Satuan No Bahan Btg 1 Dolken Kayu Ø 8-10/400 cm Kg 2 Semen M³ 3 Pasir Halus M³ 4 Batu Pecah 10-15 M³ 5 Kayu 4/6 Kg 6 Paku Biasa 2"-5" 7 Residu Lt 8 Kayu Papan Bengkirai 3/20 M³ 9 Besi Profil Kg 10 Pasir Pasang M³ 11 Seng Plat Lbr Bh Bak Mandi (Bathtube) dengan shower lux Kaca Polos 3 mm M² Kunci Tanam Biasa Bh Plywood 4 mm Lbr Pasir Urug M³ Batu Belah 15/20 cm M³ Bh Batako 15 x 30 x 7 Bh Bak mandi teraso Btg Tiang Pancang ( Mini Pile/ Ready Mix ) uk. П 20x20, 8 D 13 K 350 Batu Pecah 15 - 20 cm M³ Floordrain Bh Bak cuci stainless steel Bh
Rp Rp Rp Rp Rp Rp Rp
Harga (Rp) 8,500.00 1,500.00 115,000.00 350,000.00 1,965,000.00 20,500.00 58,400.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
13,500.00 115,000.00 49,900.00 3,250,000.00 130,000.00 55,000.00 115,000.00 115,000.00 335,000.00 1,600.00 220,000.00 1,410,000.00 335,000.00 55,000.00 500,000.00
Lt Kg Kg Kotak Kotak Kotak Bh
Rp Rp Rp Rp Rp Rp Rp
10,000.00 7,900.00 20,000.00 319,500.00 243,000.00 73,000.00 2,700.00
bh Bh Bh
Rp Rp Rp Rp Rp Rp
27,500.00 18,800.00 5,000.00 90,000.00 18,000.00 139,150.00
Parket Minyak Bekisting Besi Beton polos Kawat Beton Ubin 60x60 cm Ubin 40 x 40 cm Ubin 20X20 cm Plint Ubin 10x30 cm Engsel Pintu Engsel Jendela Door holder Kaca Wireglass 5 mm
M²
Cat Meni
Kg set
Wastafel putih (KIA)
Kg Bh Kg Kg bh
Rp Rp Rp Rp Rp
18,000.00 8,500.00 25,000.00 78,500.00 8,000.00
Pipa PVC 4"
Lbr Bh Ltr Bh Kg 40Kg Bh Bh Btg Btg
Batu Kerikil
M³
Bh Bh Btg Bh Lbr Kotak Kg Kg Bh Lbr Bh Bh 40Kg Roll Kg M1
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,000.00 5,000.00 22,100.00 224,600.00 48,300.00 52,500.00 32,500.00 3,000.00 22,500.00 116,900.00 55,000.00 78,600.00 7,500.00 4,420.00 10,700.00 600.00 42,000.00 74,600.00 6,000.00 31,400.00 2,500,000.00 193,000.00 35,000.00 40,000.00 52,500.00 10,000.00 3,500.00 8,000.00
M2 Kg Kg Bh Bh Titik Bh Bh Bh M Bh Bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
275,000.00 20,000.00 10,000.00 12,000.00 11,625.00 85,000.00 2,275.00 17,550.00 2,100.00 75,000.00 24,000.00 7,000.00
Plamir Roll Kuas Cat Tembok Cat Water Proofing Kuas 3,5" Amplas Kuas 2,5'' Thinner Kloset Duduk Porselen Skrup Gypsum Semen Nat Kran Air Sealm Tape Pipa PVC 1"
Besi Beton Genteng Bubung Palentong Genteng Beton Kayu Profil Paku plafon Gypsum board Ubin Keramik 30x30 cm Semen Warna Paku Beton Septic tank + Resapan Genteng metal Zinc Alume type Roof Nok atas (U) type Prime Roof (110x5x6) cm Nok pinggir (P) type Prima Roof semen putih kasa gypsum Tepung Gypum List profil gypsum lebar sampai 6-10 cm Kaca buram/ kaca es 3mm paku gypsum paku skrup tusuk kontak 2 kutub dengan pembumian (tanam) fitting duduk pasang instalasi / titik Lampu pijar 5watt Saklar Seri IB Sekering Kusen Aluminium Silver
Saklar Double setara Panasonic Kop Skring
M³
Daftar Harga Bahan
No
Bahan
Satuan
Harga (Rp)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Dolken Kayu Ø 8-10/400 cm Semen PC Pasir Halus Pasir Pasang Pasir Urug Batu Belah 15/20 cm Batu Pecah 15 - 20 cm Batu Pecah 10-15 Batu Kerikil Kayu 4/6 Kayu Papan Bengkirai 3/20 Kayu Profil Besi Profil Besi Beton polos Besi Beton Plywood 4 mm Batako 15 x 30 x 7 Tiang Pancang ( Mini Pile/ Ready Mix ) uk. Residu Kawat Beton Ubin 60x60 cm Ubin 40 x 40 cm Ubin 20X20 cm Ubin Keramik 30x30 cm Plint Ubin 10x30 cm Parket Seng Plat Genteng Bubung Palentong Genteng Beton Genteng metal Zinc Alume type Roof Nok atas (U) type Prime Roof (110x5x6) cm Nok pinggir (P) type Prima Roof Gypsum board List profil gypsum lebar sampai 6-10 cm Kaca Polos 3 mm Kaca Wireglass 5 mm Kaca buram/ kaca es 3mm Pipa PVC 1" Pipa PVC 4" Bak Mandi (Bathtube) dengan shower lux Bak mandi teraso Floordrain Bak cuci stainless steel Kloset Duduk Porselen Kran Air Wastafel putih (KIA) Septicktank Biosel kap. 6,00 m3
Btg Zak M³ M³ M³ M³ M³ M³ M³ M³ M³ Btg Kg Kg M³ Lbr Bh Btg Lt Kg Kotak Kotak Kotak Kotak Bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
8,500.00 75,000.00 115,000.00 115,000.00 115,000.00 335,000.00 335,000.00 350,000.00 55,000.00 1,965,000.00 6,000,000.00 10,700.00 13,500.00 7,900.00 78,600.00 115,000.00 1,600.00 1,410,000.00 58,400.00 20,000.00 319,500.00 243,000.00 73,000.00 74,600.00 2,700.00
Lbr Bh Bh Lbr Bh Bh Lbr M1 M² M² M2 Btg Btg Bh Bh Bh Bh Bh Bh set Unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
49,900.00 7,500.00 4,420.00 193,000.00 35,000.00 40,000.00 42,000.00 8,000.00 130,000.00 90,000.00 275,000.00 22,500.00 116,900.00 3,250,000.00 220,000.00 55,000.00 500,000.00 224,600.00 32,500.00 139,150.00 2,500,000.00
48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82
Engsel Pintu Engsel Jendela Door holder Paku Biasa 2"-5" Paku gypsum Paku skrup Paku Beton Skrup Gypsum Paku plafon Kunci Tanam Biasa Kuas 2,5'' Kuas 3,5" Amplas Thinner Roll Kuas Sealm Tape Semen putih Kasa gypsum Tepung Gypum Semen Warna Semen Nat Minyak Bekisting Cat Tembok Cat Water Proofing Cat Meni Plamir Tusuk kontak 2 kutub dengan pembumian (t Fitting duduk Pasang instalasi / titik Lampu pijar 5watt Saklar Seri IB Sekering Kusen Aluminium Silver Saklar Double setara Panasonic Kop Skring
No 1 2 3 4 5 6 7 8 9 10
Tenaga Pekerja Tukang Batu Tukang Cor Tukang Besi Tukang Gali Tukang Cat Tukang Kayu Tukang Tembok Kepala Tukang Mandor
bh Bh Bh Kg Kg Kg Kg Kg Bh Bh Bh bh Lbr Ltr Bh Bh 40Kg Roll Kg Kg 40Kg Lt Kg Kg Kg Kg Bh Bh Titik Bh Bh Bh M Bh Bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
27,500.00 18,800.00 5,000.00 20,500.00 20,000.00 10,000.00 31,400.00 48,300.00 600.00 55,000.00 5,000.00 8,000.00 3,000.00 22,100.00 8,500.00 3,000.00 52,500.00 10,000.00 3,500.00 6,000.00 52,500.00 10,000.00 25,000.00 78,500.00 18,000.00 18,000.00 12,000.00 11,625.00 85,000.00 2,275.00 17,550.00 2,100.00 75,000.00 24,000.00 7,000.00
Sat Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Harga 100,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 145,000.00 155,000.00
11 12
Supir Truk Kenek Truk
Oh Oh
Rp Rp
115,000.00 80,000.00
No I
Jenis Pekerjaan
Sat
Indeks
Oh
0.400
Oh
0.020
Dolken Kayu Ø 8-10/400 cm
Btg
1.250
Semen PC
Zak
5.000
Pasir Halus
M³
0.005
Batu Pecah 10-15
M³
0.009
Kayu 4/6
M³
0.072
Paku Biasa 2"-5"
Kg
0.060
Residu
Lt
0.400
Tukang Kayu
Oh
0.200
Pekerja
Oh
0.400
Kepala Tukang
Oh
0.020
Mandor
Oh
0.020
M³
0.120
Paku Biasa 2"-5"
Kg
0.020
Kayu Papan
M³
0.007
Tukang Kayu
Oh
0.100
Pekerja
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Kayu Meranti
Btg
0.035
Paku Biasa 2"-5"
Kg
0.600
PEKERJAAN PERSIAPAN A. Pembersihan Lahan (m²) Tenaga Pekerja Mandor Sub Total B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹) Bahan
Tenaga
Sub Total C. Memasang Bouwplank (m¹) Bahan Kayu 4/6
Tenaga
Sub Total D. Memasang Papan Nama Proyek 80x120 cm (Bh) Bahan
Seng Lembaran 90 cm
M¹
1.400
Batu Pecah 10-15
M³
0.041
Semen PC
Zak
16.800
Pasir Halus
M³
0.027
Tukang Kayu
Oh
1.000
Tukang Batu
Oh
0.018
Tukang Cat
Oh
1.000
Pekerja
Oh
2.100
Oh
1.005
Pekerja
Oh
0.400
Mandor
Oh
0.040
Oh
0.192
Oh
0.019
Tenaga
Mandor Sub Total
II
PEKERJAAN TANAH A. Galian Tanah Biasa sedalam 1 m (m³) Tenaga
Sub Total B. Urugan Kembali (m³) Tenaga Pekerja Mandor Sub Total C. Urugan Pasir Bawah Pondasi (m³)
Bahan Pasir Urug
M³
1.200
Pekerja
Oh
0.300
Mandor
Oh
0.010
Tenaga
Sub Total
III
PEKERJAAN PONDASI D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³) Bahan Batu Belah 15/20 cm
M³
1.100
Semen Portland
Kg
136.000
Pasir Pasang
M³
0.544
Pekerja
Oh
1.500
Tukang Batu
Oh
0.600
Kepala Tukang
Oh
0.060
Mandor
Oh
0.075
Batako press 15x30x7 cm
Bh
70.000
Semen PC
Kg
11.500
Pasir Pasang
M³
0.043
Pekerja
Oh
0.320
Tukang Batu
Oh
0.100
Kepala Tukang
Oh
0.010
Oh
0.015
Batako press 15x30x7 cm
Bh
70.000
Semen PC
Kg
4.500
Pasir Pasang
M³
0.050
Pekerja
Oh
0.320
Tukang Batu
Oh
0.100
Kepala Tukang
Oh
0.010
Oh
0.015
Kg
10.800
Tenaga
Sub Total
IV
PEKERJAAN DINDING A. Pasangan Tembok ½ Batako 1Pc:4Ps (Trasraam) (m²) Bahan
Tenaga
Mandor Sub Total B. Pasangan Tembok ½ Batako 1Pc:3Kp:10Ps (m²) Bahan
Tenaga
Mandor Sub Total
PEKERJAAN PLESTERAN DINDING V
A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm Bahan Semen Portland
Pasir Pasang
M³
0.026
Pekerja
Oh
0.250
Tukang Batu
Oh
0.200
Kepala Tukang
Oh
0.020
Mandor
Oh
0.013
Semen Portland
Kg
1.840
Pasir Pasang
M³
0.014
Pekerja
Oh
0.200
Tukang Batu
Oh
0.150
Kepala Tukang
Oh
0.015
Mandor
Oh
0.010
Tenaga
Sub Total B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm Bahan
Tenaga
Sub Total
Sub Total
PEKERJAAN BETON VII
A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³) Bahan Kayu Terentang
M³
0.270
Paku Biasa 2"-5"
Kg
2.000
Minyak Bekisting
Lt
0.600
Besi Beton polos
Kg
200.000
Kawat Beton
Kg
3.000
Semen Portland
Kg
323.000
Pasir Beton
M³
0.520
Koral Beton
M³
0.780
Pekerja
Oh
4.850
Tukang Batu
Oh
0.350
Tukang Kayu
Oh
1.560
Tukang Besi
Oh
1.400
Kepala Tukang
Oh
0.331
Mandor
Oh
0.170
Tenaga
Sub Total
B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³) Bahan Kayu Terentang
M³
0.400
Paku Biasa 2"-5"
Kg
4.000
Minyak Bekisting
Lt
2.000
Besi Beton polos
Kg
300.000
Kawat Beton
Kg
4.500
Semen Portland
Kg
323.000
Pasir Beton
M³
0.520
Koral Beton
M³
0.780
Kayu Borneo Balok
M³
0.150
Plywood 9 mm
Lbr
3.500
Dolken Kayu Ø 8-10/400 cm
Btg
20.000
Pekerja
Oh
7.300
Tukang Batu
Oh
0.350
Tukang Kayu
Oh
3.300
Tukang Besi
Oh
2.100
Kepala Tukang
Oh
0.570
Mandor
Oh
0.250
Kayu Albasiah
M³
0.003
Paku Biasa 2"-5"
Kg
0.020
Besi Beton polos
Kg
3.600
Kawat Beton
Kg
0.050
Semen Portland
Kg
5.500
Pasir Beton
M³
0.009
Koral Beton
M³
0.015
Pekerja
Oh
0.100
Tukang Batu
Oh
0.033
Tukang Kayu
Oh
0.033
Tukang Besi
Oh
0.033
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Kayu Albasiah
M³
0.003
Paku Biasa 2"-5"
Kg
0.020
Besi Beton polos
Lt
3.600
Kawat Beton
Kg
0.050
Semen Portland
Kg
5.500
Pasir Beton
Kg
0.009
Koral Beton
M³
0.015
Tenaga
Sub Total C. Membuat Ring Balok Beton Bertulang (10X15cm) (m³) Bahan
Tenaga
Sub Total D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³) Bahan
Tenaga
Pekerja
Oh
0.100
Tukang Batu
Oh
0.033
Tukang Kayu
Oh
0.033
Tukang Besi
Oh
0.033
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Semen Portland
Kg
232.000
Pasir Beton
M³
0.520
Koral Beton
M³
0.780
Pekerja
Oh
1.650
Tukang Batu
Oh
0.250
Kepala Tukang
Oh
0.025
Mandor
Oh
0.080
Besi Beton (Polos/Ulir)
Kg
1.050
Kawat Beton
Kg
0.015
Pekerja
Oh
0.007
Tukang Besi
Oh
0.007
Kepala Tukang
Oh
0.001
Oh
0.000
Kayu Terentang
M³
0.040
Paku Biasa 2"-5"
Kg
0.400
Minyak Bekisting
Lt
0.200
Balok Kayu borneo
M³
0.015
Plywood tebal 9 mm
Lbr
0.350
Dolken Kayu galam Ø 8-10/4 m
Btg
6.000
Pekerja
Oh
0.320
Tukang kayu
Oh
0.330
Kepala Tukang
Oh
0.033
Mandor
Oh
0.006
Bahan Genteng Bubung Palentong
Bh
5.000
Semen Portland
Kg
8.000
Sub Total E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³) Bahan
Tenaga
Sub Total F. Pembesian Besi Polos dan Ulir plat beton(Kg) Bahan
Tenaga
Mandor Sub Total G. Pasang Bekisting untuk Plat Beton (m²) Bahan
Tenaga
Sub Total
PEKERJAAN PENUTUP ATAP VIII
A. Pasang Genteng Bubung Palentong (m¹)
Pasir Pasang
M3
0.032
Pekerja
Oh
0.400
Tukang Kayu
Oh
0.200
Kepala Tukang
Oh
0.020
Mandor
Oh
0.002
Bahan Genteng Beton
Bh
11.000
Paku Biasa 2" - 5"
Kg
0.030
Pekerja
Oh
0.200
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.010
Kayu Profil
M¹
1.100
Paku plafon
Kg
0.010
Pekerja
Oh
0.050
Tukang Kayu
Oh
0.050
Kepala Tukang
Oh
0.005
Mandor
Oh
0.003
Pelat Asbes tebal 6mm
M²
1.100
Paku plafon
Kg
0.010
Pekerja
Oh
0.030
Tukang Kayu
Oh
0.070
Kepala Tukang
Oh
0.007
Oh
0.002
M³
1.200
Pekerja
Oh
0.300
Tukang Gali
Oh
0.000
Kepala Tukang
Oh
0.000
Tenaga
Sub Total B. Pasang Atap Genteng Beton (m²)
Tenaga
Sub Total
PEKERJAAN PLAFON IX
A. Pasang List Langit-langit Kayu Profil (m¹) Bahan
Tenaga
Sub Total B. Langit-langit Asbes (m²) Bahan
Tenaga
Mandor Sub Total
PEKERJAAN PENUTUP LANTAI DAN DINDING X
A. Pekerjaan Urug Pasir Bawah Lantai (m³) Bahan Pasir Urug Tenaga
Mandor
Oh
0.010
Ubin Keramik 33X33 cm
Bh
10.000
Semen Portland
Kg
11.380
Pasir Pasang
M³
0.042
Semen Warna
Kg
1.500
Pekerja
Oh
0.620
Tukang Batu
Oh
0.350
Kepala Tukang
Oh
0.035
Mandor
Oh
0.030
Ubin Keramik Artistik 10X20 cm
Bh
50.000
Semen Portland
Kg
11.380
Pasir Pasang
M³
0.042
Semen Warna
Kg
1.500
Pekerja
Oh
0.620
Tukang Batu
Oh
0.350
Kepala Tukang
Oh
0.035
Mandor
Oh
0.030
Ubin Abu-Abu 20X20 cm
Bh
26.500
Semen Portland
Kg
10.400
Pasir Pasang
M³
0.014
Pekerja
Oh
0.270
Tukang Batu
Oh
0.130
Kepala Tukang
Oh
0.013
Mandor
Oh
0.014
Plint Ubin 10x30 cm
Bh
3.530
Semen Portland
Kg
1.560
Pasir Pasang
M³
0.003
Pekerja
Oh
0.060
Tukang Batu
Oh
0.030
Kepala Tukang
Oh
0.003
Mandor
Oh
0.003
Sub Total B. Pasang Lantai Keramik 33X33 cm (m²) Bahan
Tenaga
Sub Total C. Pasang Lantai Keramik 10X20 cm (m²) Bahan
Tenaga
Sub Total D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²) Bahan
Tenaga
Sub Total E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²) Bahan
Tenaga
Sub Total
PEKERJAAN KUNCI DAN KACA XI
A. Pasang Kunci Tanam Biasa (Bh) Bahan Kunci Tanam Biasa
Bh
1.000
Pekerja
Oh
0.010
Tukang Kayu
Oh
0.500
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Bh
1.000
Pekerja
Oh
0.005
Tukang Kayu
Oh
0.500
Kepala Tukang
Oh
0.005
Oh
0.000
Bh
1.000
Pekerja
Oh
0.010
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.001
Bh
1.000
Pekerja
Oh
0.050
Tukang Kayu
Oh
0.500
Kepala Tukang
Oh
0.050
Mandor
Oh
0.003
M²
1.100
Pekerja
Oh
0.015
Tukang Kayu
Oh
0.150
Kepala Tukang
Oh
0.015
Oh
0.001
Tenaga
Sub Total B. Pasang Engsel pintu (Bh) Bahan Engsel Pintu Tenaga
Mandor Sub Total C. Pasang Engsel Jendela Kupu-kupu (Bh) Bahan Engsel Jendela Tenaga
Sub Total D. Pasang Pegangan Pintu/Door holder (Bh) Bahan Door holder Tenaga
Sub Total E. Pasang Kaca tebal 3 mm (m²) Bahan Kaca tebal 3 mm Tenaga
Mandor Sub Total F. Pasang Kaca wireglass tebal 5 mm (m²)
Bahan Kaca Wireglass 5 mm
M²
1.100
Pekerja
Oh
0.015
Tukang Kayu
Oh
0.150
Kepala Tukang
Oh
0.015
Oh
0.001
Cat Meni
Kg
0.200
Kertas Gosok
Lbr
0.400
Plamir
Kg
0.150
Cat dasar
Kg
0.170
Cat penutup 2 kali
Kg
0.260
Minyak Cat
Ltr
0.150
Kuas 3"
Bh
0.050
Pekerja
Oh
0.070
Tukang Cat
Oh
0.009
Kepala Tukang
Oh
0.006
Mandor
Oh
0.003
Kg
0.100
Tenaga
Mandor Sub Total
PEKERJAAN PENGECATAN XII
A. Pengecatan Kayu (m²) Bahan
Tenaga
Sub Total B. Pengecatan Tembok Baru (m²) Bahan Plamir Kertas gosok
LBR
1.000
Cat Dasar
Kg
0.100
Cat Penutup 2x
Kg
0.260
Pekerja
Oh
0.020
Tukang Cat
Oh
0.063
Kepala Tukang
Oh
0.006
Mandor
Oh
0.003
LS
1.000
Bh
1.000
Bh
1.000
Bh
1.000
Tenaga
Sub Total
PEKERJAAN INSTALASI LISTRIK XIII
A. Penyambungan Listrik PLN 2400 watt (LS)
ALS
Penyambungan PLN B. Pemasangan Lampu SL 25 Watt (Bh)
ALS
Lampu SL 25 Watt C. Pemasangan Sekering Group (Bh)
ALS
Sekering Group D. Pemasangan Stop Kontak (Bh)
ALS
Stop kontak E. Pemasangan Sakelar Tunggal (Bh)
ALS
Sakelar Tunggal
Bh
1.000
Bh
1.000
F. Pemasangan Sakelar Ganda (Bh) ALS
Sakelar Ganda
PEKERJAAN SANITASI XIV PERWALI No 16 Tahun 2017
A. Memasang Kloset Jongkok Porselen (Bh) Bahan Kloset Jongkok Porselen
Bh
1.000
Semen Portland
Kg
6.000
Pasir Pasang
M3
0.010
Tenaga Pekerja
Oh
1.000
Tukang Batu
Oh
1.500
Kepala Tukang
Oh
1.500
Mandor
Oh
0.160
Bahan Batu Bata
Bh
250.000
Semen Portland
Kg
120.000
Sub Total B. Memasang Bak Mandi Bata Bata, Vol 0.3 M³ (Bh) PERWALI No 16 Tahun 2017
Pasir Pasang
M
3
0.300
Porselen (11x11) Cm
Bh
360.000
Semen Nat
Kg
6.000
Tenaga Pekerja
Oh
6.000
Tukang Batu
Oh
3.000
Kepala Tukang
Oh
0.300
Mandor
Oh
0.300
Sub Total C. Memasang Kran Air Ø ½" atau ¾" (Bh) PERWALI No 16 Tahun 2017
Bahan Kran Air
bh
1.000
Sealm Tape
Bh
0.500
Tenaga Pekerja
Oh
0.010
Tukang Batu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Sub Total D. Memasang pipa PVC tipe AW Ø 1" (m¹) PERWALI No 16 Tahun 2017
Bahan Pipa PVC
m¹
Perlengkapan 35 % harga pipa
1.200 0.350
Tenaga Pekerja
Oh
0.081
Tukang Batu
Oh
0.135
Kepala Tukang
Oh
0.014
Mandor
Oh
0.004
Sub Total E. Memasang pipa PVC tipe AW Ø 4" (m¹) PERWALI No 16 Tahun 2017
Bahan pipa pvc
m¹
Perlengkapan 35 % harga pipa
1.200 0.350
Tenaga Pekerja
Oh
0.081
Tukang Batu
Oh
0.135
Kepala Tukang
Oh
0.014
Mandor
Oh
0.004
Sub Total F. Memasang Bak kontrol Pas batako press 40x20 (Bh) PERWALI No 16 Tahun 2017
Bahan batako press 40x20
M3
0.250
Semen Portland
Kg
77.000
Pasir Pasang
M
3
0.130
Batu kerikil
M
3
0.020
beton k125
M3
0.090
Tenaga Pekerja
Oh
1.420
Tukang Batu
Oh
0.473
Kepala Tukang
Oh
0.047
Mandor
Oh
0.071
Sub Total
Harga Satuan (Rp) Bahan
Upah
100,000.00 155,000.00
Total Harga Satuan (Rp)
40,000.00 3,100.00 43,100.00
8,500.00
10,625.00
75,000.00
375,000.00
115,000.00
575.00
350,000.00
3,150.00
1,965,000.00
141,480.00
20,500.00
1,230.00
58,400.00
23,360.00 120,000.00
24,000.00
100,000.00
40,000.00
145,000.00
2,900.00
155,000.00
3,100.00 625,420.00
1,965,000.00
235,800.00
20,500.00
410.00
6,000,000.00
42,000.00 120,000.00
12,000.00
100,000.00
10,000.00
145,000.00
1,450.00
155,000.00
775.00 302,435.00
1,687,000.00
59,045.00
20,500.00
12,300.00
49,900.00
69,860.00
350,000.00
14,350.00
75,000.00
1,260,000.00
115,000.00
3,105.00
120,000.00
120,000.00
120,000.00
2,160.00
120,000.00
120,000.00
100,000.00
210,000.00
155,000.00
155,775.00 2,026,595.00