW - boiler filter for unit V 110 MW Boiler

P.O.No.2009- 40 D126/09 Dt.05.01.09

2 Months

2 Months

TNEB

TNEB

OUR VALUED CUSTOMERS : 1.

BHEL – CHENNAI

2.

TAMILNADU ELECTRICITY BOARD

3.

M/s. SKODA EXPORT CHENNAI-600 057

4.

M/s ALSTOM POWER INDIA LTD CHENNAI-600 018

5.

M/s. LARSON TOUBRO LIMITED CHENNAI- 600 057

6.

U-TECH CONSULTANTS & ENGINEERS P LTD CHENNAI-06

7.

FICHTNER Consulting Engineers ( India ) P LTD.

8.

ANDRITZ Separation ( India ) P LTD.

9.

M/s. RADHA ENGINEERING P LTD CHENNAI-600 057

10.

M/s.KUMARAN ENGINEERING WORKS CHENNAI-600 057

PHATO GALLERY RE TUBING OF PLATE HEAT EXCHANGERS FOR UNIT IV 110 MW ETPS

BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS

BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS

TUBE CLEANING FOR AIR PRE HEATER UNIT -60 MW ETPS

RE TUBING OF PLATE HEAT EXCHANGERS UNIT IV 110 MW ETPS

TUBLAR AIR PRE HEATER POOJA WITH SKODA EXPORT OFFICALS

MODIFIED RE CIRCULATION DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

COLD AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

WATER CHAMBER

MACHINING OF STAY BOLT FOR CONENSER ETPS

OIL GUN SPARES FOR UNIT V 110 MW ETPS

FRONT WATER CHAMBER FOR 110 MW

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

ARM FOR WATER CHAMBER

REAR WATER CHAMBER

BRACKET ASSEMBLY

DURING POOJA FOR COMPLETION OF WATER CHAMBER

OUR WORK SHOP

WATER CHAMBER DOOR FOR UNIT V 110 MW

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

DURING TNEB OFFICAL INSPECTION

DURING HYDRO TEST TNEB OFFICAL INSPECTION

OUR MACHINIRIES

RAW COAL RUN BACK SYATEM FOR CONVEYOR 29

DURING DNV INSPECTION LOW PRESSURE HEAT EXCHANGERS

WATER CHAMBER FOR UNIT V 110 MW

GUILLOTINE GATE SPARES

DURING THE ERECTION OF COAL AND VAPOUR PIPES AND BENDS

MITRE BENDS FOR COAL AND VAPOUR PIPING

MITRE BEND PREPARATION

BEARING COOLING COIL FOR BOILER FEED PUMPS

MANUFACTURING GRILLS FOR ENNORE THERMAL POWER STATION

DURING THE PLATE CUTTING

P.A.FAN LAYOUT MARKING AND INSPECTION WITH TNEB OFFICALS

P.A.FAN LAYOUT CUTTING

P.A.FAN PRE ASSEMBLY INSPECTION WITH TNEB OFFICALS

P.A.FAN CASING

P.A.FAN CASING

P.A.FAN CASING

DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN

DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN

AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FAN

AFTER WELDING SUCTION BRANCH FOR P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN AND LOYDS INSPECTION GROUP INSPECTING THE ASSEMBLY

AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FA

DURING FULL ASSEMBLY OF P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN

Related Documents

Aseel Company Profile Final
December 2019 6
Company Profile
November 2019 51
Profile Company
April 2020 31
Company Profile
July 2020 27
Company Profile
November 2019 48