Satuan No Bahan Btg 1 Dolken Kayu Ø 8-10/400 cm Kg 2 Semen M³ 3 Pasir Halus M³ 4 Batu Pecah 10-15 M³ 5 Kayu 4/6 Kg 6 Paku Biasa 2"-5" 7 Residu Lt 8 Kayu Papan Bengkirai 3/20 M³ 9 Besi Profil Kg 10 Pasir Pasang M³ 11 Seng Plat Lbr Bh Bak Mandi (Bathtube) dengan shower lux Kaca Polos 3 mm M² Kunci Tanam Biasa Bh Plywood 4 mm Lbr Pasir Urug M³ Batu Belah 15/20 cm M³ Bh Batako 15 x 30 x 7 Bh Bak mandi teraso Btg Tiang Pancang ( Mini Pile/ Ready Mix ) uk. П 20x20, 8 D 13 K 350 Batu Pecah 15 - 20 cm M³ Floordrain Bh Bak cuci stainless steel Bh

Rp Rp Rp Rp Rp Rp Rp

Harga (Rp) 8,500.00 1,500.00 115,000.00 350,000.00 1,965,000.00 20,500.00 58,400.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

13,500.00 115,000.00 49,900.00 3,250,000.00 130,000.00 55,000.00 115,000.00 115,000.00 335,000.00 1,600.00 220,000.00 1,410,000.00 335,000.00 55,000.00 500,000.00

Lt Kg Kg Kotak Kotak Kotak Bh

Rp Rp Rp Rp Rp Rp Rp

10,000.00 7,900.00 20,000.00 319,500.00 243,000.00 73,000.00 2,700.00

bh Bh Bh

Rp Rp Rp Rp Rp Rp

27,500.00 18,800.00 5,000.00 90,000.00 18,000.00 139,150.00

Parket Minyak Bekisting Besi Beton polos Kawat Beton Ubin 60x60 cm Ubin 40 x 40 cm Ubin 20X20 cm Plint Ubin 10x30 cm Engsel Pintu Engsel Jendela Door holder Kaca Wireglass 5 mm



Cat Meni

Kg set

Wastafel putih (KIA)

Kg Bh Kg Kg bh

Rp Rp Rp Rp Rp

18,000.00 8,500.00 25,000.00 78,500.00 8,000.00

Pipa PVC 4"

Lbr Bh Ltr Bh Kg 40Kg Bh Bh Btg Btg

Batu Kerikil



Bh Bh Btg Bh Lbr Kotak Kg Kg Bh Lbr Bh Bh 40Kg Roll Kg M1

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,000.00 5,000.00 22,100.00 224,600.00 48,300.00 52,500.00 32,500.00 3,000.00 22,500.00 116,900.00 55,000.00 78,600.00 7,500.00 4,420.00 10,700.00 600.00 42,000.00 74,600.00 6,000.00 31,400.00 2,500,000.00 193,000.00 35,000.00 40,000.00 52,500.00 10,000.00 3,500.00 8,000.00

M2 Kg Kg Bh Bh Titik Bh Bh Bh M Bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

275,000.00 20,000.00 10,000.00 12,000.00 11,625.00 85,000.00 2,275.00 17,550.00 2,100.00 75,000.00 24,000.00 7,000.00

Plamir Roll Kuas Cat Tembok Cat Water Proofing Kuas 3,5" Amplas Kuas 2,5'' Thinner Kloset Duduk Porselen Skrup Gypsum Semen Nat Kran Air Sealm Tape Pipa PVC 1"

Besi Beton Genteng Bubung Palentong Genteng Beton Kayu Profil Paku plafon Gypsum board Ubin Keramik 30x30 cm Semen Warna Paku Beton Septic tank + Resapan Genteng metal Zinc Alume type Roof Nok atas (U) type Prime Roof (110x5x6) cm Nok pinggir (P) type Prima Roof semen putih kasa gypsum Tepung Gypum List profil gypsum lebar sampai 6-10 cm Kaca buram/ kaca es 3mm paku gypsum paku skrup tusuk kontak 2 kutub dengan pembumian (tanam) fitting duduk pasang instalasi / titik Lampu pijar 5watt Saklar Seri IB Sekering Kusen Aluminium Silver

Saklar Double setara Panasonic Kop Skring



Daftar Harga Bahan

No

Bahan

Satuan

Harga (Rp)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Dolken Kayu Ø 8-10/400 cm Semen PC Pasir Halus Pasir Pasang Pasir Urug Batu Belah 15/20 cm Batu Pecah 15 - 20 cm Batu Pecah 10-15 Batu Kerikil Kayu 4/6 Kayu Papan Bengkirai 3/20 Kayu Profil Besi Profil Besi Beton polos Besi Beton Plywood 4 mm Batako 15 x 30 x 7 Tiang Pancang ( Mini Pile/ Ready Mix ) uk. Residu Kawat Beton Ubin 60x60 cm Ubin 40 x 40 cm Ubin 20X20 cm Ubin Keramik 30x30 cm Plint Ubin 10x30 cm Parket Seng Plat Genteng Bubung Palentong Genteng Beton Genteng metal Zinc Alume type Roof Nok atas (U) type Prime Roof (110x5x6) cm Nok pinggir (P) type Prima Roof Gypsum board List profil gypsum lebar sampai 6-10 cm Kaca Polos 3 mm Kaca Wireglass 5 mm Kaca buram/ kaca es 3mm Pipa PVC 1" Pipa PVC 4" Bak Mandi (Bathtube) dengan shower lux Bak mandi teraso Floordrain Bak cuci stainless steel Kloset Duduk Porselen Kran Air Wastafel putih (KIA) Septicktank Biosel kap. 6,00 m3

Btg Zak M³ M³ M³ M³ M³ M³ M³ M³ M³ Btg Kg Kg M³ Lbr Bh Btg Lt Kg Kotak Kotak Kotak Kotak Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,500.00 75,000.00 115,000.00 115,000.00 115,000.00 335,000.00 335,000.00 350,000.00 55,000.00 1,965,000.00 6,000,000.00 10,700.00 13,500.00 7,900.00 78,600.00 115,000.00 1,600.00 1,410,000.00 58,400.00 20,000.00 319,500.00 243,000.00 73,000.00 74,600.00 2,700.00

Lbr Bh Bh Lbr Bh Bh Lbr M1 M² M² M2 Btg Btg Bh Bh Bh Bh Bh Bh set Unit

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

49,900.00 7,500.00 4,420.00 193,000.00 35,000.00 40,000.00 42,000.00 8,000.00 130,000.00 90,000.00 275,000.00 22,500.00 116,900.00 3,250,000.00 220,000.00 55,000.00 500,000.00 224,600.00 32,500.00 139,150.00 2,500,000.00

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82

Engsel Pintu Engsel Jendela Door holder Paku Biasa 2"-5" Paku gypsum Paku skrup Paku Beton Skrup Gypsum Paku plafon Kunci Tanam Biasa Kuas 2,5'' Kuas 3,5" Amplas Thinner Roll Kuas Sealm Tape Semen putih Kasa gypsum Tepung Gypum Semen Warna Semen Nat Minyak Bekisting Cat Tembok Cat Water Proofing Cat Meni Plamir Tusuk kontak 2 kutub dengan pembumian (t Fitting duduk Pasang instalasi / titik Lampu pijar 5watt Saklar Seri IB Sekering Kusen Aluminium Silver Saklar Double setara Panasonic Kop Skring

No 1 2 3 4 5 6 7 8 9 10

Tenaga Pekerja Tukang Batu Tukang Cor Tukang Besi Tukang Gali Tukang Cat Tukang Kayu Tukang Tembok Kepala Tukang Mandor

bh Bh Bh Kg Kg Kg Kg Kg Bh Bh Bh bh Lbr Ltr Bh Bh 40Kg Roll Kg Kg 40Kg Lt Kg Kg Kg Kg Bh Bh Titik Bh Bh Bh M Bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

27,500.00 18,800.00 5,000.00 20,500.00 20,000.00 10,000.00 31,400.00 48,300.00 600.00 55,000.00 5,000.00 8,000.00 3,000.00 22,100.00 8,500.00 3,000.00 52,500.00 10,000.00 3,500.00 6,000.00 52,500.00 10,000.00 25,000.00 78,500.00 18,000.00 18,000.00 12,000.00 11,625.00 85,000.00 2,275.00 17,550.00 2,100.00 75,000.00 24,000.00 7,000.00

Sat Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

Harga 100,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 145,000.00 155,000.00

11 12

Supir Truk Kenek Truk

Oh Oh

Rp Rp

115,000.00 80,000.00

No I

Jenis Pekerjaan

Sat

Indeks

Oh

0.400

Oh

0.020

Dolken Kayu Ø 8-10/400 cm

Btg

1.250

Semen PC

Zak

5.000

Pasir Halus



0.005

Batu Pecah 10-15



0.009

Kayu 4/6



0.072

Paku Biasa 2"-5"

Kg

0.060

Residu

Lt

0.400

Tukang Kayu

Oh

0.200

Pekerja

Oh

0.400

Kepala Tukang

Oh

0.020

Mandor

Oh

0.020



0.120

Paku Biasa 2"-5"

Kg

0.020

Kayu Papan



0.007

Tukang Kayu

Oh

0.100

Pekerja

Oh

0.100

Kepala Tukang

Oh

0.010

Mandor

Oh

0.005

Kayu Meranti

Btg

0.035

Paku Biasa 2"-5"

Kg

0.600

PEKERJAAN PERSIAPAN A. Pembersihan Lahan (m²) Tenaga Pekerja Mandor Sub Total B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹) Bahan

Tenaga

Sub Total C. Memasang Bouwplank (m¹) Bahan Kayu 4/6

Tenaga

Sub Total D. Memasang Papan Nama Proyek 80x120 cm (Bh) Bahan

Seng Lembaran 90 cm



1.400

Batu Pecah 10-15



0.041

Semen PC

Zak

16.800

Pasir Halus



0.027

Tukang Kayu

Oh

1.000

Tukang Batu

Oh

0.018

Tukang Cat

Oh

1.000

Pekerja

Oh

2.100

Oh

1.005

Pekerja

Oh

0.400

Mandor

Oh

0.040

Oh

0.192

Oh

0.019

Tenaga

Mandor Sub Total

II

PEKERJAAN TANAH A. Galian Tanah Biasa sedalam 1 m (m³) Tenaga

Sub Total B. Urugan Kembali (m³) Tenaga Pekerja Mandor Sub Total C. Urugan Pasir Bawah Pondasi (m³)

Bahan Pasir Urug



1.200

Pekerja

Oh

0.300

Mandor

Oh

0.010

Tenaga

Sub Total

III

PEKERJAAN PONDASI D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³) Bahan Batu Belah 15/20 cm



1.100

Semen Portland

Kg

136.000

Pasir Pasang



0.544

Pekerja

Oh

1.500

Tukang Batu

Oh

0.600

Kepala Tukang

Oh

0.060

Mandor

Oh

0.075

Batako press 15x30x7 cm

Bh

70.000

Semen PC

Kg

11.500

Pasir Pasang



0.043

Pekerja

Oh

0.320

Tukang Batu

Oh

0.100

Kepala Tukang

Oh

0.010

Oh

0.015

Batako press 15x30x7 cm

Bh

70.000

Semen PC

Kg

4.500

Pasir Pasang



0.050

Pekerja

Oh

0.320

Tukang Batu

Oh

0.100

Kepala Tukang

Oh

0.010

Oh

0.015

Kg

10.800

Tenaga

Sub Total

IV

PEKERJAAN DINDING A. Pasangan Tembok ½ Batako 1Pc:4Ps (Trasraam) (m²) Bahan

Tenaga

Mandor Sub Total B. Pasangan Tembok ½ Batako 1Pc:3Kp:10Ps (m²) Bahan

Tenaga

Mandor Sub Total

PEKERJAAN PLESTERAN DINDING V

A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm Bahan Semen Portland

Pasir Pasang



0.026

Pekerja

Oh

0.250

Tukang Batu

Oh

0.200

Kepala Tukang

Oh

0.020

Mandor

Oh

0.013

Semen Portland

Kg

1.840

Pasir Pasang



0.014

Pekerja

Oh

0.200

Tukang Batu

Oh

0.150

Kepala Tukang

Oh

0.015

Mandor

Oh

0.010

Tenaga

Sub Total B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm Bahan

Tenaga

Sub Total

Sub Total

PEKERJAAN BETON VII

A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³) Bahan Kayu Terentang



0.270

Paku Biasa 2"-5"

Kg

2.000

Minyak Bekisting

Lt

0.600

Besi Beton polos

Kg

200.000

Kawat Beton

Kg

3.000

Semen Portland

Kg

323.000

Pasir Beton



0.520

Koral Beton



0.780

Pekerja

Oh

4.850

Tukang Batu

Oh

0.350

Tukang Kayu

Oh

1.560

Tukang Besi

Oh

1.400

Kepala Tukang

Oh

0.331

Mandor

Oh

0.170

Tenaga

Sub Total

B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³) Bahan Kayu Terentang



0.400

Paku Biasa 2"-5"

Kg

4.000

Minyak Bekisting

Lt

2.000

Besi Beton polos

Kg

300.000

Kawat Beton

Kg

4.500

Semen Portland

Kg

323.000

Pasir Beton



0.520

Koral Beton



0.780

Kayu Borneo Balok



0.150

Plywood 9 mm

Lbr

3.500

Dolken Kayu Ø 8-10/400 cm

Btg

20.000

Pekerja

Oh

7.300

Tukang Batu

Oh

0.350

Tukang Kayu

Oh

3.300

Tukang Besi

Oh

2.100

Kepala Tukang

Oh

0.570

Mandor

Oh

0.250

Kayu Albasiah



0.003

Paku Biasa 2"-5"

Kg

0.020

Besi Beton polos

Kg

3.600

Kawat Beton

Kg

0.050

Semen Portland

Kg

5.500

Pasir Beton



0.009

Koral Beton



0.015

Pekerja

Oh

0.100

Tukang Batu

Oh

0.033

Tukang Kayu

Oh

0.033

Tukang Besi

Oh

0.033

Kepala Tukang

Oh

0.010

Mandor

Oh

0.005

Kayu Albasiah



0.003

Paku Biasa 2"-5"

Kg

0.020

Besi Beton polos

Lt

3.600

Kawat Beton

Kg

0.050

Semen Portland

Kg

5.500

Pasir Beton

Kg

0.009

Koral Beton



0.015

Tenaga

Sub Total C. Membuat Ring Balok Beton Bertulang (10X15cm) (m³) Bahan

Tenaga

Sub Total D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³) Bahan

Tenaga

Pekerja

Oh

0.100

Tukang Batu

Oh

0.033

Tukang Kayu

Oh

0.033

Tukang Besi

Oh

0.033

Kepala Tukang

Oh

0.010

Mandor

Oh

0.005

Semen Portland

Kg

232.000

Pasir Beton



0.520

Koral Beton



0.780

Pekerja

Oh

1.650

Tukang Batu

Oh

0.250

Kepala Tukang

Oh

0.025

Mandor

Oh

0.080

Besi Beton (Polos/Ulir)

Kg

1.050

Kawat Beton

Kg

0.015

Pekerja

Oh

0.007

Tukang Besi

Oh

0.007

Kepala Tukang

Oh

0.001

Oh

0.000

Kayu Terentang



0.040

Paku Biasa 2"-5"

Kg

0.400

Minyak Bekisting

Lt

0.200

Balok Kayu borneo



0.015

Plywood tebal 9 mm

Lbr

0.350

Dolken Kayu galam Ø 8-10/4 m

Btg

6.000

Pekerja

Oh

0.320

Tukang kayu

Oh

0.330

Kepala Tukang

Oh

0.033

Mandor

Oh

0.006

Bahan Genteng Bubung Palentong

Bh

5.000

Semen Portland

Kg

8.000

Sub Total E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³) Bahan

Tenaga

Sub Total F. Pembesian Besi Polos dan Ulir plat beton(Kg) Bahan

Tenaga

Mandor Sub Total G. Pasang Bekisting untuk Plat Beton (m²) Bahan

Tenaga

Sub Total

PEKERJAAN PENUTUP ATAP VIII

A. Pasang Genteng Bubung Palentong (m¹)

Pasir Pasang

M3

0.032

Pekerja

Oh

0.400

Tukang Kayu

Oh

0.200

Kepala Tukang

Oh

0.020

Mandor

Oh

0.002

Bahan Genteng Beton

Bh

11.000

Paku Biasa 2" - 5"

Kg

0.030

Pekerja

Oh

0.200

Tukang Kayu

Oh

0.100

Kepala Tukang

Oh

0.010

Mandor

Oh

0.010

Kayu Profil



1.100

Paku plafon

Kg

0.010

Pekerja

Oh

0.050

Tukang Kayu

Oh

0.050

Kepala Tukang

Oh

0.005

Mandor

Oh

0.003

Pelat Asbes tebal 6mm



1.100

Paku plafon

Kg

0.010

Pekerja

Oh

0.030

Tukang Kayu

Oh

0.070

Kepala Tukang

Oh

0.007

Oh

0.002



1.200

Pekerja

Oh

0.300

Tukang Gali

Oh

0.000

Kepala Tukang

Oh

0.000

Tenaga

Sub Total B. Pasang Atap Genteng Beton (m²)

Tenaga

Sub Total

PEKERJAAN PLAFON IX

A. Pasang List Langit-langit Kayu Profil (m¹) Bahan

Tenaga

Sub Total B. Langit-langit Asbes (m²) Bahan

Tenaga

Mandor Sub Total

PEKERJAAN PENUTUP LANTAI DAN DINDING X

A. Pekerjaan Urug Pasir Bawah Lantai (m³) Bahan Pasir Urug Tenaga

Mandor

Oh

0.010

Ubin Keramik 33X33 cm

Bh

10.000

Semen Portland

Kg

11.380

Pasir Pasang



0.042

Semen Warna

Kg

1.500

Pekerja

Oh

0.620

Tukang Batu

Oh

0.350

Kepala Tukang

Oh

0.035

Mandor

Oh

0.030

Ubin Keramik Artistik 10X20 cm

Bh

50.000

Semen Portland

Kg

11.380

Pasir Pasang



0.042

Semen Warna

Kg

1.500

Pekerja

Oh

0.620

Tukang Batu

Oh

0.350

Kepala Tukang

Oh

0.035

Mandor

Oh

0.030

Ubin Abu-Abu 20X20 cm

Bh

26.500

Semen Portland

Kg

10.400

Pasir Pasang



0.014

Pekerja

Oh

0.270

Tukang Batu

Oh

0.130

Kepala Tukang

Oh

0.013

Mandor

Oh

0.014

Plint Ubin 10x30 cm

Bh

3.530

Semen Portland

Kg

1.560

Pasir Pasang



0.003

Pekerja

Oh

0.060

Tukang Batu

Oh

0.030

Kepala Tukang

Oh

0.003

Mandor

Oh

0.003

Sub Total B. Pasang Lantai Keramik 33X33 cm (m²) Bahan

Tenaga

Sub Total C. Pasang Lantai Keramik 10X20 cm (m²) Bahan

Tenaga

Sub Total D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²) Bahan

Tenaga

Sub Total E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²) Bahan

Tenaga

Sub Total

PEKERJAAN KUNCI DAN KACA XI

A. Pasang Kunci Tanam Biasa (Bh) Bahan Kunci Tanam Biasa

Bh

1.000

Pekerja

Oh

0.010

Tukang Kayu

Oh

0.500

Kepala Tukang

Oh

0.010

Mandor

Oh

0.005

Bh

1.000

Pekerja

Oh

0.005

Tukang Kayu

Oh

0.500

Kepala Tukang

Oh

0.005

Oh

0.000

Bh

1.000

Pekerja

Oh

0.010

Tukang Kayu

Oh

0.100

Kepala Tukang

Oh

0.010

Mandor

Oh

0.001

Bh

1.000

Pekerja

Oh

0.050

Tukang Kayu

Oh

0.500

Kepala Tukang

Oh

0.050

Mandor

Oh

0.003



1.100

Pekerja

Oh

0.015

Tukang Kayu

Oh

0.150

Kepala Tukang

Oh

0.015

Oh

0.001

Tenaga

Sub Total B. Pasang Engsel pintu (Bh) Bahan Engsel Pintu Tenaga

Mandor Sub Total C. Pasang Engsel Jendela Kupu-kupu (Bh) Bahan Engsel Jendela Tenaga

Sub Total D. Pasang Pegangan Pintu/Door holder (Bh) Bahan Door holder Tenaga

Sub Total E. Pasang Kaca tebal 3 mm (m²) Bahan Kaca tebal 3 mm Tenaga

Mandor Sub Total F. Pasang Kaca wireglass tebal 5 mm (m²)

Bahan Kaca Wireglass 5 mm



1.100

Pekerja

Oh

0.015

Tukang Kayu

Oh

0.150

Kepala Tukang

Oh

0.015

Oh

0.001

Cat Meni

Kg

0.200

Kertas Gosok

Lbr

0.400

Plamir

Kg

0.150

Cat dasar

Kg

0.170

Cat penutup 2 kali

Kg

0.260

Minyak Cat

Ltr

0.150

Kuas 3"

Bh

0.050

Pekerja

Oh

0.070

Tukang Cat

Oh

0.009

Kepala Tukang

Oh

0.006

Mandor

Oh

0.003

Kg

0.100

Tenaga

Mandor Sub Total

PEKERJAAN PENGECATAN XII

A. Pengecatan Kayu (m²) Bahan

Tenaga

Sub Total B. Pengecatan Tembok Baru (m²) Bahan Plamir Kertas gosok

LBR

1.000

Cat Dasar

Kg

0.100

Cat Penutup 2x

Kg

0.260

Pekerja

Oh

0.020

Tukang Cat

Oh

0.063

Kepala Tukang

Oh

0.006

Mandor

Oh

0.003

LS

1.000

Bh

1.000

Bh

1.000

Bh

1.000

Tenaga

Sub Total

PEKERJAAN INSTALASI LISTRIK XIII

A. Penyambungan Listrik PLN 2400 watt (LS)

ALS

Penyambungan PLN B. Pemasangan Lampu SL 25 Watt (Bh)

ALS

Lampu SL 25 Watt C. Pemasangan Sekering Group (Bh)

ALS

Sekering Group D. Pemasangan Stop Kontak (Bh)

ALS

Stop kontak E. Pemasangan Sakelar Tunggal (Bh)

ALS

Sakelar Tunggal

Bh

1.000

Bh

1.000

F. Pemasangan Sakelar Ganda (Bh) ALS

Sakelar Ganda

PEKERJAAN SANITASI XIV PERWALI No 16 Tahun 2017

A. Memasang Kloset Jongkok Porselen (Bh) Bahan Kloset Jongkok Porselen

Bh

1.000

Semen Portland

Kg

6.000

Pasir Pasang

M3

0.010

Tenaga Pekerja

Oh

1.000

Tukang Batu

Oh

1.500

Kepala Tukang

Oh

1.500

Mandor

Oh

0.160

Bahan Batu Bata

Bh

250.000

Semen Portland

Kg

120.000

Sub Total B. Memasang Bak Mandi Bata Bata, Vol 0.3 M³ (Bh) PERWALI No 16 Tahun 2017

Pasir Pasang

M

3

0.300

Porselen (11x11) Cm

Bh

360.000

Semen Nat

Kg

6.000

Tenaga Pekerja

Oh

6.000

Tukang Batu

Oh

3.000

Kepala Tukang

Oh

0.300

Mandor

Oh

0.300

Sub Total C. Memasang Kran Air Ø ½" atau ¾" (Bh) PERWALI No 16 Tahun 2017

Bahan Kran Air

bh

1.000

Sealm Tape

Bh

0.500

Tenaga Pekerja

Oh

0.010

Tukang Batu

Oh

0.100

Kepala Tukang

Oh

0.010

Mandor

Oh

0.005

Sub Total D. Memasang pipa PVC tipe AW Ø 1" (m¹) PERWALI No 16 Tahun 2017

Bahan Pipa PVC



Perlengkapan 35 % harga pipa

1.200 0.350

Tenaga Pekerja

Oh

0.081

Tukang Batu

Oh

0.135

Kepala Tukang

Oh

0.014

Mandor

Oh

0.004

Sub Total E. Memasang pipa PVC tipe AW Ø 4" (m¹) PERWALI No 16 Tahun 2017

Bahan pipa pvc



Perlengkapan 35 % harga pipa

1.200 0.350

Tenaga Pekerja

Oh

0.081

Tukang Batu

Oh

0.135

Kepala Tukang

Oh

0.014

Mandor

Oh

0.004

Sub Total F. Memasang Bak kontrol Pas batako press 40x20 (Bh) PERWALI No 16 Tahun 2017

Bahan batako press 40x20

M3

0.250

Semen Portland

Kg

77.000

Pasir Pasang

M

3

0.130

Batu kerikil

M

3

0.020

beton k125

M3

0.090

Tenaga Pekerja

Oh

1.420

Tukang Batu

Oh

0.473

Kepala Tukang

Oh

0.047

Mandor

Oh

0.071

Sub Total

Harga Satuan (Rp) Bahan

Upah

100,000.00 155,000.00

Total Harga Satuan (Rp)

40,000.00 3,100.00 43,100.00

8,500.00

10,625.00

75,000.00

375,000.00

115,000.00

575.00

350,000.00

3,150.00

1,965,000.00

141,480.00

20,500.00

1,230.00

58,400.00

23,360.00 120,000.00

24,000.00

100,000.00

40,000.00

145,000.00

2,900.00

155,000.00

3,100.00 625,420.00

1,965,000.00

235,800.00

20,500.00

410.00

6,000,000.00

42,000.00 120,000.00

12,000.00

100,000.00

10,000.00

145,000.00

1,450.00

155,000.00

775.00 302,435.00

1,687,000.00

59,045.00

20,500.00

12,300.00

49,900.00

69,860.00

350,000.00

14,350.00

75,000.00

1,260,000.00

115,000.00

3,105.00

120,000.00

120,000.00

120,000.00

2,160.00

120,000.00

120,000.00

100,000.00

210,000.00

155,000.00

155,775.00 2,026,595.00