RENCANA ANGGARAN PEMBANGUNAN LABORATORIUM IPA PROYEK PEKERJAAN LOKASI TAHUN ANGGARAN No

: PENINGKATAN MUTU SMU : PEMBANGUNAN LABORATORIUM IPA : SMA ISLAM SUDIRMAN AMBARAWA KABUPATEN SEMARANG : 2008

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN 1 Pembuatan RAB dan Gambar kerja 2 Ijin mendirikan bangunan 3 Pembersihan Lapangan 4 Uinset Bauplang 5 Pengadaan Air Kerja 6 Papan Nama Proyek 7 Administrasi dokumentasi Sub. Total I II PEKERJAAN TANAH 1 Galian Tanah Pondasi 2 Urugan kembali 3 Urugan Pasir/sirtu bawah Pond. Lantai Sub. Total II III PEKERJAAN PASANGAN 1 Pas. Batu kosong/Aanstamping 2 Pas. Pondasi Batu belah 1:3 : 10 3 Pas. Batu Bata 1 Pc : 3 Ps 4 Pas. Batu Bata 1 Pc : 3 kp :10 Ps 5 Beton bertulang 1 : 2 : 3 6 Plesteran 7 Plesteran 1 : 3 : 10 8 Meja Beton 9 Konsul beton 10 Rabat beton keliling bangunan 11 Duk Pintu Sub. Total III IV PEKERJAAN KAYU DAN PLAFOND 1 Kosen kayu bingkirai 2 Jalusi kayu bingkirai 3 Daun Pintu panel multiplek 9 mm 4 Daun Jendela kaca rangka kay Kamfer 5 Rangka atap kayu kruing 6 Gordeng, Skor, Blk. Sdt, Blk kayu Kruing 7 Nok dan jurai kayu bingkirai 8 Usuk Kruing dan reng kayu bengkirai 9 Reuter 10 Lisplang kayu bengkirai 2.5/25 11 Plafond eternit rangka kayu kruing 12 Lis tepi plafon Sub. Total IV V PEKERJAAN PENUTUP ATAP 1 Genteng 2 Bumbungan Sub. Total V VI PEKERJAAN LANTAI 1 Rabat beton bawah lantai 2 Lantai keramik 30 x 30 cm

Volume

SAT

HARGA SATUAN

JUMLAH HARGA

I

1.00 1.00 1.00 1.00 1.00 1.00 1.00

ls ls ls ls ls ls ls

197000 0 147750 147750 73875 49250 98500

197,000.00 147,750.00 147,750.00 73,875.00 49,250.00 98,500.00 714,125.00

74.64 24.88 21.78

M3 M3 M3

7853.41 3985.31 39853.1

586,178.15 99,154.51 868,000.52 1,553,333.18

14.29 31.09 13.00 159.08 4.92 26.00 312.80 0.63 1.62 4.89 8.00

M3 M3 M2 M2 M3 M2 M2 M3 M3 M3 bh

76214.87 173102.78 39853.1 23777.9 240793.1 7899.35 8435.19 820505 324919.98 10783.78 11252.64

1,089,110.46 5,381,765.34 518,090.30 3,782,588.33 1,184,702.05 205,383.19 2,638,528.46 516,918.15 526,370.37 52,732.68 90,021.12 15,986,210.45

1.03 17.04 9.66 9.36 0.40 1.96 0.43 401.20 44.70 15.25 232.32 248.50

M3 M2 M2 M2 M3 M3 M3 M2 M' M2 M2 M'

1035235 39853.1 117215 63296.1 668594.36 668594.36 729077.3 23777.9 15472.38 39853.1 12793.18 2109.87

1,066,292.05 679,096.82 1,132,296.90 592,451.50 267,437.74 1,310,444.95 313,503.24 9,539,693.48 691,615.39 607,759.78 2,972,111.58 524,302.70 19,697,006.11

401.20 44.70

M2 M'

6317.89 15437.22

2,534,736.87 690,043.53 3,224,780.40

10.50 147.54

M3 M2

8908.34 16008.22

93,537.57 2,361,852.78

3 Dinding keramik meja lab. 20 x 20 Sub. Total VI VII PEKERJAAN ALAT PENGG. BESI/ KACA 1 Kunci pintu 2x putar 2 Engsel H14 3 Engsel H10 4 Grendel pintu 5 Kait angin jendela 6 Handel penarik jendela 7 Grendel jendela 8 Kunci pintu almari 9 Kaca bening 5mm 10 Angkur baut, begel & klem Sub. Total VII VIII PEKERJAAN SANITASI 1 Wastafel

25.33

M2

18051.11

457,234.62 2,912,624.97

4.00 12.00 50.00 6.00 13.00 13.00 13.00 6.00 5.67 1.00

Bh Bh Bh Bh Bh Bh Bh Bh M2 Ls

25787.3 3516.45 2578.73 4454.17 1406.58 1641.01 3282.02 2109.87 25787.3 105493.5

103,149.20 42,197.40 128,936.50 26,725.02 18,285.54 21,333.13 42,666.26 12,659.22 146,213.99 105,493.50 647,659.76

3.00

Bh

58607.5

175,822.50

2 Kran air

3.00

Bh

3516.45

10,549.35

3 Instalasi air bersih

1.00

ls

191287

191,287.00

4 Saluran bis beton U.20

6.10

M1

7970.62

48,620.78

4.00

Bh

11721.5

46,886.00 473,165.63

13.00 7.00 13.00 1.00 3.00 1.00 2.00

Titik Titik Bh Bh Bh Ls Bh

7501.76 7032.9 12893.65 164101 1641.01 70329 2813.16

97,522.88 49,230.30 167,617.45 164,101.00 4,923.03 70,329.00 5,626.32 559,349.98

92.79

M2

7392.65

685,963.95

2 Cat dinding

347.65

M

2

7341.14

2,552,148.00

3 Cat plafond 4 Tir-tiran Sub. Total X

232.32 1.00

M ls

2

4795.9 82050.5

1,114,183.94 82,050.50 4,434,346.40

5 Bak kontrol Sub. Total VIII IX PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu 2 Instalasi stop kontak 3 Lampu pijar 25 Watt 4 Sekring box 5 Saklar tunggal 6 Kabel overspaning 7 Saklar ganda Sub. Total IX X PEKERJAAN CAT-CATAN 1 Cat kayu

Total Biaya

Rp 50,202,601.88

Dibulatkan

Rp 50,000,000.00

Menyetujui Kepala Sekolah

Ambarawa, 4 Juni 2008 Dibuat Oleh : Perencana

Drs. H. Amir Mahmud, MM.

Ir. Judi Priyanto Mengetahui, Ketua Komite Sekolah

HM. Amin Syamsuri, BA