Presupuesto

10

Presupuesto

0701038

Subpresupuesto Cliente Lugar

001 LOSA MULTIUOSOS Y AMBIENTE ADMINISTRATIVA MUNICIPALIDAD DISTRITAL DE CANCAHQUE PIURA - HUANCABAMBA - CANCHAQUE

Item

Descripción

01

ACCESO

01.01 01.01.01 01.02

CREACIÓN DEL SERVICIO DEPORTIVO DE PRACTICA RECREATIVA EN EL CENTRO POBLADO DE LOS RANCHOS DISTRITO DE CANCHAQUE PROVINCIA DE HUANCABAMBA - PIURA Costo al

Und.

Metrado

Precio S/.

2/18/2018

Parcial S/. 12,719.78

TRABAJOS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO

266.91 m2

123.00

2.17

MOVIMIENTO DE TIERRAS

266.91 684.47

01.02.01

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL C/TRACTOR ORUGA

m3

15.82

6.25

98.88

01.02.02

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

4.65

45.21

210.23

01.02.03

RELLENO CON MATERIAL PROPIO CON EQUIPO

m3

1.79

14.05

25.15

ELIMINACION DE MATERIAL EXCEDENTE C/MAQ. D=5 KM

m3

17.32

20.22

01.02.04 01.03

CONCRETO SIMPLE

350.21 11,081.63

01.03.01

CONCRETO F`C=175 KG/CM2 EN SARDINEL

m3

7.76

395.61

3,069.93

01.03.02

ENCOFRADO Y DESENCOFRADO EN SARDINEL

m2

31.00

56.85

1,762.35

01.03.03

CONCRETO F`C=210 KG/CM2 EN LOSA

m2

71.30

83.62

5,962.11

ENCOFRADO Y DESENCOFRADO P/LOSA

m2

5.49

52.32

01.03.04 01.04 01.04.01 01.05 01.05.01

JUNTAS DE DILATACION JUNTA DE CONSTRUCCION

m

36.60

17.87

m

15.51

2.11

PINTURA PINTADO DE MARCAS DEPORTIVAS EN LOSA Costo Directo GASTOS GENERALES (10%) UTILIDAD (5%)

287.24 654.04 654.04 32.73 32.73 12,719.78 1,271.98 635.99 ==========

SUB TOTAL IGV (18%)

14,627.75 2,633.00 =========

COSTO DE OBRA SON :

DIECISIETE MIL DOSCIENTOS SESENTA Y 75/100 NUEVOS SOLES

17,260.75

Fecha :

01/04/2019 03:59:24 PM

Related Documents

Pre Supuesto Client E
October 2019 7
Pre Supuesto Client E
October 2019 9
Pre Supuesto Client E
August 2019 17
Pre Supuesto
August 2019 23
Pre Supuesto
August 2019 22
Pre Supuesto
August 2019 20

More Documents from "Marcos Saldarriaga Mujica"

Pre Supuesto Client E
October 2019 7
December 2019 77
December 2019 68
December 2019 74