Pre-construction Meeting Notice

  • Uploaded by: Cheryl Card
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pre-construction Meeting Notice as PDF for free.

More details

  • Words: 177
  • Pages: 1
MEETING NOTIFICATION TO:

ALL SUBCONTRACTORS AND VENDORS

FROM:

Dale Grunsky

PROJECT:

2009 Boyd Management Projects

DATE:

September 11, 2009

There is a mandatoryPre-Construction Meeting scheduled for September 16, 2009 at 10:00 AM. The meeting will be held at the Springhill Suites Marriott located at 511 Lady Street. All superintendents and/or project managers that will be in charge of these projects must attend. Lunch will be provided. Therefore I will need a response with the number of individuals from your company that will attend no later than September 14, 2009 by noon. cc:

Boyd Management Charles Gentry ACC Staff

D IV IS ION OF AR N OLD FA MILY C OR P OR AT I ON ▪ S ERV IC E S IN CE 1 9 5 5 7 2 0 L A DY ST RE E T

▪ C OL U MB IA , S C 2 9 20 1

P H ONE (8 0 3 ) 7 3 1 - 4 3 21 ▪ FA X (8 0 3 ) 7 31 - 1 3 81

Related Documents


More Documents from "J.Means"