HARGA DASAR SATUAN UPAH No.

URAIAN

KODE

SATUAN

HARGA SATUAN

KETERANGAN

( Rp.) 1. 2. 3. 4. 5. 6.

Pekerja/Buruh Tak Terlatih Tukang Mandor Operator Pembantu Operator Sopir / Driver

(L01) (L02) (L03) (L04) (L05) (L06)

Jam Jam Jam Jam Jam Jam

9,285.71 10,571.43 13,857.14 13,857.14 12,000.00 13,857.14

65.000 / hari 74.000 / hari 97.000 / hari 97.000 / hari 84.000 / hari 97.000 / hari

7. 8. 9. 10. 11. 12.

Pembantu Sopir / Driver Mekanik Pembantu Mekanik Kepala Tukang Buruh Terlatih Tukang Masak Aspal

(L07) (L08) (L09) (L10) (L11) (L12)

Jam Jam Jam Jam Jam Jam

12,000.00 13,857.14 12,000.00 13,000.00 13,000.00 10,571.43

84.000 / hari 97.000 / hari 84.000 / hari 91.000 / hari 91.000 / hari 74.000 / hari

DAFTAR HARGA DASAR SATUAN BAHAN No.

URAIAN

KODE

SATUAN

HARGA SATUAN

KETERANGAN

( Rp.) 1

Pasir Pasang (Sedang)

2

Pasir Beton (Kasar)

3 4

Pasir Halus (untuk HRS) Pasir Urug (ada unsur lempung)

5 6 7 8 9 10 11 12

Batu Kali Agregat Kasar Agregat Halus Filler Batu Belah / Kerakal Gravel Bahan Tanah Timbunan Bahan Pilihan (Batu Putih)

M01b M01b(1) M01a M01a M01c M01d M01d M02 M03 M04 M05 M06 M07 M08 M09

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Kg M3 M3 M3 M3

100,000.00 320,000.00 115,000.00 320,000.00 145,000.00 60,000.00 150,000.00 200,000.00 203,067.60 203,067.60 1,500.00 145,000.00 241,500.00 50,000.00 0.00

Base Camp Lokasi Pekerjaan Base Camp Lokasi Pekerjaan Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Base Camp Base Camp Proses/Base Camp Lokasi Pekerjaan Base Camp Borrow Pit/quarry Quarry

13 14 15

17 18 19 20 21 22 23 24 25

Aspal Kerosen / Minyak Tanah Semen / PC (50kg) Semen / PC (40kg) Semen / PC (kg) Semen / PC (kg) Besi Beton Kawat Beton Kawat Bronjong Sirtu Cat Marka (Non Thermoplas) Cat Marka (Thermoplastic) Paku Kayu Perancah Bensin

26 27 28 28 30 29 30 33 34 35 31 37 32 33 40 41 42 43 34 35 46 36 37 49 50 51 52 53 54 55

Solar Minyak Pelumas / Olie Plastik Filter Pipa Galvanis Dia. 1.6" Pipa Porus Bahan Agr.Base Kelas A Bahan Agr.Base Kelas B Bahan Agr.Base Kelas C Bahan Agr.Base Kelas C2 Geotextile Aspal Emulsi Gebalan Rumput Thinner Glass Bead Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Rel Pengaman Beton K-250 Baja Tulangan (Polos) U24 Baja Tulangan (Ulir) D32 Kapur Chipping Chipping (kg) Cat Pemantul Cahaya (Reflector) Pasir Urug Arbocell Baja Bergelombang Beton K-125 Baja Struktur

16

M10 M11 M12

M13 M14 M15 M16 M17a M17b M18 M19 M20

KG LITER Zak Zak Kg Kg Kg Kg Kg M3 Kg Kg Kg M3 LITER

9,700.00 10,000.00 75,000.00 60,000.00 1,500.00 1,500.00 11,000.00 15,000.00 16,500.00 0.00 71,400.00 35,000.00 17,000.00 1,500,000.00 8,500.00

Base Camp Base Camp Base Camp Lokasi Pekerjaan Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Pertamina

M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35a M35b M36 M37 M39a M39b M40 M41 M41kg M42 M43 M44 M45 M46 M47 M48

LITER LITER M2 Batang M' M3 M3 M3 M3 M2 Kg M2 LITER Kg BH BH M' M3 Kg Kg M3 M3 Kg Kg Bh. M3 Kg. Kg M3 Kg

10,800.00 35,000.00 16,500.00 125,000.00 47,500.00 0.00 0.00 230,365.33 0.00 25,000.00 8,000.00 8,500.00 20,000.00 40,000.00 120,000.00 125,000.00 412,500.00 1,598,545.79 11,000.00 11,500.00 120,000.00 203,067.60 107.74 26,400.00 12,600.00 0.00 32,000.00 12,500.00 993,061.92 11,000.00

Pertamina Pertamina Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Base Camp Base Camp Base Camp Tidak tersedia Lokasi Pekerjaan Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Hasil Proses Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Pelabuhan terdekat

M12

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

Tiang Pancang Baja Tiang Pancang Beton Pratekan Kawat Las Pipa Baja Minyak Fluks Bunker Oil Asbuton Halus Baja Prategang Baja Tulangan (Polos) U32 Baja Tulangan (Ulir) D39 Baja Tulangan (Ulir) D48 PCI Girder L=17m PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m

M49 M50 M51 M52 M53 M54 M55 M56 M57a M39c M39d M58a M58b M58c M58d

M' M3 Dos Kg Liter Liter Ton Kg Kg Kg Kg Buah Buah Buah Buah

25,247.37 423,957.93 16,000.00 15,000.00 6,237.00 3,000.00 325,000.00 8,000.00 10,000.00 8,450.00 9,000.00 86,000,000 97,000,000 124,000,000 157,000,000

Lokasi Pekerjaan Pelabuhan terdekat Lokasi Pekerjaan Pelabuhan terdekat Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat

71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 38 39 40 41 42 43 44

PCI Girder L=36m PCI Girder L=41m Beton K-300 Beton K-175 Cerucuk Elastomer Bahan pengawet: kreosot Mata Kucing Anchorage Anti stripping agent Bahan Modifikasi Beton K-500 Beton K-400 Ducting (Kabel prestress) Ducting (Strand prestress) Beton K-350 Multipleks 12 mm Elastomer jenis 1 Elastomer jenis 2 Elastomer jenis 3 Expansion Tipe Joint Asphaltic Plug Expansion Join Tipe Rubber Expansion Join Baja Siku Marmer

M58e M58f M59 M60 M61 M62 M63 M64 M65 M66 M67 M68 M69 M70 M71 M72 M73 M74a M74b M74c M75d M75e M75f M76

Buah Buah M3 M3 M buah liter buah buah Kg Kg M3 M3 M' M' M3 Lbr buah buah buah M M M Buah

168,000,000 192,000,000 1,902,674.98 1,085,043.43 15,000 300,000 5,000 160,000 480,000 40,000.00 1,000.00 49,971.92 57,774.23 150,000 50,000 59,167.50 181,500.00 385,500.00 650,000.00 838,000.00 1,200,000.00 1,200,000.00 275,000.00 400,000.00

Pelabuhan terdekat Pelabuhan terdekat Lokasi Pekerjaan Lokasi Pekerjaan

45

Kerb Type A

M77

Buah

46 97 47 48 100

Paving Block Mini Timber Pile Expansion Joint Tipe Torma Strip Bearing Joint Socket Pile 35x35

M78 M79 M80 M81 M82

Buah Buah M1 Buah Set

Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp

65,500.00 Base Camp 40,000.00 27,000.00 1,200,000.00 229,500.00 607,500.00

Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan

101 102 103 104 105 106 107 108 49 50 51 112 113 114 115

Joint Socket Pile 16x16x16 Mikro Pile 16x16x16 Matras Concrete Assetilline Oxygen Batu Bara Pipa Galvanis Dia 3" Pipa Galvanis Dia 1,5" Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 5-10 & 10-20 mm Agregat Pecah Mesin 20-30 mm Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron

M83 M84 M85 M86 M87 M88 M24a M24b M91 M92 M93 M94 M95 M96 M97

Set M1 Buah Botol Botol Kg M M M3 M3 M3 0 0 0 SATUAN

116 52 118 119 120 121 122 53 54 55 56 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145

Curing Compound Kayu Acuan Additive Casing Pasir Tailing Polimer Batubara Kerb jenis 1 Kerb jenis 2 Kerb jenis 3 Bahan Modifikasi Aditif anti pengelupasan Bahan Pengisi (Filler) Tambahan Asbuton yang diproses Elastomer Alam Elastomer Sintesis Anchorage - hidup - mati

M98 M99 M67a M100

0 0 jam M2 M3

Kabel Prategang - Selongsong - Baja Prategang - Grouting Angkur Kabel Prategang, Tipe............... Angkur Kabel Prategang, Tipe............ Baja Profil Baja Tulangan BJTP 24 (epoxy coated) Epoxy coated Cairan Perekat (Epoxy Resin) Epoxy Bahan Penutup (sealant)

kg Buah Buah Buah Kg Kg Kg Kg Kg Kg bh bh Kg M' Kg M2 M2 buah Kg Kg Kg Kg Kg

67,500.00 60,750.00 405,000.00 229,500.00 114,750.00 600.00 20,000.00 15,000.00 0.00 0.00 0.00 34,100.00 61,000.00 6,050.00 19,250.00

Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan

Base Camp Base Camp Base Camp

38,500.00 1,500,000.00 38,500.00 9,000.00 259,000.00 Base Camp 45,000.00 Base Camp 500.00 Base Camp 45,000.00 50,000.00 55,000.00 75,000.00 60,500.00 1,500.00 30,000.00 30,000.00 30,000.00 750,000.00 400,000.00 0.00 8,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34,100.00

146 147 148 149 150 151 152 153 154 155 156 157 158 159 160

Alat Penyuntik Anti Gravitasi Polymer Mortar Anti Korosif Baja Acuan/multipleks Concrete Grouting Acuan/multipleks Pelat Baja Baut Angkur Pipa Aluminium

161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 57 58 59 60 61 62 63 64 65 66 67 68 69 70

Kayu Kelas 1 Pelat Baja (Klem) Timbunan Porous Bahan pengaman tebing galian (kayu) Bahan Curing

Cat Galvanis Baut Mutu Tinggi Baja Struktur Titik leleh 2500 kg/cm2 Baja Struktur Titik leleh 2800 kg/cm2 Baja Struktur Titik leleh 3500 kg/cm2 Bahan Grouting

Gelagar baja Fibre jenis e-glass Bahan Geosynthetic Bahan Baja Profil Bahan Baja Profil, Mutu BJ 32 Bahan Baja Profil, Mutu BJ 41 Bahan Baja Profil, Mutu BJ 52 Petrolium jelly Bahan anti rayap Pelat Baja Galvanis Baja Struktur Lantai Ortotropik Batu Belah Putih Batu Keprus Batu Belah Putih 15/20 Batu Belah Putih 10/15 Batu Belah Putih 7/10 Batu Belah Putih 3/4 Batu Belah Putih 2/3 Batu Pecah Hitam 15/20 Batu Pecah Hitam 5/7 Batu Pecah Hitam 3/5 Batu Pecah Hitam 3/4 Batu Pecah Hitam 2/3 Batu Pecah (Split) 1/2 Batu Split 0,5/1

Kg Kg Kg M3 Kg M3 Kg Kg M' Kg Buah Kg Kg Kg Kg Kg Kg M3 M3 M2 Kg M2 M2 Kg Kg Kg Kg Kg Kg Kg Kg m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³

0.00 alat penyuntik epoxy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150,000.00 100,000.00 200,000.00 205,000.00 165,000.00 170,000.00 175,000.00 200,000.00 210,000.00 220,000.00 240,000.00 350,000.00 375,000.00 395,000.00

standar standar standar standar standar standar standar standar standar standar standar standar standar standar

71 72 73 74 75 76 77 78 79 80 81 82 83

Krosar 2/3 Krosar 1/2 Aspal Padat Cat Tembok Cat Besi Minyak Cat Plamir Kertas Gosok Kayu Bakar Ubin Batu Alam (30 x 30) cm Ubin Difabel (30 x 30) cm Ubin trotoar merah 30 x 30 cm Alat Bantu

m³ m³ kg kg kg kg kg lbr m³ buah buah buah set

225,000.00 230,000.00 9,700.00 25,000.00 75,000.00 20,000.00 20,000.00 3,000.00 100,000.00 9,000.00 35,000.00 12,000.00 75,000.00

standar standar standar standar standar standar standar standar standar

HARGA PEROL No.

65000 74000 97000 97000 84000 97000 84000 97000 84000 91000 91000 74000

1.00 1.14 1.49 1.49 1.29 1.49 1.29 1.49 1.29 1.40 1.40 1.14

65000 74000 97000 97000 84000 97000 84000 97000 84000 91000 91000 74000

1.00 1.15 1.50 1.50 1.30 1.50 1.30 1.50 1.30 1.40 1.40 1.15

Jenis Alat

1 2 3 4 5 6

Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Bulldozer 100-150 Hp Compressor 4000-6500 L\M Concrete Mixer 0.3-0.6 M3

7 8 9 10 11 12 13 14

Crane 10-15 Ton Dump Truck 3-4 M3 Dump Truck Excavator 80-140 Hp Flat Bed Truck 3-4 M3 Generator Set Motor Grader >100 Hp Track Loader 75-100 Hp

15

Wheel Loader 1.0-1.6 M3

16

Three Wheel Roller 6-8 T

17

Tandem Roller 6-8 T.

18 19

Tire Roller 8-10 T. Vibratory Roller 5-8 T.

20

Concrete Vibrator

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Stone Crusher Water Pump 70-100 Mm Water Tanker 3000-4500 L. Pedestrian Roller Tamper Jack Hammer Fulvi Mixer Concrete Pump Trailer 20 Ton Pile Driver + Hammer Crane On Track 35 Ton Welding Set Bore Pile Machine Asphalt Liquid Mixer Trailler 15 Ton Rock Drill Breaker

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Cold Milling Cold Recycler Hot Recycler Aggregat (chip) Spreader Asphalt Distributor Split Form Paver Concrete Pan Mixer Concrete Breaker Asphalt Tanker Cement Tanker Concrete Mixer (350) Vibrating Rammer Truk Mixer Bore Pile Machine Dia 60 Crane On Track 75 - 100Ton

52 53 54

Blending Equipment Road Marking Machine Asphalt Liquid Mixer (kap 20000)

ARGA PEROLEHAN ALAT Harga yang

Harga contoh

Sumber Data Keterangan

Harga

digunakan 3,600,313,500 3,994,800,000 300,000,000 2,403,815,000 139,114,400 56,259,500

3,600,313,500 3,994,800,000 300,000,000 2,403,815,000 139,114,400 56,259,500

349,831,800 296,641,000 943,369,525 1,398,180,000 370,289,800 404,301,225 2,097,270,000 1,298,310,000

349,831,800 296,641,000 943,369,525 1,398,180,000 370,289,800 404,301,225 2,097,270,000 1,298,310,000

1,597,920,000

1,597,920,000

484,343,150

484,343,150

233,000

233,000

1,398,180,000 1,597,920,000

1,398,180,000 1,597,920,000

5,114,500

5,114,500

1,430,269,925 28,734,949 139,114,400 153,435,000 25,572,500 100,000,000 741,602,500 306,870,000 763,390,270 500,000,000 711,938,400 150,000,000 358,015,000 179,007,500 1,306,870,000 20,458,000

1,430,269,925 28,734,949 139,114,400 153,435,000 25,572,500 100,000,000 741,602,500 306,870,000 763,390,270 500,000,000 711,938,400 150,000,000 358,015,000 179,007,500 1,306,870,000 20,458,000

2,520,000,000 12,085,563,500 3,500,000,000 409,160,000 500,000,000 1,380,915,000 767,175,000 23,015,250 350,000,000 350,000,000 42,000,000 25,572,500 664,885,000 255,725,000 5,790,125,450

2,520,000,000 12,085,563,500 3,500,000,000 409,160,000 500,000,000 1,380,915,000 767,175,000 23,015,250 350,000,000 350,000,000 42,000,000 25,572,500 664,885,000 255,725,000 5,790,125,450

687,000,000 10,500,000 179,007,500

687,000,000 10,500,000 179,007,500

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

SATUAN KERJA No. PAKET KONTRAK PROP/KAB/KODYA ITEM PEMBAYARAN NO JENIS PEKERJAAN SATUAN PENGUKURAN

NO.

: Dinas Pekerjaan Umum : Pembangunan Jalan Lingkungan : Gunungkidul : : Lapis Penetrasi Makadam 5 cm ( Lapen ) : m²

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3. 4. 5.

Mandor Operator Terlatih Pembantu Operator Buruh Tak Terlatih Buruh Terlatih

(L03) (L04) (L05) (L01) (L11)

Hari Hari Hari Hari Hari

0.004286 0.004286 0.002143 0.141429 0.004286

HARGA SATUAN (Rp.)

97,000.00 0.00 0.00 65,000.00 91,000.00

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5. 6. 7.

Batu Pecah Hitam 3/5 cm Batu Pecah Hitam 2/3 cm Batu Pecah Hitam 1/2 cm Pasir Pasang Aspal Padat Kayu Bakar Alat Bantu

m³ m³ m³ m³ kg m³ set

0.0400 0.0221 0.0111 0.0071 4.8000 0.0321 0.0058

220,000.00 350,000.00 375,000.00 320,000.00 9,700.00 100,000.00 75,000.00

JUMLAH HARGA BAHAN C. 1.

PERALATAN Tandem Roller 8 ton

0.0200

233,000.00

JUMLAH HARGA (Rp.)

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

F.

HARGA SATUAN PEKERJAAN ( D + E )

Note :

1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

AN. K 618

DPU JUMLAH HARGA (Rp.)

415.71 0.00 0.00 9,192.86 390.00

9,998.57

8,800.00 7,750.00 4,151.79 2,285.71 46,560.00 3,214.29 433.93 73,195.71

4,660.00

4,660.00 87,854.29 13,178.14 101,032.43

e dan/atau ukuran

kerjaan dari nomor

ak termasuk PPN

ANALISA KPUT

SATUAN KERJA No. PAKET KONTRAK PROP/KAB/KODYA ITEM PEMBAYARAN NO JENIS PEKERJAAN SATUAN PENGUKURAN

NO.

: Dinas Pekerjaan Umum : Pembangunan Jalan Lingkungan : Gunungkidul : Perkiraan Kuantitas : : Lapis Penetrasi Makadam 5 cm ( Lapen ) Total Harga (Rp) : : m² % Harga Jml Seluruh :

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

( L01 ) ( L03)

hari hari

0.2048 0.0101

HARGA JUMLAH SATUAN HARGA (Rp.) (Rp.)

65,000.00 97,000.00

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Batu Belah Putih 7/10 Batu Belah Putih 3/4 Batu Belah Putih 2/3 Pasir isi

m³ m³ m³ m³

0.1000 0.0200 0.0100 0.0325

165,000.00 170,000.00 175,000.00 150,000.00

JUMLAH HARGA BAHAN C. 1.

ALAT Tandem Roller 8 Ton

E17

jam

0.0233

233,000.00

JUMLAH HARGA ALAT

D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) BIAYA UMUM DAN KEUNTUNGAN 15.0 % x D

F.

HARGA SATUAN PEKERJAAN ( D + E )

An KPUT : 10 C

as

: : ruh : DPU

13,308.75 977.28 14,286.03

16,500.00 3,400.00 1,750.00 4,875.00

26,525.00

5,436.67 5,436.67

46,247.69 6,937.15 53,184.85

RENCANA ANGGARAN BIAYA Kegiatan Pekerjaan Lokasi Volume TA

: : : : :

Peningkatan Jalan Desa Bejiharjo Lapis Penetrasi Macadam 5 cm (Lapen) Jalan Karangmojo - Gunungbang Desa Bejiharjo, Kecamatan Karangmojo, Kabupaten Gunungkidul 3,00 m x 450,00 m 2017

N0.

MACAM PEKERJAAN

VOLUME

HARGA SATUAN ( Rp )

I 1 2

PERSIAPAN Uitzet/Bowplank Papan Nama Kegiatan

1.00 ls 2.00 ls

350,000.00 200,000.00

3

Pembersihan lokasi

1.00 ls

433,000.00

4

Mobilisasi dan Demobilsasi

1.00 ls

3,200,000.00

Jumlah I II

PEKERJAAN PERUMAHAN PESONA MIJAHAN

1

( LPB ) Batu Putih ( tebal : 10 cm )

454.50 m2

53,184.85

2

Aspal Penetrasi tb 5 cm

682.00 m2

101,032.43

Jumlah Harga Pekerjaan (Dipindahkan ke Rekapitulasi Biaya) lll

PEKERJAAN PERUMAHAN SEMANU RESIDANCE

1

( LPB ) Batu Putih ( tebal : 10 cm )

225.00 m2

53,184.85

2

Aspal Penetrasi tb 5 cm

700.00 m2

101,032.43

Jumlah III

Jumlah PPN 10% Jumlah Total Dibulatkan

JUMLAH HARGA ( Rp )

350,000.00 400,000.00 433,000.00 3,200,000.00 4,383,000.00 24,172,512.24 68,904,116.29 93,076,628.53

11,966,590.22 70,722,700.00 70,722,700.00

185000000 -

168,182,328.53

0

16,818,232.85 185,000,561.38 185,000,000.00