NRL-FAF-SRB-014 National Refinery Limited Korangi – Karachi PROCESS TRIPPING / ALARM BY-PASS AUTHORIZATION
Specification of Work
Date: Department: SULFUR BLOCK
Equipment / Instrument Identification: Exact work location: Reason for By-passing: Work to be performed: Equipment Securities by pass (Strike the trait) Thermal Reactor/ Incinerator Compressor Running status off Low low flow of Combustion air High high pressure of combustion air Burner detection off High high temperature of furnace High high level of 312-V1
Column
Compressor
Pumps
High high temperature of Acid gases to 312-F1 Low low temperature of Air
High high discharge pressure High high oil temperature
High high temperature of air
High high inlet differential pressure
Low low level
High high temperature of column High high level of column If 312-F1 stops
High high level of 312-V2 Low low flow of Amine acid gas Low low level of 312-E1
Precaution to be taken by performing authority 1. 2. 3.
By pass system existing at specific job? (Yes/No) Did joint inspection of the work site make? (Yes/No) Did the Unit Engineer discuss with all concerned and well informed about all securities of the bypass equipment? (Yes/No) Unit Engineer / Shift Engineer
Job begins Job ends
Maintenance Engineer
Hr Date: Hr Date:
Signature Manager Sulfur Block Name: Muhahammad Irfan NRL No. 11143
Signature Manager Maintenance II Name: NRL No.
Close Out after Job completion
Remarks:
Signature Manager Sulfur Block Name: Muhahammad Irfan NRL No. 11143
Signature Manager Maintenance II Name: NRL No.
Any other