Client:
Sonatrach
Location:
Skikda, Algeria
Scope:
FEED; EPC
Status:
Completed 2007
Skikda LNG New Train
Rapid EPC Achievement Algeria
Details:
• FEED and EPC of a Grassroots single 4.5 MTPA LNG train along with associated LPG and condensate recovery to replace damaged plant • Based on LNG reference design; Hybrid lump sum contract competitively bid
Highlights:
• 12 LNG trains completed for Sonatrach • Challenging location and environment