PRESUPUESTO Frontera de 750m  Adobe= 1500  Tierra= 2 cubos

= s/200.00 x millar = s/30.00 x cubo

= s/ 300.00 = s/ 60.00

Viga      

4 fierros de ½” = s/ 29.00 x fierro 4 fierros de ¼” = s/ 7.00 x fierro 3 kilos de alambre= s/5.00 x kilo 3 bolsas de cemento= s/ 25.00 x bolsa de cemento ¼ de cubo de arena = s/ 30.00 x cubo ¼ de cubo de piedra chancada= s/ 60.00 x cubo

= s/116.00 = s/28.00 =s/15.00 =s/75.00 = s/ 8.00 = s/15.00

Enyesado= 40m2  25 bolsas de yeso = s/3.50 x bolsa Gasto en materiales

 Mano de obra Adobe= 1500

= s/.250.00

Viga=

=s/.150.00

Enyesado= s/.10 x m2

= s/.400.00

Gasto en mano de obra = s/.800.00

= s/87.5 = s/704.5