Railway Report.docx

  • Uploaded by: DHRUV Pune
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Railway Report.docx as PDF for free.

More details

  • Words: 659
  • Pages: 3
Joint Feasibility Report for Proposal No.: CRPA0010 Proposal ID

Reporting Date: 13/03/2019

CRPA0012

Proposal Date

09/01/2019

Gauge

BG

Route

DD BRMT

No. of Tracks

1

Proposed Lines

1

Track Details

Clearance Required With Respect to Rail Level Height Above Rail Level

6525 mm

Lateral Clearance (Left) From Centre of Nearest Track

15310 mm

Lateral Clearance (Right) From 24595 mm Centre of Nearest Track

Road Over Bridge (ROB)

Feasible

Road Under Bridge (RUB)

Not Feasible

Limited Height Subway (LHS)

Not Feasible Division/Railway

Pune / Central Railway Class I- National Highways

Feasibility of Construction

Proposed Road Over Bridge/Road Under Bridge/Limited Height Subway Location Details District/State

Maharashtra

Proposal for

ROB

Road

New

Category of Road

Name of Road

Patas Vasunde Phata and Baramati Bypass

Villages/Towns on Either Side

Baramati

Location/Chainage on the Road Katfal MIDCLC Road Ch 29/0 Rail CH 300/6-7 Nearest City/Town Baramati

Between Railway Stations

DD- BRMT

Major Railway Section

DD- BRMT

Location (on Railway Line)

300 km 600 m TP

No. of Lane(s)

1

29.5 m

Skew Angle (wrt. normal to track)

120

LC No.

20

Class of LC

A

Location of LC

km m 300/600

Average no. of Trains per day

8

Width of Road Existing LC data (If applicable)

TVU / Year of TVU

48920 of 2016

LC Will be closed or not

Any Level Crossing to be closed in lieu of Road Over Bridge/Road Under Bridge/Limited Height Subway

YES NO

Road Traffic Diversion Whether required or not

No

Through Temporary Diversion

No

Through Temporary LC

No

Whether FOB is required to close LC

No

Whether additional RUB is required to close LC

No

OHE

NO

Cables (S&T, DOT, OFC)

No

Cables (Electricals)

NO

Pipe Lines (Water, Severe)

Structures/Equipment

NO

Any Other

No No

13.610 m

Width of Railway land on Right 22.895 m Hand Side from centre of nearest track

Utility Shifting

Railway & Other Land Details Width of Railway land on Left Hand Side from centre of nearest track Centre to Centre distances among tracks

0 m S/L 1700 mm

Availability of land outside railway on Left Hand Side Details of Encroachment if any

NONE

Approach Gradient Left Hand Side (1 in_)

40

Availability of land outside railway on Right Hand Side

1700 mm

Approach Gradient Right Hand 40 Side (1 in_)

Joint Site Inspection Joint Site Inspection Date Proposed as 07/12/2018

Joint Site Inspection Date 08/12/2018 Confirm/Revised as

Actual Date of Joint Site Inspection Done 08/12/2018 Name (Designation) Sponsoring Organization: NHAI Suhas D Chitnis (Project Director) Railway Officials at Joint Site Inspection Engineering P.D.Sonawane (Asstt Divi Engineer C.RLY Daund ) S&T N.S Yadav Sr. Section Engineer ( Work ) C.RLY . Loni Signing of Joint Feasibility Report Is Joint Feasibility Report signed by Sr.DEN/DEN? Is Joint Feasibility Report signed by Sponsoring Organisation?

Yes DEN/N Pune Yes

Remark by Sr.DEN/DEN Span Arrangement for ROB in Railway Portion By CBE No. of Spans in Railway Portion

1

Span arrangement in Railway Land

4200 Note:- From left to right facing in the direction of increasing railway chainage.

Length of viaduct/span on Left Hand side outside railway

24500

No. of GADs applicable for this proposal

1

Length of viaduct/span on Right 24500 Hand side outside railway

Planning & Estimation (P&E) and Way-leave charges Plan and Estimation charges Rs. 5 lakhs deducted from standing deposit MORTH/NHAI to deposit way-leave charges to Railways as Rs.6,000/- per annum for 10 years in advance i.e. Rs. 60,000/P&E Charges, Instrument Details Submitted To

Date

Instrument Details

Date

View GAD, Mou, Compliance of Checklist etc

Date of depositing hard copy of GAD, MoU, Compliance of Checklist etc in CBE's office Signing of GAD, etc by Divisional Officers Date of Examination of GAD by Drawing Office of Sr.DEN/South Date of Signing by Electrical/TRD Date of Signing by S&T Signed & Forwarded to CBE vide letter no. & date Remark Approval of GAD By Chief Bridge Engineer/Central Railway Date of Examination of GAD by Drawing Office of Chief Bridge Engineer/Central Railway Date of Approval Remark

Amount:

Related Documents

Railway
May 2020 18
Railway Pension1
June 2020 10
Railway Ticket
May 2020 7
Railway (ppm)
June 2020 7
Railway Report.docx
November 2019 22
Railway Terminologies
May 2020 23

More Documents from "Oresegun Adedapo"

Rob Cum Flyover.pdf
November 2019 16
Railway Report.docx
November 2019 22
H376943.pdf
May 2020 12
What Is 3g Spectrum
April 2020 7