PROFILE
RAJA SURYA
An Introduction Rajasurya Engineering Enterprises, a proprietary, one of the leading concern, in the field of Engineering, Detail Engineering, Mechanical, Electrical, Civil works and Erection & Commissioning of Power Plant Equipments. Rajasurya was established in the year 1999 and today, it has grown up to a level of undertaking any challenge in to Engineering. Rajasurya is a well knit Organization aspiring to do a cost effective, efficient and reliable business.
“Time and Quality” are the principles and this alone has been the ‘Mantra’ of our development. Rajasurya has got its head quarters at Chennai, equipped with latest technological background, infrastructure and a healthy financial resource. A well-trained and experienced team of engineers is the asset of Rajasurya. Power, Petroleum and Process are the key areas in developing a nation and Rajasurya is marching firmly and successfully towards these major sectors in a remarkable way.
Our strength and facilities:
The core group consists of talented engineers supported by a panel of specialists in various disciplines. Familiarity with ISO 9000 requirements RAJASURYA has link-ups in to manufacturing of components and to design products. Spacious office located in Chennai with all modern office equipment and Machinery.
Advantages working with RAJASURYA : All our professionals have,
solid work experience with leading MNC’s in the areas of boilers and auxiliaries.
Full familiarity with ASME, BS, DIN and other international codes and standards.
Excellent contacts with Indian customers and state / central government agencies.
OUR CAPABILITIES We offer the following Services
CONSULTANCY IN POWER PLANTS & PROCESS INDUSTRIES Detail Engineering Piping Layout Drawings Piping Isometric Fabrication drawings Structural Drawings Platforms ,Duct Supports Platforms, Stringer, Gangway, Railings for all platforms Preparation of Schematic Drawings, Instrumentation Drawings, etc.,
IN CONTRACTS: Annual Maintenance Contracts Heavy Pumps Erection Electrical Works Control Panel Erection Control Boxes Erection, Stand Fabrication Painting Works Oil Guns Servicing Hot Well Erection Condenser Tube Renewal Hydrogen Cooler Cleaning and Erection Baffle Plate Fabrication Piping System Erection Coal and Vapour Piping Erection Dampers Erection Erection of WIND BOX Assembly Erection of Fans Erection Fuel Firing system Erection HFO System Main steam Supports Erection Overhauling of Pumps Erection of Air Pre Heater Tubes Sea Water Pipes Re Routing Erection of Steam Blowing Piping
HP Heater, LP Heater , Ejector, M.O. Cooler Tube Renewal and Erection
MANUFACTURING & SUPPLY Guillotine Gates Oil Guns for 110 MW Tilting Spares Coupling Bolts Raw Coal Run back System Oil Filters Oil Strainer For Turbine Semi Circular Doors for Ball Mills Universal Coupling for Main Steam Stop valve Actuator Water Box for 110MW Units Water Box doors for 110MW Units Oil Nozzle Tip Supply of HT Studs and Nuts for control vale inter connection Pipes Stringer Steps for Conveyor System SS Mesh Oil Strainer Thrust Block and Cap Nuts for Boiler Drum Man Hole Doors Bearing Cooling Coils for 110MW Units Modified Re Circulation Dampers for Mill Plants
Bearing Cooling Coils for M.C. Pumps Plat form Grills for CWS System
MAJOR RESOURCES AVAILABLE WITH RAJASURYA
Sl.No .
Category
No. of Persons
1.
Project Managers
1
2.
Deputy Project Managers
2
3.
Engineers
2
4.
Supervisors
4
5.
Material Controller
2
6.
Formen
2
7.
Fitters
3
8.
Qualified Welders
5
9.
Grinders & Gas Cutters
5
10.
Riggers
10
11.
Helpers (Semi-skilled)
10
12.
Khalasis
15
13.
Unskilled Labours
20
Note: Additional requirement of manpower in any Category shall be arranged as per work content either locally or from other areas.
OUR MACHINERY QTY. IN Sl.N
DESCRIPTION
Nos.
o 1.
Center Lathe 8 feet
01 No.
2.
Center Lathe 12 feet
01 No.
3.
Center Lathe 6 feet
01 No.
4.
Radial Drilling Machine
01 No.
5.
Portable Drilling Machine
01 No.
6.
Metal cutting machine
01 No.
7.
Shaping machine
01 No.
8.
Table grinding machine
01 No.
9.
Welding machine
03 Nos
10.
Bug Cutting machine
01 No
11.
Magnetic drilling Machine
02 Nos
Sl.No.
Name of Work
Work order / Letter Ref.
Duration
Clients Name
DESIGN ORDERS 1.
Rate contract for OFF LOADING of Engineering Drawings
BHEL:PC:PUR:RC:001 Dt:16.08.2003
1 year
BHEL-CHENNAI
2.
Rate contract for OFF LOADING of Engineering Drawings
BHEL:PC:PUR:RC:3012 Dt:27.01.2004
1 year
BHEL-CHENNAI
3.
Rate contract for OFF LOADING of Engineering Drawings
PC-450-7100019295 Dt:27.07.2006
1 year
BHEL-CHENNAI
4.
Preparation of Isometric Drawings with Details
CNT 7386/MG-16/2799 Dt:26.06.2006
6 Months
FICHTNER Consulting Engineers ( India ) P LTD.
5.
Preparation of Isometric Drawings with Details
CNT 7486/MG-16/601A Dt:26.04.2007
6 Months
FICHTNER Consulting Engineers ( India ) P LTD.
6.
Preparation of Isometric Drawings with Details
CNT 7996/MG-16/1698 Dt:12.06.2007
6 Months
FICHTNER Consulting Engineers ( India ) P LTD.
7.
Preparation of Isometric Drawings with Details
327/06
6 Months
ANDRITZ Separation ( India ) P LTD.
8.
9.
As built drawings for Fuel firing system in unit II 60 MW at ETPS As built drawings for HFO Pumping Station system in unit II 60 MW at ETPS
Dt:14.10.2006 PO/UTE/234P/UNIT-I Dt:11.11.2006 PO/UTE/248 Dt08.05.2006
SKODA / U-TECH 2 Months SKODA / U-TECH 2 Months
WORK ORDERS 1.
Dismantling & erection of HP FLUSH Pumps
2.
Dismantling & Erection of control boxes
3.
Rectification of Baffle plates R&M K1&K2 Condenser in Unit I 60 MW at ETPS
PO/ETPS/S/028 Dt:14.11.2000
1 Month
SKODA EXPORT
PO/ETPS/S/043 Dt:23.04.2001
2 Months
SKODA EXPORT
PO/R&M/EN-1/002 Dt:20.01.2003
2 Months
L&T LTD.
15 days
SKODA EXPORT
2 Months
SKODA / U-TECH
IN YEAR 2004 1.
HOT WELL painting work at ETPS
2.
Refurbishment of Ennore Thermal Power Station – Dismantling, Erection of Condenser K1 & K2 – Unit II 60MW at ETPS.
PO/ETPS/S/215/VJ/04 Dt:26.07.2004
PO / ETPS/ 215C/02 Date :15.05.2004
IN YEAR 2005 Sl.No.
Name of Work
Work order / Letter Ref.
Duration
Clients Name
1.
R&M Works in condenser at Unit – IV 110MW at ETPS
PO/UTE/4346/01 Dt:18.01.2005
3 Months
TNEB / U-TECH
2.
Fabrication & Erection of HFO Pumping station works
PO/UTE/220/HFO/UNITII/01 Dt:15.04.2005
1 Month
SKODA / U-TECH
3.
Air Pre Heater Re Tubing Work at Unit II 60MW at ETPS
PO/UTE/223/01 Dt:14.05.2005
2 Months
SKODA / U-TECH
4.
Dismantling of Old Vapour Piping and Extra work at HFO Pumping station at Unit II – 60MW at ETPS
PO/UTE/226/01 Dt:21.10.2005
1 Month
SKODA / U-TECH
5.
Erection of COAL & VAPOUR Pipe Lines of Boiler in Unit II -60 MW at ETPS
PO/UTE/226/ERE/01 Dt:07.10.2005
1 Month
SKODA / U-TECH
6.
Extra Rectification works in HFO Pumping station in Unit II 60MW at ETPS
PO/UTE/220/HFO/REC/ UNIT-II/01 Dt:29.11.2005
1 Month
SKODA / U-TECH
7.
Fabrication & erection of Steam Blowing line in Unit II 60MW at ETPS
PO/UTE/220/SB/UNITII/01 Dt:25.11.2005
1 Month
SKODA / U-TECH
8.
Fabrication Supply of COAL & VAPOUR Pipe line of Boiler at Unit II 60 MW at ETPS
PO/UTE/226CA/01 Dt:02.12.2005
1 Month
SKODA / U-TECH
9.
Modification of Pipe lines at Unit II 60 MW at ETPS
PO/UTE/226CB/01 Dt:02.12.2005
1 Month
SKODA / U-TECH
10.
Overhauling of GUILLOTINE GATES in Unit I 60 MW at ETPS
PO/UTE/220/GU/UNITI/01 Dt:24.12.2005
1 Month
SKODA / U-TECH
11.
Overhauling of HFO PUMPING Station in Unit I 60 MW at ETSP
PO/UTE/220/HFO/OH/U NIT-I/01 Dt:24.12.2005
1 Month
SKODA / U-TECH
IN YEAR 2006 Sl.No.
Name of Work
Work order / Letter Ref.
1.
Fabrication & Erection of HFO PUMPING station Skid in Unit I 60 MW at ETPS
PO/UTE/220/HFO/UNIT1/01 Dt:02.01.2006
1 Month
SKODA / U-TECH
2.
Fabrication of MS VAPOUR Pipes, MS VAPOUR Bends, & Reducers in Unit II 60 MW at ETPS
PO/UTE/4445-52/01 Dt:02.02.2006
1 Month
SKODA / U-TECH
3.
Dismantling work in COAL & VAPOUR Pipe lines in Unit I 60 MW at ETPS
PO/UTE/233/P/01 Dt:11.02.2006
1 Month
SKODA / U-TECH
4.
Fabrication & Erection of MAIN OIL COOLER Pipes, Flushing line Pipes and bend in Unit II 60 MW at ETPS
PO/UTE/236/01 Dt:08.03.2006
1 Month
SKODA / U-TECH
5.
Dismantling and devolution of STEAM BLOWING line in Unit II 60 MW at ETPS
PO/UTE/235SB/01 Dt:18.03.2006
1 Month
SKODA / U-TECH
6.
Rectification of HFO Heating Station platform & fabrication & Erection of HFO Pumping station, Return / Suction / Steam lines
PO/UTE/226/02 Dt:19.05.2006
1 Month
SKODA / U-TECH
7.
Fabrication of ATYP Flange for GUILLOTINE GATES of Unit I 60 MW at ETPS
PO/UTE/240/01 Dt:20.05.2006
1 Month
SKODA / U-TECH
8.
Air Pre Heater Re Tubing Work at Unit I 60 MW at ETPS
PO/UTE/223/02 Dt:31.05.2006
2 Months
SKODA / U-TECH
9.
Renewal of CONDENSER TUBES, Partition plates, condenser tubes at ETPS
PO/UTE/241 Dt:06.06.2006
1 Month
SKODA / U-TECH
10.
Erection of WIND BOX BURNER and Fabrication and erection of Coal and Oil Pipes of BURNER,LDO PIPES, HFO Heating station Piping
PO/UTE/245
1 Month
SKODA / U-TECH
Dt :16.06.2006
Duration
Clients Name
11.
12
13.
14. 15.
Fabrication and erection of MS VAPOUR pipes in Unit I 60 MW at ETPS
PO/UTE/247
Fabrication of wind box BURNER Frame at Unit I 60 MW at ETPS
PO/UTE/252
Fabrication and erection of COAL & VAPOUR pipes in Unit I 60 MW at ETPS
PO/UTE/226/ERE/UNIT I
Fabrication & erection of Steam Blowing line in Unit I 60MW at ETPS
PO/UTE/220/SB/UNIT-I
Dismantling and devolution of Steam Blowing line in Unit I 60MW at ETPS
1 Month
SKODA / U-TECH
1 Month
SKODA / U-TECH
1 Month
SKODA / U-TECH
1 Month
SKODA / U-TECH
1 Month
SKODA / U-TECH
Dt:20.07.2006
Dt:25.08.2006
Dt:11.11.2006
Dt:11.11.2006 PO/UTE/235 SB/UNIT-I Dt:11.11.2006
16.
Fabrication & Erection of MAIN OIL COOLER pipe flushing line pipe and bend including dismantling and normalizing
PO/UTE/236/UNIT-I Dt:11.11.2006
1 Month
SKODA / U-TECH
17.
Design, Fabrication & supply of Vapour pipe lines in Unit I 60 MW at ETPS
PO/UTE/215
1 Month
SKODA / U-TECH
Maching of PLATE HEAT EXCHANGERS Stay bolts
PO/UTE/250 Dt:10.10.2006
1 Month
SKODA / U-TECH
18.
Dt:22.11.2006
IN THE YEAR 2007 1.
Fabrication and erection of Coal and PO/UTE/256 Vapour Piping in Unit – III 110 MW Dt:24.01.2007 at ETPS
1 Month
TNEB/UTECH
2.
Maching of PLATE HEAT EXCHANGERS Stay bolts
1 Month
TNEB/UTECH
3.
Erection of Economiser Beam cooling liles
1 Month
SKODA / UTECH
PO/UTE/256A Dt:02.02.2007
Drum interval Exhaust piping Feed manifold at 8.0 M Elevation Furnace Bottom sealing Piping Erection of HDPE Piping Cyclone separator Ash drain lines Membrane water wall drain and vent 4.
ETPS – MM II Circle – conveyor division Attending modification works in heavy oil pipe lines of the OIL HANDLING plant
WCT.605/D.286 Dt:21.05.2007
1 Month
TNEB
5.
ETPS-MMI Circle – Mill plant division – Unit II Modification of vapour line – fabrication of new vapour bend removal of insulation
CE/MM-I / LT-697 Dt:14.04.2007
1 Month
TNEB
IN THE YEAR 2008 1.
ETPS MM II Circle –Conveyor Dn. OHP – Attending breakdown works in heavy oil & light oil systems of oil handling plant
WCT-753/D1828 Dt:01.03.2008
1 Month
TNEB
2.
ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates.
WCT No.1904/D.251/0 8 Dt:27.02.2008
1 Month
TNEB
3.
ETPS – Mechanical Maintenance – I Circle – Turbine Maintenance division – Fabrication of Man hole doors for Debris filters with SS Plates for unit I to V
WCT No.1896/d.225/08
1 Month
TNEB
4.
ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – fabrication and supply of Main steam stop valve actuator connecting link mechanism with universal coupling and erection in Unit III
WCT No.1847/D.126/0 8 Dt:22.01.2008
1 Month
TNEB
5.
ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – Dewatering pump house 30HP Diesel engine pump – dismantling, Inspection, Reconditioning of worn out parts testing and commissioning of the 30 HP Diesel engine
WCT No.1843/D.122/0 8
20 days
TNEB
ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV Machining of gland box oil guard bolts and Nuts, MP Inner casing studs and nuts and LP HEATER studs and OIL SERVO lock nuts
WCT No.1829/D.82/08 Dt:14.01.2008
20 days
TNEB
6.
Dt:15.02.2008
Dt:22.01.2008
7.
8.
9.
10.
11.
ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV - TG Set machining of 60 nos seal oil pump coupling bolt 2 nos, Flanges with adapter, 5 nos, Casting studs, dummy flanges pins inner thread pins 35 nos Bolt machining etc.
WCT NO. 1828/ D. 86, Dt 14.01.08
ETPS – Mechanical Maintenance - I Circle – Turbine Maintenance division – 110 MW Unit IV Reconditioning of lub oil filters machining of iylam sheet, bolt machining and coupling bolt machining.
WCT NO. 1827/ D. 85, Dt. 14.01.08
ETPS – Mechanical Maintenance - I Circle –Mill Plant division – 110 MW Unit IV - Renewal/ Recondiioning of coal and vapour lines and bends providing additional strenthening plates in coal and vapour line and bends renewal of insulation work during shut down period
WCT NO 1961/ D. 435 Dt 18.04.08
ETPS - CWS Division - Removing, Reconditioning and Refixing of Pinion gear Shaft and assembling of gear box of cws pump No 6
WCT No-2024/D 586/08/Dt 24.06.08
ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates.
WCT No.4930/D.943/0 8 Dt.06.11.2008
20 days
TNEB
20 days
TNEB
20 days
TNEB
20 days
TNEB
30 days
TNEB
IN THE YEAR 2007 12.
ETPS – Mechanical maintenance – I Circle – turbine Maintenance division – 110 MW Unit IV Positioning of Debris filter flab at a time intervals and online removal of debris chocked in the debris filters in 110 MW Unit IV
WCT No.2223/D.55/09
20 days
TNEB
Dt:28.01.2009
SUPPLY ORDERS 1.
2.
3.
4.
Supply of coupling bolt and nuts for cooling water main pumps. LP & HP Flush water pumps Supply of HT studs and nuts for control valves inter connection pipes Supply of stringer steps of JT 5
Supply of SS Mesh oil Strainer
PO NO. 07 S.178 D.1596/ Dt 01.12.07
2 Months
PO NO. 07 S.134 D.1576/ Dt 05.09.07
2 Months
PO NO.2007 S. 161 D. 1463/ Dt 12.11.07
2 Months
PO NO.2007 S. 182 D. 1632/ Dt 13.12.07
2 Months
TNEB
TNEB
TNEB
TNEB
IN THE YEAR 2007 1.
2.
3.
4.
5.
6.
7.
8.
9.
Supply of semi circular door
Supply of Capnut and Thrust block for drum manhole doors in unit iii and iv (110MW) Supply of Bearing and cooling coil for110 mW unit for soft water pump
Supply of main steam stop valve actuator connector with universal coupling for 110MW
PO NO. 2008 S. 71 D. 175/ Dt 05.02.08 PO NO. 2008 S. 06 D. 38 Dt 14.01.08
PO NO. 2008 S. 94 D. 241 Dt 08.02.08 PO NO. 2008 S. 44 D. 257 Dt 17.03.08
Fabrication and supply of modified recirculation flap valve for vapour fans 60 MW with self lubricating
PO NO. 2008 212 D. 367 Dt 23.04.08
Supply of MC Pump bearing and cooling coil
P.O NO. 2008 - S - 90 D - 803/08. Dt 13.05.08
Supply of M.S Fabricated platform grills
P.O.No.2008 275 D - 452/08.Dt 23.05.08
SS guide Roller with Bracket Pin and bush for travelling water
ETPS - CWS Specn No 2238/ PO No 2008 423/D 556/08 /DT 03.07.08
Design fabrication supply and erection of WATER CHAMBER for K1 & K2 Condenser Unit V 110 MW
2 Months
2 Months
2 Months
2 Months
2 Months
2 Months
3 Months
3 Months
TNEB
TNEB
TNEB
TNEB
TNEB
TNEB
TNEB
TNEB
6 Months
IN THE YEAR 2008 1.
2.
Fabrication, Supply errection with supporting and commissioning of silenser for CBD with vent and drain arrangement for unit iv ( 110 MW ) Boiler
P.O.No.2009- 06 D050/09 Dt.17.01.09
Supply of Ignitor guide tube assembly for Unit V 110 MW - boiler filter for unit V 110 MW Boiler
P.O.No.2009- 40 D126/09 Dt.05.01.09
2 Months
2 Months
TNEB
TNEB
OUR VALUED CUSTOMERS : 1.
BHEL – CHENNAI
2.
TAMILNADU ELECTRICITY BOARD
3.
M/s. SKODA EXPORT CHENNAI-600 057
4.
M/s ALSTOM POWER INDIA LTD CHENNAI-600 018
5.
M/s. LARSON TOUBRO LIMITED CHENNAI- 600 057
6.
U-TECH CONSULTANTS & ENGINEERS P LTD CHENNAI-06
7.
FICHTNER Consulting Engineers ( India ) P LTD.
8.
ANDRITZ Separation ( India ) P LTD.
9.
M/s. RADHA ENGINEERING P LTD CHENNAI-600 057
10.
M/s.KUMARAN ENGINEERING WORKS CHENNAI-600 057
PHATO GALLERY RE TUBING OF PLATE HEAT EXCHANGERS FOR UNIT IV 110 MW ETPS
BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS
BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS
TUBE CLEANING FOR AIR PRE HEATER UNIT -60 MW ETPS
RE TUBING OF PLATE HEAT EXCHANGERS UNIT IV 110 MW ETPS
TUBLAR AIR PRE HEATER POOJA WITH SKODA EXPORT OFFICALS
MODIFIED RE CIRCULATION DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
COLD AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS
WATER CHAMBER
MACHINING OF STAY BOLT FOR CONENSER ETPS
OIL GUN SPARES FOR UNIT V 110 MW ETPS
FRONT WATER CHAMBER FOR 110 MW
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
ARM FOR WATER CHAMBER
REAR WATER CHAMBER
BRACKET ASSEMBLY
DURING POOJA FOR COMPLETION OF WATER CHAMBER
OUR WORK SHOP
WATER CHAMBER DOOR FOR UNIT V 110 MW
FABRICATION OF SHED TRESS WORK IN OUR FACTORY
DURING TNEB OFFICAL INSPECTION
DURING HYDRO TEST TNEB OFFICAL INSPECTION
OUR MACHINIRIES
RAW COAL RUN BACK SYATEM FOR CONVEYOR 29
DURING DNV INSPECTION LOW PRESSURE HEAT EXCHANGERS
WATER CHAMBER FOR UNIT V 110 MW
GUILLOTINE GATE SPARES
DURING THE ERECTION OF COAL AND VAPOUR PIPES AND BENDS
MITRE BENDS FOR COAL AND VAPOUR PIPING
MITRE BEND PREPARATION
BEARING COOLING COIL FOR BOILER FEED PUMPS
MANUFACTURING GRILLS FOR ENNORE THERMAL POWER STATION
DURING THE PLATE CUTTING
P.A.FAN LAYOUT MARKING AND INSPECTION WITH TNEB OFFICALS
P.A.FAN LAYOUT CUTTING
P.A.FAN PRE ASSEMBLY INSPECTION WITH TNEB OFFICALS
P.A.FAN CASING
P.A.FAN CASING
P.A.FAN CASING
DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN
DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN
AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FAN
AFTER WELDING SUCTION BRANCH FOR P.A.FAN
DURING FULL ASSEMBLY OF P.A.FAN
DURING FULL ASSEMBLY OF P.A.FAN AND LOYDS INSPECTION GROUP INSPECTING THE ASSEMBLY
AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FA
DURING FULL ASSEMBLY OF P.A.FAN
DURING FULL ASSEMBLY OF P.A.FAN