SMC Electrical CONTRACT: MORTONS PREMIER Cost Record Sheet
Description of Work: Supply and install 4Nr 230v low energy downlights
Labour: Name
S.McGrath
SITE: 100 WEST STREET SHEFFIELD S1 4 MR P CLIFTON Order No: N/A
Materials: Trade M
TU W TH
E
F
2
S
SU Total
4
6
Rate
£
Details
£22.50 £135.00 GRID SWITCH
Week Ending: 29-Nov-09
Plant: Qty.
Unit
Rate
£
2
EACH £1.74
£3.48
PATTRESS BOX
2
EACH £0.44
£0.88
GRID FRONT PLATE
1
EACH £0.80
£0.80
DOWNLIGHT
4
EACH £1.57
£6.28
LAMPS
4
EACH £3.99 £15.96
GRID SWITCH YOKE
1
EACH £0.88
£0.88
FUSED SPUR
1
EACH £3.96
£3.96
MINI TRUNKING
2
m
£1.70
£3.40
CABLE
3
m
£0.35
£1.05
LOW ENERGY FITTING 1
Details
Qty
Rate
£
Total £
EACH £29.90 £29.90 Labour Cost
£135.00
Material Cost
£66.59 20%
£13.32
Plant Cost % Total £ Total £
Contractor Representative
£135.00
Total £ £66.59
Employer's Representative
£214.91