Assignment 2

PROJECT MANAGEMENT IN IT (INFO 3501)

Section- 1 Madam Masita Abdul Rahman Md Rubaiyat Bhuiyan 0712855

a. Draw an AOA network diagram representing the group of activities. Put the assigned node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated duration.

TASK

KICT Course Repository Systems PRECEDENCE DURATION (DAYS)

A B C D E F G

C E E

3 3 2 1 1 5 1

H

F

2

I J K L

G H, I J K

3 1 3 3

A: Web Design B: Database construction C: Programming Phase D: Testing Phase E: Planning F: Help System G: Authentication System H: Installation of central database I: Integration J: Prototyping K: Refining L: Product Delivary

b. Identify all of the paths on the network diagram and write down how long they are. C E F H J K L  14+7+5+4+10+15+10 = 65 C E G I J K L  14+7+7+4+10+15+10 = 67

c. What is the critical path for this group of activities and how long it is?

C E G I J K L  14+7+7+4+10+15+10 = 67

d. What is the shortest possible time it will take to complete this group of activities? The shortest time possible= 65 days

e. Calculate the slack time for one path in the network diagram which is not the critical path.

Event 4 6 7 8 9 10 11 12

Earliest Time 5 5 3 6 2 7 8 8

Latest Time 7 7 5 7 4 10 11 10

slack time for one path in the network diagram which is not the critical path = 2 + 2 + 2 + 2 + 3 + 3+ 2 = 16 days Slack time for route other than the critical path is 16 days

Slack Time 2 2 2 1 2 3 3 2

Related Documents

Pmit Assignment 2
June 2020 1
Pmit Assignment 1
June 2020 1
Assignment 2
November 2019 20
Assignment 2
November 2019 19
Assignment 2
May 2020 17

More Documents from "Adibah Salihah binti Jalaluddin"

Pmit Assignment 2
June 2020 1
Pmit Assignment 1
June 2020 1
Fm Quiz.docx
November 2019 13