Production Schedule

  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Production Schedule as PDF for free.

More details

  • Words: 181
  • Pages: 1
Production Schedule Day 1

Time

Date

We filmed from 10:00am -12:00am.

The date we filmed was Tuesday 10th March 2009.

Shots •

• • • •

• • •

• •

Firstly we will film the shot where the boy runs out from the corridor and through the doors. The boy starts running down the stairs. A point of view shot running out of the stair case doors outside. An extreme close up of the boy outside (zooming in). Zooming out with shaky camera work of the boy ending with an extreme long shot. An extreme long shot of the girl on the chair. A close up of the boys face (confused expression). Threes 4 shots of the girl sat in the chair but gets closer and closer to the camera (left to right) The boy is shocked and goes out to reach to the girl. The girl will suddenly jump out of the chair screaming.

Location The location was in a school in a corridor, stair case and also outside the door of the stair case and the sports hall.

Related Documents

Production Schedule
July 2020 6
Production Schedule
April 2020 9
Production Schedule
April 2020 12
Production Schedule
April 2020 8
Production Schedule
June 2020 6
Production Schedule
October 2019 15