PIPELINE LOOPS FOR SHY-1 EXPANSION PHASE II BI-10-00295

WEEKLY QUALITY REPORT WEEK # 58

Date: 08 to 14 August 2009

NCR Summary (Engineering / Procurement) Number of NCR Issued NCR Issued By:

This Week

Cumulative

Issued

Closed

Pending

Issued

Closed

Pending

0

0

0

0

0

0

0

0

0

1

1

0

Saudi ARAMCO (PID) Suedrohrbau S.A.

NCR Summary (Construction) Number of NCR Issued

NCR Issued By:

This Week

Cumulative

Issued

Closed

Pending

Issued

Closed

Pending

0

0

0

0

0

0

0

0

0

14

14

0

Saudi ARAMCO (PID) Suedrohrbau S.A.

RFI Summary

Number of RFI Issued Discipline

This Week

Cumulative

Issued

Accepted

Rejected

Issued

Accepted

Rejected

Civil & Structural

35

39

0

1296

1256

0

Mechanical (Welding/Coating)

23

25

0

999

943

0

Electrical / Instr/ telecom.

17

11

0

342

335

0

Weld Statistics Weekly No. of Welds

Weekly No. of RT

Weekly no. of Repairs

RT Backlogs

378

156

3

90

Weekly Repair rate (Joint Basis)

Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab 1 2 3 Shop 1 2 3 Shop 1 2 3 Shop 1 2 3 Shop

5

33

215 125

0

83

61

12

0

1

1

1

5

22

22

41

Weekly Repair Rate (Linear Basis)

1.92% 0.032%

Total Welds

Total Joints RT

Total Joints Repair

23850

4814

85

LoopFab Loop- Loop- Loop- Fab Loop- Loop- Loop- Fab Loop-2 Loop-3 1 Shop 1 2 3 Shop 1 2 3 Shop

8629 12703 1533 985 2142 2373 149 150

Project Quality Index

46

31

6

2

Overall Repair Rate (Joint Basis)

Overall Repair Rate (Linear Basis)

1.77% 0.033%

Latest(June 2009): 95.0

Previous (May 2009): 93.9