Rab Rehab Masjid Di Fair.xlsx

  • Uploaded by: Ferry Friadi
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rab Rehab Masjid Di Fair.xlsx as PDF for free.

More details

  • Words: 6,367
  • Pages: 64
REKAPITULASI BIAYA : PEMBANGUNAN SARANA DAN PRASARANA IBADAH : PEMBANGUNAN MASJID ALHADIJAH : KOMPLEK PERTAMINA KELURAHAN MASRUM KECAMATAN DULLAH SELATAN TAHUN ANGGARAN : 2017 KEGIATAN PEKERJAAN LOKASI

NO

URAIAN PEKERJAAN

JUMLAH HARGA

A

PEKERJAAN PERSIAPAN

Rp

12,500,000.00

B

PEKERJAAN TANAH

Rp

10,481,215.21

C

PEKERJAAN PONDASI

Rp

70,443,266.33

D

PEKERJAAN BETON

Rp

59,230,962.81

E

PEKERJAAN KAYU

Rp

64,457,862.15

F

PEKERJAAN PASANGAN DINDING DAN LANTAI

Rp

177,133,219.30

G

PEKERJAAN LANGIT-LANGIT (PLAFON)

Rp

59,329,479.06

H

PEKERJAAN PENUTUP ATAP

Rp

19,060,346.25

I

PEKERJAAN KUNCI DAN KACA

Rp

19,859,378.08

J

PEKERJAAN PENGECATAN

Rp

5,916,028.82

K

PEKERJAAN ELEKTRIKAL

Rp

1,683,772.00

Rp Rp

500,095,530.01 500,000,000.00

1. TOTAL PEKERJAAN FISIK 4. JUMLAH KESELURUHAN DIBULATKAN Terbilang : "LIMA RATUS JUTA RUPIAH"

Tual, 19 Oktober 2017 PANITIA PEMBANGUNAN MASJID " ALHADIJAH " KETUA

SEKRETARIS

H. SAINAL LET-LET, SPd

ILHAM RAHAYAAN, SAG

RENCANA ANGGARAN BIAYA (RAB) KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN

NO A

B

C

D

E

F

: : : :

PEMBANGUNAN SARANA DAN PRASARANA IBADAH PEMBANGUNAN MASJID ALHADIJAH KOMPLEK PERTAMINA KELURAHAN MASRUM KECAMATAN DULLAH SELATAN 2017

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN A.1 Pengukuran dan pemasangan Bouwplank A.2 Pembuatan gudang semen dan peralatan A.3 Pemasangan Papan Proyek PEKERJAAN TANAH B.1 Galian tanah pondasi B.2 Pengurugan kembali galian tanah pondasi B.3 Pemadatan tanah tanah (per 20 cm) B.4 Pengurugan dengan pasir urug PEKERJAAN PONDASI C.1 Pemasangan pondasi batu belah campuran 1SP : 4PP C.2 Pemasangan batu kosong (anstamping) PEKERJAAN BETON D.1 Pembuatan sloof beton bertulang, K175 (110 kg besi + bekisting) D.2 Pembuatan kolom beton bertulang, K175 (110 kg besi + bekisting) D.3 Pembuatan balok beton bertulang, K175 (110 kg besi + bekisting) D.4 Membuat lantai kerja beton tumbuk mutu f'c=7,4 Mpa PEKERJAAN KAYU E.1 Pembuatan dan pemasangan kusen pintu kayu kelas I E.2 Pembuatan dan pemasangan daun pintu dan jalusi kaca, kayu E.3 Pembuatan dan pemasangan kuda-kuda kayu kelas I E.4 Pembuatan dan pemasangan gording kayu kelas II E.5 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I PEKERJAAN PASANGAN DINDING DAN LANTAI F.1 Pemasangan dinding Batu tela tebal ½ batu camp. 1SP :4PP F.2 Pemasangan dinding batu angin F.3 Plesteran 1SP : 4PP tebal 15 mm F.4 Acian F.5 Pemasangan lantai keramik ukuran 40cm x 40cm

VOL

1.00 1.00 1.00

m' m² Bh

JUMLAH

A

67.90 50.92 34.92 8.73

m³ m³ m³ m³

JUMLAH

B

67.90 7.38

m³ m³

JUMLAH

C

3.49 2.59 2.62 26.19 JUMLAH

m³ m³ m³ m³

0.18 13.84 3.67 2.17 154.67 JUMLAH

m³ m² m³ m³ m’

132.70 208.83 265.40 265.40 460.48

m² m² m² m² m²

JUMLAH G

PEKERJAAN LANGIT-LANGIT (PLAFON) G.1 Pemasangan langit-langit tripleks (120x240) cm, tebal 4 mm G.2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II

SAT

414.29 414.29

D

E

F m² m²

H

PEKERJAAN PENUTUP ATAP H.1 Pemasangan atap seng tebal 0.20 mm H.2 Pemasangan nok alumunium

JUMLAH

G

290.06 507.61

m² m’ H

I

PEKERJAAN KUNCI DAN KACA I.1 Pemasangan kunci tanam biasa I.2 Pemasangan engsel pintu dan jendela I.3 Pemasangan grendel pintu dan jendela

97.00 8.62 47.42

Bh Bh Bh I

J

PEKERJAAN PENGECATAN J.1 Pengecatan bidang kayu baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat J.2 penutup) Pengecatan tembok baru ( 1lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)

21.31 213.11

m² m² J

K

PEKERJAAN ELEKTRIKAL K.1 Pemasangan titik lampu (+ instalasi dan saklar) K.2 Pemasangan Stopkontak

UNIT UNIT

Bh Bh

JUMLAH

K

ANGGARAN BIAYA (RAB)

LURAHAN MASRUM KECAMATAN DULLAH SELATAN

HARGA SATUAN

JUMLAH HARGA

Rp 2,500,000.00 Rp Rp 9,500,000.00 Rp Rp 500,000.00 Rp

2,500,000.00 9,500,000.00 500,000.00

Rp

12,500,000.00

Rp Rp Rp Rp

3,728,428.70 1,039,454.31 1,425,572.26 4,287,759.94

Rp

10,481,215.21

980,053.00 Rp 528,333.00 Rp

66,543,883.61 3,899,382.72

Rp

70,443,266.33

Rp 3,740,422.75 Rp Rp 3,998,663.00 Rp Rp 3,775,155.50 Rp Rp 990,477.00 Rp

13,061,219.60 10,342,941.72 9,886,877.43 25,939,924.06

Rp

59,230,962.81

Rp 8,785,496.00 Rp Rp 469,239.00 Rp Rp 7,951,876.00 Rp Rp 5,750,891.00 Rp Rp 95,190.00 Rp

1,576,182.57 6,493,152.20 29,166,555.89 12,498,530.61 14,723,440.87

Rp

64,457,862.15

Rp Rp Rp Rp Rp

23,987,679.65 32,792,622.70 16,137,139.77 8,583,985.91 95,631,791.26

Rp Rp Rp Rp

Rp Rp

Rp Rp Rp Rp Rp

54,912.00 20,412.00 40,825.00 491,165.00

180,763.00 157,029.00 60,802.00 32,343.00 207,679.00

Rp 177,133,219.30 Rp Rp

48,075.00 Rp 95,133.00 Rp

19,916,936.94 39,412,542.12

Rp Rp

Rp Rp Rp

Rp Rp

Rp Rp

Rp

59,329,479.06

63,921.00 Rp 29,880.00 Rp

18,541,088.78 519,257.47

Rp

19,060,346.25

178,135.00 Rp 63,523.00 Rp 42,872.00 Rp

17,278,649.66 547,695.31 2,033,033.11

Rp

19,859,378.08

35,273.00 Rp 24,233.00 Rp

751,706.88 5,164,321.95

Rp

5,916,028.82

254,114.00 Rp 159,088.00 Rp

1,524,684.00 159,088.00

Rp

1,683,772.00

REKAPAPITULASI HARGA SATUAN NO A

B

C

D

E

F

G

URAIAN PEKERJAAN

SATUAN

PEKERJAAN PERSIAPAN A.1 Pengukuran dan pemasangan Bouwplank A.2 Pembuatan gudang semen dan peralatan A.3 Pemasangan Papan Proyek

m' m² Bh

PEKERJAAN TANAH B.1 Galian tanah pondasi B.2 Pengurugan kembali galian tanah pondasi B.3 Pemadatan tanah tanah (per 20 cm) B.4 Pengurugan dengan pasir urug

m³ m³ m³ m³

PEKERJAAN PONDASI C.1 Pemasangan pondasi batu belah campuran 1SP : 4PP C.2 Pemasangan batu kosong (anstamping)

m³ m³

PEKERJAAN BETON D.1 Pembuatan sloof beton bertulang, K175 (110 kg besi + bekisting) D.2 Pembuatan kolom beton bertulang, K175 (110 kg besi + bekisting) D.3 Pembuatan balok beton bertulang, K175 (110 kg besi + bekisting) D.4 Membuat lantai kerja beton tumbuk mutu f'c=7,4 Mpa

m³ m³ m³ m³

PEKERJAAN KAYU E.1 Pembuatan dan pemasangan kusen pintu kayu kelas I E.2 Pembuatan dan pemasangan daun pintu dan jalusi kaca, kayu E.3 Pembuatan dan pemasangan kuda-kuda kayu kelas I E.4 Pembuatan dan pemasangan gording kayu kelas II E.5 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I

m³ m² m³ m³ m’

PEKERJAAN PASANGAN DINDING DAN LANTAI F.1 Pemasangan dinding Batu tela tebal ½ batu camp. 1SP :4PP F.2 Pemasangan dinding batu angin F.3 Plesteran 1SP : 4PP tebal 15 mm F.4 Acian F.5 Pemasangan lantai keramik ukuran 40cm x 40cm

m² m² m² m² m²

PEKERJAAN LANGIT-LANGIT (PLAFON) G.1 Pemasangan langit-langit tripleks (120x240) cm, tebal 4 mm



H

I

J

K

G.2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II



PEKERJAAN PENUTUP ATAP H.1 Pemasangan atap seng tebal 0.20 mm H.2 Pemasangan nok alumunium

m² m’

PEKERJAAN KUNCI DAN KACA I.1 Pemasangan kunci tanam biasa I.2 Pemasangan engsel pintu dan jendela I.3 Pemasangan grendel pintu dan jendela

Bh Bh Bh

PEKERJAAN PENGECATAN J.1 Pengecatan bidang kayu baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup) J.2 Pengecatan tembok baru ( 1lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)

m² m²

PEKERJAAN ELEKTRIKAL K.1 Pemasangan titik lampu (+ instalasi dan saklar) K.2 Pemasangan Stopkontak

Bh Bh

TULASI HARGA SATUAN HARGA SATUAN

Rp Rp Rp

44,947.00 988,338.00 500,000.00

Rp Rp Rp Rp

54,912.00 20,412.00 40,825.00 491,165.00

Rp Rp

980,053.00 528,333.00

Rp Rp Rp Rp

3,740,422.75 3,998,663.00 3,775,155.50 990,477.00

Rp Rp Rp Rp Rp

8,785,496.00 469,239.00 7,951,876.00 5,750,891.00 95,190.00

Rp Rp Rp Rp Rp

180,763.00 157,029.00 60,802.00 32,343.00 207,679.00

Rp

48,075.00

Rp

95,133.00

Rp Rp

63,921.00 29,880.00

Rp Rp Rp

178,135.00 63,523.00 42,872.00

Rp Rp

35,273.00 24,233.00

Rp Rp

254,114.00 159,088.00

ANALISA HARGA SATUAN A

PEKERJAAN PERSIAPAN A.1 Pengukuran dan pemasangan 1 m’ Bouwplank No Uraian A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B

C

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Kayu 5/7, Kayu kelas III Paku 2”-3” Kayu papan kelas III

Satuan : m' Satuan Koefisien OH 0.1000 OH 0.1000 OH 0.0100 OH 0.0050 JUMLAH TENAGA KERJA m³ 0.0120 Kg 0.0200 m³ 0.0070 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F A.2

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pembuatan 1 m² gudang semen dan peralatan No Uraian A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B

15%

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Dolken kayu Ø 8-10/400 cm Kayu kelas II Paku biasa Semen portland Pasir beton Koral beton Seng gelombang Seng plat, BJLS 30

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m² Satuan Koefisien OH 1.0000 OH 2.0000 OH 0.2000 OH 0.0500 JUMLAH TENAGA KERJA Batang 1.7000 m³ 0.2100 Kg 0.3000 Kg 10.5000 m³ 0.0300 m³ 0.0500 Lbr 1.5000 Lbr 0.2500 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

A.5

Pembuatan 1 Bh kotak adukan ukuran 40cm x50cm x25cm No Uraian Kode A TENAGA Tukang Kayu L.02.04 Kepala Tukang L.03.01 B

BAHAN

15%

Satuan : Bh Satuan Koefisien OH 0.3000 OH 0.0300 JUMLAH TENAGA KERJA

Kayu papan kelas III Kayu 5/7, kayu kelas III Paku biasa C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

m³ 0.0360 m³ 0.0210 kg 0.0800 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

B

PEKERJAAN TANAH B.1 Penggalian 1 m³ tanah biasa sedalam 1 m No Uraian A TENAGA Pekerja Mandor B

15%

Kode L.01.01 L.04.01

Satuan : m³ Satuan Koefisien OH 0.7500 OH 0.0250 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

PERALATAN

JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

15%

B.2

Pengurugan kembali 1 m³ galian tanah Tanah Biasa Sedalam 1 M Satuan : m³ No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.2500 Mandor L.04.01 OH 0.0250 JUMLAH TENAGA KERJA B BAHAN JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E)

B.3

Pemadatan tanah 1 m³ tanah ( per 20 cm) No Uraian A TENAGA Pekerja Mandor B

BAHAN Tanah timbunan

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Kode L.01.01 L.04.01

Satuan : m³ Satuan Koefisien OH 0.5000 OH 0.0500 JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

B.4

Pengurugan 1 m³ dengan pasir urug No Uraian A TENAGA Pekerja Mandor B

15%

Kode L.01.01 L.04.01

BAHAN Pasir urug

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m³ Satuan Koefisien OH 0.3000 OH 0.0100 JUMLAH TENAGA KERJA m³ 1.2000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

C

PEKERJAAN PONDASI C.1 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP No Uraian Kode A TENAGA Pekerja L.01.01

15%

Satuan : m³ Satuan Koefisien OH

1.5000

Tukang Batu Kepala Tukang Mandor B

C

L.02.03 L.03.01 L.04.01

BAHAN Batu belah Semen portland Pasir Pasang

OH 0.7500 OH 0.0750 OH 0.0750 JUMLAH TENAGA KERJA m³ 1.2000 Kg 163.0000 m³ 0.5200 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F C.2

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m³ batu kosong (anstamping) No Uraian A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan : m³ Satuan Koefisien OH OH OH OH

0.7800 0.3900 0.0390 0.0390

JUMLAH TENAGA KERJA B

C

BAHAN Batu belah Pasir urug

m³ 1.2000 m³ 0.4320 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

D

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

15%

PEKERJAAN BETON Membuat 1 m³ beton mutu f’ = 14,5 MPa (K 175), slump (120 ± 20 Satuan : m³ No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 1.6500 Tukang Batu L.02.03 OH 0.2750 Kepala Tukang L.03.01 OH 0.0280 Mandor L.04.01 OH 0.0830 JUMLAH TENAGA KERJA B BAHAN Semen portland kg 326.0000 Pasir Beton m³ 0.5429 Kerikil (Maks 30 mm) m³ 0.7622 Air Liter 215.0000 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E) Pembesian 10 kg dengan besi polos atau besi ulir No Uraian A TENAGA Pekerja Tukang Besi Kepala Tukang Mandor B

Kode L.01.01 L.02.05 L.03.01 L.04.01

BAHAN Besi beton (polos/ulir) Kawat beton

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : Kg Satuan Koefisien OH 0.0700 OH 0.0700 OH 0.0070 OH 0.0040 JUMLAH TENAGA KERJA kg 10.5000 kg 0.1500 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

Pemasangan 1 m² bekisting untuk sloof No Uraian A TENAGA

15%

Kode

Satuan : m² Satuan Koefisien

Pekerja Tukang Kayu Kepala Tukang Mandor B

BAHAN Kayu kelas III Paku 5 - 10 cm Minyak bekisting

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

L.01.01 L.02.04 L.03.01 L.04.01

OH 0.5200 OH 0.2600 OH 0.0260 OH 0.0260 JUMLAH TENAGA KERJA m³ 0.0450 kg 0.3000 Liter 0.1000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

Pemasangan 1 m² bekisting untuk kolom No Uraian A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas III Plywood 60x120x9 mm Dolken kayu Ø 8-10/400 cm

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m² Satuan Koefisien OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA m³ 0.0400 kg 0.4000 Liter 0.2000 m³ 0.0150 Lbr 0.3500 Batang 2.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

Pemasangan 1 m² bekisting untuk balok No Uraian A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B

15%

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas III Plywood 60x120x9 mm Dolken kayu Ø 8-10/400 cm

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m² Satuan Koefisien OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA m³ 0.0400 kg 0.4000 Liter 0.2000 m³ 0.0180 Lbr 0.3500 Batang 2.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

D.4

Membuat 1 m³ lantai kerja beton tumbuk mutu f'c=7,4 Mpa No Uraian Kode A TENAGA Pekerja L.01.01 Tukang batu L.02.03 Kepala tukang L.03.01 Mandor L.04.01 B

BAHAN Semen portland Pasir Beton

15%

Satuan : Satuan

m³ Koefisien

OH 1.2000 OH 0.2000 OH 0.0200 OH 0.0600 JUMLAH TENAGA KERJA kg m³

230.0000 0.6379

Kerikil C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

m³ 0.7607 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

E

15%

PEKERJAAN KAYU E.1 Pembuatan dan pemasangan 1 m³ kusen pintu dan jendela kayu k Satuan : m³ No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 7.0000 Tukang kayu L.02.11 OH 21.0000 Kepala tukang L.03.01 OH 2.1000 Mandor L.04.01 OH 0.3500 JUMLAH TENAGA KERJA

B

BAHAN Balok kayu kelas I Paku 5 - 10 cm Lem Kayu/Karet

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

m³ 1.1000 kg 1.2500 cm 1.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

E.2

Pembuatan dan pemasangan 1 m² daun jendela dan jalusi kaca, Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.8000 Tukang kayu L.02.02 OH 2.4000 Kepala tukang L.03.01 OH 0.2400 Mandor L.04.01 OH 0.0400 JUMLAH TENAGA KERJA B BAHAN Kayu Papan kelas I m³ 0.0240 Lem Kayu/Karet cm 0.3000 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E)

E.3

Pembuatan dan pemasangan 1 m³ kuda-kuda kayu kelas I No Uraian Kode A TENAGA Pekerja L.01.01 Tukang kayu L.02.02 Kepala tukang L.03.01 Mandor L.04.01 B

BAHAN Balok kayu kelas I Besi strip Paku biasa

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m³ Satuan Koefisien OH 4.0000 OH 12.0000 OH 1.2000 OH 0.2000 JUMLAH TENAGA KERJA m³ 1.1000 kg 15.0000 kg 5.6000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

E.4

Pembuatan dan pemasangan 1 m³ gording kayu kelas II No Uraian Kode A TENAGA Pekerja L.01.01 Tukang kayu L.02.02 Kepala tukang L.03.01 Mandor L.04.01

15%

Satuan : m³ Satuan Koefisien OH OH OH OH

6.7000 20.1000 2.0100 0.3350

JUMLAH TENAGA KERJA B

BAHAN Balok kayu kelas II Besi strip Paku biasa

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

m³ 1.1000 kg 15.0000 kg 3.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

E.5

Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I No Uraian Kode A TENAGA Pekerja L.01.01 Tukang kayu L.02.04 Kepala tukang L.03.01 Mandor L.04.01

15%

Satuan : m’ Satuan Koefisien OH 0.1 OH 0.2 OH 0.02 OH 0.005 JUMLAH TENAGA KERJA

B

BAHAN Kayu Papan kelas I Paku Biasa

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

m³ 0.011 kg 0.05 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

F

15%

PEKERJAAN PASANGAN DINDING DAN LANTAI F.1 Pemasangan 1m² dinding Batu tela tebal ½ batu, campuran 1SP Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.3000 Tukang Batu L.02.03 OH 0.1000 Kepala Tukang L.03.01 OH 0.0100 Mandor L.04.01 OH 0.0150 JUMLAH TENAGA KERJA B BAHAN Batu tela Bh 50.0000 Semen portland Kg 11.5000 Pasir Pasang m³ 0.0430 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E) F.2

Pemasangan 1m² dinding terawang (batu angin), campuran 1SP Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.3000 Tukang Batu L.02.03 OH 0.1000 Kepala Tukang L.03.01 OH 0.0100 Mandor L.04.01 OH 0.0150 JUMLAH TENAGA KERJA B BAHAN Batu angin Bh 30.0000 Semen portland Kg 11.0000 Pasir Pasang m³ 0.0350 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E)

F.3

Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm No Uraian Kode A TENAGA Pekerja L.01.01 Tukang Batu L.02.03

Satuan : m² Satuan Koefisien OH OH

0.3000 0.1500

Kepala Tukang Mandor B

L.03.01 L.04.01

BAHAN Semen portland Pasir Pasang

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

OH 0.0150 OH 0.0150 JUMLAH TENAGA KERJA Kg 6.2400 m³ 0.0240 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

F.4

Pemasangan 1 m² acian. No Uraian A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan : m² Satuan Koefisien OH 0.2000 OH 0.1000 OH 0.0100 OH 0.0100 JUMLAH TENAGA KERJA

B

BAHAN Semen portland

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Kg 3.2500 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

F.5

Pemasangan 1m² lantai keramik ukuran 40cm x 40cm No Uraian Kode A TENAGA Pekerja L.01.01 Tukang Batu L.02.03 Kepala tukang L.03.01 Mandor L.04.01 B

C

BAHAN keramik ukuran 40cm x 40cm Semen portland Pasir Pasang Semen Warna

15%

Satuan : m² Satuan Koefisien OH 0.6000 OH 0.3000 OH 0.0300 OH 0.0300 JUMLAH TENAGA KERJA Dos 1.0500 Kg 8.1900 m³ 0.0215 Kg 1.3000 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

G

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

15%

PEKERJAAN LANGIT-LANGIT (PLAFON) G.1 Pemasangan 1 m² langit-langit tripleks (120x240) cm, tebal 4 mm Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.1000 Tukang kayu L.02.04 OH 0.1000 Kepala tukang L.03.01 OH 0.0100 Mandor L.04.01 OH 0.0050 JUMLAH TENAGA KERJA B BAHAN Tripleks 4 mm Lembar 0.3750 Paku skrup kg 0.0300 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E) G.2

Pemasangan 1 m² rangka langit-langit (50 x 100) cm, kayu kelas II Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.1500 Tukang kayu L.02.04 OH 0.3000

Kepala tukang Mandor B

BAHAN Balok kayu kelas II Paku 5 - 10 cm

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

L.03.01 L.04.01

OH 0.0300 OH 0.0750 JUMLAH TENAGA KERJA m³ 0.0154 kg 0.2000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

H

PEKERJAAN PENUTUP ATAP H.1 Pemasangan 1 m² atap seng tebal 0.20 mm No Uraian A TENAGA Pekerja Tukang Kayu Kepala tukang Mandor B

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Seng gelombang Paku seng

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m² Satuan Koefisien OH 0.1200 OH 0.0600 OH 0.0060 OH 0.0060 JUMLAH TENAGA KERJA Lbr 0.7000 Kg 0.0200 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

H.2

Pemasangan 1 m’ nok atap seng No Uraian A TENAGA Pekerja Tukang Kayu Kepala tukang Mandor B

15%

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN Seng plat, BJLS 20 Paku hak panj 15cm

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : m’ Satuan Koefisien OH 0.1500 OH 0.0700 OH 0.0070 OH 0.0060 JUMLAH TENAGA KERJA Lbr 0.3000 Kg 0.0400 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

I

PEKERJAAN KUNCI DAN KACA I.1 Pemasangan 1 Bh kunci tanam biasa No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

BAHAN Kunci tanam biasa

C

PERALATAN

D E

Jumlah (A+B+C) Overhead & Profit

15%

Kode L.01.01 L.02.04 L.03.01 L.04.01

Satuan : Bh Satuan Koefisien OH 0.010 OH 0.500 OH 0.050 OH 0.005 JUMLAH TENAGA KERJA Bh 1.000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

F I.2

Harga Satuan Pekerjaan (D+E)

Pemasangan 1 Bh engsel pintu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

BAHAN Engsel pintu

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Kode L.01.01 L.02.04 L.03.01 L.04.01

Satuan : Bh Satuan Koefisien OH 0.015 OH 0.150 OH 0.015 OH 0.001 JUMLAH TENAGA KERJA Bh 1.000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

I.3

Pemasangan 1 Bh grendel pintu No Uraian A TENAGA A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

BAHAN Grendel pintu

Kode

L.01.01 L.02.04 L.03.01 L.04.01

Satuan : Bh Satuan Koefisien

OH 0.015 OH 0.150 OH 0.015 OH 0.008 JUMLAH TENAGA KERJA Bh 1.000 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

J

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

15%

PEKERJAAN PENGECATAN J.1 1 m² Pengecatan bidang kayu baru (1 lapis Plamir, 1 lapis cat dasa Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.070 Tukang cat L.02.08 OH 0.009 Kepala tukang L.03.01 OH 0.006 Mandor L.04.01 OH 0.003 JUMLAH TENAGA KERJA B BAHAN Cat meni kayu Kg 0.200 Plamir kayu Kg 0.150 Cat dasar Kayu Kg 0.170 Cat Penutup Kayu Kg 0.260 Kuas Bh 0.010 Pengencer Kg 0.030 Ampelas Lbr 0.200 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) E Overhead & Profit 15% F Harga Satuan Pekerjaan (D+E) J.2

Pengecatan 1 m² tembok baru ( 1lapis Plamir, 1 lapis cat dasar, 2 Satuan : m² No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01.01 OH 0.020 Tukang cat L.02.08 OH 0.063 Kepala tukang L.03.01 OH 0.006 Mandor L.04.01 OH 0.003 JUMLAH TENAGA KERJA B BAHAN Plamir tembok Kg 0.100 Cat dasar Tembok Kg 0.100 Cat Penutup Tembok Kg 0.260

JUMLAH HARGA BAHAN C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA ALAT 15%

K PEKERJAAN ELEKTRIKAL K.1

Pemasangan 1 Bh titik lampu (+ instalasi dan saklar) No Uraian Kode A TENAGA Upah B

BAHAN Pipa listrik 5/8” Kabel NYM 3x2,5 mm² Tee Doos L.Bow Las Dop Klem Pipa Listrik Mongkok (Listrik) Saklar tunggal Fitting Lampu

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Satuan : Bh Satuan Koefisien 1.0000 % JUMLAH TENAGA KERJA btg 0.2830 m 10.0000 bh 2.0000 bh 4.0000 bh 3.0000 bh 4.0000 bh 1.0000 bh 1.0000 bh 1.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

K.2

Pemasangan 1 Bh Stopkontak No Uraian A TENAGA Upah B

BAHAN Pipa listrik 5/8” Kabel NYM 3x2,5 mm² Tee Doos Las Dop Saklar tunggal Fitting Lampu

C

PERALATAN

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

15%

Kode

Satuan : Bh Satuan Koefisien 1.0000 % JUMLAH TENAGA KERJA btg 0.6500 m 10.0000 bh 1.0000 bh 2.0000 bh 1.0000 bh 1.0000 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 15%

SATUAN Harga Satuan : 44,947.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 6,000.00 85,000 8,500.00 100,000 1,000.00 110,000 550.00 16,050.00 1,190,000 21,250 1,190,000 -

14,280.00 425.00 8,330.00 23,035.00 39,085.00 5,862.75 44,947.00

Harga Satuan : 988,338.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

60,000.00 170,000.00 20,000.00 5,500.00 255,500.00

8,500 2,125,000 21,250 1,700 361,250 187,000 59,500 38,250

14,450.00 446,250.00 6,375.00 17,850.00 10,837.50 9,350.00 89,250.00 9,562.50 603,925.00 859,425.00 128,913.75 988,338.00

-

Harga Satuan : 112,734.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 85,000 100,000

25,500.00 3,000.00 28,500.00

1,190,000 1,190,000 21,250 -

42,840.00 24,990.00 1,700.00 69,530.00 98,030.00 14,704.50 112,734.00

Harga Satuan : 54,912.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 45,000.00 110,000 2,750.00 47,750.00 -

-

47,750.00 7,162.50 54,912.00

Harga Satuan : 20,412.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 110,000 -

15,000.00 2,750.00 17,750.00 17,750.00 2,662.50 20,412.00

Harga Satuan : 40,825.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 110,000

-

30,000.00 5,500.00 35,500.00 35,500.00 5,325.00 40,825.00

Harga Satuan : 491,165.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 110,000 340,000 -

18,000.00 1,100.00 19,100.00 408,000.00 408,000.00 427,100.00 64,065.00 491,165.00

Harga Satuan : 980,053.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000

90,000.00

85,000 100,000 110,000 187,000 1,700 348,500 -

63,750.00 7,500.00 8,250.00 169,500.00 224,400.00 277,100.00 181,220.00 682,720.00 852,220.00 127,833.00 980,053.00

Harga Satuan : 528,333.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

46,800.00 33,150.00 3,900.00 4,290.00

88,140.00 187,000 340,000 -

224,400.00 146,880.00 371,280.00 459,420.00 68,913.00 528,333.00

Harga Satuan : 1,191,727.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

99,000.00 23,375.00 2,800.00 9,130.00 134,305.00

1,700 361,250 187,000 43

554,200.00 196,107.14 142,535.56 9,137.50 901,980.20 1,036,285.20 155,442.78 1,191,727.00

-

Harga Satuan : 215,912.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

4,200.00 5,950.00 700.00 440.00 11,290.00

16,575 16,150

174,037.50 2,422.50 176,460.00 187,750.00 28,162.50 215,912.00

-

Harga Satuan : 138,931.00 Harga Satuan (Rp.) Jumlah Harga (Rp.)

60,000 85,000 100,000 110,000

31,200.00 22,100.00 2,600.00 2,860.00 58,760.00

1,190,000 21,250 21,250

53,550.00 6,375.00 2,125.00 62,050.00 120,810.00 18,121.50 138,931.00

-

Harga Satuan : 215,952.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

39,600.00 28,050.00 3,300.00 3,630.00 74,580.00

1,190,000 21,250 21,250 1,190,000 51,442 8,500

47,600.00 8,500.00 4,250.00 17,850.00 18,004.70 17,000.00 113,204.70 187,784.70 28,167.71 215,952.00

-

Harga Satuan : 220,057.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

39,600.00 28,050.00 3,300.00 3,630.00 74,580.00

1,190,000 21,250 21,250 1,190,000 51,442 8,500

47,600.00 8,500.00 4,250.00 21,420.00 18,004.70 17,000.00 116,774.70 191,354.70 28,703.21 220,057.00

-

Harga Satuan : 990,477.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

72,000.00 17,000.00 2,000.00 6,600.00 97,600.00

1,700 361,250

391,000.00 230,425.89

187,000 -

142,258.52 763,684.41 861,284.41 129,192.66 990,477.00

Harga Satuan : 8,785,496.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

420,000.00 1,785,000.00 210,000.00 38,500.00 2,453,500.00

4,675,000 21,250 17,000

-

5,142,500.00 26,562.50 17,000.00 5,186,062.50 7,639,562.50 1,145,934.38 8,785,496.00

Harga Satuan : 469,239.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

48,000.00 204,000.00 24,000.00 4,400.00 280,400.00

5,105,610 17,000

122,534.64 5,100.00 127,634.64 408,034.64 61,205.20 469,239.00

-

Harga Satuan : 7,951,876.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

240,000.00 1,020,000.00 120,000.00 22,000.00 1,402,000.00

4,675,000 16,745 21,250

5,142,500.00 251,175.00 119,000.00 5,512,675.00 6,914,675.00 1,037,201.25 7,951,876.00

-

Harga Satuan : 5,750,891.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

402,000.00 1,708,500.00 201,000.00 36,850.00

2,348,350.00 2,125,000 16,745 21,250 -

2,337,500.00 251,175.00 63,750.00 2,652,425.00 5,000,775.00 750,116.25 5,750,891.00

Harga Satuan : 95,190.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

6,000.00 17,000.00 2,000.00 550.00 25,550.00

5,105,610 21,250 -

56,161.71 1,062.50 57,224.21 82,774.21 12,416.13 95,190.00

Harga Satuan : 180,763.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

18,000.00 8,500.00 1,000.00 1,650.00 29,150.00

1,870 1,700 348,500

93,500.00 19,550.00 14,985.50 128,035.50 157,185.50 23,577.83 180,763.00

-

Harga Satuan : 157,029.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

18,000.00 8,500.00 1,000.00 1,650.00 29,150.00

2,550 1,700 348,500

76,500.00 18,700.00 12,197.50 107,397.50 136,547.50 20,482.13 157,029.00

-

Harga Satuan : 60,802.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000

18,000.00 12,750.00

100,000 110,000

1,500.00 1,650.00 33,900.00

1,700 348,500

10,608.00 8,364.00 18,972.00 52,872.00 7,930.80 60,802.00

-

Harga Satuan : 32,343.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

12,000.00 8,500.00 1,000.00 1,100.00 22,600.00

1,700 -

5,525.00 5,525.00 28,125.00 4,218.75 32,343.00

Harga Satuan : 207,679.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

36,000.00 25,500.00 3,000.00 3,300.00 67,800.00

76,500 1,700 348,500 8,500

80,325.00 13,923.00 7,492.75 11,050.00 112,790.75 180,590.75 27,088.61 207,679.00

-

Harga Satuan : 48,075.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

6,000.00 8,500.00 1,000.00 550.00 16,050.00

66,300 29,750

24,862.50 892.50 25,755.00 41,805.00 6,270.75 48,075.00

-

Harga Satuan : 95,133.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000

9,000.00 25,500.00

100,000 110,000

3,000.00 8,250.00 45,750.00

2,125,000 21,250

32,725.00 4,250.00 36,975.00 82,725.00 12,408.75 95,133.00

-

Harga Satuan : 63,921.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

7,200.00 5,100.00 600.00 660.00 13,560.00

59,500 18,700

41,650.00 374.00 42,024.00 55,584.00 8,337.60 63,921.00

-

Harga Satuan : 29,880.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

9,000.00 5,950.00 700.00 660.00 16,310.00

29,750 18,700

8,925.00 748.00 9,673.00 25,983.00 3,897.45 29,880.00

-

Harga Satuan : 178,135.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

600.00 42,500.00 5,000.00 550.00 48,650.00

106,250

106,250.00 106,250.00 154,900.00 23,235.00

-

-

178,135.00

Harga Satuan : 63,523.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

900.00 12,750.00 1,500.00 88.00 15,238.00

40,000

40,000.00 40,000.00 55,238.00 8,285.70 63,523.00

-

Harga Satuan : 42,872.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

900.00 12,750.00 1,500.00 880.00 16,030.00

21,250

21,250.00 21,250.00 37,280.00 5,592.00 42,872.00

-

Harga Satuan : 35,273.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

4,200.00 765.00 600.00 330.00 5,895.00

22,950 18,700 21,250 46,750 8,500 17,000 5,100

4,590.00 2,805.00 3,612.50 12,155.00 85.00 510.00 1,020.00 24,777.50 30,672.50 4,600.88 35,273.00

-

Harga Satuan : 24,233.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 60,000 85,000 100,000 110,000

1,200.00 5,355.00 630.00 330.00 7,515.00

14,875 21,250 38,250

1,487.50 2,125.00 9,945.00

-

13,557.50 21,072.50 3,160.88 24,233.00

Harga Satuan : 254,114.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 110,485

110,484.63 110,484.63

14,875 3,400 4,250 5,000 1,275 4,250 4,250 10,200 8,500

4,209.63 34,000.00 8,500.00 20,000.00 3,825.00 17,000.00 4,250.00 10,200.00 8,500.00 110,484.63 220,969.25 33,145.39 254,114.00

-

Harga Satuan : 159,088.00 Harga Satuan (Rp.) Jumlah Harga (Rp.) 69,169

69,168.75 69,168.75

14,875 3,400 4,250 1,275 10,200 8,500

9,668.75 34,000.00 4,250.00 2,550.00 10,200.00 8,500.00 69,168.75 138,337.50 20,750.63 159,088.00

-

HARGA SATUAN UPAH Kode

Uraian

Satuan

Harga

L.01.01

PEKERJA

OH

60,000

L.02.01

TUKANG

OH

85,000

L.02.02

TUKANG ALUMUNIUM

OH

85,000

L.02.03

TUKANG BATU

OH

85,000

L.02.04

TUKANG KAYU

OH

85,000

L.02.05

TUKANG BESI

OH

85,000

L.02.06

Tukang Besi Konstruksi

OH

85,000

L.02.07

TUKANG BESI PROFIL

OH

85,000

L.02.08

TUKANG CAT

OH

85,000

L.02.09

Tukang ereksi

OH

85,000

L.02.10

Tukang Las Konstruksi

OH

85,000

L.02.11

Tukang Las

OH

85,000

L.02.12

TUKANG LISTRIK

OH

85,000

L.02.13

TUKANG PIPA

OH

85,000

L.02.14

TUKANG VIBRATOR

OH

85,000

L.03.01

KEPALA TUKANG

OH

100,000

L.04.01

MANDOR

OH

110,000

L.08.01

Operator Alat Berat

OH

100,000

L.08.02

Supir Truk

OH

85,000

L.09.01

Pembantu Operator Alat Berat

OH

60,000

L.09.02

Kenek Truk

OH

60,000

L.10.01

Operator Crane

OH

85,000

L.10.02

Pembantu operator crane

OH

60,000

L.11.01

Operator Alat Pipa

OH

85,000

L.11.02

Pembantu Operator Alat Pipa

OH

60,000

Operator Alat Elektronik

OH

85,000

PENJAGA MALAM

OH

60,000

TUKANG PASANG KERAMIK

OH

85,000

L.13

DAFTAR HARGA BAHAN No.

Kode

Nama

I 1 2 3

UMUM Air Lem Kayu/Karet Minyak bekisting

II 1 2 3

TANAH DAN PASIR Pasir beton Pasir Pasang Pasir urug

III 1 2 3 4 5 6

BATU DAN BETON BLOK Batu angin Batu belah Batu tela Kerikil Kerikil (Maks 30 mm) Koral beton

IV 1 2

SEMEN Semen portland Semen Warna

V 1 2 3 4 5 6 7 8 9

KAYU Balok kayu kelas I Balok kayu kelas II Balok kayu kelas III Dolken kayu Ø 8-10/400 cm Kayu 5/7, kayu kelas III Kayu kelas II Kayu kelas III Kayu Papan kelas I Kayu papan kelas III

VI 1 2 3 4 5 6 7 8

BESI DAN ALUMINIUM Besi beton (polos/ulir) Besi strip Kawat beton Las Dop Paku 2”-3” Paku 5 - 10 cm Paku 5 - 12 cm Paku Biasa

9 10 11

Paku hak panj 15cm Paku seng Paku skrup

VII 1 2 3

PENUTUP ATAP Seng gelombang Seng plat, BJLS 30 Seng plat, BJLS 20

VIII

PERLENGKAPAN KAMAR MANDI

IX 1 2 3

ALAT-ALAT PENGGANTUNG Engsel pintu Kunci tanam biasa Grendel pintu

XI 1

FINISHING LANTAI DAN DINDING keramik ukuran 40cm x 40cm

XII 1 2 3 4 5 6 7 8 9 10

PLITUR DAN CAT Ampelas Cat Dasar Kayu Cat dasar Tembok Cat meni kayu Cat Penutup Kayu Cat Penutup Tembok Kuas Pengencer Plamir kayu Plamir tembok

XIII 1 2

BAHAN OLAHAN Plywood 60x120x9 mm Tripleks 4 mm

XIV 1 2 3 4 5 6 7 8

ELEKTRIKAL Fitting Lampu Kabel NYM 3x2,5 mm² Klem Pipa Listrik L.Bow Mongkok (Listrik) Pipa listrik 5/8” Saklar tunggal Tee Doos

AFTAR HARGA BAHAN Satuan Liter cm Liter

m³ m³ m³

Bh m³ Bh m³ m³ m³

Kg Kg

m³ m³ m³ Batang m³ m³ m³ m³ m³

kg kg kg bh Kg kg kg Kg

Harga 42.50 17,000.00 21,250.00 361,250.00 348,500.00 340,000.00 2,550.00 187,000.00 1,870.00 187,000.00 187,000.00 187,000.00 1,700.00 8,500.00 4,675,000.00 2,125,000.00 1,190,000.00 8,500.00 1,190,000.00 2,125,000.00 1,190,000.00 5,105,610.00 1,190,000.00 16,575.00 16,745.00 16,150.00 1,275.00 21,250.00 21,250.00 21,250.00 21,250.00

Kg Kg kg

Lbr Lbr Lbr

Bh Bh Bh

Dos

Lbr Kg Kg Kg Kg Kg Bh Kg Kg Kg

Lbr Lembar

bh m bh bh bh btg bh bh

18,700.00 18,700.00 29,750.00 59,500.00 38,250.00 29,750.00 12,750.00 106,250.00 21,250.00 76,500.00 5,100.00 21,250.00 21,250.00 22,950.00 46,750.00 38,250.00 8,500.00 17,000.00 18,700.00 14,875.00 51,442.00 66,300.00 8,500.00 3,400.00 4,250.00 6,375.00 4,250.00 14,875.00 10,200.00 4,250.00

NO

URAIAN PEKERJAAN 1

2

3

4

5

6

7

A

PEKERJAAN PERSIAPAN A.1 Pengukuran dan pemasangan Bouwplank A.2 Pembuatan gudang semen dan peralatan A.3 Pemasangan Papan Proyek

B

PEKERJAAN TANAH B.1 Galian tanah pondasi B.2 Pengurugan kembali galian tanah pondasi B.3 Pemadatan tanah tanah (per 20 cm) B.4 Pengurugan dengan pasir urug

C

PEKERJAAN PONDASI C.1 Pemasangan pondasi batu belah campuran 1SP : 4PP C.2 Pemasangan batu kosong (anstamping)

D

PEKERJAAN BETON D.1 Pembuatan sloof beton bertulang, K175 (110 kg besi + bekisting) D.2 Pembuatan kolom beton bertulang, K175 (110 kg besi + bekisting) D.3 Pembuatan balok beton bertulang, K175 (110 kg besi + bekisting) D.4 Membuat lantai kerja beton tumbuk mutu f'c=7,4 Mpa

E

PEKERJAAN KAYU E.1 Pembuatan dan pemasangan kusen pintu kayu kelas I E.2

E.3 E.4 E.5

F

8

Rangka kusen pintu 3 : Pembuatan dan pemasangan daun pintu dan jalusi kaca, kayu Daun Pintu kebaya 3 : Jalusi jendela-pintu panel biasa : Pembuatan dan pemasangan kuda-kuda kayu kelas I Pembuatan dan pemasangan gording kayu kelas II Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I

PEKERJAAN PASANGAN DINDING DAN LANTAI F.1 Pemasangan dinding Batu tela tebal ½ batu camp. 1SP :4PP F.2 Pemasangan dinding batu angin F.3 Plesteran 1SP : 4PP tebal 15 mm F.4 Acian F.5 Pemasangan lantai keramik ukuran 40cm x 40cm

G

PEKERJAAN LANGIT-LANGIT (PLAFON) G.1 Pemasangan langit-langit tripleks (120x240) cm, tebal 4 mm G.2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II

H

PEKERJAAN PENUTUP ATAP H.1 Pemasangan atap seng tebal 0.20 mm H.2 Pemasangan nok alumunium

I

PEKERJAAN KUNCI DAN KACA I.1 Pemasangan kunci tanam biasa I.2 Pemasangan engsel pintu dan jendela I.3 Pemasangan grendel pintu dan jendela

J

PEKERJAAN PENGECATAN J.1 Pengecatan bidang kayu baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup) J.2 Pengecatan tembok baru ( 1lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)

K

PEKERJAAN ELEKTRIKAL K.1 Pemasangan titik lampu (+ instalasi dan saklar) K.2 Pemasangan Stopkontak

9

SATUAN

X1

X2

X3

KOEFISIEN

10

11

12

13

14

VOLUME BOBOT (46,63%) 15

16

m' m² Bh

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

m³ m³ m³ m³

35.90 10.77 22.40 36.29

0.50 1.00 4.50 0.13

0.60 1.00 0.40 1.00

1.00 0.20 0.90 0.90

10.77 2.15 36.29 4.08

m³ m³

35.90 35.90

0.50 0.50

0.40 0.20

0.40 0.90

2.87 3.23

m³ m³ m³ m³

35.90 17.00 1.02 22.40

0.15 0.20 1.00 4.50

0.20 0.20 1.00 0.95

0.95 2.38 1.00 0.05

1.02 1.62 1.02 4.79



m³ m³ m’

0.05 7.50 3.83 2.50 0.50 11.50 186.90 41.90

1.00 0.06 1.00 1.50 1.50 0.12 0.07 1.00

1.00 0.12 1.00 1.00 1.00 0.06 0.05 1.00

1.00 0.90 0.98 0.96 0.30 12.00 0.90 1.00

0.05 0.05 3.75 3.60 0.23 0.99 0.59 41.90

m² m² m² m² m²

34.40 34.40 26.14 52.29 22.40

1.00 1.00 1.00 1.00 4.50

0.95 1.30 1.00 1.00 1.00

0.80 0.92 2.00 1.00 0.90

26.14 41.14 52.29 52.29 90.72

9.222351 1.84447 31.07341 3.495759 0 0 2.459294 2.766705 0 0 0.876123 1.382925 0.876123 4.099964 0 0 0.041616 0.041616 3.209841 3.08268 0.192668 0.85082 0.504134 35.87897 0 0 0 22.38711 35.23024 44.77421 44.77421 77.68354 0

angka kusen pintu 3 : m²

Daun Pintu kebaya 3 : la-pintu panel biasa :

2 lapis cat penutup) is cat penutup)

m² m²

24.20 128.26

5.30 1.00

1.00 1.00

1.00 1.00

128.26 128.26

m² m’

128.26 9.06

1.00 1.12

1.00 1.00

1.12 2.00

157.15 20.29

Bh Bh Bh

1.00 10.00 4.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 10.00 4.00

m² m²

76.97 76.97

1.00 1.00

1.00 1.00

0.10 1.00

7.70 76.97

Bh Bh

8.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00

8.00 1.00

0 109.829 109.829 0 0 134.5686 17.37809 0 0 1 10 4 0 0 0 6.591236 65.91236 0 0 6 1

0.8563 500095530.006375

0.72 81.88

17.72

32.78

2

65.56

PENGUMPULAN D.1

Pembuatan 1 m³ sloof beton bertulang, K225 (110 kg besi + bekisting) Berat Besi/M² Beton Netto

D.2

110 Kg

2,375,032.00

Beton K175 1,191,727.00

Pembuatan 1 m³ kolom beton bertulang, K225 (110 kg besi + bekisting) Berat Besi/M² Beton Netto

D.3

Besi Beton

110 Kg

Besi Beton 2,375,032.00

Beton K175 1,191,727.00

Pembuatan 1 m³ balok beton bertulang, K225 (110 kg besi + bekisting) Berat Besi/M² Beton Netto

110 Kg

Besi Beton 2,375,032.00

Beton K175 1,191,727.00

Satuan : Bakesting 3 m² 173,663.75

Satuan : Bakesting 4 m² 431,904.00

Satuan : Bakesting 3 m² 208,396.50

m³ Siram dan Bongkar

3,740,422.75 Jumlah Harga 3,740,422.75

m³ Siram dan Bongkar

3,998,663.00 Jumlah Harga 3,998,663.00

m³ Siram dan Bongkar

3,775,155.50 Jumlah Harga 3,775,155.50

TINGGI LEBAR PANJANG

6.00 9.00 9.00 81.00

PONDASI 5.00 1.750 18.00 31.50

PASANGAN BETON SLOF KOLOM 5.00 0.20 5.00 1.750 0.15 0.20 18.00 36.00 0.20 31.50 1.08 0.80

BALOK 0.15 0.15 36.00 0.81

ATAP ( 6 X 8 ) KUDA-KUDAGORDING 33.00 70.00 0.06 0.05 0.12 0.07 0.24 0.25

2.5

ATAP ( 6 X 8 ) KUSEN PINTU LANTAI DINDING (8 X 6 X 3) LISPLANK SENG SENG PLAT KUSEN PINTU /JND LANTAI DINDINGPLESTERAN 21.00 9.00 37.94 5.40 0.05 108.00 21.00 0.06 4.00 9.00 108.00 0.12 9.00 20.40 26.00 42.00 7.00 0.27 9.40 4.05 223.00 446.00

KUSEN PIN KUSEN JEN PINTU JEND

14.4 12.8 5.4 4.0

3.24 7.5 4.00

Related Documents


More Documents from "James"