BANCO HIPOTECARIO DE LA VIVIENDA FORMULARIO DE PRESUPUESTO PARA VIVIENDAS-CASOS INDIVIDUALES

Actividad Constructiva

Costos Directos (materiales, mano de obra con cargas sociales, maquinaria y equipo, acarreos, etc.)

Unidad

1. TRABAJOS PRELIMINARES Limpieza de terreno Bodega Instalaciones provisionales Demoliciones trazo 2. MOVIMIENTO DE TIERRA Corte Relleno

m² gbl glob. glob. m²

Cantidad

100.00 1.00

Precio Unitario

500.00 150,000.00

1 SUBTOTAL:

520 ¢

50,000.00 150,000.00 0.00 0.00 520 200,520.00 0.00 0.00

m³ m³

Actividad Constructiva

Precio Total

Costos Directos (materiales, mano de obra con cargas sociales, maquinaria y equipo, acarreos, etc.)

Unidad

11. CIELOS EN ALEROS Emplantillado: Fibrocemento de _____ mm Durpanel Tablilla pvc Gypsum Otro: _________________________________ Precintas de: fibrolit Precintas de: _Ricalit_______________________

Cantidad

Precio Unitario

3,000.00 3,500.00

m² m² m² m² m² m² m m

6,000.00 12,500.00 5,000.00

SUBTOTAL: SUBTOTAL: 3. CIMIENTOS Excavación para cimientos(huecos en columnas) Concreto de sello Placa corrida Placas aisladas concreto de basas de columnas 4. PAREDES Bloques __________________________ Prefabricado:______________________ Forro de: _________________________ Armazón de: ______________________ Paredes de: fibrocemento Tapichel de baldosa de concreto Tapichel de fibrocemento de ____ mm Tapichel de: ______________________

m³ m³ m³ m³ m³

20,000.00 50,000.00 85,000.00 100000 SUBTOTAL: ¢

1.00

1,735,500.00

20,000.00 8,000.00

8. REPELLOS Corrientes Afinados Quemados

m² m² m²

¢

20,000.00 81,250.00 0.00 SUBTOTAL:

m² m² m²

0.00 1,735,500.00 0.00 0.00 0.00 0.00 0.00 0.00

13. INSTALACIÓN PLUVIAL Canoas de: ___________________________ Bajantes de: __________________________ Cumbreras Botaguas Limatones Limahoyas Tubo PVC Tubo PVC 100 mm 1,735,500.00 Cajas de registro con rejilla 0.00 0.00 0.00 0.00 0.00

m³ m3 m3 m²

7. TECHOS Estructura de: _____________________ Cubierta HG Solera RT

¢

7,500.00 7,000.00 2,750.00 SUBTOTAL: ¢

14. INSTALACIÓN SANITARIA Inodoro (incluye accesorios y empaque cera) Lavamanos (incluye accesorios y sifón) Ceniceros Cajas de registro con tapa Tubo PVC 0.00 Tubo PVC 75 mm ducha 0.00 Accesorios especieles(Barras de apoyo en baño) 0.00 0.00 15. TANQUE SÉPTICO Y DRENAJES 0.00 Tanque séptico en bloques de concreto Tanque séptico prefabricado 0.00 Tanque séptico de fibra de vidrio Filtro anaeróbico de flujo ascendente 0.00 tuberia pvc 38m ventilación 0.00 Drenajes Pozo de absorción 0.00

m m m m m m glob. m un

un un un un gbl m m un

1.00

52.00

0.00 0.00 2,500.00

m² m² m² m² m² m² m² m

0.00 0.00

0.00

¢

3,000.00 3,500.00

4,500.00

0.00 0.00 16. INSTALACIÓN POTABLE 130,000.00 Tubería Accesorios 130,000.00 Prueba hidrostática de instalación 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

glob. glob. glob.

0.00 0.00 0.00 0.00 0.00 0.00 40,000.00 0.00 0.00 40,000.00

50,000.00 40,000.00 12,000.00 15,000.00 50,000.00 4,000.00 0.00

m un un un un m

m gbl gbl m² gbl m²

¢

0.00 1.00 1.00

0.00 90,000.00 50,000.00

1.00

85,000.00

SUBTOTAL:

¢

145,000.00 0.00 0.00 0.00 0.00 0.00 0.00 145,000.00

55,000.00 20,000.00 20,000.00

55,000.00 0.00 0.00

¢

55,000.00

3,100.00 25,000.00 70,000.00 10,000.00 25,000.00 ¢

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 40,000.00 40,000.00 0.00

0.00 0.00 0.00 0.00

SUBTOTAL: SUBTOTAL: 10. VENTANAS Marcos de madera Marcos de aluminio Celosía con herrajes Linternillas Vidrios trasparentes Vidrios escarchado

0.00 0.00 0.00 0.00 50,000.00 0.00 0.00 0.00 50,000.00

¢

SUBTOTAL: 17. PUERTAS Marcos de madera Puertas internas Puertas externas (sólidas de: ____________) Llavines internos Llavines externos doble paso Marcos de metal

¢

145,000.00

0.00 7,000.00

1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

4,500.00 4,000.00 3,500.00 3,500.00

40,000.00 5,000.00 10,000.00 SUBTOTAL: ¢

0.00

0.00

0.00

1.00

1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

¢

SUBTOTAL: un un un un ml ml m³

¢

2,000.00

SUBTOTAL: 0.00

SUBTOTAL: 9. CIELOS INTERNOS Emplantillado: Fibrocemento de _____ mm Artesonado Durpanel Tablilla Gypsum Otros: __________________________ Cornisa de:

¢

m³ m³ m³ m³ m³ SUBTOTAL:

6. CONTRAPISO Rellenos internos Lastre compactado Contrapiso Malla electro soldada

m² m² m² m² m² m² m

SUBTOTAL: m² glob. m² m² m² m² m² m²

SUBTOTAL: 5. CONCRETO ARMADO Viga corona Vigas banquinas Viga cargador Viga tapichel Columnas armadas

12. PISOS 0.00 Tabloncillo Lujado 0.00 Mosaico 0.00 Terrazo 0.00 Cerámica antideslizante 0.00 Pulida 0.00 Rodapié 0.00

Precio Total

0.00 0.00 90,000.00 50,000.00 0.00 85,000.00 0.00 225,000.00

18. MUEBLES Mueble de cocina Fregadero de: ___________ Pila de lavar Closets

m un un m

SUBTOTAL:

¢

0.00

Formulario BANHVI P-003-04

Actividad Constructiva

19. INSTILACIÓN ELÉCTRICA Sistema eléctrico Cableado Prevista telefónica Accesorios Obras de acometida en límite de propiedad Centro de carga

Costos Directos (materiales, mano de obra con cargas sociales, maquinaria y equipo, acarreos, etc.)

Unidad

Cantidad

glob. glob. glob. glob. glob. glob.

1.00

Precio Unitario

1,000,000.00 150,000.00 30,000.00 100,000.00 150,000.00 150,000.00

SUBTOTAL:

¢

20. ENCHAPES Azulejo Cerámica Madera Otros: _____________________________

m² m² m² m²

10.00

8,000.00

SUBTOTAL:

¢

Actividad Constructiva

Precio Total

21. PINTURA 1,000,000.00 Paredes _____________ a ____ manos 0.00 Cielos _______________ a ____ manos 0.00 Otros: _______________________________ 0.00 0.00 0.00 22. OTROS 1,000,000.00 Entrepisos de: _________________________ Escaleras Aceras y gradas de acceso 80,000.00 Enzacatado 0.00 Tapias 0.00 Verjas y portones 0.00 Limpieza final para entrega Rampas de acceso 80,000.00

A.

TOTAL COSTOS DIRECTOS DE LA OBRA:

Costos Directos (materiales, mano de obra con cargas sociales, maquinaria y equipo, acarreos, etc.)

Unidad

Cantidad

Precio Unitario

2,000.00 2,000.00

m² m² m²

SUBTOTAL:

m² glob. glob. glob. glob. glob. glob. m

Precio Total

¢

50,000.00

1.00

SUBTOTAL: ¢

0.00 0.00 0.00

¢

0.00

0.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00 50,000.00

3,711,020.00