Process chart --- Part A Quantity
Travel Feet
Symbol
Process Storage in tube cradle
55 tubes
Lifting using crane 20 1500
Loading on to trailer Trailer pulled by truck to Deptt 97 stores
10 tubes
Loading onto rack with crane
10 tubes
In rack
11 tubes
Unloaded from the rack onto trailer 1000
Transported to Deptt 91 Loading onto wheeled rack
11 tubes
In wheeled rack 100
Transported to chamfering machine Chamfering Turning Cutting Unloading the stock Loading the cut piece Chamfering at cut off end
726 pieces
Cut pieces are loaded into the tub In tub 100
Transportation by gasoline lift truck to the inspection area Inspection for count and visual quality
726 pieces
Piece are loaded into tubs In tub Transported by Gasoline lift truck to Dept. 41 Loaded into washer Washing
726 pieces
Ejection into container In container
726 pieces
Pieces are loaded into tub by electric lift truck In tub 85
Transported to sand blast room Unloaded behind the sand blast machine Sand blasting
726 pieces
Loaded into the tubs In tub
726 pieces
Loaded into transportation tubs In transportation tub
1 tub
157
Transportation of tubs by electric lift truck to inspection area Counting of pieces
725 pieces
Retubbing In tub Lifting by gasoline lift truck 587
Transported to welding area
Process chart --- Part B Quantity
Travel Feet
Symbol
Process Storage in Warehouse
58 strips
5 500
Loaded into a trailer Transported by trailer truck combo to Dept. 56 Loading on to piercing machine Piercing Blanking Unloading from machine Checking for size and no. of holes
500 pieces
Unloading to pan In pan 25
Transportation by lift truck to flattening machine Loading on machine Restriking Flattening
3000 pieces
Loading into tub In tub Checking for quality
1 tub
Lifting by electric hoist 12
Transported to washing machine Unloaded to washing machine Washing
3000 pieces
Unloading into tubs In tub Weighing for verification of count 1265
Transported by gasoline lift truck to Dept. 41 Unloading beside sand blasting machine Loading into sand blasting machine Sand blasting Extraction of grit
3000 pieces
Shoveling into tubs In tub
1 tub
Loading into electric lift truck 157
Transported to inspection area Verification of counts
1 tub
Loading onto gasoline lift truck 2250
Transported to Dept. 43 by gasoline lift truck Unloading from truck
3000 pieces
Loading into box In boxes
1 box
Transportation by gasoline lift truck to Dept. 42
3000 pieces
Unloading into bins by hand In bins
1 bin
Transportation to welding assembly fixtures Positioning on assembly fixtures
Process chart --- Assembly Quantity
Travel Feet
Symbol
Process Storage near welding machine
1 each
Clamping of parts A and B Gas welding Inspection Storage