Pre Supuesto

  • Uploaded by: Joe A. Dueñas Paco
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pre Supuesto as PDF for free.

More details

  • Words: 246
  • Pages: 2
¤ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Item 01 01.01 01.02 01.02.01 02 02.01 02.01.01 02.01.02 02.01.03 02.01.04 02.02 02.02.01 02.02.01.01 02.02.02 02.02.02.01 02.02.02.02 02.02.03 02.02.03.01 02.03 02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.04 02.04.01 02.05 02.06

Descripción OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD. LIMPIEZA DEL TERRENO TRAZO, NIVELES Y REPLANTEO TRAZO, NIVELES Y REPLANTEO PRELIMINAR ESTRUCTURAS MOVIMIENTO DE TIERRAS EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL EXCAVACION PARA DADOS DE CONCRETO NIVELACION Y COMPACTACION ELIMINACION MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE CIMIENTO CORRIDO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% DE P.G. SOBRECIMIENTO CONCRETO 1:8 + 25% P.M. SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS DE 0.30 A 0.60 DADOS DE CONCRETO CONCRETO F'c=175 kg/cm2 ESTRUCTURA METALICA Y COBERTURA ARMADURA 1 ARMADURA 2 VIGUETA COLUMNAS METALICAS 2° PISO COBERTURA CON PLANCHA DE POLICARBONATO TRANSPARENTE ALVEOLADO VARIOS VARIOS FLETE FLETE TERRESTRE

Und. Metrado m2

42.38

m2

42.38

m3 m3 m2 m3

1.86 0.83 40.48 3.51

m3

1.86

m3 m2

0.58 5.81

m3

1.00

glb glb m m m2

1.00 1.00 395.15 15.40 98.13

glb

1.00

glb

1.00

Precio (S/.)

2,500.00

Parcial (S/.) 110.61 38.99 71.62 71.62 52,869.24 249.01 59.56 23.22 98.77 67.46 1,158.07 444.61 444.61 358.57 166.08 192.49 354.89 354.89 29,830.13 6,000.00 1,200.00 8,092.67 385.15 14,152.31 2,500.00 2,500.00

19,132.03

19,132.03

0.92 1.69

32.02 27.98 2.44 19.22

239.04 286.34 33.13 354.89 6,000.00 1,200.00 20.48 25.01 144.22

Related Documents

Pre Supuesto
August 2019 23
Pre Supuesto
August 2019 22
Pre Supuesto
August 2019 20
Pre Supuesto
May 2020 9
Pre Supuesto
August 2019 29
Pre Supuesto Client E
October 2019 7

More Documents from "mario canova"

Simu_2015.pdf
June 2020 24
It100f 95b.pdf
December 2019 27
Rapidillas 21 Agosto
May 2020 11
Torneo De 30'+10''
April 2020 15