Production Schedule 2

  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Production Schedule 2 as PDF for free.

More details

  • Words: 106
  • Pages: 1
Day 5

We filmed from 12:30am -1:00am.

The date we filmed was Friday 4th April 2009.

Day 6

We filmed from 10:00am12:30.

The date we filmed was Sunday 6th April 2009.

•The boy (Jack) walking across the road. •The boy walking across road as he spins around looking towards the oncoming traffic. •The boy laying on the ground using a high angle shot. •In a car driving through the country side. •In a car driving through a town. •In a car driving into a hospital ground. •Zooming in on the hospital name and symbol.

A road in Ilkley.

Ilkley Moore and Otley town centre and hospital.

Related Documents

Production Schedule 2
April 2020 6
Production Schedule 2
December 2019 18
Production Schedule
July 2020 6
Production Schedule
April 2020 9
Production Schedule
April 2020 12
Production Schedule
April 2020 8