PIPELINE LOOPS FOR SHY-1 EXPANSION PHASE II BI-10-00295
WEEKLY QUALITY REPORT WEEK # 58
Date: 08 to 14 August 2009
NCR Summary (Engineering / Procurement) Number of NCR Issued NCR Issued By:
This Week
Cumulative
Issued
Closed
Pending
Issued
Closed
Pending
0
0
0
0
0
0
0
0
0
1
1
0
Saudi ARAMCO (PID) Suedrohrbau S.A.
NCR Summary (Construction) Number of NCR Issued
NCR Issued By:
This Week
Cumulative
Issued
Closed
Pending
Issued
Closed
Pending
0
0
0
0
0
0
0
0
0
14
14
0
Saudi ARAMCO (PID) Suedrohrbau S.A.
RFI Summary
Number of RFI Issued Discipline
This Week
Cumulative
Issued
Accepted
Rejected
Issued
Accepted
Rejected
Civil & Structural
35
39
0
1296
1256
0
Mechanical (Welding/Coating)
23
25
0
999
943
0
Electrical / Instr/ telecom.
17
11
0
342
335
0
Weld Statistics Weekly No. of Welds
Weekly No. of RT
Weekly no. of Repairs
RT Backlogs
378
156
3
90
Weekly Repair rate (Joint Basis)
Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab 1 2 3 Shop 1 2 3 Shop 1 2 3 Shop 1 2 3 Shop
5
33
215 125
0
83
61
12
0
1
1
1
5
22
22
41
Weekly Repair Rate (Linear Basis)
1.92% 0.032%
Total Welds
Total Joints RT
Total Joints Repair
23850
4814
85
LoopFab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop-2 Loop-3 1 Shop 1 2 3 Shop 1 2 3 Shop
8629 12703 1533 985 2142 2373 149 150
Project Quality Index
46
31
6
2
Overall Repair Rate (Joint Basis)
Overall Repair Rate (Linear Basis)
1.77% 0.033%
Latest(June 2009): 95.0
Previous (May 2009): 93.9