DAFTAR ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG - RUMAH Wilayah Makassar dan sekitarnya Tahun Periode 2012 Koef

Sat

1 An. 1. 1 M1 Pengukuran dan Pemasangan Bouwplank Bahan : 0.012 Kayu 5/7 Klas III Paku Biasa 2"-5" 0.02 0.007 Kayu Papan Klas III

M3 Kg

No

Uraian

Harga Satuan

M3

Rp. Rp. Rp.

Jumlah

1,700,000.00 Rp. 15,000.00 Rp. 2,000,000.00 Rp.

Upah : Tukang Kayu Pekerja Kepala Tukang

0.1 0.1 0.01

Hr Hr Hr

Rp. Rp. Rp.

Mandor

0.005

Hr

Rp.

50,000.00 Rp. Rp. Harga Satuan

1 An. 1. 1 M2 Membersihkan Lapangan dan Peralatan Upah : 0.1 Pekerja 0.05 Mandor

Hr Hr

Rp. Rp.

35,000.00 Rp. 60,000.00 Rp. Rp. Harga Satuan

An. . 1 M' Pengukuran & Pemasangan Bowplank Upah : 0.012 M³ Kayu 5/7 0.02 Kg Paku Biasa 2"-5" 0.007 M³ Kayu papan 3/20 Tenaga : Tukang Kayu 0.1 Hr Pekerja 0.1 Hr Kepala Tukang 0.01 Hr Mandor 0.005 Hr

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

2,500,000.00 15,000.00 3,000,000.00

45,000.00 30,000.00 51,000.00

Rp. Rp. Rp.

Rp. Rp. Rp.

60,000.00 Rp. 50,000.00 Rp. 55,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

Pembuatan direksi keet dan los kerja Upah : Kayu 5/7 Paku Biasa 2"-5" Kayu papan 3/20 Tenaga : Tukang Kayu

0.001 M³ 0.02 Kg 0.004 M³ 0.1

Hr

Rp. Rp. Rp.

3,100,000.00 24,000.00 3,500,000.00

Rp. Rp. Rp.

Rp.

75,000.00

Rp.

Pekerja Kepala Tukang Mandor

0.1 0.01 0.005

Hr Hr Hr

Rp. Rp. Rp.

50,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

2 An. 2. 1 M3 Galian Tanah biasa Upah : Pekerja Mandor

0.75 0.025

Hr Hr

Rp. Rp.

50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

3 An. 3. 1 M3 Urugan Kembali Upah : Pekerja Mandor

0.192 0.019

Hr Hr

Rp. Rp.

50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

4 An. 4. 1 M3 Pemadatan Tanah Upah : Pekerja Mandor

0.5 0.05

Hr Hr

Rp. Rp.

50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

Pasir Urug

1.1

M3

Rp.

Pekerja Mandor

0.3 0.01

Hr Hr

Rp. Rp.

Sirtu

1.2

M3

Rp.

Pekerja Mandor

0.3 0.01

Hr Hr

Rp. Rp.

1.2

M3

Rp.

5 An. 5. 1 M3 Urugan Pasir Bahan : 60,000.00

Rp.

Upah : 50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

6 An. 6. 1 M3 Urugan Sirtu Bahan : 75,000.00

Rp.

Upah : 50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

7 An. 7. 1 M3 Urugan Tanah Bahan : Tanah Urug

150,000.00

Rp.

Upah : 0.192 0.01

Hr Hr

Rp. Rp.

Batu Gunung 15/20 cm

1.2

M3

Rp.

160,000.00

Rp.

Pasir Urug

0.3

M3

Rp.

60,000.00

Rp.

0.78 0.39 0.039 0.039

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

M3 Kg M3

Rp. Rp. Rp.

1.5 0.6 0.06 0.075

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

M3 Kg

Pasir Pasangan

1.1 104 0.52

M3

Rp. Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

3 1 0.05 0.03

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

11 An. 11. 1 M2 Pasang Bata Merah 1/2 Bata, 1 Pc : 3 Ps Bahan : 140 Bata Merah 5x11x22

Bh

Rp.

Pekerja Mandor

50,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

8 An. 8. 1 M3 Pasang Pondasi Batu Kosong Bahan :

Upah : Pekerja Tukang Batu Kepala Tukang Mandor

9 An. 9. 1 M3 Pasang Pondasi Batu Gunung 1 Pc : 3 Ps Bahan : 1.1 Batu Gunung 392 Semen Portland 0.314 Pasir Pasangan

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

160,000.00 140.00 80,000.00

Rp. Rp. Rp.

Upah : Pekerja Tukang Batu Kepala Tukang Mandor

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

10 An. 10. 1 M3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps Bahan : Batu Kali Semen Portland

150,000.00 875.00 80,000.00

Rp. Rp. Rp.

Upah : 50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

550.00

Rp.

Kg

Pasir Pasangan

43.5 0.08

M3

Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

0.65 0.2 0.02 0.03

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Bh Kg M3

Rp. Rp. Rp.

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

13 An. 13. 1 M2 Pasang Lantai Bata Merah 1/4 Bata , 1 Pc : 5 Ps Bahan : 35 Bata Merah 5x11x22 Bh 4.84 Kg Semen Portland 0.023 M3 Pasir Pasangan

Rp. Rp. Rp.

Semen Portland

875.00 80,000.00

Rp. Rp.

Upah :

12 An. 12. 1 M3 Pasang Bata Merah 1/2 Bata, 1 Pc : 5 Ps Bahan : 70 Bata Merah 5x11x22 9.68 Semen Portland 0.045 Pasir Pasangan

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

550.00 875.00 80,000.00

Rp. Rp. Rp.

Upah : Pekerja Tukang Batu Kepala Tukang Mandor

0.32 0.1 0.01 0.015

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

550.00 875.00 80,000.00

Rp. Rp. Rp.

Upah : 0.16 0.05 0.005 0.008

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Kg

Pasir Pasangan

6.48 0.019

3

Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

0.2 0.15 0.015 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

14 An. 14. 1 M2 Plesteran 1 Pc : 3 Ps, tebal 1,5 cm Bahan : Semen Portland

M

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

875.00 80,000.00

Rp. Rp.

Upah : 50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

15 An. 15. 1 M2 Plesteran 1 Pc : 5 Ps, tebal 1,5 cm Bahan : Semen Portland

Kg

Pasir Pasangan

4.32 0.022

M3

Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

0.2 0.15 0.015 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Kg

Pasir Pasangan

10.8 0.026

3

Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

0.25 0.2 0.02 0.013

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Kg

Pasir Pasangan

7.29 0.028

M3

Rp. Rp.

Pekerja Tukang Batu Kepala Tukang Mandor

0.25 0.2 0.02 0.013

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

5 0.03

Kg Kg

Rp. Rp.

1 1 0.1 0.05

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

875.00 80,000.00

Rp. Rp.

Upah :

16 An. 16. 1 M2 Plesteran 1 Pc : 3 Ps, tebal 2 cm Bahan : Semen Portland

M

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

875.00 80,000.00

Rp. Rp.

Upah :

17 An. 17. 1 M2 Plesteran 1 Pc : 5 Ps, tebal 2 cm Bahan : Semen Portland

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

875.00 80,000.00

Rp. Rp.

Upah :

18 An. 18. 1 M2 Acian Plesteran Bahan : Semen Portland Kapur Pasangan Upah : Pekerja Tukang Batu Kepala Tukang Mandor

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

875.00 80,000.00

Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

19 An. 19. 1 M3 Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr Bahan : 197 Semen Portland 0.47 Pasir Beton Kerikil Air Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

M3

Rp. Rp.

95,000.00

Rp. Rp.

0.94 180

M3 L

Rp. Rp.

200,000.00 100.00

Rp. Rp.

1.65 0.25 0.025 0.08

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Kg

20 An. 20. 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr Bahan : 425 Kg Semen Portland 0.54 M3 Pasir Beton 0.82 M3 Kerikil 225 Air L Tenaga : 13.45 Hr Pekerja 1 Tukang Batu Hr 1.25 Hr Kepala Tukang 0.4 Mandor Hr

21 1M3 BETON BERTULANG A.COR BETON K-225 ADUKAN 1PC:1,5PS:3KR Cipping Semen Portand 40 KG Pasir beton B.UPAH KERJA PENGECORAN Tukang Batu Kepala Tukang Batu Pekerja Mandor C.BESI TULANGAN :100 KG BESI BETON Besi Beton Kawat Beton Tukang Besi Kepala Tukang Besi Pekerja

875.00

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

Rp. Rp.

95,000.00

Rp. Rp.

Rp. Rp.

200,000.00 100.00

Rp. Rp.

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

0.81 m3 7.14 ZAK 0.552 m3

Rp. Rp. Rp.

270,000.00 35,000.00 95,000.00

Rp. Rp. Rp. Rp.

1 1.25 13.45 0.4

HR HR HR HR

Rp. Rp. Rp. Rp.

75,000.00 75,000.00 50,000.00 100,000.00

Rp. Rp. Rp. Rp. Rp.

105 1.5 0.7 0.07 0.7

KG HR HR HR

Rp. Rp. Rp. Rp. Rp.

7,200.00 15,000.00 80,000.00 100,000.00 70,000.00

Rp. Rp. Rp. Rp. Rp.

875.00

Mandor

0.03 HR

Rp.

125,000.00

Haraga Satuan 22 An. 22 1 Kg Pembesian dengan Besi Polos atau Besi Ulir Bahan : 1.05 Besi Beton ( Polos/ulir ) 0.015 Kawat Beton Tenaga : 0.007 Pekerja 0.007 Tukang Besi 0.001 Kepala Tukang 0 Mandor

Rp. Rp. Rp.

Kg Kg

Rp. Rp.

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

0.045 0.3 0.1

M3 Kg Ltr

Rp. Rp. Rp.

3,000,000.00 15,000.00 19,000.00

0.3 0.26 0.026 0.005

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 75,000.00 Rp. 100,000.00 Rp. Rp. Harga Satuan

1 145

M3 Kg

Rp. Rp.

1,490,925.00 87,282.50

8

M2

Rp.

178,350.00 Rp. Rp. Harga Satuan

Balok Kayu Klas I

1.1

M3

Rp.

9,000,000.00

Rp.

Balok Kayu Klas II

1.1

M3

Rp.

3,100,000.00

Rp.

1.1 15 0.8

M3 Kg Kg

Rp. Rp. Rp.

2,300,000.00 9,250.00 24,000.00

Rp. Rp. Rp.

4

Hr

Rp.

50,000.00

Rp.

82,000.00 15,000.00

Rp. Rp.

23 An. 23. 1 M2 Pasangan Bekisting Bahan : Papan Kayu Klas III Paku Biasa 2" - 5" Minyak Bekisting Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

Rp. Rp. Rp.

24 An. 24. 1 M3 Membuat Beton Bertulang Analisa : An. 20. Beton Bertulang An. 22 Pembesian Beton An. 23. Bekisting

Rp. Rp.

25 An. 25. 1 M3 Pasang Konstruksi Kuda-kuda Bahan :

Balok Kayu Klas III Besi Strip Paku Biasa 2" - 5" Tenaga : Pekerja

Tukang Kayu Kepala Tukang Mandor

12 1.2 0.2

Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

26 An. 26. 1 M3 Pasang Gurding Bahan : Balok Kayu Klas I

1.1

M3

Rp.

9,000,000.00

Rp.

Balok Kayu Klas II

1.1

M3

Rp.

3,100,000.00

Rp.

1.1 0.8

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

6 12 1.8 0.3

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

27 An. 27. 1 M2 Pasang Kaso + Reng Atap Genteng Bahan : Balok Kayu Klas I

0.012

M3

Rp.

9,000,000.00

Rp.

Balok Kayu Klas II

0.012

M3

Rp.

3,100,000.00

Rp.

0.014 0.15

M3 Kg

Rp. Rp.

2,300,000.00 13,000.00

Rp. Rp.

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

0.1 0.1 0.01 0.005

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

28 An. 28. 1 M2 Pasang Karet Pelapis Atap Genteng Bahan : Karet Pelapis Paku Biasa 2" - 5" Tenaga : Pekerja

1.2 0.5

M2 Kg

Rp. Rp.

20,500.00 24,000.00

Rp. Rp.

0.15

Hr

Rp.

50,000.00

Rp.

0.1 0.01 0.01

Hr Hr Hr

Rp. Rp. Rp.

11 0.03

Lbr Kg

Rp. Rp.

0.2 0.1 0.01 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

3 5 0.02

Lbr Kg M3

Rp. Rp. Rp.

0.15 0.075 0.008 0.008

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

Balok Kayu Klas I

0.011

M3

Rp.

12,300,000.00

Rp.

Balok Kayu Klas II

0.011

M3

Rp.

3,500,000.00

Rp.

0.011 0.05

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

Tukang Kayu Kepala Tukang Mandor

29 An. 29. 1 M2 Pasang Atap Genteng Bahan : Genteng Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

30 An. 30. 1 M1 Pasang Nok Atap Genteng Bahan : Nok Genteng Beton Semen Portland Pasir Pasangan Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

46,000.00 24,000.00

Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

43,000.00 1,200.00 75,000.00

Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

31 An. 31. 1 M2 Pasang Listplank 3/20 Bahan :

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

32 An. 32. 1 M2 Pasang Listplank 3/30

0.11 0.22 0.022 0.005

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

Bahan : Balok Kayu Klas I

0.011

M3

Rp.

12,300,000.00

Rp.

Balok Kayu Klas II

0.011

M3

Rp.

3,500,000.00

Rp.

0.011 0.05

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

0.11 0.22 0.022 0.005

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

33 An. 33. 1 M2 Pasang Listplank 2x3/20 Bahan : Balok Kayu Klas I

0.011

M3

Rp.

12,300,000.00

Rp.

Balok Kayu Klas II

0.011

M3

Rp.

3,500,000.00

Rp.

0.011 0.05

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

0.11 0.22 0.022 0.005

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

34 An. 34. 1 M1 Pasang Listplank 2x2/20 Bahan : Balok Kayu Klas I

0.011

M3

Rp.

12,300,000.00

Rp.

Balok Kayu Klas II

0.011

M3

Rp.

3,500,000.00

Rp.

0.011 0.05

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

0.11 0.22 0.022 0.005

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

35 An. 35. 1 M2 Pasang Atap Genteng Bahan : Genteng Paku Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

11 0.03

Lbr Kg

Rp. Rp.

0.2 0.1 0.01 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

3.5 0.05

Lbr Kg

Rp. Rp.

0.4 0.2 0.02 0.02

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

37 An. 37. 1 M2 Pasang Rangka Langit-langit 100x100 cm Bahan : 0.012 Balok Kayu Klas I

M3

Rp.

9,000,000.00

Rp.

0.012

M3

Rp.

3,100,000.00

Rp.

0.012 2

M3 Kg

Rp. Rp.

2,300,000.00 24,000.00

Rp. Rp.

36 An. 36. 1 M2 Pasang Nok Genteng Bahan : Nok Genteng Paku Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

Balok Kayu Klas II Balok Kayu Klas III Paku Biasa 2" - 5" Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

38 An. 38. 1 M2 Pasang Langit-langit 100x100 cm Bahan : Etermit Tripleks Paku Tenaga :

0.6 1.8 0.18 0.03

1 0.39 0.02

46,000.00 29,150.00

Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

43,000.00 29,150.00

Rp. Rp.

Rp. Hr 50,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Hr 85,000.00 Rp. Rp. Hr 75,000.00 Rp. Rp. Balok Kayu Klas I Rp. Balok Kayu Klas II Rp. Balok Kayu Klas III

Lbr Lbr Kg

Rp. Rp. Rp.

25,000.00 130,250.00 24,000.00

Rp. Rp. Rp.

Pekerja Tukang Kayu Kepala Tukang Mandor

0.3 0.5 0.05 0.02

Rp. Hr Rp. Hr Rp. Hr Rp. Hr Plafond Eternit Plafond Tripleks

50,000.00 75,000.00 85,000.00 75,000.00

Rp. Rp. Rp. Rp. Rp. Rp.

8,500.00

Rp.

39 An. 39. 1 M1 Pasang List Plafound Kayu Profil Bahan : 1.1

M1

Rp.

0.05 0.05 0.005 0.003

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

M3

Rp.

9,000,000.00

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

41 An. 41. 1 M2 Pasang Jalusi Pintu dan Jendela Kayu Klas I Bahan : 0.064 M3 Papan Kayu Klas I (kayu bangkirei)

Rp.

Kayu Profil Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

40 An. 40. 1 M3 Pasang Kusen Pintu dan Jendela Klas I Bahan : 1.1 Balok Kayu Klas I Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

6 20 2 0.3

1 3 0.3 0.3

42 An. 42. 1 M2 Pasang Jalusi Mati Kusen Kayu Klas I Bahan : 0.06 Papan Kayu Klas I (kayu bangkirei) 0.15 Paku Biasa 1/2"-1" Tenaga : 0.5 Pekerja 2 Tukang Kayu

12,300,000.00

Rp.

Rp.

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

M3 Kg

Rp. Rp.

12,300,000.00 24,000.00

Rp. Rp.

Hr Hr

Rp. Rp.

50,000.00 75,000.00

Rp. Rp.

Kepala Tukang Mandor

0.2 0.025

Hr Hr

43 An. 43. 1 M2 Pasang Pintu dan Jendela Panil Kayu Klas I Bahan : 0.04 M3 Papan Kayu Klas I (kayu bangkirei) Tenaga : 1.544 Hr Pekerja 4.633 Hr Tukang Kayu 0.463 Hr Kepala Tukang 0.463 Hr Mandor

44 An. 44. 1 M2 Pasang Pintu dan Jendela Panil Kaca Klas I Bahan : 0.035 M3 Papan Kayu Klas I (kayu bangkirei) 1.1 Kaca Bening 5 mm M2 Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

Rp. Rp.

Rp. Rp. Rp. Rp. Rp.

85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

12,300,000.00

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

Rp.

12,300,000.00

Rp.

Rp.

147,000.00

Rp.

0.8 2 0.2 0.04

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

1

M2

Rp.

147,000.00

Rp.

0.005

M3

Rp.

3,500,000.00

Rp.

0.15 0.5 0.05 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

Keramik 20x20

1

M2

Rp.

38,650.00

Rp.

Keramik 20x25

1

M2

Rp.

39,650.00

Rp.

Keramik 30x30

1

M2

Rp.

39,500.00

Rp.

Keramik 40x40 Semen Portland

1 11.38

M2 Kg

Rp. Rp.

55,000.00 1,200.00

Rp. Rp.

45 An. 45. 1 M2 Pasang Kaca Mati Bahan : Kaca Bening 5 mm Kayu Les Klas II Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

46 An. 46. 1 M2 Pasang Lantai Keramik Bahan :

Pasir Pasangan Semen Warna Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

0.042 1.5 0.62 0.35 0.035 0.03

M3 Kg

Rp. Rp.

Rp. Hr Rp. Hr Rp. Hr Rp. Hr Keramik 20x20 Keramik 20x25 Keramik 30x30 Keramik 40x40

75,000.00 15,000.00

Rp. Rp.

50,000.00 75,000.00 85,000.00 75,000.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

47 An. 47. 1 M2 Pasang Dinding Keramik Bahan : Keramik 10/20

1

M2

Rp.

41,000.00

Rp.

Keramik 20x20

1

M2

Rp.

36,650.00

Rp.

Keramik 20x25

1

M2

Rp.

42,000.00

Rp.

Keramik 30x30

1

M2

Rp.

39,500.00

Rp.

Batu Tempel Semen Portland

1 9.3 0.018 1.5

M2 Kg

Rp. Rp. Rp. Rp.

1,200.00

Rp. Rp. Rp. Rp.

Pasir Pasangan Semen Warna Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

0.6 0.45 0.045 0.03

M3 Kg

Rp. Hr Rp. Hr Rp. Hr Rp. Hr Keramik 10/20 Keramik 20x20 Keramik 20x25 Keramik 30x30 Batu Tempel

48 An. 48. 1 M2 Pengecatan Tembok/Eternit Baru ( 1 Lps Plamir, 1 Lps Cat Dasar, 2 Lps Cat Penutup ) Bahan : 0.1 Plamir 1 x Kg 0.1 Cat Dasar 1 x Kg 0.2 Cat Penutup 2 x Kg Tenaga : 0.2 Pekerja Hr 0.1 Tukang Cat Hr 0.009 Hr Kepala Tukang

75,000.00 15,000.00 50,000.00 75,000.00 85,000.00 75,000.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

Rp. Rp. Rp.

31,500.00 24,000.00 18,000.00

Rp. Rp. Rp.

Rp. Rp. Rp.

50,000.00 75,000.00 85,000.00

Rp. Rp. Rp.

Mandor

0.03

Hr

Rp.

75,000.00 Rp. Rp. Harga Satuan

49 An. 49. 1 M2 Pengecatan Kayu Baru ( 1 Lps Plamir, 1 Lps Cat Dasar, 2 Lps Cat Penutup ) Bahan : 0.2 Cat Meni Kg Rp. 24,000.00 Rp. 0.15 Kg Rp. Plamir 1 x 31,500.00 Rp. 0.17 Kg Rp. Cat Dasar 1 x 24,000.00 Rp. 0.35 Kg Rp. Cat Penutup 2 x 30,000.00 Rp. Tenaga : 0.07 Hr Rp. Pekerja 50,000.00 Rp. 0.105 Hr Rp. Tukang Cat 75,000.00 Rp. 0.004 Hr Rp. Kepala Tukang 85,000.00 Rp. 0.003 Rp. Mandor Hr 75,000.00 Rp. Rp. Harga Satuan 50 An. 50. 1 M2 Pengecatan Atap Seng Baru ( 1 Lps Cat Dasar, 2 Lps Cat Penutup ) Bahan : 0.17 Kg Rp. Cat Dasar 1 x 24,000.00 Rp. 0.26 Kg Rp. Cat Penutup 2 x 30,000.00 Rp. Tenaga : 0.07 Hr Rp. Pekerja 50,000.00 Rp. 0.009 Hr Rp. Tukang Cat 75,000.00 Rp. 0.006 Hr Rp. Kepala Tukang 85,000.00 Rp. 0.003 Rp. Mandor Hr 75,000.00 Rp. Rp. Harga Satuan 51 An. 51. 1 Bh Kunci Tanam 2 x Putar Bahan : Kunci Tanam 2 x Putar Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

52 An. 52. 1 Bh Engsel Pintu Kuningan Bahan : Engsel Pintu Kuningan Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

1

Bh

Rp.

0.01 0.5 0.01 0.005

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

17,500.00

Rp.

0.015 0.15 0.015 0.001

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 75,000.00 85,000.00 75,000.00

Rp. Rp. Rp. Rp.

225,000.00

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

Harga Satuan 53 An. 53. 1 Bh Engsel Jendela Kuningan Bahan : Engsel Jendela Kuningan Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

54 An. 54. 1 Bh Grendel Pintu Bahan : Grendel Pintu Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

55 An. 55. 1 Bh Grendel Jendela Bahan : Grendel Jendela Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

56 An. 56. 1 Bh Kait Angin Jendela Bahan : Kair Angin Tenaga : Pekerja Tukang Kayu Kepala Tukang Mandor

57 An. 57. 1 Bh Kloset Jongkok Porselain Bahan : Kloset Jongkok

1

Bh

Rp.

0.02 0.2 0.02 0.01

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

0.01 0.1 0.01 0.005

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

0.012 0.12 0.012 0.006

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

0.015 0.15 0.015 0.001

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

15,000.00

Rp.

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

26,000.00

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

9,000.00

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

9,650.00

Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

133,000.00

Rp.

Semen Portland Pasir Pasangan Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

58 An. 58. 1 Bh Kloset Duduk Bahan : Kloset Duduk Lengkap Perlengkapan Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

59 An. 59. 1 Bh Urinoir Bahan : Urinoir Perlengkapan Semen Portland Pasir Pasangan Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

60 An. 60. 1 Bh Wastafel Bahan : Wastafel Perlengkapan Semen Portland Pasir Pasangan Tenaga : Pekerja Tukang Batu Kepala Tukang Mandor

6 0.01

Kg M3

Rp. Rp.

1 1.5 1.5 0.16

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

1

Bh

Rp.

1,100,000.00

3.3 1.1 0.001 0.16

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

1

Bh

Rp.

580,000.00

6 0.01

Kg M3

Rp. Rp.

1,200.00 75,000.00

1 1 0.1 0.1

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1

Bh

Rp.

451,650.00

6 0.01

Kg M3

Rp. Rp.

1,200.00 75,000.00

1.2 1.45 0.15 0.1

Hr Hr Hr Hr

Rp. Rp. Rp. Rp.

1,200.00 75,000.00

Rp. Rp.

Rp. Rp.

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

Rp. Rp. Rp. Rp.

50,000.00 Rp. 75,000.00 Rp. 85,000.00 Rp. 75,000.00 Rp. Rp. Harga Satuan

Ir. Muhammad Rizal Team Leader

Makassar dan sekitarnya Tahun

Jumlah

20,400.00 300.00 14,000.00 4,500.00 3,000.00 510.00 250.00 42,960.00

3,500.00 3,000.00 6,500.00

30,000.00 300.00 21,000.00 6,000.00 5,000.00 550.00 500.00 63,350.00

3,100.00 480.00 14,000.00 7,500.00

5,000.00 850.00 375.00 31,305.00

37,500.00 2,500.00 40,000.00

9,600.00 1,900.00 11,500.00

25,000.00 5,000.00 30,000.00

66,000.00 15,000.00 1,000.00 82,000.00

90,000.00 15,000.00 1,000.00 106,000.00

180,000.00

9,600.00 1,000.00 190,600.00

192,000.00 18,000.00 39,000.00 29,250.00 2,925.00 3,900.00 285,075.00

176,000.00 54,880.00 25,120.00 75,000.00 45,000.00 4,500.00 7,500.00 388,000.00

165,000.00 91,000.00 41,600.00 150,000.00 75,000.00 3,750.00 3,000.00 529,350.00

77,000.00

1.1 104 0.52 3 1 0.05 0.03

140

38,062.50 6,400.00 32,500.00 15,000.00 1,500.00 3,000.00 173,462.50

43.5 0.08 0.65 0.2 0.02 0.03

38,500.00 8,470.00 3,600.00 16,000.00 7,500.00 750.00 1,500.00 76,320.00

19,250.00 4,235.00 1,800.00 8,000.00 3,750.00 375.00 750.00 38,160.00

5,670.00 1,520.00 10,000.00 11,250.00 1,125.00 1,000.00 30,565.00

6.48 0.019 0.2 0.15 0.015 0.01

3,780.00 1,760.00 10,000.00 11,250.00 1,125.00 1,000.00 28,915.00

9,450.00 2,080.00 12,500.00 15,000.00 1,500.00 1,250.00 41,780.00

6,378.75 2,240.00 12,500.00 15,000.00 1,500.00 1,250.00 38,868.75

4,375.00 2,400.00 50,000.00 75,000.00 7,500.00 5,000.00 144,275.00

4.32 0.022 0.2 0.15 0.015 0.01

10.8 0.026 0.25 0.2 0.02 0.0125

7.29 0.028 0.25 0.2 0.02 0.0125

5 0.03 1 1 0.1 0.05

172,375.00 44,650.00 188,000.00 18,000.00 82,500.00 18,750.00 1,875.00 8,000.00 534,150.00

371,875.00 51,300.00 164,000.00 22,500.00 672,500.00 75,000.00 93,750.00 40,000.00 1,490,925.00

218,700.00 249,900.00 52,440.00 521,040.00 75,000.00 93,750.00 672,500.00 40,000.00 881,250.00 756,000.00 22,500.00 56,000.00 7,000.00 49,000.00

3,750.00 894,250.00 2,296,540.00

86,100.000 225.000 350.000 525.000 52.500 30.000 87,282.50

135,000.000 4,500.000 1,900.000 15,000.000 19,500.000 1,950.000 500.000 178,350.00

1,490,925.000 12,655,962.500 1,426,800.000 15,573,687.50

9,900,000.000

1.1

3,410,000.000

1.1

2,530,000.000 138,750.000 19,200.000

1.1 15 0.8 4 12

200,000.000

900,000.000 102,000.000 15,000.000 11,274,950.00 4,784,950.00 3,904,950.00

1.2 0.2

9,900,000.000

1.1

3,410,000.000

1.1

2,530,000.000 19,200.000

1.1 0.8 6 12 1.8 0.3

300,000.000 900,000.000 153,000.000 22,500.000 11,294,700.00 4,804,700.00 3,924,700.00

108,000.000

0.012

37,200.000

0.012

32,200.000 1,950.000

0.014 0.15 0.1 0.1 0.01 0.005

5,000.000 7,500.000 850.000 375.000 123,675.00 52,875.00 47,875.00

24,600.000 12,000.000 7,500.000

1.2 0.5 0.15 0.1

7,500.000 850.000 750.000 53,200.00

0.01 0.01

506,000.000 720.000

11 0.03 0.2 0.1 0.01 0.01

10,000.000 7,500.000 850.000 750.000 525,820.00

129,000.000 6,000.000 1,500.000 7,500.000 5,625.000 637.500 562.500 150,825.00

135,300.000 38,500.000 25,300.000 1,200.000 5,500.000 16,500.000 1,870.000 375.000 160,745.00 63,945.00 50,745.00

3 5 0.02 0.15 0.075 0.0075 0.0075

135,300.000 38,500.000 25,300.000 1,200.000 5,500.000 16,500.000 1,870.000 375.000 160,745.00 63,945.00 50,745.00

135,300.000 38,500.000 25,300.000 1,200.000 5,500.000 16,500.000 1,870.000 375.000 160,745.00 63,945.00 50,745.00

135,300.000 38,500.000 25,300.000 1,200.000 5,500.000 16,500.000 1,870.000 375.000 160,745.00 63,945.00 50,745.00

506,000.000 874.500 10,000.000 7,500.000 850.000 750.000 525,974.50

150,500.000 1,457.500 20,000.000 15,000.000 1,700.000 1,500.000 190,157.50

108,000.000 37,200.000 27,600.000 48,000.000 30,000.000 135,000.000 15,300.000 2,250.000 338,550.00 267,750.00 258,150.00

25,000.000 50,797.500 480.000

15,000.000 37,500.000 4,250.000 1,500.000 83,730.00 109,527.50

9,350.000 2,500.000 3,750.000 425.000 225.000 16,250.00

9,900,000.000 300,000.000 1,500,000.000 170,000.000 22,500.000 11,892,500.00

787,200.000 50,000.000 225,000.000 25,500.000 22,500.000 1,110,200.00

738,000.000 3,600.000 25,000.000 150,000.000

1.1 6 20 2 0.3

0.064 1 3 0.3 0.3

0.06 0.15 0.5 2 0.2

17,000.000 1,875.000 935,475.00

0.025

492,000.000 77,200.000 347,475.000 39,355.000 34,725.000 990,755.00

430,500.000

0.035

161,700.000

1.1 0.8 2 0.2 0.04

40,000.000 150,000.000 17,000.000 3,000.000 802,200.00

147,000.000

1

17,500.000

0.005 0.15 0.5 0.05 0.01

7,500.000 37,500.000 4,250.000 750.000 214,500.00

38,650.000 39,650.000 39,500.000 55,000.000 13,656.000

3,150.000 22,500.000 31,000.000 26,250.000 2,975.000 2,250.000 140,431.00 39,650.00 141,281.00 156,781.00

41,000.000 36,650.000

1

42,000.000

1

39,500.000

1

11,160.000

1 9.3 0.018 1.5 0.6 0.45 0.045 0.03

1,350.000 22,500.000 30,000.000 33,750.000 3,825.000 2,250.000 41,000.00 141,485.00 42,000.00 39,500.00 -

3,150.000 2,400.000 3,600.000 10,000.000 7,500.000 765.000

0.1 0.1 0.2 0.2 0.1 0.009 0.03

2,250.000 29,665.00

4,800.000 4,725.000 4,080.000 10,500.000 3,500.000 7,875.000 340.000 187.500 31,207.50

4,080.000 7,800.000 3,500.000 675.000 510.000 187.500 16,752.50

225,000.000 500.000 37,500.000 850.000 375.000 264,225.00

17,500.000 750.000 11,250.000 1,275.000 56.250

0.2 0.15 0.17 0.35 0.07 0.105 0.004 0.0025

0.17 0.26 0.07 0.009 0.006 0.0025

1 0.01 0.5 0.01 0.005

1 0.015 0.15 0.015 0.00075

30,831.25

15,000.000 1,000.000 15,000.000 1,700.000 750.000 33,450.00

26,000.000 500.000 7,500.000 850.000 375.000 35,225.00

9,000.000 600.000 9,000.000 1,020.000 450.000 20,070.00

9,650.000 750.000 11,250.000 1,275.000 56.250 22,981.25

133,000.000

1 0.02 0.2 0.02 0.01

1 0.01 0.1 0.01 0.005

1 0.012 0.12 0.012 0.006 1 0.015 0.15 0.015 0.00075

7,200.000 750.000 50,000.000 112,500.000 127,500.000 12,000.000 442,950.00

1,100,000.000 165,000.000 82,500.000 85.000 12,000.000 1,359,585.00

580,000.000 174,000.000 7,200.000 750.000 50,000.000 75,000.000 8,500.000 7,500.000 902,950.00

451,650.000 54,198.000 7,200.000 750.000 60,000.000 108,750.000 12,750.000 7,500.000 702,798.00

uhammad Rizal Team Leader

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN PEMERINTAH PROVINSI SULAWESI SELATAN MAKASSAR TAHUN 2013

No. 1

2 3 4

3 4

5 6 7 8 9 10 11

Jenis Bahan BAHAN DASAR Batu Kali Utuh Batu Pecah 7 - 10 cm Batu Pecah 5 - 7 cm Batu Pecah 3 - 5 cm Batu Pecah 2 - 3 cm Batu Pecah 1 - 2 cm Batu Pecah 0,51 - 1 cm Batu Merah Batu Gunung Batu Alam Andesit biasa Andesit susun sirih Andesit halus Andesit gelombang Batu candi permukaan rata Batu palimanan kuning Batu hijau sukabumi Batu bali green Batu bali napoli Paras jokja besar Batu cirebon beraturan Batu cirebon tidak beraturan Tanah Timbunan pasir beton Timbunan / Urug Pasangan Beton Kerikil Sirtu Kapur Pasangan Semen portland Semen Putih ( 50 kg ) Batu Merah Paving Blok Mutu ( K 175 ) Tebal 8 cm

Satuan

Makassar

m² m² m² m² m² m² m² buah m3

150,000 240,000 250,000 260,000 260,000 270,000 270,000 550 160,000

m² m² m² m² m² m² m² m² m² m² m² m² m³ m³ m³ m³ m³ m³ Zak Zak Zak Buah

185,000 190,000 180,000 195,000 155,000 165,000 140,000 165,000 170,000 175,000 145,000 76,000 150,000 80,000 60,000 80,000 95,000 200,000 75,000 50,000 50,550 45,000 400



50,000

18,750 30,000 31,250 32,500 32,500 33,750 33,750 69 20,000 23,125 23,750 22,500 24,375 19,375 20,625 17,500 20,625 21,250 21,875 18,125 9,500 18,750 10,000 7,500 10,000 11,875 25,000 9,375 6,250 6,319 5,625 50 6,250

13

14

15 16 17

1

2

3

1

2

Berlian Paving Blok Mutu ( K 225 ) Tebal 6 cm Tebal 8 cm Paving Blok Mutu ( K 300 ) Tebal 6 cm Tebal 8 cm Paving Blok Mutu ( K 400 ) Topiuskup (K225) Buis Beton d=20 cm d=30 cm d=40 cm d=50 cm d=60 cm BAHAN KAYU Kayu Kelas I Balok gergaji samwil Papan gergaji samwil Balok gergaji sansaw Papan gergaji sansaw Kayu Kelas II Balok Papan Kayu Kelas III Balok Papan BAHAN LANTAI Tegel PC PC Abu - abu 20 x 20 cm PC Abu - abu 30 x 30 cm PC Warna 20 x 20 cm PC Badak 20 x 20 cm PC Badak 30 x 30 cm PC Wafel 20 x 20 cm PC Wafel 30 x 30 cm Plint PC 15 x 20 cm Plint PC 15 x 30 cm Tegel Mozaik 30 x 30 cm Tegel Keramik Putih 10 x 20 cm Warna 10 x 20 cm



50,000

m² m²

48,000 52,000

m² m² m² biji

55,000 60,000 65,000 3,500

biji biji biji biji biji

210,000 255,000 325,000 385,000 440,000

m³ m³ m³ m³

9,000,000 9,500,000 8,000,000 8,100,000

m³ m³

4,000,000 4,500,000

m³ m³

2,500,000 3,000,000

Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

1,500 2,500 2,900 2,200 2,500 2,700 2,900 3,000 6,500 8,000

Dos Dos

41,000 41,000

6,250 6,000 6,500 6,875 7,500 8,125 438 26,250 31,875 40,625 48,125 55,000 1,125,000 1,187,500 1,000,000 1,012,500 500,000 562,500 312,500 375,000 188 313 363 275 313 338 363 375 813 1,000 5,125 5,125

1

2

3

Putih 20 x 20 cm Dos Warna 20 x 20 cm Dos Putih 20 x 25 cm Dos Warna 20 x 25 cm Dos Putih 30 x 30 cm Dos Warna 30 x 30 cm Dos Putih 40 x 40 cm Dos Warna 40 x 40 cm Dos Warna 50 x 50 cm Dos Warna 60 x 60 cm Dos BAHAN KACA Kaca bening 3 mm m² Kaca bening 5 mm m² Kaca buram 3 mm m² Kaca buram 5 mm m² Kaca ryben 3 mm m² Kaca ryben 5 mm m² Rangka nako lengkap terali 7 ma Set / daun BAHAN BESI Besi Beton d = 4 mm Btg d = 6 mm Btg d = 8 mm Btg d = 10 mm Btg d = 12 mm Btg d = 14 mm Btg d = 16 mm Btg d = 19 mm Btg d = 20 mm Btg Besi Ulir d = 12 mm Btg d = 16 mm Btg d = 19 mm Btg Paku Paku biasa kg Paku asbes kg Paku seng ( payung ) RRT kg Paku skrup 3½ inci kg Paku skrup 4 inci kg Paku payung berulir 75 mm kg Paku sirap kg Paku beton hitam Dos Paku beton putih Dos

35,000 37,000 38,000 42,000 37,000 45,000 40,000 55,000 109,000 170,000 98,000 105,000 100,000 110,000 115,000 150,000 350,000

16,500 25,000 38,000 58,500 85,000 117,000 153,000 217,000 292,000 82,000 158,000 275,000 15,000 20,000 17,000 350 500 17,500 15,000 42,000 25,000

4,375 4,625 4,750 5,250 4,625 5,625 5,000 6,875 13,625 21,250 12,250 13,125 12,500 13,750 14,375 18,750 43,750 2,063 3,125 4,750 7,313 10,625 14,625 19,125 27,125 36,500 10,250 19,750 34,375 1,875 2,500 2,125 44 63 2,188 1,875 5,250 3,125

4

5

6

7

8

Kawat kawat beton Nyamuk Ayakan kecil Duri Besi Plat 2 mm = 120 x 240 mm 3 mm = 120 x 240 mm Besi H 15 cm 12 cm panjang Besi Strep 30,3 mm 35,4 mm 46,4 mm 40,6 mm 50,6 mm Besi Siku 30.30.3 40.40.4 40.40.3 50.50.4 50.50.5 60.60.6 70.70.7 Besi 6 mm Besi Tipe C ( Rangka baja ringan ) 6 m Lebar 10 ; tebal 1,8 - 2 mm Lebar 12,5 ; tebal 1,8 - 2 mm Lebar 15 ; tebal 1,8 - 2 mm

1

BAHAN PIPA Pipa Besi GIP Ø ½ inci - 6 m Ø ¾ inci - 6 m Ø 1 inci - 6 m Ø 2 inci - 6 m Ø 2 ½ inci - 6 m Ø 3 inci - 6 m Pipa PVC Air Bersih Ø ½ inci - 4 m Ø ¾ inci - 6 m Ø 1 inci - 6 m Ø ½ inci - 6 m

kg mtr mtr roll

15,000 18,000 15,000 150,000

Lbr Lbr Btg

700,000 760,000 4,725,000

Btg Btg Btg Btg Btg

18,500 26,000 28,000 29,000 37,500

Btg Btg Btg Btg Btg Btg Btg mtr

90,000 150,000 85,000 105,000 225,000 350,000 450,000 24,000

Btg Btg Btg

160,000 135,000 220,000

Btg Btg Btg Btg Btg Btg

127,500 170,000 251,500 543,500 863,500 1,145,000

Btg Btg Btg Btg

15,000 22,000 35,500 79,500

1,875 2,250 1,875 18,750 87,500 95,000 590,625 2,313 3,250 3,500 3,625 4,688 11,250 18,750 10,625 13,125 28,125 43,750 56,250 3,000 20,000 16,875 27,500 15,938 21,250 31,438 67,938 107,938 143,125 1,875 2,750 4,438 9,938

Ø 2 inci - 6 m Ø 2 ½ inci - 6 m Ø 3 inci - 6 m Ø 4 inci - 6 m Ø 6 inci - 6 m Ø 8 inci - 6 m Ø 10 inci - 6 m 3

4

1 2

3 4 5

6 7

Pipa untuk Saluran Pembuangan Air Ø ½ inci - 4 m Ø ¾ inci - 4 m Ø 1 inci - 4 m Ø 1½ inci - 4 m Ø 2 inci - 4 m Ø 2 ½ inci - 4 m Ø 3 inci - 4 m Ø 4 inci - 4 m Ø 5 inci - 4 m Ø 6 inci - 4 m Ø 10 inci - 4 m Pipa untuk Instalasi Listrik Ø 5/8 inci - 4 mm Ø ¾ inci - 4 m Ø 1 inci - 4 m Ø 1½ inci - 4 m BAHAN LANGIT - LANGIT Eternit 100 x 100 Tripleks 122 x 244 x 0,2 cm 122 x 244 x 0,3 cm 122 x 244 x 0,6 cm 122 x 244 x 0,9 cm Tripleks Melamin 122 x 244 x 0,3 cm Acoustic 40 x 60 Teakwood 80 x 244 x 0,3 cm 122 x 244 x 0,3 cm Karsiboard Gypsum Les Gipsum Hard Board 122 x 244 cm Asbes Plat Harfek

Btg Btg Btg Btg Btg Btg Btg

114,000 161,500 233,000 350,500 741,500 1,210,000 1,884,500

Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg

11,500 17,000 28,500 96,000 151,500 219,000 314,000 472,000 762,500 1,006,000 2,456,000

Btg Btg Btg Btg

8,000 25,000 32,000 96,000

Set

17,000

Lbr Lbr Lbr Lbr

52,000 50,500 82,000 129,000

Lbr Lbr

83,000 55,000

Lbr Lbr Lbr Lbr Lbr Lbr

77,000 96,000 69,500 55,000 29,000 76,500

14,250 20,188 29,125 43,813 92,688 151,250 235,563 1,438 2,125 3,563 12,000 18,938 27,375 39,250 59,000 95,313 125,750 307,000 1,000 3,125 4,000 12,000 2,125 6,500 6,313 10,250 16,125 10,375 6,875 9,625 12,000 8,688 6,875 3,625 9,563 -

200 x 100 x 0,3 cm List Profil 2 x 3 cm / 4 m 3 x 3 cm / 4 m 4 x 4 cm / 4 m 4 x 5 cm / 4 m 1

2 3 4 5

6

7 8

9 10

BAHAN ATAP Genteng Beton Keramik Asbes gelombang 7 kaki Harfles ( 115 x 85 x 0,5 cm ) Atap Metal Asbes Genteng Sirap Seng Gelombang kecil BJLS 0,20 mm BJLS 0,22 mm BJLS 0,30 mm BJLS 0,35 mm Bitumen Gelombang (200x95x0, Bitumen Genteng (106x40x0,3 c Nok Bitumen (50x90x0,3 cm) Seng Plat BJLS 0,30 mm 40 x 180 BJLS 0,35 mm Seng Super Deck 180 x 70 cm - 10 kaki Seng Alumunium Gelombang SWG 32" 0,27 mm SWG 30" 0,31 mm SWG 28" 0,38 mm Seng Plastik ( Fiber ) Fiber Semen ( Harflex ) Super 240 x 108 x 0,6 cm Super 180 x 108 x 0,6 cm Ekonomi 240 x 92 x 0,5 cm Ekonomi 180 x 92 x 0,4 cm Mini 240 x 105 x 0,4 cm Mini 180 x 92 x 0,5 cm Super 240 x 105 x 0,4 cm Super 180 x 105 x 0,4 cm

Lbr

48,000

Btg Btg Btg Btg

11,000 15,000 19,000 25,000

Biji Bh Lbr Lbr Lbr Lbr ikat

33,000 15,000 59,500 62,500 86,500 32,000 300,000

kaki kaki Lbr Lbr Lbr Lbr Lbr

6,500 7,000 53,500 70,000 158,000 69,500 95,000

Lbr Lbr

49,500 60,000

kaki

12,500

kaki kaki kaki kaki

9,000 11,500 12,500 13,000

kaki kaki kaki kaki kaki kaki kaki kaki

76,000 64,000 69,000 62,500 62,000 70,500 66,000 68,500

6,000 1,375 1,875 2,375 3,125 4,125 1,875 7,438 7,813 10,813 4,000 37,500 813 875 6,688 8,750 19,750 8,688 11,875 6,188 7,500 1,563 1,125 1,438 1,563 1,625 9,500 8,000 8,625 7,813 7,750 8,813 8,250 8,563

11

12

13

14 15

1

2

Nok / Bubungan Genteng beton Genteng asbes Genteng keramik Alm. SWG 28" - 180 cm Alm. SWG 28" - 105 cm Nok Steel Gelombang Super - 180 cm Mini - 105 cm Ekonomi - 95 cm Nok Steel Rata Super - 180 cm Mini - 105 cm Ekonomi - 95 cm Nok ½ Lingkaran Karet Pelapis Genteng Ukuran 55 Ukuran 90 BAHAN PENGGANTUNG Kunci Tanam 1 slag Double slag Penggantung Hak angin kecil Hak angin besar Grendel kecil Grendel besar Engsel pintu Engsel jendela Expanyolet BAHAN SANITER Kloset jongkok Kloset duduk Wasthafel warna Wasthafel cuci piring logam Pompa Mesin Urinor lengkap Bak mandi fiber Reservoir fiber = 1 m³ Reservoir Stainless stell = 1 m³ Stop kran Kran air BAHAN FINISHING / CAT

bh bh bh Lbr Lbr

35,000 55,000 20,000 44,500 39,500

bh bh bh

52,000 41,000 18,500

bh bh bh bh

29,000 25,000 20,500 40,000

mtr mtr

9,000 18,500

bh bh

172,000 306,000

bh bh bh bh bh bh bh

10,000 15,000 13,000 15,000 28,500 25,500 110,000

Set bh bh bh bh bh bh bh bh bh bh

1,750,000 450,000 400,000 450,000 1,800,000 1,900,000 750,000 1,050,000 3,850,000 75,000 37,500

4,375 6,875 2,500 5,563 4,938 6,500 5,125 2,313 3,625 3,125 2,563 5,000 1,125 2,313 21,500 38,250 1,250 1,875 1,625 1,875 3,563 3,188 13,750 218,750 56,250 50,000 56,250 225,000 237,500 93,750 131,250 481,250 9,375 4,688 -

1

2

3

4

5

Cat Tembok Cat Dasar Cat Kilap Cat Kayu Cat Dasar Cat Kilap Palatone ICI Politur Meni Minyak Cat Cat Atap Cat Dasar Cat Kilap Lem Seng Amplas / Kertas gosok Dempul Residu BAHAN INSTALASI LISTRIK Kabel Listrik Type NYA ( Full ) 1 ½ mm 2 ½ mm Type NYY 2 x 1 ½ mm 2 x 2 ½ mm 2 x 4 mm Lampu TL 1 x 20 W 2 x 20 W 1 x 40 W 2 x 40 W Lampu Pijar 25 W 40 W 60 W 100 W Lampu Taman Mercury Saklar Phase Tunggal putih Tunggal hitam Double putih Double hitam

5 kg 5 kg

90,000 145,000

kg kg kg kg kg 4 kg ltr

55,000 50,000 49,000 71,000 50,000 50,000 30,000

kg mtr 5 kg lbr kg 10 ltr

77,000 102,000 8,000 7,000 30,000 63,000

Roll Roll

300,000 385,000

Roll Roll Roll

610,000 760,000 350,000

bh bh bh bh

90,000 120,000 115,000 149,000

bh bh bh bh bh

30,000 55,000 105,000 187,000 350,000

bh bh bh bh

22,500 17,500 25,000 20,000

11,250 18,125 6,875 6,250 6,125 8,875 6,250 6,250 3,750 9,625 12,750 1,000 875 3,750 7,875 37,500 48,125 76,250 95,000 43,750 11,250 15,000 14,375 18,625 3,750 6,875 13,125 23,375 43,750 2,813 2,188 3,125 2,500

6

6

Stop Kontak Hitam Putih Zekering Kast Lokal Biasa Lokal 2 group automat Lokal 3 group biasa Fitting BAHAN JALAN Aspal Minyak tanah Minyak solar Minyak pelumas

UPAH KERJA Pekerja Buruh Pembantu Masinis Penjaga Gudang Penjaga Malam Tukang Tukang Kayu Tukang batu Tukang Cat Tukang Listrik Tukang Pipa Tukang Besi Kepala Tukang Kepala Tukang Kayu Kepala Tukang Batu Kepala Tukang Listrik Kepala Tukang Cat Kepala Tukang Pipa Kepala Tukang Besi Mandor

bh bh

25,000 27,000

bh bh bh

82,500 95,000 10,000

kg ltr ltr ltr

15,000 10,000 4,500 25,000

org / hr org / hr org / hr org / hr org / hr

50,000 50,000 50,000 70,000 50,000

org / hr org / hr org / hr org / hr org / hr org / hr

60,000 75,000 60,000 95,000 85,000 75,000

org / hr org / hr org / hr org / hr org / hr org / hr org / hr

80,000 75,000 100,000 75,000 100,000 75,000 100,000

3,125 3,375 10,313 11,875 1,250 1,875 1,250 563 3,125 6,250 6,250 6,250 8,750 6,250 7,500 9,375 7,500 11,875 10,625 9,375 10,000 9,375 12,500 9,375 12,500 9,375 12,500 -

KABUPATEN KECAMATAN JENIS PEKERJAAN NO. LINK PENAWAR

: : : : :

SINJAI SINJAI UTARA PEMBANGUNAN RUMAH TINGGAL TIPE 90 PT. IKBAL SARANA

RAB NO. I 1 2

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Pek. Pengukuran/Pasangan Bowuplank Pek. Pembersihan Lokasi

VOLUME

SAT.

HARGA SATUAN

JUMLAH HARGA

c

d

e

f

237.00 160.00

M' M2

Rp. Rp.

42,960.00 Rp. 6,500.00 Rp. Rp.

II 1 2 3 4 5

PEKERJAAN TANAH DAN PASIR Pek. Galian Tanah Pondasi Pek. Timbunan Tanah Kembali Pek. Timbunan Tanah Bawah Lantai Urugan Pasir bawah lantai Pek. Pasir Urug Bawah Pondasi

83.54 36.03 21.92 17.08 2.58

M3 M3 M3 M3 M3

Rp. Rp. Rp. Rp. Rp.

40,000.00 11,500.00 190,600.00 82,000.00 82,000.00

Rp. Rp. Rp. Rp. Rp. Rp.

III 1 2

PEKERJAAN PONDASI Pas. Pondasi Batu Gunung /Batu kali 1:5 Pek. Pas Batu Kosong

35.05 17.43

M3 M3

Rp. Rp.

529,350.00 Rp. 285,075.00 Rp. Rp.

IV PEKERJAAN BETON 1 Pek. Sloef 2 Pek. Kolom 3 Pek. Ring Balk

3.56 2.81 1.70

M3 M3 M3

Rp. Rp. Rp.

2,296,540.00 Rp. 2,296,540.00 Rp. 2,296,540.00 Rp. Rp.

V 1 3 4 5 6

PEKERJAAN TEMBOK DAN LANTAI Pek. Dinding 1 : 5 Pek. Plesteran 1 : 5 Pek. Acian Pek. Lantai Keramik 30 x 30 Pek. Lantai Keramik 20 x 20

35.68 650.94 650.94 91.01 4.32

M3 M2 M2 M2 M2

Rp. Rp. Rp. Rp. Rp.

76,320.00 38,868.75 144,275.00 141,281.00 140,431.00

Rp. Rp. Rp. Rp. Rp. Rp.

VI PEKERJAAN PINTU DAN JENDELA 1 2 3 4 5

Pek. Kusen Pintu dan Jendela Kls 1 Pek. Daun Pintu Kls 1 Pek. Kaca Mati Pas. Kunci Tanam Pas. Engsel Pintu

0.66 15.07 6.25 7.00 24.00

M3 M2 M2 buah Pas

Rp. Rp. Rp. Rp. Rp.

11,892,500.00 990,755.00 214,500.00 264,225.00 30,831.25

Rp. Rp. Rp. Rp. Rp.

6 7 8

Pas. Grendel Pintu Pas. Engsel Jendela Pas. Grendel Jendela

7.00 36.00 4.00

buah buah Pas

Rp. Rp. Rp.

35,225.00 Rp. 33,450.00 Rp. 20,070.00 Rp. Rp.

VII PEKERJAAN ATAP DAN PALFON 1 2 3 4 5 6 7 8

Pek. Kuda-kuda Pek. Balok Nok Pek. Gording Pek. Kaso + Reng Pek. Atap Genteng Pek. Nok Atap Genteng Pek. Rangka Plafond Pek. Listplank

8.83 0.10 0.91 0.88 139.94 14.59 5.44 34.88

M3 M3 M3 M3 M2 M M3 M

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

4,784,950.00 4,784,950.00 4,804,700.00 52,875.00 525,820.00 150,825.00 267,750.00 63,945.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

VIII 1 2 3

PEKERJAAN PENGECATAN Pek. Pengecatan Tembok Pek. Cat Kusen, Pintu & Jendela Pek. Pengecatan Plafond

650.94 21.92 87.83

M2 M2 M2

Rp. Rp. Rp.

29,665.00 Rp. 31,207.50 Rp. 29,665.00 Rp. Rp.

IX 1 2 3 4 6 7

PENGERJAAN INSTALASI LISTRIK Pas. Instalasi Listrik dalam Pas. Saklar Ganda Pas. Saklar Tunggal Pas. Stop Kontak Pas. Lampu Pijar 20 Watt Pas. Lampu Pijar 40 Watt

57.60 5.00 2.00 7.00 2.00 9.00

m bh bh bh bh bh

Rp. Rp. Rp. Rp. Rp. Rp.

2,000.00 17,500.00 15,000.00 17,500.00 20,000.00 30,000.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp.

X 1 2 3 4 6 8

PEKERJAAN SANITASI Pek. Stop Kran Pek. Pipa 3/4 ' Pek. Pipa PVC 4" Pas. Kloset Duduk Bak Air Fiber Pek. Septiktank

5.00 7.08 6.42 2.00 2.00 1.00

Unit btg btg Pas Pas Pas

Rp. Rp. Rp. Rp. Rp. Rp.

HARGA TOTAL

25,000.00 100,000.00 155,000.00 1,359,585.00 250,000.00 1,500,000.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

NGGAL TIPE 90

JUMLAH HARGA f 10,181,520.00 1,040,000.00 11,221,520.00 3,341,720.00 414,347.30 4,178,857.35 1,400,539.50 211,191.00 9,546,655.15 18,555,967.24 4,968,857.25 23,524,824.49 8,164,199.70 6,457,870.48 3,892,635.30 18,514,705.48 2,723,371.59 25,301,107.52 93,913,935.68 12,857,277.41 606,661.92 135,402,354.11 7,813,372.50 14,929,092.64 1,340,539.20 1,849,575.00 739,950.00

246,575.00 1,204,200.00 80,280.00 28,203,584.34 42,244,409.57 468,094.43 4,366,319.17 46,440.91 73,582,025.64 2,200,084.28 1,457,149.05 2,230,145.82 126,594,668.86 19,310,046.11 684,080.88 2,605,328.63 22,599,455.61 115,200.00 87,500.00 30,000.00 122,500.00 40,000.00 270,000.00 665,200.00 125,000.00 708,300.00 995,100.00 2,719,170.00 500,000.00 1,500,000.00 6,547,570.00 382,820,538.04

KABUPATEN KECAMATAN JENIS PEKERJAAN NO. LINK PENAWAR

: : : : :

SINJAI SINJAI UTARA PEMBANGUNAN RUMAH TINGGAL TIPE 90 PT. IKBAL SARANA

REKAPITULASI RENCANA ANGGARAN BIAYA NO.

URAIAN JENIS PEKERJAAN

JUMLAH HARGA

A

B

C

I II III IV V VI VII VIII IX X

PEKERJAAN PERSIAPAN PEKERJAAN TANAH DAN PASIR PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN TEMBOK DAN LANTAI PEKERJAAN PINTU DAN JENDELA PEKERJAAN ATAP DAN PLAFOND PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK PEKERJAAN SANITASI

REAL COST PPN 10% JUMLAH DIBULATKAN HARGA 1M2 ( LUAS RUMAH : 95.325 M2 )

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

11,221,520.00 9,546,655.15 23,524,824.49 18,514,705.48 135,402,354.11 28,203,584.34 126,594,668.86 22,599,455.61 665,200.00 6,547,570.00

Rp Rp Rp Rp Rp

382,820,538.04 38,282,053.80 421,102,591.85 422,000,000.00 4,015,951.09

Terbilang : EMPAT RATUS DUA PULUH DUA JUTA RUPIAH

KABUPATEN KECAMATAN JENIS PEKERJAAN NO. LINK PENAWAR

: : : : :

SINJAI SINJAI UTARA PEMBANGUNAN RUMAH TINGGAL TIPE 90 PT. IKBAL SARANA

BOBOT RAB NO.

URAIAN PEKERJAAN

HARGA

I 1 2

PEKERJAAN PERSIAPAN Pek. Pengukuran/Pasangan Bowuplank Pek. Pembersihan Lokasi

Rp. Rp.

II 1 2 3 4 5

PEKERJAAN TANAH DAN PASIR Pek. Galian Tanah Pondasi Pek. Timbunan Tanah Kembali Pek. Timbunan Tanah Bawah Lantai Urugan Pasir bawah lantai Pek. Pasir Urug Bawah Pondasi

Rp. Rp. Rp. Rp. Rp.

III 1 2

PEKERJAAN PONDASI Pas. Pondasi Batu Gunung /Batu kali 1:5 Pek. Pas Batu Kosong

TOTAL HARGA

382,820,538.04 382,820,538.04

2.660 0.272

Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

0.873 0.108 1.092 0.366 0.055

Rp. Rp.

18,555,967.24 Rp. 4,968,857.25 Rp.

382,820,538.04 382,820,538.04

4.847 1.298

IV PEKERJAAN BETON 1 Pek. Sloef 2 Pek. Kolom 3 Pek. Ring Balk

Rp. Rp. Rp.

8,164,199.70 Rp. 6,457,870.48 Rp. 3,892,635.30 Rp.

382,820,538.04 382,820,538.04 382,820,538.04

2.133 1.687 1.017

V 1 3 4 5 6

Rp. Rp. Rp. Rp. Rp.

2,723,371.59 25,301,107.52 93,913,935.68 12,857,277.41 606,661.92

Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

0.711 6.609 24.532 3.359 0.158

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

7,813,372.50 14,929,092.64 1,340,539.20 1,849,575.00 739,950.00 246,575.00 1,204,200.00 80,280.00

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

2.041 3.900 0.350 0.483 0.193 0.064 0.315 0.021

PEKERJAAN TEMBOK DAN LANTAI Pek. Dinding 1 : 5 Pek. Plesteran 1 : 5 Pek. Acian Pek. Lantai Keramik 30 x 30 Pek. Lantai Keramik 20 x 20

10,181,520.00 Rp. 1,040,000.00 Rp.

BOBOT ( % )

3,341,720.00 414,347.30 4,178,857.35 1,400,539.50 211,191.00

VI PEKERJAAN PINTU DAN JENDELA 1 2 3 4 5 6 7 8

Pek. Kusen Pintu dan Jendela Kls 1 Pek. Daun Pintu Kls 1 Pek. Kaca Mati Pas. Kunci Tanam Pas. Engsel Pintu Pas. Grendel Pintu Pas. Engsel Jendela Pas. Grendel Jendela

VII PEKERJAAN ATAP DAN PALFON 1 2 3 4 5 6 7 8

Pek. Kuda-kuda Pek. Balok Nok Pek. Gording Pek. Kaso + Reng Pek. Atap Genteng Pek. Nok Atap Genteng Pek. Rangka Plafond Pek. Listplank

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

42,244,409.57 468,094.43 4,366,319.17 46,440.91 73,582,025.64 2,200,084.28 1,457,149.05 2,230,145.82

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

11.035 0.122 1.141 0.012 19.221 0.575 0.381 0.583

VIII 1 2 3

PEKERJAAN PENGECATAN Pek. Pengecatan Tembok Pek. Cat Kusen, Pintu & Jendela Pek. Pengecatan Plafond

Rp. Rp. Rp.

19,310,046.11 Rp. 684,080.88 Rp. 2,605,328.63 Rp.

382,820,538.04 382,820,538.04 382,820,538.04

5.044 0.179 0.681

IX 1 2 3 4 6 7

PENGERJAAN INSTALASI LISTRIK Pas. Instalasi Listrik dalam Pas. Saklar Ganda Pas. Saklar Tunggal Pas. Stop Kontak Pas. Lampu Pijar 20 Watt Pas. Lampu Pijar 40 Watt

Rp. Rp. Rp. Rp. Rp. Rp.

115,200.00 87,500.00 30,000.00 122,500.00 40,000.00 270,000.00

Rp. Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

0.030 0.023 0.008 0.032 0.010 0.071

X 1 2 3 4 6 8

PEKERJAAN SANITASI Pek. Stop Kran Pek. Pipa 3/4 ' Pek. Pipa PVC 4" Pas. Kloset Duduk Bak Air Fiber Pek. Septiktank

Rp. Rp. Rp. Rp. Rp. Rp.

125,000.00 708,300.00 995,100.00 2,719,170.00 500,000.00 1,500,000.00

Rp. Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

0.0327 0.1850 0.2599 0.7103 0.1306 0.3918 100.00

KABUPATEN KECAMATAN JENIS PEKERJAAN NO. LINK PENAWAR

: : : : :

SINJAI SINJAI UTARA PEMBANGUNAN RUMAH TINGGAL TIPE 90 PT. IKBAL SARANA

BOBOT REKAP NO. I II III IV V VI VII VIII IX X

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN PEKERJAAN TANAH DAN PASIR PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN TEMBOK DAN LANTAI PEKERJAAN PINTU DAN JENDELA PEKERJAAN ATAP DAN PALFON PEKERJAAN PENGECATAN PENGERJAAN INSTALASI LISTRIK PEKERJAAN SANITASI

HARGA Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

11,221,520.00 9,546,655.15 23,524,824.49 18,514,705.48 135,402,354.11 28,203,584.34 126,594,668.86 22,599,455.61 665,200.00 6,547,570.00

TOTAL HARGA Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04 382,820,538.04

BOBOT ( % ) 2.931 2.494 6.145 4.836 35.370 7.367 33.069 5.903 0.174 1.710 100.00

KABUPATEN KECAMATAN JENIS PEKERJAAN NO. LINK PENAWAR

: : : : :

SINJAI SINJAI UTARA PEMBANGUNAN RUMAH TINGGAL TIPE PT. IKBAL SARANA

JADWAL WA NILAI NO.

URAIAN PEKERJAAN

BOBOT (%)

I.

PEKERJAAN PERSIAPAN

2.93

II.

PEKERJAAN TANAH DAN PASIR

2.49

III.

PEKERJAAN PONDASI

6.15

IV

PEKERJAAN BATU BETON

4.84

IV.

PEKERJAAN TEMBOK DAN LANTAI

35.37

V.

PEKERJAAN KAYU

7.37

VI.

PEKERJAAN ATAP

33.07

VII.

PEKERJAAN INSTALASI LISTRIK

0.17

VIII.

PEKERJAAN SANITASI AIR

1.71

IX

PEKERJAAN PENGECATAN

5.90

JUMLAH BOBOT

BULAN I 1

2

2.93 1.25

RENCANA KEMAJUAN PEKERJAAN

100.00 (%)

2.93

1.25

KOMULATIF KEMAJUAN PEKERJAAN

(%)

2.93

4.18

RENCANA KEMAJUAN PEKERJAAN KOMULATIF KEMAJUAN PEKERJAAN DEVIASI

LANGKAH ME 1. Menghitung Bobot Pekerja Bobot =

2. Membagi bobot terhadap d

3. Menjumlahkan kemajuan p 4. Menghitung kumulatif

NAN RUMAH TINGGAL TIPE 90

DWAL WAKTU PELAKSANAAN ( TIME SCHEDUL WAKTU PELAKSANAAN BULAN I 3

BULAN II 4

5

6

7

1.21

1.21

1.21

7.07

7.07

7.07

BULAN III 8

9

10

11

7.07

7.07

1.84

1.84

1.84

1.84

6.61

6.61

6.61

12

1.25 3.07

3.07 1.21

6.61 0.06

4.32

4.28

8.28

8.28

8.28

8.92

15.53

8.46

8.46

6.67

8.50

12.78

21.06

29.35

37.63

46.54

62.07

70.53

78.98

85.66

LANGKAH MEMBUAT KURVA S hitung Bobot Pekerjaan Haraga per item Pekerjaan Harga Total

x 100%

agi bobot terhadap durasi pelaksanaan pekerjaan

mlahkan kemajuan pekerjaan per minggu

hitung kumulatif

SCHEDULE ) NILAI BULAN IV 13

14

15

KURVA 16

KET.

(%)

100%

112 Hari Masa Pelaksanaan

75% 120 Hari Masa Pemeliharaan

50% 6.61 0.06

0.06 0.86

25% 0.86 2.95

2.95

6.67

0.91

3.81

2.95

92.33

93.24

97.05

100

0%

Related Documents

Rab Iwa Haridman.xlsx
October 2019 16
Iwa 2
June 2020 3
Rab
June 2020 33
Wierzba Iwa
November 2019 3
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47

More Documents from "HamidAffandy"

Hhh.docx
May 2020 17
Etiket - Copy.docx
June 2020 17
Rab Iwa Haridman.xlsx
October 2019 16
Mater Pkn.docx
June 2020 18
577975_dear Love.docx
December 2019 11